This document contains questions and answers related to the OCYCF Med/Dental Remodel project, which involves construction work in Marion County and the City of Salem, Oregon. The questions cover various aspects of the project, such as the need for spray fireproofing, the provision of vendor-supplied equipment, the wall mounting channel for a computer, and the integration of the new project with the existing system. The responses provided by the project team clarify the requirements, indicate that an addendum has been posted, and provide guidance on how to handle certain elements of the project.
The document suggests that this is an integrated project, with substitutions allowed for the controls system as long as the project requirements are met. The project team has limited information on the vendor-supplied equipment, and it appears that the owner will provide further details and specifications once the equipment purchase orders are signed.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for the OCYCF Med/Dental Remodel
• (Q) X3 on G2.01 calls for spray fireproofing. I don’t see a spec.
• (A) No spray fireproofing is required. Please delete that note.
• (Q) Can you please provide additional info for all of the Vendor Provided equipment on Q2.01 that is contractor installed (everything on that equipment schedule)?
• (A) This documentation must come from the owner. We have limited information on this equipment. Vendor can likely provide a package of ‘cut-sheets’ once owner has signed equipment P.O.
• (Q) Please clarify if the Wall Mounting Channel for Computer per the Equipment Schedule on Q2.01 is owner or contractor furnished. There’s an “X” in each column.
Also, please provide additional info for this item whether we are to install (so we know what we’re installing) or if we’re providing (so we know what to price)?
• (A) Please disregard this row – owner will provide wall mounting hardware for the PC as needed. Contractor to only provide backing for a wall mounted workstation in this location (precise information about where it goes can be handled as an RFI during framing).
• (Q) Will this new project be run separately, or do you want it to be attached to the main system?
• (A) An integrated system is preferred, and substitutions are allowed by the controls specification. No specific restrictions on manufacturers as long as system meets project requirements otherwise.
• (Q) Where is title sheet, sheet G0.01, and drawing index such as A5.01, A7.02, PD1.02, P2.02, P3.02, E0.02? Also,
• (A) An addendum has been posted addressing this question.
File details come from the government source that posted it. Updated .