This set of construction documents outlines requirements for renovating space to create a new mental health unit at a Department of Veterans Affairs medical center. Key details include renovating an existing area on the first floor to accommodate the new unit, demolishing and replacing HVAC ductwork and equipment, and installing a new 7,760 CFM rooftop unit to serve the renovated space. The documents provide specifications for mechanical, controls, and HVAC work. Details cover demolition plans, new duct layouts, control sequences, and specifications for equipment such as the rooftop unit, terminal units, and exhaust fans. Completion is required by November 30, 2020. The solicitation was issued by VA Network 9 for project number 596A4-18-107.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
H4
H7
A
COLD WATER (CITY WATER)
HOT WATER
QUICK-COUPLE HOSE CONNECTOR
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
HOSE CONNECTOR
FLOW METER
ABBREVIATIONS DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
DUCTWORK SYMBOLS
LIMIT OF DEMOLITION
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
SQUARE 4-WAY CEILING DIFFUSERS
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
FC
10x8
FLEXIBLE CONNECTION, EQUIPMENT,
VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
COMBINATION FIRE/SMOKE DAMPER
FSD
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
2 1
1/24
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
TERMINAL UNIT SYMBOLS
2'x2' RADIANT CEILING PANEL
UNIT HEATER (HORIZONTAL)
AIR TERMINAL SYMBOLS
DOUBLE DUCT MIXING BOX.
TERMINAL UNIT WITH REHEAT COIL
PIPING SYMBOLS
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
VENT LINE
CHILLED WATER SUPPLY
CHILLED WATER RETURN
DRAIN LINE
HOT WATER HEATING RETURN
HPS
HPR
MPS
MPR
LPS
LPR
HWS
HWR
V
CHR
CHS
D
HW
CW
GENERAL PIPING SYMBOLS
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
FLOW ELEMENTFE
PIPE UP
PIPE DOWN
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
AV
MANUAL AIR VENTMV
VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WATER BALANCE DEVICE
MODULATING CONTROL BUTTERFLY VALVE
CIRCUIT SETTER VALVE
CONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
MG MAGNEHLIC PRESSURE GAUGE
PDS PRESSURE DIFFERENTIAL SWITCH
A SENSOR WITH AVERAGING ELEMENT TO TRANSMIT
TEMPERATURE TO EMCS
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
T
A/E ARCHITECT / ENGINEER
ACU AIR CONDITIONING UNIT ADMINISTRATION
ACD AUTOMATIC CONTROL DAMPER,MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO POSITION
AFF ABOVE FINISHED FLOOR
AHU AIR-HANDLING UNIT
AP ACCESS PANEL
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BOD BASIS OF DESIGN
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2)
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CG CEILING GRILLE
CH CHILLER
CHP CHILLED WATER PUMP
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CHW CHILLER WATER
CW COLD WATER (POTABLE)
CWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
DD-1 DESIGN DEVELOPMENT (SUBMISSION1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION2)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EX. EXISTING
F FAHRENHEIT
F/SDPR COMBINATION FIRE SMOKE DAMPER
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCUC FAN COIL UNIT COOLING ONLY
FD FLOOR DRAIN
FD FIRE DAMPER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
GA GAUGE
GAL GALLONS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HSTAT HUMIDISTAT
HW HOT WATER
HWC HOT WATER COIL
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HX HEAT EXCHANGER
IAQ INDOOR AIR QUALITY
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
kg KILOGRAM kW KILOWATT kWh KILOWATT HOUR
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPS LOW PRESSURE STEAM
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR METERS/SECOND)
MA MIXED AIR
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MIN MINIMUM
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PSI POUNDS PER SQUARE INCH
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RPM REVOLUTIONS PER MINUTE
RR RETURN REGISTER
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAC SUPPLY AIR COLD
SAH SUPPLY AIR HOT
SAT SUPPLY AIR TEMPERATURE
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SDPR SMOKE DAMPER COMP COMPRESSOR UNIT
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SP STATIC PRESSURE
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
ST STEAM TRAP
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TG TRANSFER GRILLE
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
W WATTS
WC WATER COOLED
FIRE RATING SYMBOLS
ES END SWITCH
(FC) FAIL CLOSED
(FO) FAIL OPEN
(FLP) FAIL LAST POSITION
T STEAM TRAP
CP CONDENSATE PUMP
GENERAL SYMBOLS
ACCESS PANEL
TERMINAL UNIT W/ REHEAT COIL AND AIR DEVICE
SD
SMOKE DETECTOR
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
S STARTER
CT CURRENT SENSOR
POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE
IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES [200mm] MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
