Addendum 1.pdf
PDF 2 MB Posted
- Attached to
- Re-Bid NEW BOILER AT CHICAGO WEST
- Solicitation number
- 26-350SOS-SOS35-B-52358
- Issued by
- Cook County, Illinois
About this file
This Addendum 1 document pertains to the Illinois Secretary of State's boiler replacement project at the Chicago West facility located at 5301 W. Lexington Street, Chicago, Illinois 60644. The project involves the installation of new condensing boilers (CB-2 and CB-3) to replace existing equipment, along with comprehensive modifications to the hydronic piping systems, controls integration, and related mechanical equipment. The scope includes demolition of the existing Burnham boiler, air separator, expansion tanks, and associated piping, while retaining existing condensing boiler CB-1, hot water boiler HWB-1, constant flow pumps (HWP-1 through HWP-5), and combustion air intake systems. The contractor must provide all labor, materials, equipment, and accessories necessary for installation in accordance with the 2019 Chicago Building Code and Illinois Accessibility Code. The document was issued for bid on January 6, 2026, with Addendum 1 issued on April 20, 2026, and requires compliance with OSHA requirements, permit acquisition, and coordination with multiple trades to avoid interference.
The contractor is responsible for obtaining all necessary permits and inspections, maintaining existing building operations with minimal downtime during service connections, and providing vibration isolation for all mechanical equipment. New controls must seamlessly integrate with the existing BACnet Eclipse system by Automatic Building Controls LLC, and the contractor must provide four on-site training sessions for equipment operators with additional sessions at six and twelve months post-project completion. Key responsibilities include submitting detailed shop drawings and as-built documentation, maintaining a minimum 6'8" clearance in mechanical rooms, performing all testing and balancing in accordance with AABC or NEBB standards, and coordinating concrete housekeeping pad sizing and location with the general contractor. The contractor must also remove all abandoned piping, conduit, and ductwork, fire-stop all wall penetrations, and daily remove all construction debris from the site while maintaining the facility in operational condition throughout the project duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Disclosure v 24.1 Formerly Forms A~17.docx | DOCX document | |
| Questions and Answers~10.docx | DOCX document | |
| Chicago West Boiler Re-bid IFB 26PS759001~1.pdf | ||
| M2.01L-MECHANICAL HYDRONIC PIPING LOWER PLAN N.pdf | ||
| IPG Active Registered Vendor Disclosure formerly Forms B v.23.1~40.docx | DOCX document | |
| Mechanical Drawings.pdf | ||
| Questions and Answers Set 1~10.docx | DOCX document | |
| Electrical Drawings.pdf | ||
| Questions and Answers Set 2~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
A. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS AND
EQUIPMENT NECESSARY FOR THE NEW AND DEMOLITION WORK AND
MODIFICATIONS TO EXISTING PIPING SYSTEMS, INCLUDING ALL NEW
EQUIPMENT AND RELATED ACCESSORIES, AS SHOWN ON THE PLANS
AND AS NOTED ON THE DRAWINGS AND AS HEREINAFTER SPECIFIED.
B. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH THE LATEST
OSHA REQUIREMENTS.
C. PAY ALL FEES FOR PERMITS AND INSPECTIONS APPLICABLE TO
THEIR TRADE AND SHALL OBTAIN ALL CERTIFICATIONS OF
INSPECTIONS.
D. DRAWINGS AND DIAGRAMS ARE INTENDED TO SHOW APPROXIMATE
LOCATIONS UNLESS SPECIFICALLY DIMENSIONED. COORDINATE THE
WORK WITH ALL TRADES TO AVOID INTERFERENCE. WORK THAT IS
INSTALLED WHICH INTERFERES WITH THE WORK OF OTHER TRADES
DUE TO LACK OF COORDINATION SHALL BE CHANGED AT NO
ADDITIONAL COST TO THE OWNER.
E. CONTRACTOR SHALL PROVIDE ALL MINOR ITEMS WHICH ARE
OBVIOUSLY AND REASONABLY NECESSARY TO COMPLETE THE
INSTALLATION AND USUALLY INCLUDED IN SIMILAR WORK EVEN
THOUGH NOT SPECIFICALLY MENTIONED IN THE CONTRACT
DOCUMENTS. SUCH ITEMS ARE BOLTS, NUTS, ANCHORS, HANGERS,
BRACKET SLEEVES, MINOR OFFSETS IN PIPING BECAUSE OF
UNFORESEEN OBSTRUCTIONS, ETC.
F. THE CONTRACTOR SHALL DAILY REMOVE FROM THE PREMISES ALL
RUBBISH ACCUMULATED AND GENERATED AND KEEP EACH
BUILDING AREA CLEAN DURING THE PROGRESS OF THE WORK.
ACCUMULATED DEBRIS MUST BE REMOVED FROM SITE AND
DISPOSED IN A LEGAL AND RESPONSIBLE MANNER.
G. SUBMIT ONE (1) COMPLETE SET OF "AS-BUILT" SHOP DRAWINGS AND
CATALOG CUTS TO THE OWNER. LAYOUT SHOP DRAWINGS SHALL BE
IN A REPRODUCIBLE FORMAT.
