The document is a Bid Proposal for the Durango La Plata County Airport Upper Overflow Parking Lot Expansion project, issued by the City of Durango, Colorado. The bid schedule outlines detailed line items for a comprehensive parking lot reconstruction, including mobilization, clearing and grubbing, construction surveying, excavation, asphalt removal and paving, aggregate base course installation, concrete work, fencing, lighting, signage, and landscaping. The project includes two primary sections: the Upper Overflow Parking Lot Expansion and improvements to the existing Credit Card Lot's ADA infrastructure. An additional alternate (Add Alternate #1) is included for cobble landscape cover spanning 2,080 square yards.
The bid proposal requires contractors to provide unit pricing for 33 distinct line items, with quantities specified for each. The project involves multiple construction elements such as 2,340 cubic yards of excavation, 8,750 square yards of asphalt paving, installation of lighting units, underground conduit and wiring, and various site improvements. The document stipulates that all unit prices must include applicable taxes, delivery, and freight charges, and warns that bids submitted with blank spaces will be considered "non-responsive". While the exact total project budget is not specified, the comprehensive nature of the bid schedule suggests a significant infrastructure investment in expanding and upgrading the airport's parking facilities.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Durango – La Plata County Airport
Upper Overflow Parking Lot Expansion
City Project No. 5064
DIV 2 - 11 Contract Documents – Division II
6) BID PROPOSAL
CONTRACTOR NAME:
DURANGO LA PLATA COUNTY AIRPORT
UPPER OVERFLOW PARKING LOT EXPANSION
LINE
NO. DESCRIPTION
APPROX.
QTY UNIT
UNIT
PRICE AMOUNT
GENERAL
Mobilization/General
Conditions at the unit price of ____________________
___________dollars and _________ cents.
1 LS
2 Clearing and Grubbing at the unit price of ____________________
___________dollars and _________ cents.
1 LS
3 Construction Surveying at the unit price of ____________________
___________dollars and _________ cents.
1 LS
4 Record Drawings at the unit price of ____________________
___________dollars and _________ cents.
1 LS
5 Quality Control / Testing at the unit price of ____________________
___________dollars and _________ cents.
1 LS
Storm Water Management
(Pre-Construction and During
Construction) at the unit price of ____________________
___________dollars and _________ cents.
1 LS
DIV 2 - 12 Contract Documents – Division II
LINE
NO. DESCRIPTION
APPROX.
QTY UNIT
UNIT
PRICE AMOUNT
UPPER OVERFLOW PARKING LOT EXPANSION
7 Excavation at the unit price of ____________________
___________dollars and _________ cents.
2340 CY
8 Embankment at the unit price of ____________________
___________dollars and _________ cents.
305 CY
9 Asphalt Removal at the unit price of ____________________
___________dollars and _________ cents.
360 SY
10 Removal of Culverts at the unit price of ____________________
___________dollars and _________ cents.
2 EA
11 Removal of Light Poles at the unit price of ____________________
___________dollars and _________ cents.
2 EA
Asphalt Paving (HMA) (4-in thick) at the unit price of ____________________
___________dollars and _________ cents.
8750 SY
13a Aggregate Base Course (CDOT
Class 6) (4-in thick) at the unit price of ____________________
___________dollars and _________ cents.
9167 SY
13b Aggregate Base Course (CDOT
Class 2)/Millings (6-in thick) at the unit price of ____________________
___________dollars and _________ cents.
9167 SY
DIV 2 - 13 Contract Documents – Division II
LINE
NO. DESCRIPTION
APPROX.
QTY UNIT
UNIT
PRICE AMOUNT
UPPER OVERFLOW PARKING LOT EXPANSION
14 3-FT Concrete Pan at the unit price of ____________________
___________dollars and _________ cents. 448 LF
15 Curb and Gutter at the unit price of ____________________
___________dollars and _________ cents. 1396 LF
Pavement Marking paint
(Waterborne) at the unit price of ____________________
___________dollars and _________ cents. 1880 SF
17 Removal of Fence at the unit price of ____________________
___________dollars and _________ cents. 727 LF
18 Fencing at the unit price of ____________________
___________dollars and _________ cents. 793 LF
Remove and Relocate Double
Swing Gate at the unit price of ____________________
___________dollars and _________ cents. 1 EA
20a Signage (Tubular Steel
Support) at the unit price of ____________________
___________dollars and _________ cents. 2 EA
20b Signage (Light Pole Mounted) at the unit price of ____________________
___________dollars and _________ cents. 11 EA
DIV 2 - 14 Contract Documents – Division II
LINE
NO. DESCRIPTION
APPROX.