MHU ARCHITECTURAL RENOVATION AREA
TERMINAL UNIT WITHOUT REHEAT COIL
A. THE FOLLOWING NOTES APPLY EQUALLY TO THE FULL SET OF MECHANICAL DOCUMENTS.
B. REFER TO SHEET M-001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT NOTES.
C. EXISTING WORK TO REMAIN IS INDICATED WITH LIGHT LINE WEIGHT.
D. COORDINATE ALL SYSTEM OUTAGES WITH OWNER PRIOR TO ALL WORK PER SPECIFICATIONS. PROVIDE AT LEAST 14 DAYS ADVANCE NOTICE TO THE OWNER
FOR ANY UTILITY SHUTDOWNS.
E. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. REFER TO SCHEDULES, DETAILS, AND DIAGRAMS FOR DUCT, PIPING, EQUIPMENT, AND CONTROL
INFORMATION NOT INDICATED ON FLOOR PLANS.
F. LOCATIONS AND SIZES OF EXISTING DUCTWORK, PIPING AND EQUIPMENT HAVE BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE
INVESTIGATIONS WHERE POSSIBLE. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE OWNER IN WRITING BEFORE PROCEEDING WITH THE WORK.
G. ALL WORK MUST BE COORDINATED TO MAINTAIN OPERATION OF THE FACILITY.
H. EACH CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF OTHERS.
I. COORDINATE ALL MECHANICAL WORK WITH OTHER DISCIPLINES: ARCHITECTURAL, PLUMBING, ELECTRICAL, ETC., SHOWN ON OTHER CONTRACT DOCUMENTS.
J. PROVIDE OFFSETS AND TRANSITIONS AS NECESSARY TO COMPLETE SYSTEMS AND COORDINATE WORK WITH OTHER TRADES.
K. ASBESTOS MAY BE PRESENT. CONTRACTOR SHALL IMMEDIATELY INFORM THE OWNER IN THE EVENT THAT MATERIALS OBSERVED ARE SUSPECTED TO
CONTAIN ASBESTOS. IF LOCATED, ABATE IN ACCORDANCE WITH SPECIFICATIONS AND ICRA PERMIT. REFER TO SPECIFICATIONS 02 82 11 (TRADITIONAL ASBESTOS ABATEMENT) FOR ITEMS REQUIRING ABATEMENT. ASBESTOS ON EXISTING PIPING, DUCT, AND EQUIPMENT SHALL BE REMOVED BACK TO MAIN BY ABATEMENT CONTRACTOR AND NEEDS TO BE RE-INSULATED BY THE MECHANICAL CONTRACTOR. WORK SHALL BE COORDINATED WITH ABATEMENT
CONTRACTOR.
L. ALL WORK SHALL BE IN COMPLIANCE WITH GOVERNING CODES AND OWNER STANDARDS.
M. ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRESTOPPED AS REQUIRED TO MAINTAIN FIRE RATINGS. REFER TO
ARCHITECTURAL PLANS FOR LOCATIONS OF FIRE-RATED ASSEMBLIES.
