This document contains general notes, abbreviations, mechanical equipment schedules, demolition and installation plans, and details for a mechanical system upgrade project for the Oak Creek Expansion facility in Albany, Oregon. The project is being undertaken by the Oregon Youth Authority and involves coordinating work across multiple jurisdictions including Marion County and the City of Salem.
The key scope items include demolishing existing HVAC equipment and ductwork, installing a new variable refrigerant flow (VRF) system with fan coil units, and an energy recovery ventilator. The new HVAC equipment must comply with applicable building codes and be integrated with the facility's building management system. The contractor is responsible for obtaining necessary permits, coordinating utility connections, and ensuring the existing systems remain operational during the renovation work.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE LATEST EDITION OF
THE FOLLOWING CODES AS ADOPTED BY LOCAL JURISDICTION.
OREGON STRUCTURAL SPECIALTY CODE (OSSC)
OREGON MECHANICAL SPECIALTY CODE (OMSC)
OREGON PLUMBING SPECIALTY CODE (OPSC)
OREGON FIRE CODE (OFC)
OREGON ENERGY EFFICIENCY SPECIALTY CODE (OEESC)
2. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE AND ADOPTED REGULATIONS INCLUDING BUT NOT LIMITED TO NATIONAL, CITY, STATE, LOCAL CODES AND ORDINANCES WHICH MAY BE IN EFFECT. ALL MECHANICAL MATERIALS, INSTALLATION PROCEDURES AND SYSTEM LAYOUTS SHALL BE APPROVED BY ALL APPLICABLE CODE ENFORCEMENT AUTHORITIES HAVING JURISDICTION. THE MECHANICAL
CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY PERMITS AND APPROVALS FOR THIS
INSTALLATION. PAY ALL ROYALTIES OR FEES REQUIRED IN CONNECTION WITH THE USE OF PATENTED
DEVICES AND SYSTEMS.
3. UPON CONTRACT AWARD, CONTRACTOR SHALL CONTACT LOCAL UTILITY COMPANY TO SCHEDULE UTILITY CONNECTIONS. CONTRACTOR SHALL BE RESPONSIBLE TO COORDINATE ALL UTILITY WORK, SECURE ALL
PERMITS AND INSPECTIONS.
4. ALL CONNECTIONS TO BUILDING SERVICES SHALL BE CAREFULLY COORDINATED WITH THE UTILITY CO AND THE CONSTRUCTION MANAGER. SERVICE WORK OF THIS NATURE TO OCCUR DURING UNOCCUPIED BUILDING HOURS. THE CONTRACTOR SHALL BE RESPONSIBLE TO ENSURE THAT ALL EXISTING EQUIPMENT IS
OPERATIONAL AFTER ANY SHUTDOWN OCCURS.
5. ALL CONTRACT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL REQUIREMENTS OF THE WRITTEN SPECIFICATIONS FOR THIS PROJECT WHICH ARE CONSIDERED TO BE AN INTEGRAL PART OF THE CONTRACT DOCUMENTS. ALL CONTRACTORS AND SUBCONTRACTORS SHALL MAINTAIN (AT THE JOBSITE) AND REFER TO COPIES OF THE WRITTEN SPECIFICATIONS AS PART OF THESE DRAWINGS. REFER TO THE WRITTEN SPECIFICATIONS IN CONJUNCTION WITH THE PLANS FOR FULL PROJECT SCOPE. IN ALL CASES OF DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS, THE MORE STRINGENT REQUIREMENTS SHALL GOVERN AND WHERE IT IS UNCLEAR, SUCH CASES SHALL BE REFEREED TO THE ENGINEER FOR ADJUDICATION.
6. ANY DISCREPANCIES OR INADEQUACIES WITHIN THESE BID DOCUMENTS OR BETWEEN THESE BID DOCUMENTS AND RELATED PLUMBING, ELECTRICAL, FIRE PROTECTION, ARCHITECTURAL, INTERIOR DECOR AND FIELD CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND/OR ENGINEER PRIOR TO BID SUBMISSION. DURING THE COURSE OF CONSTRUCTION COORDINATION AND ACTUAL CONSTRUCTION, THE MECHANICAL CONTRACTOR SHALL COOPERATE WITH ALL OTHER CONTRACTORS AND TRADES ON THIS
PROJECT TO ENSURE A SMOOTH RUNNING AND CAREFULLY COORDINATED INSTALLATION.
7. THE CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTING HIS BID FOR THE PROPOSED WORK. HE SHALL BE RESPONSIBLE TO VERIFY FIELD CONDITIONS. ANY DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION
OF THE ENGINEER PRIOR TO SUBMISSION OF BIDS IN WRITING.
8. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING LOUVERS, CONCRETE EQUIPMENT PADS, FLASHING DETAILS, ETC. REFER TO ARCHITECTURAL DRAWINGS FOR ROOM ELEVATIONS, LOCATE MECHANICAL DEVICES SUCH AS TEMPERATURE SENSORS, HUMIDISTATS, PANELS, ETC.
SO THAT THEY DO NOT CONFLICT WITH GENERAL CONSTRUCTION (WAINSCOT, DOOR HARDWARE, ETC.) NOR
WITH ELECTRICAL SYSTEM (LIGHT SWITCHES, SPEAKERS, OUTLETS, ETC.).
9. COORDINATE WITH OTHER TRADES: A) REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF MECHANICAL EQUIPMENT (VOLTAGE, PHASE, HZ, ETC. B) PROVIDE ADEQUATE CLEARANCE OF MECHANICAL WORK FROM ELECTRICAL ITEMS. MAINTAIN MINIMUM ACCESS OF 6-INCHES ABOVE ELECTRICAL CABLE TRAYS
AND 18-INCHES TO THE SIDE OF CABLE TRAYS.
10. DUCTING AND PIPING SHOWN ON DRAWINGS SHOW THE GENERAL RUN AND CONNECTIONS AND MAY OR MAY NOT IN ALL PARTS BE SHOWN IN ITS EXACT POSITION. CONTRACTOR SHALL BE RESPONSIBLE FOR ERECTING THE DUCTING AND PIPING SUITABLE IN EVERY RESPECT FOR THE WORK PERFORMED. DUCTWORK AND PIPING SHALL BE INSTALLED SO THAT ACCESS, CLEARANCE, HEADROOM, AND PITCH ARE MAINTAINED. CONTRACTORS OF THE VARIOUS TRADES SHALL COORDINATE THE INSTALLATION. MECHANICAL CONTRACTOR SHALL REVIEW ARCHITECTURAL DRAWINGS FOR CHASE AND SOFFIT LOCATIONS TO COORDINATE ALL EXPOSED DUCTWORK
AND PIPE ROUTING.
11. THE COMMISSIONING SPECIFICATION, INCLUDING ALL FUNCTIONAL TEST PROCEDURES, SHALL BE PROVIDED
AND ENFORCED BY THE CONTRACTOR.
12. PROVIDE SEISMIC RESTRAINT IN ACCORDANCE WITH IBC AND ASCE STANDARD 7. SUBMIT CALCULATIONS BY LICENSED STRUCTURAL ENGINEER. PRODUCTS MAY CONFORM TO SMACNA SEISMIC RESTRAINT GUIDELINES.
13. PROVIDE A SINGLE SUBMITTAL OF ALL MECHANICAL EQUIPMENT AS SPECIFIED. AS A MINIMUM, SUBMIT PRODUCT DATA FOR ALL EQUIPMENT AND FIXTURES LISTED IN ACCOMPANYING SCHEDULES FOR APPROVAL.
14. USE EXPERIENCED INSTALLERS. DELIVER, HANDLE, AND STORE MATERIALS IN ACCORDANCE WITH
MANUFACTURER'S INSTRUCTIONS.
15. ARRANGEMENT OF SYSTEMS INDICATED ON THE DRAWINGS IS DIAGRAMMATIC, AND INDICATES THE MINIMUM REQUIREMENTS FOR PLUMBING AND MECHANICAL WORK. ADJUST BOX LOCATIONS, BASED ON FIELD MEASUREMENTS, TO AVOID INSTALLATION ABOVE DESKS. SITE CONDITIONS SHALL DETERMINE THE ACTUAL ARRANGEMENT OF THE WORK. TAKE FIELD MEASUREMENTS BEFORE PREPARING SHOP DRAWINGS, OBTAIN APPROVAL OF SHOP DRAWINGS BEFORE BEGINNING FABRICATION. BE RESPONSIBLE FOR ACCURACY OF DIMENSIONS AND LAYOUT. OVERHEAD PIPING AND DUCTWORK SHALL BE ARRANGED TO OBTAIN MAXIMUM HEAD ROOM. SHOP DRAWING SHALL BE SUBMITTED TO AND REVIEWED BY THE ENGINEER OF RECORD.
16. CLEAN AND PROTECT WORK FROM DAMAGE. RESTORE DAMAGED FINISHES. COVER ENDS OF PIPING AND DUCTWORK NOT ACTIVELY BEING WORKED ON. DO NOT USE ANY PART OF THE OWNER'S BUILDING AS A SHOP, EXCEPT PARTS DESIGNATED FOR SUCH PURPOSES BY THE OWNER.
17. CHANGES OR SUBSTITUTIONS OF EQUIPMENT WILL NOT BE ALLOWED WITHOUT SPECIFIC WRITTEN APPROVAL FROM THE ARCHITECT OR ENGINEER. ALL COSTS RESULTING FROM THE SELECTION OF OTHER THAN SPECIFIED EQUIPMENT SHALL BE BORNE BY THE CONTRACTOR, INCLUDING, BUT NOT LIMITED TO WORK
AFFECTING OTHER CONTRACTORS, THE OWNER, OR RE-DESIGN ISSUES.
18. ALL INDICATED WORK SHALL BE PERFORMED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED.
CONTRACTOR SHALL COORDINATE HIS SCHEDULING WITH THE OWNER AND GENERAL CONTRACTOR TO
COMPLY WITH THE OWNERS USAGE OF THE BUILDING.
19. ALL CONTRACTORS SHALL PROVIDE CUTTING AND PATCHING FOR THEIR RESPECTIVE TRADES. ALL CONTRACTORS REMOVING OR RELOCATING ANY EQUIPMENT, PIPES, DUCTS, CONDUITS, ETC SHALL PATCH ALL
SURFACES DISTURBED BY THIS WORK TO MATCH ADJACENT SURFACES.
