Project Information Form.docx

DOCX document 29 KB Posted

Attached to
Dry Dock 2 Complex, Portsmouth Naval Shipyard, Kittery, ME
Solicitation number
N4008521R1225
Issued by

About this file

This sources sought notice requests capability statements from small businesses for the construction of multiple enclosures at the Dry Dock 2 Complex at the Portsmouth Naval Shipyard in Kittery, Maine. The scope of work includes the fabrication and installation of approximately 23,100 square feet of enclosures, including a 21,500 square foot permanently installed enclosure with towers, storage areas, cranes, and HVAC, electrical and communication systems. An additional 1,600 square foot modular relocatable enclosure is required along with utility and infrastructure modifications. Relevant experience must include projects over $40 million involving new fabrication and installation of fixed and relocatable equipment enclosures. Capability statements are due by November 24, 2020 and should include a project information form and matrix demonstrating experience with complex structural fabrication, mechanical systems, construction in limited areas, overhead cranes from 5-10 tons and 20-60 foot spans. The notice seeks responses from small businesses, with a potential for set aside to small business categories including 8(a).

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOURCES SOUGHT – PROJECT INFORMATION FORM

Use this form (one per project) to provide supporting information that demonstrates project experience relevant to the subject announcement. Submit up to five (5) projects. Please limit response to two pages per project.

1.
Contractor Name:
2.
Project No. (check one):
|_| 1|_| 2|_| 3|_| 4|_| 5
3.
Contract Number:
Delivery/Task Order No.:
Project Number:
Title:
Location:
4.
Award Date (mm/dd/yy):
5.
Final Contract Price:
$
Completion Date (mm/dd/yy):
(includes all options and mods)
Project is % complete (as of submission due date)
This is the |_| total project |_| subcontract price.
6.
Type of work:
|_| New Construction|_| Repair|_| Renovation
7.
Customer/Owner Name:
Point of Contact Name/Title: (person with project knowledge)
POC Phone Number:
POC Email Address:
8.
Were you the Prime contractor for this project?
|_| Yes|_| No
Were you a subcontractor for this project?
|_| Yes|_| No
If subcontractor, who was the Prime contractor?
9.
Type of Contract (check all that apply):

|_| Design-Build |_| Design-Bid-Build (fully designed project)

|_| Other (explain):
If Design-Build, provide the following information:
|_| Design accomplished in-house
Lead design firm name:
Years working together:
Address:

10. Provide a detailed description of the project:

11. Percentage of work you self-performed on this project: %.

Provide a detailed description of the work your firm self-performed on this project:

Form may be expanded. Please DO NOT change content of the form

File details come from the government source that posted it. Updated .