N. WHENEVER NOTES REQUIRE A PRE-TAB ON A SYSTEM, IT SHALL BE PERFORMED BEFORE ANY DEMOLITION OCCURS. MECHANICAL CONTRACTOR SHALL HAVE
BALANCER PERFORM A PRE-TAB TO DETERMINE EXISTING REQUESTED PARAMETER(S) (AIRFLOW, WATERFLOW, STATIC PRESSURE, ETC.), AND BALANCER SHALL SUBMIT A PRE-TAB REPORT WITH RESULTS TO MECHANICAL CONTRACTOR WHO SHALL SUBMIT TO THE OWNER AND ENGINEER. SYSTEM SHALL BE
REBALANCED AS PART OF NEW WORK TO ORIGINAL PARAMETER(S) OBTAINED FROM PRE-TAB.
O. ROOFING CONTRACTOR SHALL MAKE ALL REQUIRED MODIFICATIONS TO THE ROOF TO ACCOMMODATE NEW EQUIPMENT.
P. DURING DEMOLITION OF THE EXISTING HVAC SYSTEMS AND DURING CONSTRUCTION UNTIL NEW HVAC SYSTEM IS OPERATIONAL IN THE WORK AREA, CONTRACTOR SHALL PREVENT FREEZING OF WATER LINES AND OVERHEATING OF ELECTRIC AND IT EQUIPMENT. CONTRACTOR SHALL ALSO MAINTAIN ALL TEMPERATURES LOCATED OUTSIDE OF THE CONSTRUCTION AREA IN SPACES THAT ARE ALSO SERVED BY THE SAME HVAC SYSTEMS. CONTRACTOR SHALL PROPOSE A CONSTRUCTION HVAC PLAN TO THE COR AND HAVE IT APPROVED BEFORE IMPLEMENTATION. THE PLAN MIGHT INCLUDE USE OF THE EXISTING HVAC SYSTEM (CUT DUCT BACK AS DEMOLITION PROGRESSES AND LET IT BLOW IN AREAS), OR CONTRACTOR MIGHT PROVIDE THEIR OWN TEMPORARY HVAC SYSTEMS, OR A COMBINATION OF BOTH MIGHT BE APPROPRIATE AS LONG AS THE PLAN IS REVIEWED AND APPROVED BY THE COR.
Q. EVERY FASTENER/SCREW EXPOSED TO MENTAL HEALTH PATIENTS SHALL BE CENTER PIN, TORX TYPE, TAMPER-PROOF, ANTI LIGATURE TYPE, AND MAY BE STAINLESS STEEL. SEE SPECIFICATIONS SUCH AS 23 37 00 AIR OUTLETS AND INLETS, 2.2, A.
R. COORDINATE PHASING FOR NIGHTS AND WEEKEND WORK OVER OCCUPATIONAL THERAPY AND PHYSICAL THERAPY UNITS WITH VA COR.
S. COORDINATE ALL UTILITY OUTAGES PER 23 05 11-16, 1.8, B, AND HOT WORK PERMITS PER 23 05 11-14, 1.5, K. WITH VA COR.
GENERAL MECHANICAL NOTES:
1 - HOUR FIRE BARRIER
2 - HOUR FIRE BARRIER
SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\c ra ig \D o cu m e n ts
\R e vi t
L o ca l M o d e ls \M e ch a n ic a l ( cr a ig
.li e g ib e l@ ff e
-s e rv .c o m
.r vt
/1
/2
:0
:1
P
M
M-001
MECHANICAL LEGEND SHEET
03/24/2020 GC KG/CL03/24/2020Revisions: Date:
T
T
T
T
T
T
(E)24"x24" EA
9"ø
(E)4"ø
(E)4"x8" SA
(E)5"ø SA
5"ø
(E)16"x18"
(E)16"ø
(E) MB-3
(E) MB-2
(E) MB-1 (E) MB-1
(E)48"x24" EA
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
(E) MB-1
NMLKJHG
F
5.