20. CONTRACTOR IS RESPONSIBLE FOR THE PROPER CARE OF ALL OWNER'S EQUIPMENT AND/OR FURNISHINGS WHICH ARE REQUIRED TO BE TEMPORARILY REMOVED, STORED, OR RELOCATED. CONTRACTOR SHALL REPLACE, REPAIR, OR REIMBURSE OWNER FOR ALL DAMAGES TO SUCH PROPERTIES AT FULL REPLACEMENT VALUE AND EQUIVALENCY. CONTRACTOR SHALL ADVISE OWNER FOR DISPOSITION OF REMOVED EQUIPMENT
AND/OR MATERIALS.
21. CONTRACTOR'S WORK MAY BE REQUIRED OUTSIDE OF THE DESIGNATED SPACE. ALL SYSTEMS BEING DEMOLISHED AND REMOVED, MODIFIED, AND/OR TERMINATED SHALL BE FIELD VERIFIED TO INSURE NO WORK PERFORMED, INSIDE OR OUTSIDE, OF THE DESIGNATED SPACE SHALL DISRUPT ANY SERVICE OR SYSTEMS OF ANY OTHER AREAS. IF ANY CONDITIONS ARISE THAT ARE NOT IDENTIFIED ON THE DRAWINGS, IMMEDIATE NOTIFICATION SHALL BE PROVIDED TO THE ENGINEER OR OWNER. NO WORK SHALL PROCEED WITHOUT
APPROVALS FROM ENGINEER OR OWNER.
22. DO NOT CUT STRUCTURAL ELEMENTS WITHOUT PRIOR WRITTEN APPROVAL.
23. THE MECHANICAL CONTRACTOR SHALL MOUNT THE DUCT SMOKE DETECTOR. THE ELECTRICAL CONTRACTOR TO PROVIDE AND WIRE DUCT MOUNTED SMOKE DETECTOR. ELECTRICAL CONTRACTOR SHALL ALSO PROVIDE AND WIRE A REMOTE MONITORING KEY OPERATED TEST AND ALARM STATION FOR EACH DUCT SMOKE DETECTOR. THE REMOTE TEST ALARM STATION SHALL BE MOUNTED AS DIRECTED IN THE AREA OF THE SMOKE
DETECTOR.
24. THE MECHANICAL CONTRACTOR TO PROVIDE ALL ROOF CURBS, EQUIPMENT RAILS, SUPPORTS, ROOF PORTALS AND ASSOCIATED EQUIPMENT TO ENSURE A COMPLETE INSTALLATION FOR NEW HVAC EQUIPMENT.
MECHANICAL CONTRACTOR RESPONSIBLE TO PROVIDE EXACT LOCATIONS AND REVIEWED AND RELEASED EQUIPMENT SUBMITTALS OF ROOF CURBS, EQUIPMENT SUPPORTS, ROOF PORTALS, AND ASSOCIATED EQUIPMENT TO THE ARCHITECT. ALL ROOF PENETRATIONS, EQUIPMENT SUPPORTS, ROOF PORTALS AND ASSOCIATED EQUIPMENT SHALL BE INSTALLED BY ROOFING SUB-CONTRACTOR. ROOFING CONTRACTOR SHALL BE BONDED AND ALL WORK SHALL BE DONE SO AS NOT TO VOID ROOF WARRANTY. ROOFING CONTRACTOR SHALL PROVIDE BASE FLASHING, AND PROVIDE TEMPORARY WEATHER-PROOF COVERS UNTIL MECHANICAL CONTRACTOR INSTALLS NEW HVAC UNITS. MECHANICAL CONTRACTOR TO PROVIDE COUNTER FLASHING.
25. FURNISH TO ELECTRICAL CONTRACTOR ALL MOTOR STARTERS AND CONTROL DEVICES FOR MECHANICAL EQUIPMENT. ELECTRICAL CONTRACTOR SHALL INSTALL AND WIRE STARTER AND CONTROL EQUIPMENT FOR
ALL MOTORS.
26. ALL HVAC EQUIPMENT CONTAINING COOLING (EVAPORATOR) COILS INCLUDING DOWN FLOW ROOF TOP UNITS SHALL HAVE CONDENSATE MONITORING FOR OVERFLOW PROTECTION FOR PRIMARY OR SECONDARY DRAIN PANS AS APPLICABLE. SUCH DEVICES SHALL BE LABELED TO COMPLY WITH UL#508 AND SHALL SHUT DOWN
COOLING SYSTEM AND SIGNAL BMS SYSTEM IF APPLICABLE.
27. ALL EXPOSED HORIZONTAL AND VERTICAL PIPING SHALL BE INSTALLED IN A NEAT ARRANGEMENT IN LOCATIONS WHICH ARE THE MOST INCONSPICUOUS. VERTICAL DROPS SHALL BE KEPT TO AN ABSOLUTE MINIMUM AND THEIR FINAL LOCATIONS SHALL BE COORDINATED AND RUN WITHIN CHASES, WALLS, OR SOFFITS WITH OTHER PLUMBING AND ELECTRICAL FEEDS. MECHANICAL CONTRACTOR SHALL REVIEW ARCHITECTURAL DRAWINGS FOR CHASE AND SOFFIT LOCATIONS TO COORDINATE ALL EXPOSED PIPING ROUTING. ALL SUCH
LOCATIONS SHALL BE REVIEWED WITH ARCHITECT/ENGINEER PRIOR TO INSTALLATION.
GENERAL NOTES:
1. PERFORM ALL SHEETMETAL WORK IN ACCORDANCE WITH CURRENT SMACNA STANDARDS.
2. CONSTRUCT DUCTS WITH G-60 OR BETTER GALVANIZED STEEL (ASTM 527) LFQ, CHEM TREAT IN GENERAL.
3. CONSTRUCT RECTANGULAR DUCTWORK TO MEET ALL FUNCTIONAL CRITERIA DEFINED IN CHAPTER 11, OF THE SMACNA HVAC DUCT CONSTRUCTION STANDARDS. PROVIDE DIAGONAL CREASING OR BEADING ON ALL PANELS WIDER THAN 18-INCHES, AND PANELS LESS THAN 18 GAGE. CONSTRUCT ROUND AND FLAT OVAL
DUCTWORK IN ACCORDANCE WITH CHAPTER 3 OF SMACNA HDCS.
4. DUCTMATE, METZ, OR W.D.C.I. DUCT CONNECTION SYSTEMS ARE ACCEPTABLE. DUCTS CONSTRUCTED USING THESE SYSTEMS WILL REFER TO THE MANUFACTURER'S GUIDELINES FOR SHEET GAGE, INTERMEDIATE
REINFORCEMENT SIZE AND SPACING, AND JOINT REINFORCEMENTS.
5. PROVIDE COLLARS WHEREVER AN EXPOSED DUCT PASSES THROUGH A WALL, SLAB, OR CEILING--1-INCH WIDE, 18-GAGE ANGLE WITH MITERED CORNERS & SEAL WITH FIBERGLASS AND MASTIC.
6. SPIN-IN FITTINGS SHALL BE CONICAL TYPE WITH VOLUME DAMPER, AND QUADRANT; FLEX MASTER ELGEN OR
EQUIVALENT.
7. ELBOWS IN RECTANGULAR OR SQUARE DUCTWORK SHALL HAVE AN INSIDE RADIUS EQUAL TO DIMENSION OF
ELBOW IN THE PLANE OF THE TURN; OTHERWISE USE SQUARE ELBOWS WITH TURNING VANES.
8. ELBOWS IN ROUND DUCTWORK SHALL HAVE THE INSIDE RADIUS EQUAL TO DIMENSION OF ELBOW IN THE PLANE OF THE TURN. USE SEGMENTED, STANDING SEAM, PLEATED, OR STAMPED ELBOWS. ADJUSTABLE
ELBOWS ARE ALLOWED IF RADIUS CONFORMS TO ABOVE.
9. SQUARE CORNER INSERTS (TURNING VANES) SHALL BE SMACNA FIG. 4.3 DOUBLE THICKNESS, RUNNER TYPE 2
WITH 2-1/8-INCH SPACING.
10. VOLUME DAMPERS ARE NOT SHOWN GENERALLY, INCLUDE A DAMPER IN THE DUCT TO EACH SUPPLY, EXHAUST, OR RETURN OPENING; ALSO IN EACH BRANCH DUCT WHERE THREE OR MORE OPENINGS ARE ASSOCIATED WITH THE BRANCH. LOCATE DAMPERS AT A POINT WHERE THE DUCT IS ACCESSIBLE; AS FAR
FROM THE OUTLET AS POSSIBLE.
11. THOROUGHLY CLEAN ALL DEBRIS FROM THE INSIDE OF ALL DUCTWORK AND PLENUMS. BLOW FREE ALL SMALL
PARTICLES OF RUBBISH AND DUST.
12. MECHANICAL DRAWINGS SHOW APPROXIMATE LOCATIONS FOR GRILLES AND DIFFUSERS. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ELEVATIONS FOR EXACT LOCATIONS. AFTER SHOP DRAWINGS ARE COMPLETED VERIFY EXACT LOCATION OF GRILLES AND DIFFUSERS IN THE FIELD. ENSURE THAT DIFFUSER AND GRILLE FRAMES MATCH CEILING TYPES AND FINISH PRIOR TO ORDERING.
13. CONNECT FLEXIBLE DUCTS TO METAL DUCTS WITH A SLIP JOINT MADE USING FIRE RESISTANT MASTIC AND CLAMP, IDEAL "SNAP-LOCK" OR VENTLOCK "SURETIGHT NO. 670" AT EACH END. SUPPORT IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS. DO NOT INSTALL WITH ABRUPT BENDS OR OFFSETS.
MAXIMUM LENGTH 5-FEET. LOW PRESSURE INSULATED FLEXIBLE DUCT SHALL BE THERMAFLEX MK-E. HIGH
PRESSURE INSULATED FLEXIBLE DUCT SHALL BE THERAMFLEX MK-C.
