This is a mechanical hydronic piping plan for the Illinois Secretary of State's boiler replacement project at the Chicago West facility located at 5301 W. Lexington Street, Chicago, Illinois 60644. The plan details the lower-level mechanical hydronic piping layout for the installation of two new condensing boilers (CB-2 and CB-3) to replace an existing water tube boiler. The design includes new piping connections for hot water supply (HWS) and return (HWR) lines ranging from 2 inches to 4 inches in diameter, integration with existing constant flow pumps (HWP-1 through HWP-4), a new chemical pot feeder, and a new 4-inch concrete housekeeping pad. The plan shows connections to existing boiler room infrastructure, including a 14-inch by 18-inch chimney shaft, existing combustion air intake, and floor drain relocation. A 12-inch stainless steel flue insert is specified for installation through the existing chimney shaft, with all piping penetrations requiring firestopping. The drawing was issued for 50% review on May 9, 2025, progressed through 75% review on August 13, 2025, 100% review on October 14, 2025, and was issued for bid on January 6, 2026, with subsequent addenda issued on April 20, 2026, and May 19, 2026.

The plan serves as a technical specification document supporting the competitive bidding process for the new boiler installation project. Bidders must be pre-qualified by the Illinois Capital Development Board and demonstrate seven years of documented commercial boiler installation experience. A mandatory pre-bid conference is scheduled for May 15, 2026, at 10:00 AM at the project site, with bids due on May 28, 2026. The work scope requires compliance with the Illinois Works Jobs Program Act and Apprenticeship Initiative, general commercial liability insurance of $1,000,000 per occurrence, a 10% bid bond at submission, and a performance bond for the full contract amount. The project will be awarded on a lowest-price-responsive-and-responsible-bidder basis with a firm, fixed total cost pricing structure. Contract work must be performed during normal business hours (7:00 AM to 5:00 PM, Monday through Friday) unless otherwise arranged, and the initial contract term is four years from execution with a maximum total term not to exceed ten years including any renewals.

View the file

Other files

File Type Posted
Vendor Disclosure v 24.1 Formerly Forms A~17.docx DOCX document
Questions and Answers~10.docx DOCX document
Chicago West Boiler Re-bid IFB 26PS759001~1.pdf PDF
IPG Active Registered Vendor Disclosure formerly Forms B v.23.1~40.docx DOCX document
Mechanical Drawings.pdf PDF
Questions and Answers Set 1~10.docx DOCX document
Electrical Drawings.pdf PDF
Addendum 1.pdf PDF
Questions and Answers Set 2~1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4" EX-HWS

E X

-H W

S

E X

-H W

S

E X

-H W

S

E X

-H W

S

3/4" EX-HWS

NEW 4" AIR

SEPARATOR

EXISTING

CONDENSING

BOILER

CB-1

EXISTING

BOILER

B07

3" EX-NG

EXISTING PIPING ABOVE NEW

BOILERS

4" EX-HWS

4" EX-HWR

E X

-H W

S

4" HWS

4" HWS

4" HWR

4" HWS

EXISTING

HOT WATER

BOILER

HWB-1

EXISTING

CONSTANT FLOW

PUMP HWP-4 ABOVE

HWP-3 BELOW

EXISTING

CONSTANT FLOW

PUMP SPARE

EXISTING

CONSTANT FLOW

PUMP HWP-2 ABOVE

HWP-1 BELOW

NEW

CHEMICAL

POT FEEDER

3/4" EX-CHM

2 1/2" EX-HWS

2 1/2" EX-HWR

CL=7'-7"

CL=7'-7"

EX-DUCT

12"Ø VENTING SUITABLE FOR CATEGORY IV APPLIANCE,

LISTED AND INSTALLED PER MANUFACTURER'S INSTRUCTIONS.

ROUTED UP THROUGH SHAFT TO ROOF

EXISTING 110"x26"

COMBUSTION AIR

INTAKE TO REMAIN,

INTERLOCK EXISTING

DAMPER WITH

BOILER FLUE.

4" HWR

3" NG

3" NG

45 DEG TAKE OFF DN TO

CB-3 FLUE CONNECTION

CLEANOUT

12"Ø EXHAUST DUCT

EMERGENCY SHUT-OFF SWITCH

SHALL SHUT DOWN BOILERS,

AND BOILER PUMPS.

(TYPICAL)

PROVIDE WITH CLEAR ENCLOSURE

EXISTING 14" x 18" CHIMNEY SHAFT

UP THRU ROOF

M

EXISTING FLOOR DRAIN

TO BE RELOCATED

SEE PLUMBING PLANS

FOR DETAILS

NEW 4" CONCRETE

HOUSEKEEPING PAD.

COORDINATE FLOOR

DRAINS AND

BOILER/EXPANSION

TANK SIZE. EXTEND

4" ON ALL SIDES.

NEW 12" STAINLESS STEEL FLUE

INSERT UP THROUGH EXISTING

CHIMNEY SHAFT - REFER TO

MANUFACTURER'S LIST OF

APPROVED VENTING MATERIALS

EXISTING MASONRY WALL TO BE

OPENED AND SEALED AS REQUIRED

TO ALLOW FOR NEW FLUE INSERT

AND CONNECTION

NOTES:

1. NOT ALL PIPING IS SHOWN.

2. PIPING AND EQUIPMENT SIZE AND LOCATION AS SHOWN IS

TAKEN FROM "PREMIER MECHANICAL INC. DRAWING

SPOOL MAP-1

3. MODIFY AND EXTEND CONCRETE HOUSE KEEPING PAD

UNDER EXISTING BOILER AS REQUIRED TO ACCOMODATE

LOCATION OF NEW BOILERS.

ILLINOIS SECRETARY

OF STATE CHICAGO

WEST FACILITY

BOILER REPLACEMENT

5301 W. LEXINGTON ST.,

CHICAGO, IL 60644

SHEET NO.

DESIGN BY: JFA

DRAWN BY: RC

CHECKED BY: FS

PROJECT NO.

ISSUE DESCRIPTION DATEREV.

623 COOPER COURT

SCHAUMBURG, IL 60173

(312) 346-8181

N

ILLINOIS SECRETARY OF STATE

KEY PLAN

0 ISSUED FOR 50% REVIEW 05/09/2025

ISSUED FOR REVIEW 08/01/20251

ISSUED FOR 75% REVIEW 08/13/20252

ISSUED FOR 100% REVIEW 10/14/20253

ISSUED FOR BID 1/6/20264

ADDENDUM 1 4/20/20265

ADDENDUM 2 5/19/20266

MECHANICAL

HYDRONIC PIPING

LOWER PLAN

NEW CONDITIONS

M2.01L

BOILER LOWER PLAN NEW CONDITIONS

1/2" = 1'-0"

NORTH

0 5' 10'

GENERAL NOTE:

1. ALL EXISTING PIPING, CONDUIT, ETC. PENETRATING

BOILER ROOM WALLS SHALL BE FIRESTOPPED AT

PENETRATION. CONTRACTOR TO FIELD VERIFY EXTENT

OF WORK.

PROPOSED BOILER INGRESS PLAN

1/4" = 1'-0"

NORTH

NOTE:

1. REFERENCE IMAGE IS FROM 2012 RENOVATION PLANS AND DO NOT REFLECT EXACT

LOCATION OF EXISTING WATER HEATER.

File details come from the government source that posted it. Updated .