PWS Appendix B - SEC Inventory.xlsx

XLSX spreadsheet 44 KB Posted

Attached to
AMENDMENT 0002 - Columbus Security System Upgrade
Solicitation number
HC102825R0046
Issued by

About this file

The file is a Performance Work Statement (PWS) Appendix B inventory spreadsheet for a Security System Upgrade project at a Defense Information Systems Agency (DISA) facility. The document outlines a detailed process for implementing equipment inventory labeling, including steps for UID (Unique Identifier) submission, review, and approval involving multiple contractors and project teams.

The process involves comprehensive tracking of equipment details such as common names, design labels, CMMS designators, room locations, manufacturer information, serial numbers, and electrical specifications. Key participants include the Project Contractor, BAS (Building Automation Services) Contractor, TIM Contractor, Project Lead, and BOS-SEL41 team. The spreadsheet requires specific data entry across multiple columns, with green and blue highlighted sections indicating required information for initial submission and project commissioning. The related solicitation (HC102825R0046) for the Columbus Security System Upgrade is scheduled with a site visit on 16 July 2025, questions due 23 July 2025, and full proposal submission due 25 August 2025.

View the file

Other files

File Type Posted
HC102825R0046 A0002.pdf PDF
HC102825R0046 A0001.pdf PDF
QA FOR AMENDMENT 0001.docx DOCX document
Photos.docx DOCX document
Attachment 2 QASP.docx DOCX document
HC102825R0046 Solicitation.pdf PDF
PWS Appendix D - NDA.docx DOCX document
Attachment 3 Site Visit Instructions.docx DOCX document
Attachment 1 CLIN Pricing Sheet.xlsx XLSX spreadsheet
832571348 - JA Brand Name -COL Security_Redacted.pdf PDF
PWS Appendix C - Electrical Safety Program.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Process Diagram Labeling Process Diagram

Implementation Project Transition Design Project Lead Review and approve UID Submission Form columns A-F. Send to BOS-HC341 and include associated Project Drawings.

TIM Contractor Work with BOS-SEL41 and Project Transition team to Complete UID Submission Form columns O, Proposed UID. Reserve UIDs in CMMS. Return to BOS-HC341 for Review.

Reference Documents 01-02 - Identification Labeling and Marking Spec - 2020-04-28.docx, SEC Designator List Tab, and SEC Sys Designator List Tab.

Project Lead Review and Approve UID Submission Form column R. Send to Project Contractor.

TIM Contractor Implement changes to CMMS, PDU Schedules, Metrics, and upload to SharePoint.

Project Lead Upon project completion, verfiy As-Built Drawings and EasyPower Updates. Provide both to Project Transition/CAD team for record drawing implementation. Verify modifications to Building Automation Services (BAS) to reflect changes.

Project Transition/CAD Implement changes to As-Built Drawings and EasyPower data.

Project Contractor Complete UID Submission Form columns A-F Send to Project Lead for review.

BOS - SEL41

Review data recieved from Project Lead. Send to TIM Contractor and BAS Contractor for completion. Review returned completed data and send to Project Lead for final approval.

BAS Contractor Work with BOS-HC341 and Project Transition team to Complete UID Submission Form columns N, Proposed Valve UID. Reserve UIDs in CMMS. Return to BOS-HC341 for Review.

Project Contractor Update Design Drawings. Complete UID Submission Form columns G-M. Apply new labels to physical equipment in the field. Update CMMS Asset Inventory.

Project Lead Send approval with CMMS update to BOS-HC341 and Project Transition team. Site walk to verify labels on physical equipment. Verify UID's on screens in the Building Automation Services (BAS).

BOS - SEL41

Send project completion data to TIM Contractor to reflect changes to CMMS. Modify Service Contracts.

UID Submission Form

Project ContractorBAS ContractorTIM Contracter InputBAS ContractorProject Lead Input
Common/Project NameDesign LabelNotesBus Change from UPS to Essential, C to D, A to B etc.CMMS Designator from ListRoom DesignatorManufactureModel NoSerial NoGrid DesignatorCapacityCapacity Units"FED FROM"/CKT # or "Parent ID"Proposed Valve UIDProposed UID (Excluding Valves)Proposed BAS Point NameUID/Point Name Reviewed and Approved?
Green Highlighted Columns Required for Intial SubmissionBlue Highlighted Columns Required Prior to Project Commisioning
The name the equipment is commonly referred to on the project.What the equipment is labeled as on the project drawingsStart with "REMOVED", "MODIFIED", or "NEW". Then add any other pertinent notes, if necessary, that clarify information about the equipment.If moving equipment to a different distribution bus, designate here. For example, "From Critical Bus A to Essential Bus D. If N/a, so state.This is theCMMS Designator (abbreviation) from the CMMS Designator List TAB.Interior: Room Number; Exterior: Name of Location (Ex: MechYard)text 20 chartext 40 char; If no Model , use Configuration # or CO#Grid Location on the raised floor based on the front-left corner of the equipment. If not on the raised floor, put "N/A".Capacity of the asset (Number)n/a, Gal, kW, kVA, A, BTU, Ton, GPM, CFM, RPM, PSIElectrical only-the first upstream device feeding the equipment.The UID proposed by the DISA BAS ContractorThe UID proposed by the DISA TIM ContractorThe Point Name proposed by the DISA BAS ContractorProject Engineer Concurrence

"Y/N"

CMMS Designator & Sys Des List

Please reference the most up to date Lableing Standard here:
S:\Facility\Standards\!DISA Facilities Engineering Standards\!Facilities Engineering Circular