(E) MB-3
(E) MB-3
(E) MB-3
(E) MB-1
(E) MB-1
(E) MB-3
SPS SPS
EXHAUST DUCT UP TO
EXHAUST FAN ON ROOF
AIR CONDITIONER
FAN
(E) WALK-IN
COOLER
RA
100 CFM
150 CFM
12 12
(E)18"ø HD
(E)18"ø CD
(E)34"x24" EA
(E)16"ø
(E)12"ø CD
(E)12"ø HD
MHU ARCHITECTURAL
RENOVATION AREA
MHU ARCHITECTURAL
RENOVATION AREA
1 1 1
1 1
1 1
1 1
MHU ARCHITECTURAL
RENOVATION AREA
HG
(E)VAV-34
(E)VAV-33
(E)VAV-35
(E)VAV-31
(E)VAV-29 (E)VAV-30
MHU ARCHITECTURAL
RENOVATION AREA
MHU ARCHITECTURAL
RENOVATION AREA
A. WORK TO BE DEMOLISHED IS INDICATED WITH BOLD DASHED LINE TYPE.
B. ISOLATE THE FOLLOWING SYSTEMS FROM MAINS SERVING THE BUILDING PRIOR TO
DEMOLITION:
1. STEAM PIPING
2. CHILLED WATER
3. HEATING HOT WATER
4. DUCTWORK SERVING ZONES BOTH INSIDE AND OUTSIDE WORK AREAS
5. POWER SERVING ZONES BOTH INSIDE AND OUTSIDE WORK AREAS
C. DRAIN LINES PRIOR TO DEMOLITION.
D. PROTECT EXISTING PLUMBING, STEAM, AND CONDENSATE LINES FROM FREEZING
WHILE HEATING SYSTEM IS OUT OF SERVICE.
E. SEAL ANY FLOOR PENETRATIONS WHERE DUCT OR PIPES ARE REMOVED FOR 2-HR
FIRE RATING.
F. HOLES IN WALLS AND FLOORS CREATED OR EXPOSED DURING DEMOLITION SHALL
BE REPAIRED TO MATCH EXISTING CONDITIONS. OR, SHALL BE REPAIRED TO NEW
CONDITIONS WHERE NEW WORK CHANGES EXISTING.
G. DUCT/PIPING ADJACENT TO DEMOLITION SCOPE SHALL BE LEFT IN OPERATIONAL
CONDITION. REPAIR INSULATION AND VERIFY SUPPORTS REMAIN AS REQUIRED PER
SPECIFICATIONS.
H. REMOVE ALL HANGERS, SUPPORTS, TUBING, AND CONTROL DEVICES ASSOCIATED
WITH EQUIPMENT TO BE REMOVED UNLESS OTHERWISE NOTED.
I. PERFORM PRE-TAB ON ALL AFFECTED SYSTEMS PRIOR TO ANY MODIFICATIONS.
GENERAL NOTES:
NM
(E)8"x8" EA
MICROBIOLOGY
LAB
B114
NML
FUNCTIONING
EXHAUST FAN
TO REMAIN
FUNCTIONING
EXHAUST FAN
TO REMAIN
MECHANICAL ROOM
EXISTING ROOF
DRAIN - SEE PLUMBING
EXISTING
CURB TO
REMAIN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\c ra ig \D o cu m e n ts
\R e vi t
L o ca l M o d e ls \M e ch a n ic a l ( cr a ig
.li e g ib e l@ ff e
-s e rv .c o m
.r vt
/1
/2
:0
:2
P
M
MD-101
HVAC DEMOLITION PLAN - FIRST
FLOOR AND ROOF
03/24/2020 GC KG/CL03/24/2020
1/8" = 1'-0"
1 DEMOLITION PLAN - FIRST FLOOR - AREA A
1/8" = 1'-0"
2 DEMOLITION PLAN - FIRST FLOOR - AREA B
DRAWING NOTES:
1 REMOVE BOLD, DASHED DUCTWORK BACK TO “LIMIT OF DEMOLITION” SYMBOLS AND CAP DUCT AT LOCATIONS
SHOWN. TYPICAL.