H. SUBMIT COPIES OF PRODUCT DATA AND SHOP DRAWINGS FOR
APPROVAL. SHOP DRAWINGS SHALL BE SUBMITTED FOR APPROVAL
PRIOR TO STARTING WORK.
I. CONTRACTOR SHALL COORDINATE NEW WORK WITH EXISTING
CONDITIONS AND WITH OTHER TRADES.
J. CONTRACTOR SHALL COORDINATE WITH THE OWNER AND
SEQUENCE ALL WORK TO MAINTAIN ALL EXISTING SYSTEMS IN
OPERATION WITH THE MINIMUM DOWN TIME DURING PERIODS OF
FINAL CONNECTION AND CHANGE-OVER WITH THE EXISTING
SYSTEM.
K. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR
REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL
SYSTEMS AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS
REQUIRED BY CODE.
L. CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE
DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND
GENERAL ARRANGEMENT ONLY.
M. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN
ACCORDANCE WITH MANUFACTURERS' RECOMMENDATIONS,
CONTRACT DOCUMENTS, AND APPLICABLE CODES AND
REGULATIONS.
N. PROVIDE VIBRATION ISOLATION FOR MECHANICAL EQUIPMENT TO
PREVENT TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
O. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS
CONNECTED TO, AND WITHIN 50 FT. OF ISOLATED EQUIPMENT
(EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS)
THROUGHOUT MECHANICAL EQUIPMENT ROOMS.
P. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH
ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT
DRAWINGS.
Q. MAINTAIN A MINIMUM 6'-8" CLEARANCE TO THE UNDERSIDE OF PIPES,
DUCTS, CONDUITS, SUSPENDED EQUIPMENT, ETC., THROUGHOUT
ACCESS ROUTES IN MECHANICAL ROOMS.
R. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL
EQUIPMENT OR PIPING INSULATION IS APPLIED.
S. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING
DEVICES IN ACCESSIBLE LOCATIONS WITH THE STRAIGHT SECTION
OF PIPE OR DUCT UP- AND DOWN-STREAM AS RECOMMENDED BY
THE MANUFACTURER FOR GOOD ACCURACY.
T. TESTING, ADJUSTING, AND BALANCING AGENCY SHALL BE A
MEMBER OF THE ASSOCIATED AIR BALANCE COUNCIL (AABC) OR
THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB).
TESTING, ADJUSTING, AND BALANCING SHALL BE PERFORMED IN
ACCORDANCE WITH THE AABC STANDARDS ON ALL AFFECTED
SYSTEMS. HYDRONIC TESTING AND BALANCING SHALL ALSO BE
PERFORMED ON ALL AFFECTED SYSTEMS.
U. WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT
ARE REQUIRED, THE PRODUCT OF ONE MANUFACTURER SHALL BE
USED.
V. COORDINATE ALL EQUIPMENT CONNECTIONS WITH
MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND
PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED FOR FINAL
EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD
VERIFY AND COORDINATE ALL DUCT AND PIPING DIMENSIONS
BEFORE FABRICATION.
W. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT
SHALL BE SIZED AND LOCATED BY THE MECHANICAL CONTRACTOR.
MINIMUM CONCRETE PAD THICKNESS SHALL BE 6 IN. PAD SHALL
EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 6 IN. ON EACH SIDE.
CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE
GENERAL CONTRACTOR. IT SHALL BE THE RESPONSIBILITY OF THE
MECHANICAL CONTRACTOR TO COORDINATE THE SIZE AND
LOCATION OF CONCRETE HOUSEKEEPING PADS WITH THE GENERAL
CONTRACTOR.
X. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, ETC.) IS
SUBCONTRACTED, IT SHALL BE THE MECHANICAL CONTRACTOR'S
RESPONSIBILITY TO COORDINATE SUBCONTRACTORS AND THE
ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE
PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM
OF THE MECHANICAL CONTRACT OR WHICH CONTRACTOR PROVIDES
FINAL CONNECTIONS FOR A PARTICULAR ITEM OF THE MECHANICAL
CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE
MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
Y. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR
CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY
FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT
LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS
AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING
INSTALLED. DO NOT SCALE DRAWINGS.
Z. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER
INSTALLATION AND AS SHOWN IN THE DETAILS FOR PIPING,
DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL
BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
AA. ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED
AS DETAILED, SPECIFIED, AND REQUIRED TO PROVIDE A
VIBRATION-FREE INSTALLATION.
AB. ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM
STRUCTURAL STEEL SHALL BE COORDINATED WITH THE GENERAL
CONTRACTOR AND ARCHITECT OR STRUCTURAL ENGINEER. ALL
ATTACHMENTS TO STEEL BAR JOISTS, TRUSSES, OR JOIST GIRDERS
SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS MEETING MSS
STANDARDS. WELDING TO STRUCTURAL MEMBERS SHALL NOT BE
PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.
AC. MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE
SUPPORTED FROM A METAL DECK.
AD. EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE
MECHANICAL CONTRACTOR TO BE FURNISHED BY THE MECHANICAL
CONTRACTOR AND INSTALLED BY THE GENERAL CONTRACTOR.