14. GREASE EXHAUST TO BE ½ INCH W.G. PRESSURE CLASS, 18 GAGE STAINLESS STEEL WITH LIQUID TIGHT CONSTRUCTION WITH CONTINUOUS EXTERNAL WELD FOR ALL SEAMS AND JOINTS. PROVIDE ALL ACCESS
DOORS AS REQUIRED BY CODE.
15. FUME HOOD EXHAUST TO BE ½ INCH W.G. PRESSURE CLASS, 18 GAGE STAINLESS STEEL CONSTRUCTION WITH
CONTINUOUS EXTERNAL WELD FOR ALL SEAMS AND JOINTS.
SHEETMETAL NOTES:
1. HEAT PUMPS HAVING SUPPLEMENTARY ELECTRIC RESISTANCE HEAT HAVE CONTROLS THAT, EXCEPT DURING DEFROST, PREVENT SUPPLEMENTARY HEAT OPERATION WHEN THE HEAT PUMP CAN MEET THE HEATING LOAD.
2. WHERE USED TO CONTROL BOTH HEATING AND COOLING, ZONE THERMOSTATIC CONTROLS PROVIDE A TEMPERATURE RANGE OR DEADBAND OF AT LEAST 5°F WITHIN WHICH THE SUPPLY OF HEATING AND COOLING
ENERGY TO THE ZONE IS CAPABLE OF BEING SHUT OFF OR REDUCED TO A MINIMUM.
3. EACH HVAC SYSTEM HAS CONTROLS THAT VARY THE START-UP TIME OF THE SYSTEM TO JUST MEET THE
TEMPERATURE SET POINT AT TIME OF OCCUPANCY.
4. EACH ZONE IS PROVIDED WITH THERMOSTATIC SETBACK CONTROLS THAT ARE CONTROLLED BY EITHER AN
AUTOMATIC TIME CLOCK OR PROGRAMMABLE CONTROL SYSTEM.
5. BOTH OUTDOOR AIR SUPPLY AND EXHAUST ARE EQUIPPED WITH NOT LESS THAN CLASS I MOTORIZED
DAMPERS.
6. WHERE A HUMIDITY CONTROL DEVICE EXISTS IT IS SET TO MAINTAIN A DEADBAND OF AT LEAST 10% RELATIVE
HUMIDITY WHERE NO ACTIVE HUMIDIFICATION OR DEHUMIDIFICATION TAKES PLACE.
7. DEMAND CONTROLLED VENTILATION (DCV) IS INCLUDED FOR SPACES LARGER THAN 500 FT2 FOR SIMPLE
SYSTEMS AND SPACES LARGER THAN 150 FT2 FOR MULTIPLE ZONE SYSTEMS.
8. ALL LONGITUDINAL AND TRANSVERSE JOINTS, SEAMS AND CONNECTIONS OF LOW-PRESSURE SUPPLY AND RETURN DUCTS ARE SECURELY FASTENED AND SEALED WITH WELDS, GASKETS, MASTICS (ADHESIVES), MASTIC-PLUS-EMBEDDED-FABRIC SYSTEMS OR TAPES INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER’S INSTALLATION INSTRUCTIONS.
EXCEPTION(S):
A. CONTINUOUSLY WELDED AND LOCKING-TYPE LONGITUDINAL JOINTS AND SEAMS ON DUCTS OPERATING
AT STATIC PRESSURES LESS THAN 2 INCHES W.G. PRESSURE CLASSIFICATION.
9. AN OPERATING AND MAINTENANCE MANUAL WILL BE PROVIDED TO THE BUILDING OWNER BY THE MECHANICAL
CONTRACTOR.
ENERGY CODE MECHANICAL NOTES:
28. ALL PENETRATIONS THRU FIRE RATED WALLS, FLOORS, AND CEILINGS SHALL BE SEALED WITH A UL APPROVED FIRESTOP MATERIAL SUITABLE FOR CONSTRUCTION MATERIAL TO MAINTAIN FIRE, SMOKE AND DRAFT INTEGRITY OF STRUCTURE. FIRE RESISTANT SEALER SHALL BE TESTED IN ACCORDANCE WITH ASTM E84.
INSTALL SEALANT, INCLUDING FOAMING, PACKING AND OTHER ACCESSORY MATERIALS TO FILL OPENINGS WHERE FIRE RATED PENETRATIONS OCCUR. COMPLY WITH INSTALLATION REQUIREMENTS ESTABLISHED BY
TESTERS AND INSPECTION AGENCY.
29. FURNISH AND INSTALL PIPE SLEEVES PASSING THROUGH EXTERIOR WALLS. SLEEVES SHALL BE STEEL PIPE:
ASTM A53, TYPE E, GRADE A, SCHEDULE 40, GALVANIZED PLAIN ENDS, 2" LONGER THAN WALL WIDTH.
30. MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER HANDLING, DISPOSAL AND ASSOCIATED COSTS OF ALL REFRIGERANT MATERIAL DURING THIS CONTRACT IN ACCORDANCE WITH ALL FEDERAL, STATE
AND LOCAL CODES AND/OR REGULATIONS.
31. THERMOSTATS SHALL BE MOUNTED AT 48" AFF TO MEET ADA REQUIREMENTS. PROVIDE TAMPER PROOF
COVERS IN PUBLIC AREAS AND WIRE GUARDS IN GYMNASIUMS.
32. ALL DUCTWORK SHALL BE CONNECTED TO MOTORIZED EQUIPMENT WITH FLEXIBLE DUCT CONNECTORS.
33. ALL DUCTWORK SIZES SHOWN ON DRAWINGS ARE CLEAR INTERNAL DIMENSIONS.
34. INSTRUCT OWNER IN PROPER OPERATION OF SYSTEMS.
35. DRAWINGS ARE DIAGRAMMATIC IN NATURE AND MAY HAVE TO BE ADAPTED TO COMPLY WITH BUILDING CONDITIONS. CONTRACTOR SHALL SUBMIT HVAC SHOP DRAWINGS, INDICATING LOCATIONS, AND ROUTING OF ALL DUCTS, PIPING, WIRING AND ASSOCIATED ACCESSORIES. MAKE OFFSETS WITH FITTINGS WITH AS SMALL ANGLE OF OFFSET AS POSSIBLE. DUCTWORK & PIPING SHALL BE ROUTED TO AVOID ALL STRUCTURAL
SUPPORTS, AND COORDINATE ALL WORK WITH WORK OF OTHER TRADES.
36. ALL MECHANICAL EQUIPMENT AND APPLIANCES SHALL BEAR THE LABEL OF AN APPROVING AGENCY. LISTING AND LABELING AGENCY QUALIFICATIONS: A "NATIONALLY RECOGNIZED TESTING LABORATORY" AS DEFINED IN
THE INTERNATIONAL MECHANICAL CODE.
37. THE MECHANICAL CONTRACTOR SHALL PROVIDE A COMPLETE SET OF "AS-BUILT" DRAWINGS INDICATING THE PRECISE LOCATION OF ALL SYSTEMS, EQUIPMENT, DUCTWORK, PIPING AND ACCESS DOORS. THESE PLANS
SHALL ALSO INCLUDE ALL CHANGES AND DEVIATIONS FROM BID DOCUMENTS.
A AIR, AMP
ACU AIR CONDITIONING UNIT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AL ALUMINUM, ACOUSTICAL LINING
ARRGT ARRANGEMENT
ATM ATMOSPHERE
BC BLOWER COIL
BDD BACKDRAFT DAMPER
BFF BELOW FINISHED FLOOR
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BLDG BUILDING
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BOS BOTTOM OF STEEL
BTUH BRITISH THERMAL UNITS PER HOUR
CAP CAPACITY
CC COOLING COIL
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CLG CEILING, COOLING
CNTFGL CENTRIFUGAL
CO CLEANOUT
CONC CONCRETE
COND CONDENSATE
CONT CONTINUE, CONTROL
COMP COMPRESSOR
COP COEFFICIENT OF PERFORMANCE
CP CIRCULATING PUMP
CRU CONDENSATE RETURN UNIT
CU CONDENSING UNIT
CU FT CUBIC FEET
CV CONSTANT VOLUME
CVTR CONVERTER
CW COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
dB DECIBELS
DB DRY BULB
DCVA DOUBLE CHECK VALVE ASSEMBLY
DEG DEGREE
DF DRINKING FOUNTAIN
DI DE-IONIZED
DIA DIAMETER
DMPR DAMPER
DN DOWN
DS DOWNSPOUT
E EXISTING
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATING
EF EXHAUST FAN
EFF EFFICIENCY
EG EXHAUST GRILLE
EL ELEVATION
EQUIP EQUIPMENT
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR, EXTERNAL
F FAHRENHEIT, FIRE LINE
FD FIRE DAMPER, FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FLA FULL LOAD AMPS
FLR FLOOR
FLTR FILTER
FM FLOW METER
FOB FLAT ON BOTTOM
FO FLAT OVAL
FOT FLAT ON TOP
FPM FEET PER MINUTE
FPS FEET PER SECOND
FSD FIRE SMOKE DAMPER
FT FEET, FAN TERMINAL
FV FACE VELOCITY
GA GAGE
GAL GALLONS
GALV GALVANIZED
GPM GALLONS PER MINUTE
H HUMIDIFIER, HEIGHT
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HEX HEAT EXCHANGE
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER, HEAT PUMP
HPS HIGH PRESSURE STEAM
HTG HEATING
HW HOT WATER
HWC HOT WATER CIRCULATING
HWP HOT WATER PUMP
HWR HEATING WATER RETURN
HWS HEATING WATER SUPPLY
HZ HERTZ
ABBREVIATIONS
IDE DIAMETER, INDIRECT DRAIN
IE INVERT ELEVATION
IH INTAKE HOOD
IN INCH
INIT INITIAL
INT INTERIOR
IPLV INTEGRATED PART LOAD VALUE
KW KILOWATT
KWH KILOWATT HOURS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LB POUND, LINEAR BAR
LBS POUNDS
LD LINEAR DIFFUSER
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTU PER HOUR
MCA MINIMUM CIRCUIT AMPACITY
MD MANUAL DAMPER
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MOCP MAXIMUM OVER CURRENT PROTECTION