2 REMOVE BOLD, DASHED DUCTWORK, ASSOCIATED AIR DEVICES, TERMINAL UNITS, AND TEMPERATURE
SENSORS. TYPICAL.
3 EXISTING LIGHT, SOLID LINE WEIGHT DUCTWORK AND ASSOCIATED EQUIPMENT TO REMAIN, TYPICAL.
4 LOCATION OF EXISTING STATIC PRESSURE SENSORS SERVING AC-4. BALANCER SHALL REBALANCE AC-4
SYSTEM PER TAB SHEET MH-504. CONTRACTOR SHALL PROVIDE NEW STATIC PRESSURE SENSORS WITH THE PROPER PRESSURE RANGE FOR THE NEW REQUIRED STATIC PRESSURE SETPOINTS AND SHALL LOCATE THE NEW SENSORS TO SERVE THE CRITICAL PATHS AT THE ZONE #6 HOT AND COLD DECKS PRE-TAB TRAVERSE LOCATION AS SHOWN ON SHEET MH-504. THE NEW PRESSURE RANGE AND STATIC PRESSURE SETPOINTS SHOULD BE BASED ON THE MEASURED PRESSURE VALUES WHEN AIRFLOWS IN THE RENOVATED SYSTEM ARE AT THE PRE-TAB VALUES FOR THE VARIOUS REMAINING ZONES RECORDED DURING THE PRE-TAB PERFORMED DURING DESIGN. NEW STATIC PRESSURE SENSORS SHALL BE LOCATED IN AN ACCESSIBLE LOCATION AND SHALL BE MADE ACCESSIBLE WITH ACCESS PANELS IF NOT LOCATED ABOVE A CEILING WITH CEILING TILE.
5 EXISTING TO REMAIN.
6 EXISTING HOOD TO REMAIN. BEFORE ANY DUCT IS DEMOLISHED, PERFORM A PRE-TAB OF THIS HOOD TO
DETERMINE EXISTING AIRFLOW AT HOOD. HOOD SHALL BE REBALANCED AS PART OF NEW WORK TO ORIGINAL
AIRFLOW FROM PRE-TAB. REMOVE DUCT SERVING HOOD AT LOCATIONS SHOWN.
7 PERFORM A PRE-TAB OF THIS DUCT BEFORE DEMOLITION TO DETERMINE EXISTING AIRFLOW AND STATIC FOR DUCT. DEMOLISH EXISTING EXHAUST DUCT AT LOCATIONS SHOWN. AIR DEVICE SERVING DUCT SHALL BE REBALANCED AS PART OF NEW WORK TO ORIGINAL AIRFLOW AND STATIC OBTAINED FROM PRE-TAB. SEE PLAN WITH COLUMN LINES SHOWING LOCATION OF AIR DEVICE SERVED BY DUCT IN MICROBIOLOGY LAB B114.
8 REMOVE ALL EXISTING AIR DEVICES, EXISTING THERMOSTATS, AND FLEX DUCT BACK TO HARD DUCT, ALL FOR
REPLACEMENT. TYPICAL.
9 EXISTING VAV BOX AND ASSOCIATED DUCTWORK TO REMAIN. BEFORE DEMOLITION OF ANY DUCT OR EQUIPMENT, PERFORM A PRE-TAB TO DETERMINE EXISTING AIRFLOW AT THIS VAV ZONE (MEANING BOX AND AIR DEVICE BEYOND BOX). VAV ZONE SHALL BE REBALANCED AS PART OF NEW WORK TO ORIGINAL AIRFLOW
OBTAINED FROM PRE-TAB.