AE. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS
SHALL BE COORDINATED WITH ALL OTHER TRADES INVOLVED.
AF. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT,
ETC., SHALL BE FIRE STOPPED WITH A PRODUCT SIMILAR TO 3M OR
AN APPROVED EQUAL.
AG. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND
EQUIPMENT INSTALLATION
AH. ANY ALTERNATIVE PRODUCTS SUBMITTED BY THE CONTRACTOR
SHALL PROVIDE THE SERVICE AND MAINTENANCE CLEARANCES AS
REQUIRED BY THE CONSTRUCTION MANAGER AND MANUFACTURER.
AI. TIMELINESS AND QUALITY OF ALTERNATIVE PRODUCTS SHALL BE
NECESSARY CRITERIA AND SHALL BE CONSIDERED AS A BASIS FOR
ALTERNATIVE DESIGN REJECTION.
AJ. TO THE GREATEST EXTENT POSSIBLE, THIS BUILDING IS TO BE IN
OPERATION WHILE THE CONSTRUCTION OF THIS CONTRACT IS
TAKING PLACE.
AK. THE CONTRACTOR IS TO SUPPLY DETAILED LAYOUT DRAWINGS
SHOWING ALL PIPING CONNECTIONS FOR ACCEPTANCE BEFORE
START OF WORK.
AL. UNUSED PIPING, CONDUIT, WIRING, ETC. SHALL NOT BE LEFT AFTER
THE COMPLETION OF THIS PROJECT.
AM. MAINTAINING PRESENT SERVICES:
a. ALL COSTS INCURRED IN ORDER TO MAINTAIN PRESENT
SERVICES SHALL BE INCLUDED IN THE CONTRACTOR'S BID FOR
THE WORK.
b. THE SYSTEMS INVOLVED IN THIS PROJECT ARE CRITICAL TO
THE OWNER'S OPERATIONS AND THEREFORE SHOULD REMAIN
IN SERVICE. THE CONTRACTOR SHALL TAKE ALL
PRECAUTIONARY MEASURES AND PROVIDE ALL TEMPORARY
FACILITIES AS REQUIRED TO ENSURE THAT THESE SYSTEMS
REMAIN OPERATIONAL.
c. WHERE NEW SERVICE CONNECTIONS ARE TO BE MADE TO
EXISTING SERVICES AND SERVICE INTERRUPTIONS CAN IN NO
WAY BE AVOIDED, THE SERVICE INTERRUPTIONS SHALL BE
MADE WITH A MINIMUM OF INCONVENIENCE TO THE OWNER.
THE WORK SHALL BE DONE AT SUCH A TIME OF ANY DAY
(SATURDAYS AND SUNDAYS INCLUDED) AS DIRECTED BY THE
CONSTRUCTION MANAGER.
d. WHEN EXISTING SYSTEMS ARE ALTERED OR AFFECTED BY THE
NEW WORK, THE EXISTING SYSTEMS SHALL BE LEFT IN
OPERATING CONDITION AND SHALL BE READJUSTED AND
BALANCED IF NECESSARY.
AN. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH
BRINGING EQUIPMENT INTO THE BUILDING AND LOWER LEVEL
MECHANICAL ROOM AND FOR DETERMINING THE BEST POSSIBLE
METHOD OF DOING SO.
AO. THE EXISTING CONTROLS ARE BACNET ECLIPSE BY AUTOMATIC
BUILDING CONTROLS LLC. ALL NEW CONTROLS SHALL SEAMLESSLY
INTEGRATE INTO THE EXISTING SYSTEM AND BE INSTALLED BY THE
SAME CONTRACTOR.
AP. OPERATOR TRAINING:
a. THE CONTRACTOR SHALL PROVIDE TRAINING FOR THE
EQUIPMENT OPERATORS.
b. TRAINING SHALL BE PROVIDED AS SOON AS NEW SYSTEMS
AND EQUIPMENT ARE STARTED UP, TESTED, AND PUT INTO
SERVICE. IF TRAINING IS TOO FAR IN ADVANCE OF THIS TIME,
USERS MAY FORGET TOO MUCH OF WHAT THEY HAVE
LEARNED, AND MAY HAVE TO BE RETRAINED.
AP. INSTRUCTION FORMAT
c. PROVIDE FOUR (4) ON-SITE OR CLASSROOM TRAINING
SESSIONS.
1. HOLD TRAINING SESSIONS AT TIMES TO MEET THE
SCHEDULES OF THE MULTIPLE SHIFTS OF THE
OPERATING ENGINEERS. COORDINATE TRAINING
SESSIONS WITH OPERATING ENGINEERS TO MEET
THIS REQUIREMENT.
2. PROVIDE TIME FOR QUESTIONS AND ANSWERS AT
EACH TRAINING SESSION.
3. KEY SUBJECTS OF THE TRAINING SESSIONS SHALL BE
RECORDED FOR THE PURPOSE OF FUTURE TRAINING.
4. PROVIDE ADDITIONAL TRAINING SESSIONS AT 6 AND 12
MONTHS FOLLOWING THE PROJECT'S TURNOVER.
