Q&A Document 2.pdf
PDF 2 KB Posted
- Solicitation number
- 2023-0066
- Issued by
- Lincoln County, Colorado
About this file
This document is a Questions & Answers (Q&A) file for the Durango-La Plata County Airport Upper Overflow Parking Lot Reconstruction project, issued by the City of Durango, Colorado. The Q&A document contains three specific questions raised by potential bidders on 01/19/2024, addressing technical details about the project. The questions seek clarification on asphalt pavement scarification depth (12" vs. 8"), ADA sidewalk earthwork requirements, and sign support details. For each question, the response directs bidders to consult Addendum #3 and the Revised Bid Schedule dated 1/23/2024.
The document is part of the bid process for a local government infrastructure project, with sealed bids to be received by the City of Durango until Tuesday, February 6th, 2024 at 3:00 pm (Mountain Time). The Q&A document indicates that potential bidders are seeking precise technical specifications to ensure accurate bidding, which suggests the project involves complex engineering and construction requirements for airport parking lot reconstruction. The consistent reference to additional documents (Addendum #3 and Revised Bid Schedule) implies that the project specifications are being actively refined to provide clarity for potential contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers - 2
Project 2023-0066 - DURANGO-LA PLATA COUNTY AIRPORT UPPER OVERFLOW
PARKING LOT RECONSTRUCTION
Buying Organization City of Durango
No Question/Answer Question Date
Q3 Question: Asphalt Paving Clarification
The “Asphalt Pavement Parking Lot Section” on drawing#4 shows 12” of scarified and compacted subgrade. Bid Item Descriptions 7 and 8 notes 8” should be scarified and compacted. Please confirm the depth of the scarification and compaction.
Answer: See Addendum #3
01/19/2024
Q4 Question: ADA Sidewalk
Drawing #11 does not appear to show any work under the ADA sidewalk. Other details, such as those on drawing#18, show 6” of Class 6 under concrete. Please provide a detail or confirm the earthwork necessary for this concrete.
Answer: See Addendum#3 and Revised Bid Schedule, 1/23/2024.
01/19/2024
Q5 Question: Sign Support Detail
Can a detail be provided for the sign supports? The supports are noted on drawing#20.
Answer: See Addendum #3 and Revised Bid Schedule, 1/23/2024.
01/19/2024