10 BEFORE ANY DEMOLITION, PERFORM A PRE-TAB TO DETERMINE EXISTING AIRFLOW AND STATIC AT THIS EXISTING RETURN AIR DEVICE. REMOVE EXISTING RETURN DUCT AT LOCATIONS SHOWN. AIR DEVICE SERVING DUCT SHALL BE REBALANCED AS PART OF NEW WORK TO ORIGINAL AIRFLOW OBTAINED FROM
PRE-TAB.
11 BEFORE ANY DEMOLITION, PERFORM A PRE-TAB TO DETERMINE EXISTING AIRFLOW AT EXHAUST AIR DEVICES.
REMOVE EXISTING EXHAUST DUCT AT LOCATIONS SHOWN. AIR DEVICES SERVING THIS DUCT SHALL BE
REBALANCED AS PART OF NEW WORK TO ORIGINAL AIRFLOW OBTAINED FROM PRE-TAB.
12 REMOVE ALL EXISTING HVAC EQUIPMENT INSIDE AND OUTSIDE THE FIVE EXISTING LAB ROOMS INCLUDING BUT NOT LIMITED TO THE AIR CONDITIONER, SUPPLY AND EXHAUST FANS, SUPPLY AND EXHAUST DUCTWORK INSIDE AND OUTSIDE THE BUILDING INCLUDING EXHAUST DUCT MOUNTED ON WALL THAT EXTENDS UP TO THE EXHAUST FAN ON THE ROOF, HOODS, HUMIDIFIER, PIPE, CONTROLS, MOUNTING DEVICES, HANGERS, ETC.
13 REMOVE ABANDONED EXHAUST FAN AND CURB.
14 EXISTING HOT WATER RETURN PIPE TO REMAIN. SEE NOTE 7A ON SHEET MH-504.
1/8" = 1'-0"
3 DEMOLITION PLAN - FIRST FLOOR - AREA B
KEY PLAN
N
AREA B
AREA A
NJHG
1/8" = 1'-0"
4 DEMOLITION PLAN - ROOF
Revisions: Date:
W/D
T T
T
T
T T
T
(E)4"x8"
(E)5"ø
NMLKJHGF
5.
O P Q R
PRIVATE
A132
PRIVATE
A131
PRIVATE
A130
PRIVATE
A127
PRIVATE
A126
PRIVATE
A122
PRIVATE
A121
PRIVATE
A120
SEMI-PRIVATE
A129
SEMI-PRIVATE
A128
TOILET
A130A
TOILET
A131A
TOILET
A132A TOILET
A127A
TOILET
A126A
TOILET
A124A
TOILET
A122A
TOILET
A121A
TOILET
A120A
GROUP
ROOM
A143
TOILET
A128A
TOILET
A129A
SECLUSION
ANTEROOM
A136A
TOILET
A136B
SECLUSION
ROOM
A136
CONSULT
A137
STAFF
STATION
A141
EXAM ROOM
A108
CLEAN
UTILITY
A109
SOILED
UTILITY
A110
GROUP
ROOM
A111
LAB SOILED
A107
LAB CLEAN
ROOM
A105
PATIENT
TOILET
A112
CLOSET
A113TOILET
A103
TOILET
A102 ELECTRICAL
AU104
OFFICE:
PROGRAM
MGR.
A133
OFFICE:
HEAD
NURSE
A134
SEMI-PRIVATE
A124
LAUNDRY
A123
MULTI-PURPOSE
ROOM
A115
BREAK
ROOM
A119JAN.
A117
CORRIDOR
A116
DAY/DINING
ROOM
A125
SALLY PORT
ENTRY
A101
STAIR
AS101
MED ROOM
A142
ELEC.