5. PROVIDE TIME FOR QUESTIONS AND ANSWERS AT EACH
TRAINING SESSION.
6. KEY SUBJECTS OF THE TRAINING SESSIONS SHALL BE
RECORDED FOR THE PURPOSE OF FUTURE TRAINING.
AQ. TRAINING DOCUMENTATION
d. IT SHOULD BE NOTED THAT BUILDING STAFF MAY NOT BE
HIRED FOR MANY MONTHS AFTER THE EQUIPMENT BECOMES
OPERATIONAL, AND TRAINING MAY ONLY BE AVAILABLE TO
THEM THROUGH THE CONTRACTOR'S RECORDINGS AND
DOCUMENTATION.
AR. PROVIDE VIBRATION ISOLATION FOR EACH PIECE OF EQUIPMENT.
AS. REPLACE ANY VALVES, INSTRUMENTS, GAUGES, METERS (OR
APPURTENANCES) THAT ARE REMOVED WHETHER SHOWN ON THE
DRAWINGS OR NOT.
AT. REMOVE EXISTING PNEUMATIC CONTROLS PIPING, FITTINGS,
HANGERS, AND APPURTENANCES REPLACED WITH NEW CONTROLS
SYSTEM.
NOTE:
NO STATEMENTS MADE ON THIS DRAWING WILL
CONTRADICT WHAT IS AND WILL BE STATED IN THE
SPECIFICATIONS.IN CASE OF CONFLICT FOLLOW THE
SPECIFICATION AND BRING THE ISSUE TO ILLINOIS
SECRETARY OF STATE'S PROJECT MANAGER.
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: JFA
DRAWN BY: RC
CHECKED BY: FS
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
ILLINOIS SECRETARY OF STATE
0 ISSUED FOR 50% REVIEW 05/09/2025
ISSUED FOR REVIEW 08/01/20251
ISSUED FOR 75% REVIEW 08/13/20252
ISSUED FOR 100% REVIEW 10/14/20253
ISSUED FOR BID 1/6/20264
iLLINOIS REGISTRATION NO.: 062.074755
DATE: 1/8/2026
ADDENDUM 1 4/20/20265
MECHANICAL
HYDRONIC PIPING
GENERAL NOTES
M0.04
AutoCAD SHX Text
4" EX-HWS
2" E
X- H
W S
2" E
X- H
W S
2" E
X- H
W S
4" E
X- H
W S
3/4" EX-HWS
EXISTING AIR
SEPARATOR
TO BE
REMOVED.
EXISTING BURNHAM BOILER
TO BE REMOVED
EXISTING CONDENSING
BOILER TO REMAIN
CB-1
EXISTING
BOILER TO
REMAIN
B07
1 1/2" EX-NG
3" EX-NG
4" EX-HWR
4" EX-HWS
EXISTING
CHEMICAL
POT FEEDER
SEE NOTE 4
1" EX-VT
3/4" EX-CHM SEE NOTE 4
EXISTING
HOT WATER
BOILER TO
REMAIN
HWB-1
EXISTING
CONSTANT FLOW
PUMPS TO REMAIN.
HWP-4 ABOVE
HWP-3 BELOW
EXISTING
CONSTANT FLOW
PUMP SPARE TO
REMAIN
EXISTING
CONSTANT FLOW
PUMPS TO REMAIN.
HWP-2 ABOVE
HWP-1 BELOW
2 1/2" EX-HWS
2 1/2" EX-HWR
EX-DUCT
CL=7'-7"
CL=7'-7"
SEE NOTE 4
EXISTING
COMBUSTION AIR
INTAKE TO REMAIN
EXISTING JANITOR'S SINK
TO BE REMOVED BY OWNER
QTY 3 EXISTING
COMPRESSION
TANKS OVER HEAD
OF AIR SEPARATOR
TO BE REMOVED
RELCOATE EXISTING
STORAGE CABINET.
COORDINATE
LOCATION WITH
BUILDING ENGINEER
NOTES:
1. NOT ALL PIPING IS SHOWN.
2. PIPING AND EQUIPMENT SIZE AND LOCATION AS SHOWN IS TAKEN
FROM "PREMIER MECHANICAL INC. DRAWING SPOOL MAP-1
3. DENOTES PIPING AND OR EQUIPMENT TO BE DEMOLISHED.
4. EXISTING BURNHAM BOILER, EXISTING AIR SEPARATOR,EXISTING
EXPANSION TANK (LOCATED ABOVE AIR SEPARATOR) AND CHEMICAL
POT FEEDER TO BE DEMOLISHED, SOME PIPING MAY HAVE TO BE
MODIFIED.
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: JFA
DRAWN BY: RC
CHECKED BY: FS
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
N
ILLINOIS SECRETARY OF STATE
KEY PLAN
0 ISSUED FOR 50% REVIEW 05/09/2025
ISSUED FOR REVIEW 08/01/20251
ISSUED FOR 75% REVIEW 08/13/20252
ISSUED FOR 100% REVIEW 10/14/20253
ISSUED FOR BID 1/6/20264
iLLINOIS REGISTRATION NO.: 062.074755
DATE: 1/8/2026
ADDENDUM 1 4/20/20265
MECHANICAL
HYDRONIC PIPING
LOWER PLAN
DEMO CONDITIONS
M2.01DL
BOILER LOWER PLAN DEMO CONDITIONS
1/2" = 1'-0"
NORTH
0 5' 10'
DEMO NOTES:
1. UNLESS OTHERWISE INDICATED. EXISTING CONSTRUCTION SHALL
REMAIN.