MOD MOTOR OPERATED DAMPER
MTR MOTOR
NC NORMALLY CLOSED
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NUMBER, NORMALLY OPEN
NTS NOT TO SCALE
OA OUTDOOR AIR
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
ORD OVERFLOW ROOF DRAIN
ORL OVERFLOW RAIN LEADER
P PUMP, PLUMBING
PD PRESSURE DROP
PH PHASE
POC POINT OF CONNECTION
POS POSITIVE
PR PUMPED RETURN
P/T PRESSURE/TEMPERATURE
PVC POLYVINYL CHLORIDE
QTY QUANTITY
RA RETURN AIR
RD ROOF DRAIN
REF REFERENCE
REQD REQUIRED
RF RETURN FAN
RG RETURN GRILLE
RH RELIEF HOOD, RELATIVE HUMIDITY
RL RAIN LEADER
RPBFP REDUCED PRESSURE BACKFLOW
PREVENTER
RPM REVOLUTIONS PER MINUTE
S SOIL
SA SUPPLY AIR
SD STORM DRAIN, SMOKE DAMPER
SENS SENSIBLE
SEER SEASONAL ENERGY EFFICIENCY RATING
SF SUPPLY FAN, SQUARE FEET
SG SUPPLY GRILLE
SL SOUNDLINING
SP STATIC PRESSURE
SPR SPRINKLER
SS STAINLESS STEEL, SANITARY SEWER
STP STANDPIPE
T THERMOSTAT
TEMP TEMPERATURE
TG TRANSFER GRILLE
TOD TOP OF DUCT
TOT TOTAL
TP TRAP PRIMER, TOTAL PRESSURE
TSP TOTAL STATIC PRESSURE
TU TERMINAL UNIT
TYP TYPICAL
UH UNIT HEATER
UON UNLESS OTHERWISE NOTED
V VENT, VOLT
VA VALVE
VAV VARIABLE AIR VOLUME
VEL VELOCITY
VFD VARIABLE FREQUENCY DRIVE
VTR VENT THROUGH ROOF
W WASTE, WATER, WATT, WIDTH
WB WET BULB
WG WATER GAGE
WH WATER HEATER, WALL HYDRANT
WTR WATER
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
LL
C
O
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P h on e:
3/
4-
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/2
/2
:1
:0
A
M
GENERAL NOTES,
ABBREVIATIONS AND
SHEET INDEX
04.02.21
M0.00
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
MECHANICAL SHEET INDEX
M0.00 GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX
M0.01 MECHANICAL LEGEND
M0.03 MECHANICAL SCHEDULES
MD1.01 MECHANICAL DEMOLITION - FLOOR PLAN
M2.01 MECHANICAL - FLOOR PLAN
M2.02 MECHANICAL - ROOF PLAN
M3.01 MECHANICAL PIPING PLAN
M3.02 MECHANICAL PIPING - ROOF PLAN
M4.00 MECHANICAL DETAILS
Expires: 06/30/22
FD
SD
FSD
M
BDD
FD
SD
FSD
M
BDD
R
AP
AD
SYMBOLS LEGEND - AIR HANDLING
DESCRIPTIONSYMBOL
POSITIVE PRESSURE DUCT - TURNING TOWARD
POSITIVE PRESSURE DUCT - TURNING AWAY
NEGATIVE PRESSURE DUCT - TURNING TOWARD
NEGATIVE PRESSURE DUCT - TURNING AWAY
ROUND DUCT - TURNING TOWARD
ROUND DUCT - TURNING AWAY
FLAT-OVAL DUCT - TURNING TOWARD
FLAT-OVAL DUCT - TURNING AWAY
INCLINE RISE (R) OR DROP (D) IN DIRECTION OF ARROW
FLEXIBLE CONNECTION
ACCESS DOOR (AD) OR ACCESS PANEL (AP)
VOLUME DAMPER
FIRE DAMPER
SMOKE DAMPER
FIRE SMOKE DAMPER
MOTOR OPERATED DAMPER
BACKDRAFT DAMPER
FLEXIBLE DUCT
SYMBOLS LEGEND - AIR HANDLING
DESCRIPTIONSYMBOL
ROUND, 90° ELBOW, R/W OR R/D = 1.5
RECTANGULAR, 90° ELBOW, R/W OR R/D = 1.5
RECTANGULAR OR ROUND, 90° ELBOW,
R/W OR R/D = 1.5
SQUARE CORNER ELBOW WITH TURNING VANES
45° BRANCH CONNECTION
RECTANGULAR BRANCH TO RECTANGULAR DUCT
CONNECTION WITH 45° TAPER
ROUND OR RECTANGULAR BRANCH TO ROUND OR RECTANGULAR DUCT
CONNECTION
ROUND BRANCH TO RECTANGULAR DUCT CONNECTION
ROUND BRANCH TO ROUND DUCT CONNECTION
TRANSITION OR REDUCER - NOTED FOT (FLAT ON TOP) OR FOB (FLAT ON
BOTTOM) IF REQUIRED
RECTANGULAR TO ROUND TRANSITION
SYMBOLS LEGEND - AIR HANDLING
DESCRIPTIONSYMBOL
EQUIPMENT WITH EQUIPMENT IDENTIFICATION
THERMOSTAT
DIFFUSER IDENTIFIER
CONNECTION SIZE
AIR FLOW (CFM)
DIFFUSER TYPE MARK
CEILING SUPPLY DIFFUSER
CEILING RETURN DIFFUSER
AIRFLOW, SUPPLY
AIRFLOW, RETURN
SYMBOLS LEGEND - GENERAL
DESCRIPTIONSYMBOL
X-XX
X
XX.XX
X
XX.XX
X
XX.XX
N
DRAWING CONSTRUCTION ("FLAG") NOTE
EQUIPMENT IDENTIFIER
MATCHLINE
REVISION CLOUD (ENCIRCLES DRAWING CHANGES MADE SINCE THE
PREVIOUS RELEASE)
REVISION REFERENCE
EXISTING TO BE REMOVED (HATCH)
HEAVY LINEWEIGHT INDICATES NEW WORK
LIGHT LINEWEIGHT INDICATES EXISTING INFORMATION
POINT OF CONNECTION
DETAIL REFERENCE
DETAIL IDENTIFICATION NUMBER
SHEET WHERE DETAIL IS DRAWN
ELEVATION REFERENCE
ELEVATION IDENTIFICATION
NUMBER SHEET WHERE ELEVATION IS DRAWN
SECTION REFERENCE SECTION
IDENTIFICATION NUMBER
SHEET WHERE SECTION IS DRAWN
NORTH REFERENCE
SYMBOLS LEGEND - FIRE PROTECTION
DESCRIPTIONSYMBOL
SYMBOLS LEGEND - PIPING
DESCRIPTIONSYMBOL
MAV AAV
SOIL OR WASTE
VENT
RAIN LEADER
OVERFLOW RAIN LEADER
INDIRECT DRAIN
COLD WATER
HOT WATER
HOT WATER CIRCULATING
140° POTABLE HOT WATER
120° POTABLE HOT WATER
FIRE
SPRINKLER
STANDPIPE
HIGH PRESSURE STEAM
REDUCER, CONCENTRIC
WYE STRAINER WITH CAPPED HOSE END BLOWDOWN VALVE
ANGLE VALVE
AUTOMATIC CONTROL VALVE - TWO WAY (PNEUMATIC OPERATOR
SHOWN)
AUTOMATIC CONTROL VALVE - THREE WAY (ELECTRIC OPERATOR
SHOWN)
BUTTERFLY VALVE
FLEXIBLE CONNECTION IN PIPING
MANUAL AIR VENT (MAV), AUTOMATIC AIR VENT (AAV)
PRESSURE GAUGE
THERMOMETER
THERMOMETER WELL
SIGHT GLASS
HOSE BIB
SYMBOLS LEGEND - PIPING
DESCRIPTIONSYMBOL
A
PS
P/T
PIPE ANCHOR
PIPE ALIGNMENT GUIDE
CONTROL VALVE STATION
PIPE SUPPORT
PRESSURE/TEMPERATURE TEST PORT
CAP
UNION
WYE STRAINER
GATE VALVE
GLOBE VALVE
BALL VALVE
BALANCING OR PLUG VALVE
PRESSURE REDUCING VALVE
BALANCING/MEASURING VALVE
RELIEF VALVE
CHECK VALVE
PIPE TURNING DOWN / AWAY
PIPE TURNING UP / TOWARDS
PIPE DOWN TEE
PIPE DOWN TEE / AWAY
PIPE UP TEE / TOWARDS
PLUG
SYMBOLS LEGEND - PIPING & AIRFLOW DIAGRAMS
DESCRIPTIONSYMBOL
M
M
PUMP
CENTRIFUGAL FAN
ELECTRIC MOTOR/STARTER ASSEMBLY
ELECTRIC MOTOR OPERATOR (VALVES AND DAMPERS)
FLOOR DRAIN
FUNNEL DRAIN
FLOW DIRECTION
T
10X10
V
RD
OD
ID
140º HW
120º HW
F
SPR
STP
HPS
X-XX
F FIRE
FDC
WET PIPE ALARM VALVE
FIRE DEPARTMENT CONNECTION
PRESSURE REGULATING VALVE WITH SUPERVISORY SWITCH
WET SPRINKLER HEAD
DRY SPRINKLER HEAD
SYMBOLS LEGEND - MEDICAL GASSES
DESCRIPTIONSYMBOL
OXYGENO2
MA
MV
MEDICAL COMPRESSED AIR
MEDICAL VACUUM
WAG
MA
WAG
NO2
N2
CO2
ETO
WAGD
ZVB
MAB
MA
WASTE ANESTHETIC GAS
MEDICAL AIR OUTLET
WASTE ANESTHETIC GAS DEVICE
NITROUS OXIDE (NITROUS)
NITROGEN
CARBON DIOXIDE
ETHYLENE OXIDE
MEDICAL GAS VALVE (SERVICE VALVE)
MEDICAL AIR PRESSURE SENSOR
HOSE REEL (RETRACTABLE)
ZONE VALVE BOX
MEDICAL GAS ALARM BOX
SYMBOLS LEGEND - LABORATORY
DESCRIPTIONSYMBOL
NON POTABLE COLD WATER· + ·
LA
LV
NON POTABLE HOT WATER
NON POTABLE HOT WATER RECIRCULATE
LABORATORY AIR
LABORATORY VACUUM
M
FLOOR SINK (SQUARE AND ROUND)
6"Ø
CEILING EXHAUST DIFFUSER
SIDEWALL GRILL DIFFUSER
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P ho ne
: 5
/2
-4
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/2
/2
:1
:1
A
M
MECHANICAL LEGEND
04.02.21
M0.01
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P ho ne
: 5
/2
-4
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/2
/2
:1
:1
A
M
MECHANICAL
SCHEDULES
04.02.21
M0.03
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
8. SYSTEM MUST BE INSTALLED BY A CERTIFIED INSTALLER. SUPPORT UNIT AS PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE VIBRATION ISOLATION AS REQUIRED.
