Protective Coatings Statement of Work FY2025.pdf
PDF 129 KB Posted
- Attached to
- JB Andrews Paint, Coatings, and Markings IDIQ
- Solicitation number
- FA286026R0002
About this file
This Statement of Work (SOW) dated 29 July 2025 details exterior painting requirements for the B3305 Entomology Compound at Joint Base Andrews. The scope of work includes providing all necessary labor, equipment, supplies, and materials to complete the following specific painting tasks: applying two coats of exterior paint to the B3305 Entomology Compound building, painting steel overhang supports with one coat of exterior paint, painting exterior doors with one coat of paint, painting the fire hydrant and gas meter, and pressure washing the steel overhead supports. The contractor must coordinate all work with the Contracting Officer and/or Contracting Office Representative, following the JBA Protective Coatings Statement of Work guidelines.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JBA Protective Coating QandA.xlsx | XLSX spreadsheet | |
| Airfield Marking Handbook.pdf | ||
| Solicitation Amendment FA286026R00020001 SF 30 Signed.pdf | ||
| Airfield Painting and Rubber Removal .pdf | ||
| Solicitation Amendment - FA286026R00020001.pdf | ||
| Standards for Marking Airfields p2.pdf | ||
| Standard for Airfield Marking.pdf | ||
| JBA Protective Coatings_Teaming and Subcontractor Consent.docx | DOCX document | |
| B3305 Entomology Exterior Paint Contract Estimate.xlsx | XLSX spreadsheet | |
| Wage Determination Residential.pdf | ||
| Official Short Term Request.xls | XLS spreadsheet | |
| B3305 Entomology Exterior Paint Contract Estimate.xlsx | XLSX spreadsheet | |
| Wage Determination Building.pdf | ||
| Solicitation - FA286026R0002.pdf | ||
| JBA Protective Coatings_SOW.pdf | ||
| Wage Determination Heavy_Highway.pdf | ||
| JBA Protective Coatings_Price List.xlsx | XLSX spreadsheet | |
| JBA Protective Coatings_PPQ.docx | DOCX document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW) 29 July 2025
For Joint Base Andrews
B3305 Entomology Compound Exterior Painting
GENERAL: The contractor shall provide all labor, equipment, supplies, tools, materials, and management as necessary for accomplishing the work described herein. The contractor shall accomplish work in accordance with the JBA Protective Coatings Statement of Work. All work will be coordinated with the Contracting Officer and/or the Contracting Office Representative.
DESCRIPTION OF WORK: The contractor shall provide exterior painting for B3305 Entomology Compound. This work includes painting of the exterior of the steel overhang supports, doors, fire hydrant, gas meter, and pressure washing of the steel overhead supports.
• Paint B3305, Entomology Compound, using two coats of exterior paint
• Paint steel overhand supports using one coat of exterior paint
• Paint exterior doors using one coat of paint
• Paint fire hydrant
• Paint gas meter
• Pressure wash the steel overhead supports