2. THIS PROJECT SHALL INCLUDE ALL SELECTIVE DEMOLITION ACTIVITIES
THAT MAY BE REQUIRED FOR A FULL AND COMPLETE EXECUTION OF THE
WORK.
3. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO
BEGINNING DEMOLITION WORK. CONTRACTOR SHALL REPORT
DISCREPANCIES BETWEEN CONDITIONS AND DRAWINGS TO ENGINEER
PRIOR TO BEGINNING DEMOLITION WORK.
4. PROTECT ALL EXISTING CONSTRUCTION TO REMAIN AT ALL TIMES.
DAMAGE TO EXISTING CONSTRUCTION TO REMAIN RESULTING FROM
DEMOLITION OR CONSTRUCTION ACTIVITIES SHALL BE REMEDIED AT
CONTRACTOR'S EXPENSE.
5. REMOVE ALL DEBRIS DAILY FROM SITE AND DISPOSE OF ALL MATERIAL IN
A LEGAL AND RESPONSIBLE MANNER.
6. CONSTRACTOR SHALL CONDUCT ALL ACTIVITIES IN SUCH MANNER AS TO
AVOID DISRUPTIONS TO REGULAR ACTIVITIES AND OPERATIONS THAT
TAKE PLACE IN ADJACENT AREAS OF THE BUILDING. CONTRACTOR SHALL
TAKE NECESSARY PRECAUTIONS TO CONTROL DUST, NOISE AND ODOR
MIGRATION.
7. CONTRACTOR SHALL COMMUNICATE WITH OWNER, THE SCHEDULE FOR
ALL ACTIVITIES WHICH COULD POTENTIALLY IMPACT OWNER OPERATION
AS MOVEMENT OF MATERIALS AND EQUIPMENT OUTSIDE OF THE
PROJECT SPACE. INTERRUPTIONS OF UTILITY SERVICE, ETC.
CONTRACTOR SHALL OBTAIN APPROVAL FROM THE CONSTRUCTION
MANAGER PRIOR BEGINNING SUCH ACTIVITIES.
8. CONTRACTOR SHALL PROVIDE PROTECTION TO OCCUPANTS OF THE
BUILDING FROM CONSTRUCTION AREA AT ALL TIMES THROUGHOUT THE
PROJECT.
9. CONTRACTOR SHALL COORDINATE WITH GENERAL, ELECTRICAL,
PLUMBING, STRUCTURAL CONTRACTOR FOR COMPLETE REMOVAL OF
ALL EXISTING EQUIPMENT AND COMPONENTS.
10. CONTRACTOR TO PATCH AND PAINT TO MATCH EXISTING CONDITIONS
AFTER REMOVAL OF MECHANICAL EQUIPMENT.
11. REMOVE EXISTING ABANDONED PIPING, CONDUITS AND DUCTWORK AS
REQUIRED BY THE OWNER. DEMOLITION CONTRACTOR SHALL HAVE A
JOBSITE WALK THROUGH WITH OWNER TO CLARIFY THE SCOPE OF
WORK BEFORE BIDDING.
12. WHERE EXISTING PIPING IS TO REMAIN, THEY SHALL BE CUT AT A POINT
SUCH THAT A HANGER IS PROVIDING ADEQUATE SUPPORT.
13. LINES UNDER 2" ARE NOT SHOWN FOR CLARITY, ALL SMALL BORE PIPING
ASSOCIATED WITH DEMOLISHED EQUIPMENT SHALL ALSO BE
DEMOLISHED.
14. REMOVE CONDUIT AND CABLE BETWEEN DEMOLISHED EQUIPMENT AND
EXISTING ELECTRICAL SUPPLIES AT THEIR ORIGINATING PANEL BOARDS.
CONTRACTOR SHALL TAG CIRCUIT BREAKERS AS SPARE FOR REUSE AT
A LATER DATE. ASSOCIATED THERMOSTATS ALONG WITH THEIR CABLE
AND CONDUIT SHALL BE REMOVED..
15. FOR STRUCTURAL DEMOLITION SEE STRUCTURAL DEMO DRAWINGS.
15. FOR ELECTRICAL DEMOLITION SEE ELECTRICAL DEMO DRAWINGS.
16. WORK THIS SHEET WITH DRAWING M2.01E UPPER PLAN EXISTING
CONDITIONS.