7. PROVIDE FACTORY MOTOR STARTERS. SEE ELECTRICAL DRAWINGS FOR SEPARATE DISCONNECT SWITCH.
6. PROVIDE 410A REFRIGERANT. LINE SET REFRIGERANT PIPING SIZED BY MANUFACTURER. INSULATE ALL REFRIGERANT LINES AND FITTINGS.
5. PROVIDE TEMPERATURE SENSORS; ONE FOR EACH INDOOR UNIT. THERMOSTAT TO BE BY FAN COIL MAUFACTURER AND BE A TOUCHSCREEN PROGRAMMABLE UNIT.
4. PROVIDE INTEGRAL CONDENSATE PUMP.
3. PROVIDE MERV 8 FILTER INSTALLED AT AIR INTAKE SIDE OF UNIT. INTAKE PLENUM BY SHEETMETAL CONTRACTOR IF REQUIRED.
2. FACTORY PROVIDED INTEGRAL DRAIN PAN AND WATER LEVEL DETECTION SENSOR TO SHUT DOWN INDOOR UNIT IN THE EVENT OF CONDENSATE OVERFLOW ON INDOOR UNITS.
1. PROVIDE 10-YEAR WARRANTY ON ALL PARTS.
REMARKS:
FCU-10 CEILING HALLWAY 65 SAMSUNG AM005NNNDCH/AA CASSETTE 300 25 N/A 5 4.8 78.6 6 70 0.24 15 208/1/60 30 26 1,2,3,4,5,6,7,8
FCU-09 CEILING EXAM 109 SAMSUNG AM006RN4DCH/AA CASSETTE 547 60 N/A 6.3 5.8 78.6 7.1 70 0.4 15 208/1/60 32 34 1,2,3,4,5,6,7,8
FCU-08 CEILING EXAM 104 SAMSUNG AM009RN4DCH/AA CASSETTE 547 60 N/A 9 8.3 78.6 10 70 0.4 15 208/1/60 32 33 1,2,3,4,5,6,7,8
FCU-07 CEILING OFFICE 107 SAMSUNG AM005NNNDCH/AA CASSETTE 300 25 N/A 5 4.8 78.6 6 70 0.24 15 208/1/60 30 26 1,2,3,4,5,6,7,8
FCU-06 CEILING OFFICE 106 SAMSUNG AM005NNNDCH/AA CASSETTE 300 25 N/A 5 4.8 78.6 6 70 0.24 15 208/1/60 30 26 1,2,3,4,5,6,7,8
FCU-05 CEILING OFFICE 105 SAMSUNG AM009NNNDCH/AA CASSETTE 353 25 N/A 9.5 8.8 78.6 10.5 70 0.24 15 208/1/60 33 27 1,2,3,4,5,6,7,8
FCU-04 CEILING MED UTILITY 110 SAMSUNG AM005NNNDCH/AA CASSETTE 300 25 N/A 5 4.8 78.6 6 70 0.24 15 208/1/60 30 26 1,2,3,4,5,6,7,8
FCU-03 CEILING DENTAL UTILITY 103 SAMSUNG AM005NNNDCH/AA CASSETTE 300 25 N/A 5 4.8 78.6 6 70 0.24 15 208/1/60 30 26 1,2,3,4,5,6,7,8
FCU-02 CEILING NURSE 101 SAMSUNG AM012RN4DCH/AA CASSETTE 547 50 N/A 12 11 78.6 13.5 70 0.4 15 208/1/60 32 33 1,2,3,4,5,6,7,8
FCU-01 CEILING WAITING 100 SAMSUNG AM005NNNDCH/AA CASSETTE 300 20 N/A 5 4.8 78.6 6 70 0.24 15 208/1/60 30 26 1,2,3,4,5,6,7,8
TOTAL LOAD
(MBH)
SENSIBLE LOAD
(MBH)
COOLING LOAD
OA DESIGN TEMP
(DEG F)
TOTAL LOAD
(MBH)
OA DESIGN TEMP
(DEG F)
MCA MOCP V/PH/HZ
EQUIP. NO LOCATION SERVICE
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN SERIES TYPE
SUPPLY AIRFLOW
(CFM)-HIGH
MIN OUTSIDE
AIRFLOW
(CFM)
EXT SP
(IN WG)
COOLING CAPACITY HEATING CAPACITY ELECTRICAL DATA
MAXIMUM
SOUND
PRESSURE
(dBA)
OPERATING
WEIGHT
(LBS)
REMARKS
VARIABLE REFRIGERANT FLOW FAN COIL SCHEDULE
7. MOUNT AS PER MANUAFACTURER'S RECOMMENDATIONS. UNITS TO BE ON MINIMUM 18' STAND.
6. PROVIDE COMPLETE MANUFACTURER'S CONTROLS CAPABLE OF FULL CONTROL OF ALL EQUIPMENT
5. SYSTEM MUST BE INSTALLED AND COMMISSIONED BY A LG CERTIFIED TECHNICIAN TO RECEIVE THE 10 YEAR MANUFACTURER PARTS WARRANTY.
4. PROVIDE FACTORY PROVIDED INTEGRAL CRANKCASE HEATER
3. COMPRESSOR FOR OUTDOOR UNIT TO BE OPERATING WITH VARIABLE SPEED DRIVE (VSD)
2. PROVIDE 120V/1Ø CONVENIENCE OUTLET ON A SEPARATE CIRCUIT UNLESS OUTLET IS AVAILABLE WITHIN 25 FEET OF EQUIPMENT
1. PROVIDE FACTORY MOTOR STARTERS. SEE ELECTRICAL DRAWINGS FOR SEPARATE DISCONNECT SWITCH
REMARKS:
HP-01 ROOF DENTAL OFFICES SAMSUNG AM060NXMDCR/AA 60 70 11.2 66 70 11.5 32 50 208/1/60 59 276 1,2,3,4,5,6,7
MCA MOCP V/PH/HZ
TOTAL
LOAD
(MBH)
OA DESIGN
TEMP
(DEG F)
EER
TOTAL
LOAD
(MBH)
OA DESIGN
TEMP
(DEG F)
COP
CHASSIS 1
EQUIP. NO LOCATION SERVICE
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN SERIES
COOLING CAPACITY HEATING CAPACITY ELECTRICAL DATA
MAXIMUM
SOUND
PRESSURE
(dBA)
OPERATING
WEIGHT (LBS)
REMARKS
VARIABLE REFRIGERANT FLOW HEAT PUMP SCHEDULE
3. PROVIDE ISOLATION VALVES ON COMPRESSOR SIDE REFRIGERANT PIPING OF ALL BOXES.
2. PROVIDE 10 -YEAR WARRANTY ON ALL PARTS.
1. MOUNT AS PER MANUFACTURER'S RECOMMENDATIONS.
REMARKS:
BS-02 DENTAL OFFICES MCU-S6NEK2N 6 216 2 15 208/1/60 63 HP-01 1,2,3
BS-01 DENTAL OFFICES MCU-R4NEK0N 4 76 2 15 208/1/60 47 HP-01 1,2,3
MCA MOP V/PH/HZ
EQUIP. NO LOCATION
BASIS OF DESIGN
SERIES
PORTS
CONNECTED
CAPACITY MAX
(MBH)
ELECTRICAL
WEIGHT (LBS) ASSOCIATED HP REMARKS
BRANCH SELECTOR BOX SCHEDULE
1. PROVIDE SINGLE-STAGE DUCT THERMOSTAT, UL LISTING, PRIMARY AND SECONDARY OVER-TEMPERATURE PROTECTION, DISCONNECTING CONTACTOR, CONTROL OPTION G
REMARKS:
EDH-01 ERV-01 SA FCU'S RENEWAIRE EK-1212002SCCHR-23 2 1 395 60 76 12x12 6.94 15 208/3/60 50 1
MCA MOCP V/PH/HZ
EQUIP. NO LOCATION SERVICE
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN SERIES
CAPACITY
(KW)
NO. OF
STAGES
AIRFLOW
(CFM)
AIR
VELOCITY
(FPM)
EAT
(DEG F)
LAT
(DEG F)
DUCT
SIZE
WxH
(INxIN)
ELECTRICAL
OPERATING
WEIGHT
(LBS)
REMARKS
ELECTRIC DUCT HEATER SCHEDULE
0 1,353 17 135 73 208 261 395 390
113 HALLWAY 293 - 0 - - 0.06 17.6 18 0.8 22 25 0 0 0
112 SOILED HOLDING 45 30 0 8 0 0.12 5.4 5 0.8 7 8 SOILD HOLDING 2 12 25 10 60 80
200 TOILET 57 - 0 - - - - - 0.8 - 0 0 50 70
111 TOILET 45 - 0 - - - - - 0.8 - 0 0 50 70
110 MED UTILITY 58 10 1 5 5 0.18 10.4 15 0.8 19 8 CLEAN WORKROOM 2 15 25 0 0 25
109 MED EXAM 142 20 2 15 30 - - 30 0.8 38 10 EXAM ROOM 2 48 60 0 0 60
107 OFFICE 61 5 1 5 5 0.06 3.7 9 0.8 11 25 0 0 0
106 OFFICE 88 5 2 5 10 0.06 5.3 15 0.8 19 25 0 0 0
105 OFFICE 108 5 2 5 10 0.06 6.5 16 0.8 21 25 0 0 0
104 DENTAL EXAM 109 20 3 15 45 - - 45 0.8 56 10 TREATMENT ROOM 2 37 60 0 0 60
103 DENTAL UTILITY 72 5 1 5 5 0.06 4.3 9 0.8 12 8 CLEAN WORKROOM 2 19 25 0 0 25
102 FILE STORAGE 63 - 0 - - 0.12 7.6 8 0.8 9 - - - - 25 0 0 0
101 NURSE STATION 145 5 3 5 15 0.06 8.7 24 0.8 30 - - - - 50 0 0 0
100 WAITING ROOM 67 10 2 5 10 0.06 4.0 14 0.8 18 - - - - 25 0 0 0
Az Pz Rp Vbzp Ra Vbza Vbz Ez Voz FT MIN. OA ACH CFM ACH
ROOM NUMBER ROOM NAME
TOTAL
AREA
(SQFT)
DEFAULT
OCCUPANT
DENSITY
#/1,000 SQFT
ZONE NO.
