The file is a Performance Work Statement (PWS) Appendix B inventory spreadsheet for a Security System Upgrade project at a Defense Information Systems Agency (DISA) facility. The document outlines a detailed process for implementing equipment inventory labeling, including steps for UID (Unique Identifier) submission, review, and approval involving multiple contractors and project teams.
The process involves comprehensive tracking of equipment details such as common names, design labels, CMMS designators, room locations, manufacturer information, serial numbers, and electrical specifications. Key participants include the Project Contractor, BAS (Building Automation Services) Contractor, TIM Contractor, Project Lead, and BOS-SEL41 team. The spreadsheet requires specific data entry across multiple columns, with green and blue highlighted sections indicating required information for initial submission and project commissioning. The related solicitation (HC102825R0046) for the Columbus Security System Upgrade is scheduled with a site visit on 16 July 2025, questions due 23 July 2025, and full proposal submission due 25 August 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC102825R0046 A0002.pdf | ||
| HC102825R0046 A0001.pdf | ||
| QA FOR AMENDMENT 0001.docx | DOCX document | |
| Photos.docx | DOCX document | |
| Attachment 2 QASP.docx | DOCX document | |
| HC102825R0046 Solicitation.pdf | ||
| PWS Appendix D - NDA.docx | DOCX document | |
| Attachment 3 Site Visit Instructions.docx | DOCX document | |
| Attachment 1 CLIN Pricing Sheet.xlsx | XLSX spreadsheet | |
| 832571348 - JA Brand Name -COL Security_Redacted.pdf | ||
| PWS Appendix C - Electrical Safety Program.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Process Diagram Labeling Process Diagram
Implementation Project Transition Design Project Lead Review and approve UID Submission Form columns A-F. Send to BOS-HC341 and include associated Project Drawings.
TIM Contractor Work with BOS-SEL41 and Project Transition team to Complete UID Submission Form columns O, Proposed UID. Reserve UIDs in CMMS. Return to BOS-HC341 for Review.
Reference Documents 01-02 - Identification Labeling and Marking Spec - 2020-04-28.docx, SEC Designator List Tab, and SEC Sys Designator List Tab.
Project Lead Review and Approve UID Submission Form column R. Send to Project Contractor.
TIM Contractor Implement changes to CMMS, PDU Schedules, Metrics, and upload to SharePoint.
Project Lead Upon project completion, verfiy As-Built Drawings and EasyPower Updates. Provide both to Project Transition/CAD team for record drawing implementation. Verify modifications to Building Automation Services (BAS) to reflect changes.
Project Transition/CAD Implement changes to As-Built Drawings and EasyPower data.
Project Contractor Complete UID Submission Form columns A-F Send to Project Lead for review.
BOS - SEL41
Review data recieved from Project Lead. Send to TIM Contractor and BAS Contractor for completion. Review returned completed data and send to Project Lead for final approval.
BAS Contractor Work with BOS-HC341 and Project Transition team to Complete UID Submission Form columns N, Proposed Valve UID. Reserve UIDs in CMMS. Return to BOS-HC341 for Review.
Project Contractor Update Design Drawings. Complete UID Submission Form columns G-M. Apply new labels to physical equipment in the field. Update CMMS Asset Inventory.
Project Lead Send approval with CMMS update to BOS-HC341 and Project Transition team. Site walk to verify labels on physical equipment. Verify UID's on screens in the Building Automation Services (BAS).
BOS - SEL41
Send project completion data to TIM Contractor to reflect changes to CMMS. Modify Service Contracts.
UID Submission Form
| Project Contractor | BAS Contractor | TIM Contracter Input | BAS Contractor | Project Lead Input | ||||||||||||
| Common/Project Name | Design Label | Notes | Bus Change from UPS to Essential, C to D, A to B etc. | CMMS Designator from List | Room Designator | Manufacture | Model No | Serial No | Grid Designator | Capacity | Capacity Units | "FED FROM"/CKT # or "Parent ID" | Proposed Valve UID | Proposed UID (Excluding Valves) | Proposed BAS Point Name | UID/Point Name Reviewed and Approved? |
| Green Highlighted Columns Required for Intial Submission | Blue Highlighted Columns Required Prior to Project Commisioning | |||||||||||||||
| The name the equipment is commonly referred to on the project. | What the equipment is labeled as on the project drawings | Start with "REMOVED", "MODIFIED", or "NEW". Then add any other pertinent notes, if necessary, that clarify information about the equipment. | If moving equipment to a different distribution bus, designate here. For example, "From Critical Bus A to Essential Bus D. If N/a, so state. | This is theCMMS Designator (abbreviation) from the CMMS Designator List TAB. | Interior: Room Number; Exterior: Name of Location (Ex: MechYard) | text 20 char | text 40 char; If no Model , use Configuration # or CO# | Grid Location on the raised floor based on the front-left corner of the equipment. If not on the raised floor, put "N/A". | Capacity of the asset (Number) | n/a, Gal, kW, kVA, A, BTU, Ton, GPM, CFM, RPM, PSI | Electrical only-the first upstream device feeding the equipment. | The UID proposed by the DISA BAS Contractor | The UID proposed by the DISA TIM Contractor | The Point Name proposed by the DISA BAS Contractor | Project Engineer Concurrence |
"Y/N"
CMMS Designator & Sys Des List
| Please reference the most up to date Lableing Standard here: |
| S:\Facility\Standards\!DISA Facilities Engineering Standards\!Facilities Engineering Circular |
../../../../../Standards/!DISA%20Facilities%20Engineering%20Standards/!Facilities%20Engineering%20Circular
File details come from the government source that posted it. Updated .