AutoCAD SHX Text
HWP
4" EX-HWS
2" E
X- H
W S
2" E
X- H
W S
2" E
X- H
W S
4" E
X- H
W S
3/4" EX-HWS
NEW 4" AIR
SEPARATOR
EXISTING
CONDENSING
BOILER
CB-1
EXISTING
BOILER
B07
3" EX-NG
EXISTING PIPING ABOVE NEW
BOILERS
4" EX-HWS
4" EX-HWR
4" E
X- H
W S
4" HWS
4" HWS
4" HWR
4" HWS
EXISTING
HOT WATER
BOILER
HWB-1
EXISTING
CONSTANT FLOW
PUMP HWP-4 ABOVE
HWP-3 BELOW
EXISTING
CONSTANT FLOW
PUMP SPARE
EXISTING
CONSTANT FLOW
PUMP HWP-2 ABOVE
HWP-1 BELOW
NEW
CHEMICAL
POT FEEDER
3/4" EX-CHM
2 1/2" EX-HWS
2 1/2" EX-HWR
CL=7'-7"
CL=7'-7"
EX-DUCT
12"Ø VENTING SUITABLE FOR CATEGORY IV APPLIANCE,
LISTED AND INSTALLED PER MANUFACTURER'S INSTRUCTIONS.
ROUTED UP THROUGH SHAFT TO ROOF
EXISTING 110"x26"
COMBUSTION AIR
INTAKE TO REMAIN,
INTERLOCK EXISTING
DAMPER WITH
BOILER FLUE.
4" HWR
3" NG
3" NG
45 DEG TAKE OFF DN TO
CB-3 FLUE CONNECTION
CLEANOUT
12"Ø EXHAUST DUCT
CB
HWP
(STANDBY)
EMERGENCY SHUT-OFF SWITCH
SHALL SHUT DOWN BOILERS,
AND BOILER PUMPS.
(TYPICAL)
CB
PROVIDE WITH CLEAR ENCLOSURE
EXISTING 14" x 18" CHIMNEY SHAFT
UP THRU ROOF
M
EXISTING FLOOR DRAIN
TO BE RELOCATED
SEE PLUMBING PLANS
FOR DETAILS
ET
NOTES:
1. NOT ALL PIPING IS SHOWN.
2. PIPING AND EQUIPMENT SIZE AND LOCATION AS SHOWN IS
TAKEN FROM "PREMIER MECHANICAL INC. DRAWING
SPOOL MAP-1
3. MODIFY AND EXTEND CONCRETE HOUSE KEEPING PAD
UNDER EXISTING BOILER AS REQUIRED TO ACCOMODATE
LOCATION OF NEW BOILERS.
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: JFA
DRAWN BY: RC
CHECKED BY: FS
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
N
ILLINOIS SECRETARY OF STATE
KEY PLAN
0 ISSUED FOR 50% REVIEW 05/09/2025
ISSUED FOR REVIEW 08/01/20251
ISSUED FOR 75% REVIEW 08/13/20252
ISSUED FOR 100% REVIEW 10/14/20253
ISSUED FOR BID 1/6/20264
iLLINOIS REGISTRATION NO.: 062.074755
DATE: 1/8/2026
ADDENDUM 1 4/20/20265
MECHANICAL
HYDRONIC PIPING
LOWER PLAN
NEW CONDITIONS
M2.01L
BOILER LOWER PLAN NEW CONDITIONS
1/2" = 1'-0"
NORTH
0 5' 10'
GENERAL NOTE:
1. ALL EXISTING PIPING, CONDUIT, ETC. PENETRATING
BOILER ROOM WALLS SHALL BE FIRESTOPPED AT
PENETRATION. CONTRACTOR TO FIELD VERIFY EXTENT
OF WORK.
PROPOSED BOILER INGRESS PLAN
1/4" = 1'-0"
NORTH
NOTE:
1. REFERENCE IMAGE IS FROM 2012 RENOVATION PLANS AND DO NOT REFLECT EXACT
LOCATION OF EXISTING WATER HEATER.
AutoCAD SHX Text
ES
AutoCAD SHX Text
ES
AutoCAD SHX Text
ES
AutoCAD SHX Text
ES
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
BOILER PIPING & CONTROL DIAGRAM1
A. BOILER CONTROLS AND PRIMARY PUMP CONTROLS:
1. BAS ENABLES HEATING PLANT CONSISTING OF BOILERS AND PUMPS WHEN OUTDOOR AIR IS 60°F AND BELOW.
2. BOILER INTERGRAL CONTROL PANEL SHALL CYCLE BURNERS & BOILERS TO MAINTAIN SUPPLY WATER TEMPERATURE OF 160°F BASED ON AN OUTDOOR RESET SCHEDULE OF -10°F TO 60°F.
3. AT AN OUTDOOR AIR TEMPERATURE BETWEEN -10°F to 20°F, BOILER SUPPLY WATER TEMPERATURE SHALL BE 160°F. WHEN THE OUTDOOR AIR TEMPERATURE IS BETWEEN 20°F AND 60°F, RESET BOILER
SUPPLY WATER TEMPERATURE.
4. BOILER CONTROL PANEL SHALL OPERATE BOILERS IN LEAD/LAG SEQUENCE.
B. EXISTING CONTROLS SEQUENCE
1. VERIFY EXISTING SEQUENCE OF OPERATIONS FOR THE FOLLOWING EXISTING EQUIPMENT TO CONFIRM. REPORT ANY DISCREPANCIES AND COMPLY AS FOLLOWS.