OF
PEOPLE
CFM PER
PERSON
Rp*Pz
(CFM)
CFM
PER
SQFT.
Ra*Rz
(CFM)
Vbzp+Vbza
(CFM)
Voz=Vbz/E z
(CFM)
CEILING
HEIGHT
ASHRAE 170 FUNCTION
OF SPACE
ASHRAE 170
REQUIRED OA
PER ASHRAE
SCHEDULED
OUTDOOR
AIRFLOW
(CFM)
REQUIRED
EXHAUST
ASHRAE 170
REQUIRED
EXHAUST
AIRFLOW
RATE (CFM)
SCHEDULED
EXHAUST
AIRFLOW
(CFM)
MINIMUM VENTILATION RATES FROM TABLE 403.3, 2019 OREGON MECHANICAL SPECIALTY CODE & ASHRAE 170
REQUIRED OUTSIDE AIR FLOW RATE
4. PROVIDE ALL DAMPERS AS REQUIRED BY THE ENERGY CODE. INSTALL AS PER MANUFACTURER'S RECOMMENDATIONS. PROVIDE ALL COMPONENTS REQUIRED FOR CONTROL AS PER THE SEQUENCE OF OPERATIONS.
3. INSTALL UNIT ON MANUFACTURER'S ROOF CURB. MINIMUM HEIGHT 14"
2. UNIT TO HAVE CONTROL BOARD FOR INTEGRATION INTO MANUFACTURER OF VRF EQUIPMENT CONTROLS FOR ENABLE/DISABLE TIME SCHEDULING FROM THE VRF CONTROL FRONT END.
1. PROVIDE MERV 13 PRE-FILTER PRIOR TO SUPPLY AND EXHAUST FANS
REMARKS:
WINTER 80.8 77.6 25 20.5 60.9 48 Aux Heat 5.5 15 208/3/60 65
ERV-01 ROOF RENEWAIRE HE1.5XRT
SUMMER 80.8 76.8
101 395 0.5 1
92.9 67 78.6 63.2 390 0.5 1
ERV 13.9 15 208/1/60 548
SENSIBLE LATENT TOTAL
AIRFLOW
(CFM)
ESP
(IN WG)
MOTOR (HP)
EAT DB
(DEG F)
EAT WB
(DEG F)
LAT DB
(DEG F)
LAT WB
(DEG F)
AIRFLOW
(CFM)
ESP
(IN WG)
MOTOR (HP)
EAT DB
(DEG F)
EAT WB
(DEG F)
LAT DB
(DEG F)
LAT WB
(DEG F)
CONNECTION POINTS MCA MOCP SINGLE POINT V/PH/HZ
EQUIP. NO LOCATION SERVICE
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN SERIES MODE
EFFICIENCY
AIR VELOCITY
(FPM)
SUPPLY AIR EXHAUST AIR ELECTRICAL
WEIGHT LBS REMARKS
ENERGY RECOVERY VENTILATOR SCHEDULE
5. WHITE FACEPLATE, HOT ROLLED STEEL WITH 3/16" DIA. HOLES.
4. ALUMINUM, WHITE FOR GWB CEILING, 3/4" BLADE SPACING, 35 DEG. FIXED DEFLECTION
3. BORDER TO MATCH CEILING TYPE.
2. STEEL, WHITE, ROUND NECK, SEE MECHANICAL FLOOR PLANS FOR NECK SIZE
1. SEE MECHANICAL FLOOR PLANS FOR DUCT SIZE AND CFM
REMARKS:
EG-2 CEILING EXHAUST GRILLE PRICE MSRRP MAX SECURITY GRILLE, PERFORATED CORE 30 1,5
EG-1 CEILING EXHAUST GRILLE PRICE 630 SINGLE DEFLECTION GRILLE, 12"x12" FACE 30 1,4
CD-1 CEILING SUPPLY DIFFUSER PRICE SMCD 4-WAY ADJUSTABLE, MODULAR CORE DIFFUSER, 24"x24" 30 1,2,3
EQUIP. NO LOCATION SERVICE
BASIS OF DESIGN
MANUFACTURER
BASIS OF DESIGN
SERIES
DESCRIPTION
MAXIMUM SOUND
PRESSURE (dBA)
REMARKS
DIFFUSER-GRILLE SCHEDULE
B
A
C
(E) 9X9
(E) 9X9
(E) TU 4-30
(E) TU 4-32
(E) 36X16
(E) 12X12(E) 16X8
(E
X
(E) 9X9
(E) 10X8
(E
X
(E) 9X9
(E) 9X9
(E) 6X6
(E) 5"Ø
(E) 5"Ø
(E) 10"Ø
(E
"Ø
(E) 6X6
(E) 15X15
(E) 12X12
(E) 6X6
(E) 9X9
(E) TU 4-31
(E) 15X15
(E) 12X12
(E) 12X12
210240
(E) 12X12
(E) 12X12
(E) 6X6
(E) 8"Ø (E) 8"Ø
(E) 10X10
(E) 6"Ø
(E) 5"Ø
(E) 13"Ø
(E) 9"Ø
(E) 9"Ø
(E
8" Ø
(E
7" Ø
(E) 9X9
(E) 9X9
(E) 9X9
(E) 6"Ø
(E) 6"Ø
(E) 6"Ø
(E) 9X9
(E) 6X6
(E
X
(E
6" Ø
REBALANCE EXISTING
TERMINAL UNITS ASSOCIATED
WITH THIS SYSTEM
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P ho ne
: 5
/2
-4
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/2
/2
:1
:2
A
M
MECHANICAL
DEMOLITION - FLOOR
PLAN
04.02.21
MD1.01
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
1/4" = 1'-0"MD1.01
1 MECHANICAL DEMOLITION - FIRST FLOOR PLAN
1. SUPPLY AND RETURN AIR DROPS FROM EXISTING ACU-4 TO
REMAIN.
2. DEMOLISH EXISTING TERMINAL UNIT, ASSOCIATED CONTROLS
AND WIRING.
3. DEMOLISH EXISTING DUCTWORK AND ASSOCIATED HANGERS.
4. CAP EXISTING AIR DUCT
1FLAG NOTES:
SHEET NOTES:
1. DRAWINGS ARE SCHEMATIC IN NATURE. NOT ALL EXISTING
FIXTURES, FITTINGS OR BRANCHES ARE SHOWN. IT IS UP TO
THE CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS
AND THE EXTENT OF WORK REQUIRED.
2. CONTRACTORS TO LOCATE AND PRESERVE ALL PORTIONS OF
THE EXISTING HVAC SYSTEM TO BE REUSED. ANY EXISTING
DAMAGE TO THE EXISTING HVAC SYSTEM TO BE REUSED WILL
BE REPLACED/REPAIRED BY THE CONTRACTOR AS PART OF
THIS CONTRACT.
3. ANY DAMAGE CAUSED TO THE EXISTING SYSTEM TO BE REUSED
WILL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
ADDITIONAL COST TO THE OWNER.
4. WHERE EXISTING EXHAUST DUCTWORK IS TO BE MODIFIED,
MEASURE EXISTING AIRFLOW PRIOR TO DEMOLITION.
REBALANCE GRILLES DOWNSTREAM OF MODIFICATION TO
PRE-DEMO AIRFLOWS AFTER MODIFICATIONS ARE COMPLETE.
5. WHERE EXISTING SUPPLY DUCTWORK IS TO BE MODIFIED
MEASURE EXISTING AIRFLOW ON ALL BRANCHES DOWNSTREAM
OF THE TERMINAL UNIT SERVING THE MODIFIED AREA PRIOR TO
DEMOLITION. RE-BALANCE ALL DIFFUSERS/BRANCES
DOWNSTREAM OF THE TERMINAL UNIT SERVING THE MODIFIED
AREA TO PRE-DEMO AIRFLOW AFTER MODIFICATIONS ARE
COMPLETE.
6. DIFFUSERS AND GRILLES IN CEILING GRIDS TO BE REPLACED
SHALL BE REMOVED U.N.O.
B
A
C
57 SF
STAFF TLT
63 SF
FILE STORAGE
142 SF
MED EXAM
71 SF
DENTAL UTILITY
59 SF
OFFICE
87 SF
PSYCH OFFICE
106 107 SF
PSYCH OFFICE
108 SF
DENTAL EXAM
58 SF
MED UTILITY
45 SF
PAT TLT
45 SF
SOILED HOLDING/
POCT
144 SF
NURSE STATION
291 SF
HALLWAY
67 SF
WAITING
FCU-01
T
T
T
T
T
TT
T
FCU-02
FCU-04
FCU-09
FCU-03
FCU-08
FCU-07
FCU-06
CAP
66X24
EDH-01
FCU-10
X
CAP
CAP
4"Ø
6"Ø
6"Ø
8"Ø
6"Ø
4"Ø
8"Ø
4"Ø
4"Ø
4"Ø
FCU-05
T
6"Ø
CD-1
6X6
EG-1
6X6
EG-2
6X6
EG-1
6"Ø
CD-1
6X6
EG-1
6X6
EG-1
6X6
EG-16"Ø
6"Ø
8"Ø
6"Ø
6"Ø
12X12
8"Ø 6"Ø
6"Ø
6"Ø
8"Ø
BS-01
BS-02
4 (TYP)
4 (TYP)
T 7
3"Ø
3"Ø
6X6
EG-1
6"Ø
CD-1
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P ho ne
: 5
/2
-4
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/2
/2
:1
:3
A
M
MECHANICAL - FLOOR
PLAN
04.02.21
M2.01
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
1/4" = 1'-0"M2.01
1 MECHANICAL FIRST FLOOR PLAN
1FLAG NOTES:SHEET NOTES:
1. PLANS ARE DIAGRAMMATIC IN NATURE AND REPRESENT
CONCEPTUAL ROUTING ONLY. CONTRACTOR IS RESPONSIBLE
FOR FIELD VERIFICATION OF ALL ACTUAL CONDITIONS AND
COORDINATING WITH OTHER TRADES.