QTY UNIT
UNIT
PRICE AMOUNT
UPPER OVERFLOW PARKING LOT EXPANSION
21a Lighting Unit Type 1 at the unit price of ____________________
___________dollars and _________ cents. 3 EA
21b Lighting Unit Type 2 at the unit price of ____________________
___________dollars and _________ cents. 3 EA
21c Lighting Unit Type 3 at the unit price of ____________________
___________dollars and _________ cents. 1 EA
21d Light Foundation Design
Special at the unit price of ____________________
___________dollars and _________ cents. 7 EA
22a 2” Non-Metallic Conduit at the unit price of ____________________
___________dollars and _________ cents. 1013 LF
22b Underground Wire 1/C 6 AWG at the unit price of ____________________
___________dollars and _________ cents. 3522 LF
23 Native Seeding at the unit price of ____________________
___________dollars and _________ cents. 2080 SY
24 Topsoil
___________dollars and _________ cents. 595 CY
DIV 2 - 15 Contract Documents – Division II
LINE
NO. DESCRIPTION
APPROX.
QTY UNIT
UNIT
PRICE AMOUNT
UPPER OVERFLOW PARKING LOT EXPANSION
31 Catch Basin at the unit price of ____________________
___________dollars and _________ cents. 1 EA
32 Riprap Lined Channel at the unit price of ____________________
___________dollars and _________ cents. 120 LF
33 Grass Lined Channel at the unit price of ____________________
___________dollars and _________ cents. 481 LF
Subtotal Amount of Items (Upper Overflow Parking Lot Expansion)
DIV 2 - 16 Contract Documents – Division II
LINE
NO. DESCRIPTION
APPROX.
QTY UNIT
UNIT
PRICE AMOUNT
CREDIT CARD LOT EXISTING ADA IMPROVEMENTS
25 Removal of Existing Concrete at the unit price of ____________________
___________dollars and _________ cents. 896 SF
26 Removal of Curb and Gutter at the unit price of ____________________
___________dollars and _________ cents. 138 LF
9 Asphalt Removal at the unit price of ____________________
___________dollars and _________ cents. 16 LF
7 Excavation at the unit price of ____________________
___________dollars and _________ cents. 60 CY
27 Concrete Sidewalk at the unit price of ____________________
___________dollars and _________ cents. 896 SF
28 Variable Height Curb at the unit price of ____________________
___________dollars and _________ cents. 138 LF
Asphalt Paving (HMA) (4-in thick) at the unit price of ____________________
___________dollars and _________ cents. 16 SY
13a Aggregate Base Course (CDOT
Class 6) (4-in thick)
___________dollars and _________ cents. 48 SY
DIV 2 - 17 Contract Documents – Division II
LINE
NO. DESCRIPTION
APPROX.
QTY UNIT
UNIT
PRICE AMOUNT
CREDIT CARD LOT EXISTING ADA IMPROVEMENTS
13b Aggregate Base Course (CDOT
Class 2) (6-in thick) at the unit price of ____________________
___________dollars and _________ cents. 48 SY
15 Curb and Gutter at the unit price of ____________________
___________dollars and _________ cents. 138 LF
29 Concrete Wheel Stop at the unit price of ____________________
___________dollars and _________ cents. 12 EA
Pavement Marking paint
(Waterborne) at the unit price of ____________________
___________dollars and _________ cents. 310 SF
20a Signage (Tubular Steel
Support) at the unit price of ____________________
___________dollars and _________ cents. 12 EA
Subtotal Amount of Items (Credit Card Lot Existing ADA Improvements)
Grand Total Amount
/100 Dollars
Written Words:____________________________________________________________________________________________________________________
DIV 2 - 18 Contract Documents – Division II
LINE
NO. DESCRIPTION
APPROX.
QTY UNIT
UNIT
PRICE AMOUNT
ADD ALTERNATE #1
30 Cobble Landscape Cover at the unit price of ____________________
___________dollars and _________ cents.
2080 SY
Total Amount Add Alternate #1
NOTE TO BIDDERS: All unit prices and bid totals of extended prices include all applicable taxes, delivery, and freight charges. Bidders are required to fill in all blank spaces with an entry. Bids submitted with blank spaces shall be considered “non-responsive.”