A114
ANTEROOM
A106A
TOILET
A106
STAFF
TOILET
A118
CORRIDOR
ELEC
AU101
ELEC
AU102
ELEC
AU103WAITING
A100
SEROLOGY
LAB
A139
PCR 3
A139C
IFA SCOPE
A139D
SRL OFFICE
A138
PCR 1
A139A
PCR 2
A139B
SRL
TESTING
B111
CAV-20
CAV-18
CAV-25
CAV-17
CAV-24
CAV-19
CAV-21
CAV-2
CAV-3
CAV-22
CAV-1
CAV-4 CAV-5
CAV-6
CAV-7
CAV-9
CAV-11
CAV-23
CAV-12
CAV-13
CAV-26
CAV-16
CAV-15
CAV-14
VAV-10
CAV-8
155 CFM
SD-2
265 CFM
SD-3
60 CFM
SD-1
140 CFM
SD-2
140 CFM
SD-2
135 CFM
SD-2
145 CFM
SD-2
140 CFM
SD-2
140 CFM
SD-2
120 CFM
SD-1
130 CFM
SD-1
55 CFM
SD-1
40 CFM
SD-1
80 CFM
SD-1
135 CFM
SD-2
105 CFM
SD-1
100 CFM
SD-1
100 CFM
SD-1
100 CFM
SD-1
145 CFM
SD-2
245 CFM
SD-3
245 CFM
SD-3
175 CFM
SD-2
265 CFM
SD-3
270 CFM
SD-3
250 CFM
SD-3 125 CFM
SD-1
130 CFM
SD-1
120 CFM
SD-1
125 CFM
SD-1
250 CFM
SD-3
135 CFM
SD-2
215 CFM
SD-2
80 CFM
SD-1
220 CFM
SD-2
80 CFM
SD-1 160 CFM
SD-2
155 CFM
SD-2
115 CFM
SD-1110 CFM
SD-1
245 CFM
SD-3
35 CFM
SD-1
100 CFM
SD-1100 CFM
SD-1
125 CFM
SD-1
50 CFM
SD-1
245 CFM
SD-3
240 CFM
SD-3
"x
" S
A
28"x12" SA10"ø SA
8"ø
8"ø
10"ø SA
8"ø
6"ø
6"ø SA
6"ø
8"ø
8"ø
6"ø
6"ø
8"ø
10"ø8"ø
6"ø
8"ø
6"ø
6"ø
6"ø 8"ø
8"ø 16"x10"
12"ø
8"ø
10"ø
6"ø
8"ø
8"ø
6"ø
6"ø
16"x10"
12"ø
12"ø
8"ø
8"ø
8"ø8"ø
8"ø 6"ø
8"ø
8"ø
6"ø
6"ø
6"ø
8"ø 6"ø
6"ø
6"ø
6"ø6"ø
8"ø 8"ø
6"ø8"ø
6"ø
6"ø
8"ø
VAV-27
310 CFM
SG-1
150 CFM
SG-1
8"ø
8"ø
RP-2
8"ø
12"x8"
RP-1
6"ø
CAV-30
VAV-28
90 CFM
SD-1
170 CFM
SD-2
(E)18"ø HD
(E)18"ø CD
(E)10"ø HD
8"ø
8"ø
10"ø
8"ø
6"ø
6"ø 6"ø
10"ø 10"ø
8"ø
10"ø 8"ø
8"ø
8"ø
6"ø
14"ø
40"x14" SA
8"ø
5"ø
10"ø HD 10"ø CD 2
8"ø 6"ø
8"ø
6"ø
10"ø
8"ø
CAV-29
8"ø
14"x10" 20"x12" SA
8"ø
8"ø
14"x10"
40"x16" SA
12"ø
12"ø 12"ø
6"ø 8"ø
10"ø
12"ø 8"ø
10"ø
8"ø
8"ø
12"ø SA
12"ø SA
6"ø CD 6"ø HD
8"ø
8"ø
8"ø
8"ø
8"ø
(E)10"ø CD
40"x16" SA 8"ø
10"ø CD
10"ø HD
FSD-5
FSD-4
FSD-7
FSD-2FSD-1
FSD-9
(E)12"ø HD
(E)12"ø CD 12"ø CD 12"ø HD
8"ø CD 8"ø HD
8"ø 16"x10"
16"x12"
SD
SD
MHU ARCHITECTURAL
RENOVATION AREA
MHU ARCHITECTURAL
RENOVATION AREA
MHU ARCHITECTURAL
RENOVATION AREA
FSD-10
FSD-11
FSD-12
FSD-13
MHU ARCHITECTURAL
RENOVATION AREA
2-HR FIRE BARRIER
SEE G-103
2-HR FIRE BARRIER
SEE G-103
2-HR FIRE BARRIER
SEE G-103
HGF
SHARED
OFFICE
B129J
OFFICE
B129H
OFFICE
B129G
