This is a mechanical hydronic piping plan for the Illinois Secretary of State's boiler replacement project at the Chicago West facility located at 5301 W. Lexington Street, Chicago, Illinois 60644. The plan details the lower-level mechanical hydronic piping layout for the installation of two new condensing boilers (CB-2 and CB-3) to replace an existing water tube boiler. The design includes new piping connections for hot water supply (HWS) and return (HWR) lines ranging from 2 inches to 4 inches in diameter, integration with existing constant flow pumps (HWP-1 through HWP-4), a new chemical pot feeder, and a new 4-inch concrete housekeeping pad. The plan shows connections to existing boiler room infrastructure, including a 14-inch by 18-inch chimney shaft, existing combustion air intake, and floor drain relocation. A 12-inch stainless steel flue insert is specified for installation through the existing chimney shaft, with all piping penetrations requiring firestopping. The drawing was issued for 50% review on May 9, 2025, progressed through 75% review on August 13, 2025, 100% review on October 14, 2025, and was issued for bid on January 6, 2026, with subsequent addenda issued on April 20, 2026, and May 19, 2026.
The plan serves as a technical specification document supporting the competitive bidding process for the new boiler installation project. Bidders must be pre-qualified by the Illinois Capital Development Board and demonstrate seven years of documented commercial boiler installation experience. A mandatory pre-bid conference is scheduled for May 15, 2026, at 10:00 AM at the project site, with bids due on May 28, 2026. The work scope requires compliance with the Illinois Works Jobs Program Act and Apprenticeship Initiative, general commercial liability insurance of $1,000,000 per occurrence, a 10% bid bond at submission, and a performance bond for the full contract amount. The project will be awarded on a lowest-price-responsive-and-responsible-bidder basis with a firm, fixed total cost pricing structure. Contract work must be performed during normal business hours (7:00 AM to 5:00 PM, Monday through Friday) unless otherwise arranged, and the initial contract term is four years from execution with a maximum total term not to exceed ten years including any renewals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Vendor Disclosure v 24.1 Formerly Forms A~17.docx | DOCX document | |
| Questions and Answers~10.docx | DOCX document | |
| Chicago West Boiler Re-bid IFB 26PS759001~1.pdf | ||
| IPG Active Registered Vendor Disclosure formerly Forms B v.23.1~40.docx | DOCX document | |
| Mechanical Drawings.pdf | ||
| Questions and Answers Set 1~10.docx | DOCX document | |
| Electrical Drawings.pdf | ||
| Addendum 1.pdf | ||
| Questions and Answers Set 2~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4" EX-HWS
E X
-H W
S
E X
-H W
S
E X
-H W
S
E X
-H W
S
3/4" EX-HWS
NEW 4" AIR
SEPARATOR
EXISTING
CONDENSING
BOILER
CB-1
EXISTING
BOILER
B07
3" EX-NG
EXISTING PIPING ABOVE NEW
BOILERS
4" EX-HWS
4" EX-HWR
E X
-H W
S
4" HWS
4" HWS
4" HWR
4" HWS
EXISTING
HOT WATER
BOILER
HWB-1
EXISTING
CONSTANT FLOW
PUMP HWP-4 ABOVE
HWP-3 BELOW
EXISTING
CONSTANT FLOW
PUMP SPARE
EXISTING
CONSTANT FLOW
PUMP HWP-2 ABOVE
HWP-1 BELOW
NEW
CHEMICAL
POT FEEDER
3/4" EX-CHM
2 1/2" EX-HWS
2 1/2" EX-HWR
CL=7'-7"
CL=7'-7"
EX-DUCT
12"Ø VENTING SUITABLE FOR CATEGORY IV APPLIANCE,
LISTED AND INSTALLED PER MANUFACTURER'S INSTRUCTIONS.
ROUTED UP THROUGH SHAFT TO ROOF
EXISTING 110"x26"
COMBUSTION AIR
INTAKE TO REMAIN,
INTERLOCK EXISTING
DAMPER WITH
BOILER FLUE.
4" HWR
3" NG
3" NG
45 DEG TAKE OFF DN TO
CB-3 FLUE CONNECTION
CLEANOUT
12"Ø EXHAUST DUCT
EMERGENCY SHUT-OFF SWITCH
SHALL SHUT DOWN BOILERS,
AND BOILER PUMPS.
(TYPICAL)
PROVIDE WITH CLEAR ENCLOSURE
EXISTING 14" x 18" CHIMNEY SHAFT
UP THRU ROOF
M
EXISTING FLOOR DRAIN
TO BE RELOCATED
SEE PLUMBING PLANS
FOR DETAILS
NEW 4" CONCRETE
HOUSEKEEPING PAD.
COORDINATE FLOOR
DRAINS AND
BOILER/EXPANSION
TANK SIZE. EXTEND
4" ON ALL SIDES.
NEW 12" STAINLESS STEEL FLUE
INSERT UP THROUGH EXISTING
CHIMNEY SHAFT - REFER TO
MANUFACTURER'S LIST OF
APPROVED VENTING MATERIALS
EXISTING MASONRY WALL TO BE
OPENED AND SEALED AS REQUIRED
TO ALLOW FOR NEW FLUE INSERT
AND CONNECTION
NOTES:
1. NOT ALL PIPING IS SHOWN.
2. PIPING AND EQUIPMENT SIZE AND LOCATION AS SHOWN IS
TAKEN FROM "PREMIER MECHANICAL INC. DRAWING
SPOOL MAP-1
3. MODIFY AND EXTEND CONCRETE HOUSE KEEPING PAD
UNDER EXISTING BOILER AS REQUIRED TO ACCOMODATE
LOCATION OF NEW BOILERS.
ILLINOIS SECRETARY
OF STATE CHICAGO
WEST FACILITY
BOILER REPLACEMENT
5301 W. LEXINGTON ST.,
CHICAGO, IL 60644
SHEET NO.
DESIGN BY: JFA
DRAWN BY: RC
CHECKED BY: FS
PROJECT NO.
ISSUE DESCRIPTION DATEREV.
623 COOPER COURT
SCHAUMBURG, IL 60173
(312) 346-8181
N
ILLINOIS SECRETARY OF STATE
KEY PLAN
0 ISSUED FOR 50% REVIEW 05/09/2025
ISSUED FOR REVIEW 08/01/20251
ISSUED FOR 75% REVIEW 08/13/20252
ISSUED FOR 100% REVIEW 10/14/20253
ISSUED FOR BID 1/6/20264
ADDENDUM 1 4/20/20265
ADDENDUM 2 5/19/20266
MECHANICAL
HYDRONIC PIPING
LOWER PLAN
NEW CONDITIONS
M2.01L
BOILER LOWER PLAN NEW CONDITIONS
1/2" = 1'-0"
NORTH
0 5' 10'
GENERAL NOTE:
1. ALL EXISTING PIPING, CONDUIT, ETC. PENETRATING
BOILER ROOM WALLS SHALL BE FIRESTOPPED AT
PENETRATION. CONTRACTOR TO FIELD VERIFY EXTENT
OF WORK.
PROPOSED BOILER INGRESS PLAN
1/4" = 1'-0"
NORTH
NOTE:
1. REFERENCE IMAGE IS FROM 2012 RENOVATION PLANS AND DO NOT REFLECT EXACT
LOCATION OF EXISTING WATER HEATER.
File details come from the government source that posted it. Updated .