2. ALL DIFFUSERS, GRILLES AND REGISTERS TO BE PROVIDED
WITH A BALANCING DAMPER.
3. PENETRATION AT ALL RATED ASSEMBLIES TO BE PROPERLY
SEALED.
1. SUPPLY AND RETURN AIR DUCT FROM ERV-01 ON ROOF.
2. RETURN AIR OPENING IN PLENUM SPACE ABOVE THE EXISTING
CORRIDOR.
3. PROVIDE DUCT WITH 1" INTERNAL ACOUSTICAL LINING.
4. PROVIDE A 24X18 CEILING ACCESS PANEL ON PIPING CONNECTION SIDE
OF THE CASSETTE FAN COIL UNIT.
5. PROVIDE 24X24 ACCESS PANEL FOR ELECTRIC DUCT HEATER.
6. PROVIDE BURGLAR BAR AT RETURN AIR OPENING.
7. REPLACE EXISTING THERMOSTAT ASSOCIATED WITH SPACE HEATER.
8. CONDITIONED SUPPLY AIR DOWN TO COMPRESSOR.
9. CONTRACTOR TO COORDINATE EXACT LOCATION OF BRANCH
SELECTOR WITH LIGHTING.
B
A
C
(E) ACU-04
HP-01
ERV-01
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P h on e:
3/
4-
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/2
/2
:1
:3
A
M
MECHANICAL - ROOF
PLAN
04.02.21
M2.02
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
1/4" = 1'-0"M2.02
1 MECHANICAL ROOF PLAN
B
A
C
57 SF
STAFF TLT
63 SF
FILE STORAGE
142 SF
MED EXAM
71 SF
DENTAL UTILITY
59 SF
OFFICE
87 SF
PSYCH OFFICE
107 SF
PSYCH OFFICE
108 SF
DENTAL EXAM
58 SF
MED UTILITY
45 SF
PAT TLT
45 SF
SOILED HOLDING/
POCT
144 SF
NURSE STATION
291 SF
HALLWAY
67 SF
WAITING
BS-02
BS-01
FCU-10
FCU-02
FCU-01
FCU-04
FCU-03
FCU-09
FCU-08
FCU-07
FCU-06
FCU-05
EDH-01
CO
CO
CO
3/4" CD DN
3/4" CD DN
3/4" CD DN
EMERGENCY
GENERATOR
(E)
ENGINEERING
(E)
OFFICE
(E)
CO
3/4" CD DN
CO
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P h on e:
3/
4-
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/1
/2
:4
:1
P M
MECHANICAL PIPING
PLAN
04.02.21
M3.01
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
1 Addendum 1 06-01-21
1/4" = 1'-0"M3.01
1 MECHANICAL PIPING - FIRST FLOOR PLAN
#FLAG NOTES:SHEET NOTES:
1. PLANS ARE DIAGRAMMATIC IN NATURE AND REPRESENT
CONCEPTUAL ROUTING ONLY. CONTRACTOR IS RESPONSIBLE
FOR FIELD VERIFICATION OF ALL ACTUAL CONDITIONS AND
COORDINATING WITH OTHER TRADES.
1. PROVIDE REFRIGERANT ISOLATION VALVE AT PIPING CONNECTION FOR
VRF EQUIPMENT.
B
A
C
ERV-01
HP-01
(E) ACU - 4
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P h on e:
3/
4-
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/2
/2
:1
:4
A
M
MECHANICAL PIPING -
ROOF PLAN
04.02.21
M3.02
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
1/4" = 1'-0"M3.02
1 MECHANICAL PIPING - ROOF PLAN
A. OUTBOARD FASTENERS B. INBOARD FASTENERS
MINI OUTDOOR
UNIT
MINI OUTDOOR
UNIT
AIR FLOW
1 2
1 2
5 5
1. MOUNTING MUST BE EITHER INBOUND (VIEW A) OR OUTBOUND (VIEW B) PER
UNISTRUT RUN. MIXING AN OUTBOUND MOUNTING INBOUND MOUNTING ALONG A
SINGLE UNISTRUT RUN IS NOT PERMITED.
2. VIBRATION ISOLATION NOT SHOWN.
3. ALL ROOFING TO BE DONE BY ROOFING CONTRACTOR TO MAINTAIN WARRANTY.
AIR FLOW
GENERAL NOTES:
FLAG NOTES:
1 PROVIDE NEOPRENE VIBRATION ISOLATION.
FASTEN OUTDOOR UNIT TO HORIZONTAL BRACING.
HORIZONTAL BRACING TO BE UNISTRUT OR STEEL CHANNEL. LENGTH TO
OVERLAP ROOF SLEEPERS BY NO LESS THEN 1".
SLEEPER CAP. TO BE FABRICATED TO OVERLAP ALL 4 SIDES OF SLEEPER, AND
COMPLETELY COVER ANY FASTENERS PENETRATING ROOF MEMBRANE.
SLEEPER. TO BE FURNISHED AND INSTALLED BY CARPENTER, FRAMER,
STRUCTURAL CONTRACTOR OR ROOFER.
ROOFING.
ANGLED SHEET METAL OR ANGLE IRON.
FASTEN ANGLE TO SLEEPER AS SHOWN. SEAL PENETRATION IN ROOFING WITH
CALKING RATED FOR ROOFING MATERIAL. ENSURE FASTENER IS COMPLETELY
COVERED BY SLEEPER CAP.
ALL THREAD ROD, FASTENED IN PLACE BY NUTS AS SHOWN. SECURE WITH
NYLON NUTS AT TOP AND BOTTOM.
CONICAL CONNECTION
RECTANGULAR DUCT
VOLUME DAMPER - COORDINATE
FOR ACCESSIBLE LOCATIONFLEXIBLE OR
SOLID DUCT
BRANCH DUCT TAKE-OFF
PLAN VIEW
W
(1/4)'W' OR 4" MIN.
A
IR
F
LO
W
AIRFLOW
VOLUME DAMPER
MAIN SUPPLY
DUCT
AIR SPLIT DUCT TAKE-OFF
PLAN VIEW
SUPPLY REGISTER TAKE-OFF
PLAN VIEW
VOLUME
DAMPER
(TYP)SUPPLY REGISTER
OR BRANCH DUCT
AIRFLOW
MAIN SUPPLY
DUCT
TURNING VANES
SEE FLOOR
PLAN FOR SPLIT
DIMENSION
AIRFLOW
A
IR
F
LO
W
REGISTER
MAIN SUPPLY
DUCT
ADJUSTABLE
METAL ROD
OR LINKAGE
AIRFLOWAIRFLOW
VOLUME EXTRACTOR;
ADJUSTABLE FROM FULLY
CLOSED POSITION TO CFM
NOTED ON FLOOR PLANS
CONDENSATE DRAIN PIPE
ROUTED IN THE WALL
CONDENSATE DRAIN PIPE
TURNED OUTSIDE THE WALL
SINK/LAVATORY
P-TRAP
CLEAN OUT
45 DEGREE WYE
SINK
SUPPLY DUCT
SPIN-IN FITTING WITH
VOLUME DAMPER
CLAMP (TYP.)
DIFFUSER NECK, SEE PLANS
FOR SIZE
SECURE ELBOW TO DIFFUSER WITH A
MINIMUM OF 4 SHEETMETAL SCREWS
LAY-IN T-BAR CEILING SHOWN,
VERIFY TYPE OF CEILING.
SEE SCHEDULE
INSULATED FLEXIBLE DUCT MAX. 5'-0"
STRAP HANGER, 1" WIDE. BOLT AROUND DUCT AND
EXTEND A SINGLE STRAP UP TO STRUCTURE
ADJUST SUPPORT TO RELIEVE STRAIN FROM
DIFFUSER
SHEETMETAL ELBOW, CENTERLINE RADIUS 1.5 X THE
DIAMETER OF THE DUCT. NOTE: WHERE CENTERLINE RADIUS
(1.5 X THE DIAMETER OF THE DUCT) CAN NOT BE MAINTAINED
SHORT RADIUS RIGID METAL ELBOW MAY BE USED.
NOTES:
1. PROVIDE WITH TAMPER PROOF FASTENERS WHERE INDICATED IN
SECURITY PLANS.
CEILING DIFFUSER
SQUARE
DIFFUSER NECK
DUCT
CONNECTION SIZE
INSULATED PLENUM
SCREWED TO DIFFUSER NECK
40% FREE AREA PERFORATED
PLATE ACROSS PLENUM TOP OF
PLATE AT CENTERLINE OF INLET
CLAMP (TYP.)
SPIN-IN FITTING WITH
VOLUME DAMPER
SUPPLY DUCT
INSULATED
FLEXIBLE DUCT
MAX. 5'-0"
STRAP HANGER, 1" WIDE. BOLT TO
PLENUM AND EXTEND A STRAP UP
TO STRUCTURE ADJUST SUPPORT
TO RELIEVE STRAIN FROM DIFFUSER.
CEILING
4"
2"
NOTES:
1. CHECK THAT THERE IS ENOUGH HEIGHT.
2. SQUARE DIFFUSER NECK IS REQUIRED - INSURE THAT SCHEDULES MATCH.
3. PROVIDE WITH TAMPER PROOF FASTENERS WHERE INDICATED IN
SECURITY PLANS.
1. GENERAL
1.1. THE PACKAGED ENERGY RECOVERY VENTILATOR (ERV) IS COMPOSED OF FILTERS, A SUPPLY FAN, AN EXHAUST FAN, AN
OUTSIDE AIR DAMPER, A RETURN AIR DAMPER, AND A HEAT EXCHANGE CORE.
