QASP.pdf
PDF 121 KB Posted
- Attached to
- 7 Separate Sites Phone Services
- Solicitation number
- N0018926RL014
About this file
This is a Quality Assurance Surveillance Plan (QASP) for Integrated, Switched Voice and Data Telecommunication Services supporting NCTAMS LANT. The QASP establishes the Government's systematic method for monitoring contractor performance to ensure timely, accurate, and complete service delivery per the Performance Work Statement (PWS).
The QASP defines five primary performance elements with specific metrics and surveillance methods. Contract deliverables must be furnished as prescribed in the PWS with 100% inspection by the Contracting Officer's Representative (COR), requiring greater than 95% of deliverables submitted timely without rework. Service usability and infrastructure maintenance workmanship are monitored randomly through service ticket data recording and random inspections of demarcation points, requiring tidy work areas, organized cable management, and work performed safely in accordance with industry best practices. Monthly invoices must achieve 100% accuracy and timely submission per contract procedures, reviewed and accepted monthly. Overall contract performance is assessed annually by the COR and must achieve a Satisfactory or higher rating. Compliance with FAR Clause 52.222-50 (Combatting Trafficking in Persons) is monitored with 100% compliance required, with non-compliance immediately reported to the Contracting Officer. Performance failures result in Contract Discrepancy Reports (CDRs) requiring contractor written response within five days, and unsatisfactory performance may result in contract termination and loss of future Government contracts. The contractor is incentivized to provide quality services through the requirement that deficient work be corrected at no additional cost to the Government.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QASP & MATRIX
QUALITY ASSURANCE SURVEILLANCE PLAN
Purpose- To ensure that the Government has an effective and systematic method of surveillance for the services in the Performance Work Statement, PWS. The QASP will be used primarily as a tool to verify that the contractor is performing all services required by the PWS in a timely, accurate and complete fashion.
1. Critical performance processes and requirements. Critical to the performance of Integrated, Switched
Voice and Data Telecommunication Services in support of NCTAMS LANT is the timely, accurate and thorough completion of all contract/task order requirements.
2. Performance Standards
a. Schedule - The due dates for deliverables and the actual accomplishment of the schedule will be assessed against standards set in the PWS.
b. Deliverables – The required deliverables will be assessed against the specifications for the deliverables detailed in the PWS for data accuracy, timeliness, and usability with regard to compatibility with the
Navy’s systems and effort required to receive the information that is transmitted.
c. Past Performance - In addition to any schedule, deliverables, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.
3. Surveillance methods- The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to, random or planned sampling, periodic inspection, and validated customer complaints.
4. Performance Measurement- Performance will be measured in accordance with the following table-
QASP MATRIX
Performance
Element
Performance
Requirement
Surveillance
Method
Frequency Acceptable Quality
Level
Contract Deliverables
Contract deliverables furnished as prescribed in the
PWS.
Inspection by the
COR
100% inspection of all contract deliverables.
>95% of deliverables submitted timely and without rework required.
Service usability and infrastructure maintenance workmanship
As prescribed in the
PWS
Recording and monitoring service ticket data; submit and resolution date
Randomly, on occasion.
Tidy work area, organized cable management.
Random inspection of demarcation points and other accessible points of the infrastructure
Work done safely and in accordance with industry best practices
Overall Contract
Performance
Overall contract performance of sufficient quality to earn a
Satisfactory (or higher) rating in the COR’s annual report on
Contractor Performance
Assessment by the COR
Annual All performance elements rated
Satisfactory (or higher)
Invoicing
Monthly invoices per contract procedures are timely and accurate.
Review & acceptance of the invoice
Monthly
100% accuracy.
Submitted as required in the Contract or
Task Order
Compliance with FAR Clause 52.222-50 Combatting Trafficking In Persons (CTIP)
The COR will monitor the Contractor's performance regarding trafficking in persons such that non-compliance with FAR Clause 52.222-50 is brought to the immediate attention of the Contracting Officer.
Inspection by the COR.
100% compliance;
Randomly
Non-compliance will be immediately reported to the Contracting Officer
(DFARS PGI
222.1703).
If performance is within acceptable levels, it will be considered to be satisfactory. If not, overall performance may be considered unsatisfactory.
Incentives/Disincentives-
The COR’s makes an annual report on Contractor Performance (CPARS or other annual report). The contractor’s failure to achieve satisfactory performance under the contract/task order, reflected in the COR’s annual report, may result in termination of the contract/task order and may result in the loss of future Government contracts/task orders.
For each item that does not meet acceptable levels, the Government may issue a Contract Discrepancy Report
(CDR). CDRs will be forwarded to the Contracting Officer with a copy sent to the contractor. The contractor must reply in writing within 5 days of receipt identifying how future occurrences of the problem will be prevented.
Based upon the contractor’s past performance and plan to solve the problem, the Contracting Officer will determine if any further action will be taken.
In accordance with the inspection of services provisions of the contract, the contractor will be incentivized to provide quality products in a timely manner since the Government can require the Contractor, at no additional cost, to replace or correct work that fails to meet contract requirements. To maximize the profit earned on costs incurred, the contractor is incentivized to ensure that quality services are provided in a timely manner.
File details come from the government source that posted it. Updated .