2. HWP-1 THRU HWP-5 AND STAND-BY PUMP: PUMPS OPERATE AT CONSTANT SPEED ON CALL FOR HEAT FROM BAS.
3. HWP-3 & HWP-4, 3-WAY VALVES MODULATE TO MAINTAIN WATER TEMPERATURE OF 135°F TO 160°F PER RESET SCHEDULE ABOVE.
4. HWP-5 SHALL START BASED ON CALL FOR HEAT FROM BAS AND RUN CONTINUOUSLY.
5. THE ABOVE PUMPS SHALL BE PROVEN ON BY EXISTING DIFFERENTIAL PRESSURE SENSOR AND ALARM BAS IF FAIL.
6. EXISTING BOILER CB-1 AND HWP-6 CONTROLS SHALL NOT CHANGE AND REMAIN AS EXISTING.
7. EXISTING COMBUSTION AIR DAMPER OPENS UPON BOILER ENERGIZING.
C. NEW CONTROLS SEQUENCE
1. ON CALL FOR HEAT HWP-7 PROVES ON VIA DIFFERENTIAL PRESSURE SENSOR AND BOILER GENERATES HOT WATER SUPPLY TEMPERATURE AFTER INTERNAL VALVES OPEN AS SENSED BY T1.
2. IF HOT WATER SUPPLY TEMPERATURE IS NOT ACHIEVED,HWP-8 PROVES ON VIA DIFFERENTIAL PRESSURE SENSOR AND RUNS SIMULTANEOUSLY WITH HWP-7 AND BOILERS MODULATE TO MAINTAIN HOT
WATER TEMPERATURE AS SENSED BY T1.
3. REPORT T2,T3,&T4 HOT WATER SUPPLY TERMPERATURE TO BAS.
4. PROVIDE EMERGENCY GAS SHUT OFF BUTTON AT ALL EXITS FROM BOILER ROOM. UPON ACTIVATION OF BUTTON ALL NATURAL GAS EQUIPMENT SHALL SHUT OFF, AND ALL NATURAL GAS VALVES SHALL
CLOSE.
5. PROVIDE NEW INSTRUMENTATION INCLUDING: DP SENSOR AROUND EACH NEW PUMP, DP SENSOR AROUND EACH NEW BOILER, INLET AND OUTLET TEMP FOR EACH NEW BOILER, AND SUPPLY MIXING TEMP
SENSORS AROUND COMMON PIPE.
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: JFA
DRAWN BY: RC
CHECKED BY: FS
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
ILLINOIS SECRETARY OF STATE
0 ISSUED FOR 50% REVIEW 05/09/2025
ISSUED FOR REVIEW 08/01/20251
ISSUED FOR 75% REVIEW 08/13/20252
ISSUED FOR 100% REVIEW 10/14/20253
ISSUED FOR BID 1/6/20264
iLLINOIS REGISTRATION NO.: 062.074755
DATE: 1/8/2026
ADDENDUM 1 4/20/20265
M5.03
MECHANICAL
HYDRONIC
BOILER PIPING &
CONTROL DIAGRAM
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text M
AutoCAD SHX Text
CONDENSING BOILER CB-1
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
4" HWS
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
4" HWS
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
4" HWS
AutoCAD SHX Text
EXISTING HWP-4: 40 GPM
AutoCAD SHX Text
EXISTING HWP-3: 55 GPM
AutoCAD SHX Text
EXISTING STAND-BY PUMP: 65 GPM
AutoCAD SHX Text
EXISTING HWP-1: 43.5 GPM
AutoCAD SHX Text
EXISTING HWP-2: 62.7 GPM
AutoCAD SHX Text
CONSTANT FLOW PUMP HWP-6: 48 GPM
AutoCAD SHX Text
VARIABLE FLOW PUMP HWP-7 200 GPM
AutoCAD SHX Text
VARIABLE FLOW PUMP HWP-8 200 GPM
AutoCAD SHX Text
TI
AutoCAD SHX Text T4
AutoCAD SHX Text
TI
AutoCAD SHX Text T3
AutoCAD SHX Text
5 GAL. CHEMICAL POT FEEDER
AutoCAD SHX Text
SEE TYPICAL PI DETAIL FOR ALL 5 PUMPS
AutoCAD SHX Text
2" WTR
AutoCAD SHX Text
3/4" CHM
AutoCAD SHX Text
3/4" CHM
AutoCAD SHX Text
FROM: EXISTING HEADER
AutoCAD SHX Text W
AutoCAD SHX Text
NEW AIR SEPARATOR
AutoCAD SHX Text
TT
AutoCAD SHX Text
HOT WATER SUPPLY TEMP SENSOR
AutoCAD SHX Text N.C.