2. OCCUPANCY SPACE CONDITIONING
2.1. THE BUILDING IS TO BE ASSUMED OCCUPIED BASED ON OWNER SUPPLIED SCHEDULE.
2.2. THE ERV IS TO SUPPLY THE OUTSIDE AIR AND EXHAUST THE RETURN AIR, AS SCHEDULED TO / FROM EACH SPACE.
2.3. THE ERV FANS ARE TO BE ON, AND RUN EVEN IF COOLING OR HEATING IS NOT REQUIRED TO MAINTAIN CONTINUOUS
MINIMUM OUTSIDE AIR, REQUIRED BY CODE.
2.3. WHEN OUTSIDE AIR CONDITIONS ARE IDEAL, THE ERV SHALL UTILIZE THE ECONOMIZER BYPASS TO DELIVER AIR AT
TEMPERATURE EQUAL TO SUPPLY AIR TEMPERATURE WITHOUT ANY HEATING OR COOLING STAGES ENABLED.
3. FILTER STATUS
3.1. A FILTER DIFFERENTIAL PRESSURE TRANSDUCER SHALL READ THE PRESSURE DROP ACROSS THE FILTER. WHEN A
READING EQUALS 90% OF THE FILTER DIRTY THRESHOLD CREATE A MAINTENANCE ALERT.
4. EMERGENCY SHUTDOWN, FIRE ALARM
4.1. IF THE FIRE ALARM SYSTEM SIGNALS A GENERAL ALARM, THE ERV CONTROL SYSTEM SHALL SHUTDOWN ALL OF THE
EQUIPMENT FOLLOWING RECEIPT OF SIGNAL VIA THE GENERAL FIRE ALARM RELAY.
4.2. IF THE RETURN AIR DUCT MOUNTED SMOKE DETECTOR SIGNALS A FIRE ALARM, AUXILIARY CONTACTS SHALL INDICATE
THE DETECTOR ALARM TO THE FIRE ALARM SYSTEM AND A HARD WIRED INTERLOCK TO THE ERV CONTROLS SHALL
DISABLE POWER TO THE FANS.
5. ERV TO BE INTEGRATED INTO VRF CONTROLLER.
1. GENERAL
1.1. THE SPLIT SYSTEM HP UNIT CONSISTS OF MULTIPLE INDOOR FAN COILS (FCU) AND A GARAGE
MOUNTED OUTDOOR CONDENSING UNITS, (CU), INTERLOCKED WITH THEIR RESPECTIVE FAN COIL
UNITS.
2. SPACE CONDITIONING
2.1. COOLING MODE
2.1.1. A TEMPERATURE SENSOR (RETURN AIR THERMISTOR, OPTIONAL REMOTE-TEMPERATURE
SENSOR, OR THERMOSTAT) SIGNALS AN INDOOR UNIT TO TURN ON WHEN THE INDOOR
TEMPERATURE ISES ABOVE THE SET POINT TEMPERATURE AND KEEPS THAT INDOOR UNIT
OPERATING UNTIL THEINDOOR TEMPERATURE FALLS BELOW THE SET POINT TEMPERATURE.
WHEN THE INDOOR UNIT IS TURNED ON, THE INDOOR UNIT CONTROLLER TURNS ON THE INDOOR
FAN TO MEET THE COOLING LOAD AND SIGNALS THE AIR SOURCE UNIT TO GO INTO COOLING
MODE. THE AIR SOURCE UNIT'S MAIN PRINTED CIRCUIT BOARD (PCB) TURNS ON THE VARIABLE-
SPEED INVERTER COMPRESSOR (INVERTER), WHICH SPEEDS UP OR SLOWS DOWN TO MATCH THE
INDOOR COOLING LOAD.
2.1.2. THE INDOOR-UNIT ELECTRONIC EXPANSION VALVE (EEV) MEETS COOLING DEMAND BY ADJUSTING
THE REFRIGERANT FLOW TO MAINTAIN SUPERHEAT. AN EEV LOCATED IN THE AIR-SOURCE
OUTDOOR UNIT STAYS FULLY OPEN AND THE FOUR-WAY REVERSING VALVE REMAINS OFF. THE
AIR SOURCE UNIT CONTROLS ITS VARIABLE-SPEED OUTDOOR FANS TO MAINTAIN A TARGET HIGH
PRESSURE. THE INVERTER RUNS AT 30 HZ WHEN STARTING.
2.1.3. AIR SOURCE UNIT COMPRESSORS FOLLOW THIS SEQUENCE FOR NORMAL COOLING MODE:
2.2. HEATING MODE
2.2.1. A TEMPERATURE SENSOR (RETURN AIR THERMISTOR, OPTIONAL REMOTE-TEMPERATURE
SENSOR, OR THERMOSTAT) SIGNALS AN INDOOR UNIT TO TURN ON WHEN THE INDOOR
TEMPERATURE FALLS BELOW THE SET POINT AND KEEPS THAT INDOOR UNIT OPERATING UNTIL
THE INDOOR TEMPERATURE RISES ABOVE THE SET POINT TEMPERATURE. WHEN AN INDOOR UNIT
IS TURNED ON, ITS INDOOR UNIT CONTROLLER SIGNALS THE AIR SOURCE UNIT TO TURN ON
HEATING MODE. THE FOUR-WAY REVERSING VALVE SWITCHES TO HEATING MODE. THE AIR
SOURCE UNIT'S MAIN PCB TURNS ON THE INVERTER, WHICH SPEEDS UP OR SLOWS DOWN TO
MATCH THE INDOOR HEATING LOAD. ONCE THE INDOOR-UNIT COIL TEMPERATURE REACHES 76°F, THE INDOOR UNIT FAN TURNS ON TO MEET THE HEATING LOAD.
2.2.2. THE INDOOR UNIT EEV MEETS HEATING DEMAND BY ADJUSTING REFRIGERANT FLOW THROUGH
THE COIL TO MAINTAIN SUB COOLING. COMPRESSOR SPEEDS ARE ADJUSTED TO MEET HEATING
DEMAND. THE AIR SOURCE EEV OPENS AS NEEDED TO MAINTAIN SUPERHEAT. THE AIR SOURCE
UNIT CONTROLS ITS VARIABLE-SPEED OUTDOOR FANS TO MAINTAIN A LOW PRESSURE TARGET.
THE INVERTER RUNS AT 30 HZ WHEN STARTING.
2.2.3. AIR SOURCE UNIT COMPRESSORS FOLLOW THIS SEQUENCE IN HEATING MODE:
3. DEFROST CYCLE
3.1. THE DEFROST CYCLE MELTS FROST THAT ACCUMULATES ON OUTDOOR-UNIT HEAT EXCHANGERS
DURING HEATING MODE. THE DEFROST CYCLE IS INITIATED BASED ON ANY ONE OR A COMBINATION
OF OUTDOOR AMBIENT TEMPERATURE, HEAT EXCHANGER TEMPERATURE, INDOOR-UNIT PIPE-IN
TEMPERATURE, ELAPSED TIME FROM PREVIOUS DEFROST, COMPRESSOR OPERATION TIME AND
VARIOUS DIFFERENTIAL PRESSURE VARIABLES.
4. OIL MANAGEMENT
4.1. THE SYSTEM SHALL HAVE AN OIL LEVEL SENSOR IN THE COMPRESSOR TO PROVIDE OIL LEVEL
SENSING DATA TO THE MAIN CONTROLLER. THE SENSOR SHALL PROVIDE DATA TO THE MAIN
OUTDOOR UNIT PCB TO START OIL RETURN MODE AND BALANCE OIL LEVELS BETWEEN MULTIPLE COMPRESSORS. THE SYSTEM SHALL ONLY INITIATE AN OIL RETURN CYCLE IF THE SENSED OIL LEVEL IS BELOW TARGET VALUES AS DETERMINED BY THE MICROPROCESSOR. THE SYSTEM SHALL DISPLAY AN ERROR IF THE OIL SENSOR SIGNALS LOW OIL LEVEL FOR A PERIOD OF 130 MINUTES OR LONGER. A DEFAULT OIL RETURN ALGORITHM SHALL AUTOMATICALLY INITIATE THE OIL RETURN MODE IF THE
SYSTEM DETECTS A FAILURE OF THE OIL SUMP SENSOR.
PROJECT NO.:
ISSUE DATE:
REVISIONS:
C
LA
R K
K
JO
S A
R C
H
IT
E C
T S
P Y
R
IG
H T
S W
A ld er S t., S ui te
P or tla nd
, O R
P h on e:
3/
4-
111 SW Fifth Ave, Ste 2120 Portland, Oregon 97204
Tel 503.416.2400 Fax 206.267.1701
SAZAN# 257-20047
/2
/2
:1
:4
A
M
MECHANICAL DETAILS
04.02.21
M4.00
IS
S
U E
D F
O R
P E
R M
IT
20018
O A
K C
R E
E K
E X
P A
N S
IO
N
L O
C H
N E
R R
D S
E A
L B
A N
Y
O R
O R
E G
O N
Y O
U T
H A
U T
H O
R
IT
Y
12" = 1'-0"
SLEEPER MOUNTING DETAIL - MINI SPLIT
12" = 1'-0"
SUPPLY DUCTWORK TAKE-OFFS DETAIL
12" = 1'-0"
CONDENSATE DRAIN TAIL-PIECE TIE-IN
12" = 1'-0"
CEILING DIFFUSER DETAIL
12" = 1'-0"
MEC 01.02 - CEILING DIFFUSER W- PLENUM DETAIL
ERV SOO
VRF SOO
| 257-20047 MEP Central v20_Theophilus. |
| M0.00 - GENERAL NOTES, ABBREVIATIONS AND SHEET INDEX |
| M0.01 - MECHANICAL LEGEND |
| M0.03 - MECHANICAL SCHEDULES |
| MD1.01 - MECHANICAL DEMOLITION - FLOOR PLAN |
| M2.01 - MECHANICAL - FLOOR PLAN |
| M2.02 - MECHANICAL - ROOF PLAN |
| M3.01 - MECHANICAL PIPING PLAN |
| M3.02 - MECHANICAL PIPING - ROOF PLAN |
| M4.00 - MECHANICAL DETAILS |
File details come from the government source that posted it. Updated .