AutoCAD SHX Text
TI
AutoCAD SHX Text T1
AutoCAD SHX Text
TT
AutoCAD SHX Text
TT
AutoCAD SHX Text
TI
AutoCAD SHX Text T5
AutoCAD SHX Text T6
AutoCAD SHX Text T7
AutoCAD SHX Text T8
AutoCAD SHX Text T9
AutoCAD SHX Text
HOT WATER SUPPLY TEMP SENSOR
AutoCAD SHX Text
HOT WATER SUPPLY TEMP SENSOR
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
3/4" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
2" HWS
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
4" HWS
AutoCAD SHX Text
4" HWS
AutoCAD SHX Text
4" HWS
AutoCAD SHX Text
4" HWR
AutoCAD SHX Text
TO: ALL FTR ZONES
AutoCAD SHX Text
HWS
AutoCAD SHX Text
TO: ENTRY CAB HEATERS
AutoCAD SHX Text
HWS
AutoCAD SHX Text
TO:PENTHOUSE 2
AutoCAD SHX Text
HWS
AutoCAD SHX Text
TO: PENTHOUSE 1
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HWR
AutoCAD SHX Text
FROM: RED ZONE 1 (VEHICLES)
AutoCAD SHX Text
HWR
AutoCAD SHX Text
FROM: RED ZONE 2+3+1 (DRIVERS)
AutoCAD SHX Text
HWR
AutoCAD SHX Text
FROM: ENTRY CAB HEATERS
AutoCAD SHX Text
HWR
AutoCAD SHX Text
FROM: RED ZONE 4
AutoCAD SHX Text
HWR
AutoCAD SHX Text
FROM: RED ZONE 3
AutoCAD SHX Text
HWR
AutoCAD SHX Text
HOT WATER RETURN TEMP SENSOR
AutoCAD SHX Text
1 " 14" ETR
AutoCAD SHX Text
EXISTING CONSTANT FLOW PUMP HWP-5: 200 GPM
AutoCAD SHX Text
CONDENSING BOILER CB-3
AutoCAD SHX Text
CONDENSING BOILER CB-2
AutoCAD SHX Text
HOT WATER SUPPLY TEMP SENSOR
AutoCAD SHX Text
HOT WATER SUPPLY TEMP SENSOR
AutoCAD SHX Text T2
AutoCAD SHX Text
DP
AutoCAD SHX Text
DP
AutoCAD SHX Text
DP
AutoCAD SHX Text
DP
AutoCAD SHX Text
DP
AutoCAD SHX Text
DP
AutoCAD SHX Text
FROM: EXISTING 3" FROM PENTHOUSE
AutoCAD SHX Text
FROM: EXISTING 3" FROM PENTHOUSE
AutoCAD SHX Text
EMERGENCY GAS SHUT-OFF BUTTONS (SEE PLANS)
AutoCAD SHX Text
MS
AutoCAD SHX Text
NEW EXPANSION TANK TO REPLACE EXISTING.
AutoCAD SHX Text
INTERLOCK EXISTING MOTORIZED COMBUSTION AIR DAMPER WITH NEW BOILER OPERATION
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: JFA
DRAWN BY: RC
CHECKED BY: FS
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
I HAVE PREPARED OR CAUSED TO BE PREPARED UNDER MY DIRECT
SUPERVISION, THE ATTACHED PLANS AND SPECIFICATIONS. I STATE
THAT, TO THE BEST OF MY KNOWLEDGE AND BELIEF AND TO THE
EXTENT OF MY CONTRACTUAL OBLIGATION, THEY ARE IN
COMPLIANCE WITH THE 2019 CHICAGO BUILDING CODE
MANDATED BY THE CITY OF CHICAGO BUILDING
DEPARTMENT/CODE ENFORCEMENT AND THE ILLINOIS
ACCESSIBILITY CODE, 2018 EDITION
STATEMENT OF COMPLIANCE
SIGNED:
ARCHITECT/ENGINEER
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
CITY APPROVAL STAMP BOX
ILLINOIS SECRETARY OF STATE
0 ISSUED FOR 50% REVIEW 05/09/2025
ISSUED FOR REVIEW 08/01/20251
ISSUED FOR 75% REVIEW 08/13/20252
ISSUED FOR 100% REVIEW 10/14/20253
ISSUED FOR BID 1/6/20264
iLLINOIS REGISTRATION NO.: 062.074755
DATE: 1/8/2026
ADDENDUM 1 4/20/20265
M6.01
MECHANICAL
HYDRONIC PIPING
SCHEDULES
| M0.04-MECHANICAL HYDRONIC PIPING GENERAL NOTES-M0.04 |
| M0.04-MECHANICAL HYDRONIC PIPING GENERAL NOTES-M0.04 |
| M2.01DL-MECHANICAL HYDRONIC PIPING LOWER PLAN DEMO CONDITIONS-M2.01DL |
| M2.01DL-MECHANICAL HYDRONIC PIPING LOWER PLAN DEMO CONDITIONS-M2.01DL |
| M2.01L-MECHANICAL HYDRONIC PIPING LOWER PLAN NEW CONDITIONS-M2.01L |
| M2.01L |
| M5.03-MECHANICAL HYDRONIC BOILER CONTROL DIAGRAM-M5.03 |
| M5.03 |
| M6.01-MECHANICAL HYDRONIC PIPING SCHEDULES-M6.01 |
| M6.01-MECHANICAL HYDRONIC PIPING SCHEDULES-M6.01 |
File details come from the government source that posted it. Updated .