OFFICE
B129F
CORRIDOR
B129
STUDENTS
B129L
PANTRY
B129K
OFFICE
B129B OFFICE
B129C
CLOSET
B129D
OFFICE
B129E
CLOSET
B129A
(E)VAV-29
(E)VAV-30
(E)VAV-32(E)VAV-31
(E)VAV-33
(E)VAV-34
(E)VAV-35
(E)6"ø
(E)6"ø
(E)6"ø
(E)6"ø
(E)5"ø
(E)6"ø SA
(E)6"ø SA
(E)22"ø SA
(E)28"ø SA
175 CFM
SD-2
150 CFM
SD-2
150 CFM
SD-2
150 CFM
SD-2
175 CFM
SD-2
150 CFM
SD-2
150 CFM
SD-2
100 CFM
SD-1
100 CFM
SD-1
(E )8
"ø S
A
(E)5"ø
(E)6"ø
TYP.
MHU ARCHITECTURAL
RENOVATION AREA
A. NEW WORK IS INDICATED WITH HEAVY LINE WEIGHT.
B. LOCATE VOLUME DAMPERS AS FAR AWAY FROM AIR DEVICES AND AS CLOSE
TO TAKEOFFS FROM MAINS AS POSSIBLE TO PREVENT NOISE (MINIMUM OF
FIVE FEET AWAY FROM AIR DEVICES WHEREVER POSSIBLE). LOCATE VOLUME
DAMPERS SO THEY CAN BE ACCESSED THROUGH LAY-IN CEILING TILE OR WITH
REMOTE LIGATURE RESISTANT VOLUME DAMPER ADJUSTMENT DEVICE WITH
CABLE LOCATED INSIDE THE DUCT AND ADJUSTMENT DEVICE INSIDE
PERFORATED AIR DEVICE COVER (LIGATURE RESISTANT ACCESS BEHIND
PERFORATED AIR DEVICE COVER SECURED BY TAMPER RESISTANT
FASTENERS). FOR VOLUME DAMPERS ACCESSIBLE FROM LAY-IN CEILINGS,
PROVIDE HANDLE WITH LOCKING QUADRANT AND INSULATION STAND-OFF
DEVICE TO PREVENT HANDLE FROM CONFLICTING WITH EXTERNAL DUCT
INSULATION. SEE VOLUME DAMPER DETAIL.
C. INSTALL ALL EQUIPMENT AND ACCESSORIES IN ACCORDANCE WITH
MANUFACTURERS’ RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE
CODES, REGULATIONS, AND OWNER STANDARDS.
D. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT AND
PIPING INSULATION IS APPLIED.
E. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN
ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND
DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR OPTIMUM
PERFORMANCE.
F. THE LOCATIONS OF ITEMS SHOWN ON THE DRAWINGS OR REQUIRED BY THE
SPECIFICATIONS NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE
ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST RESULTS
MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE
THE APPROVAL OF THE OWNER AND ENGINEER BEFORE BEING INSTALLED. DO
NOT SCALE DRAWINGS.
G. LOCATE BALANCE VALVES SO THEY CAN BE ACCESSED THROUGH THE CEILING
TILE OR PROVIDE ACCESS PANEL(S).
H. INSTALL EQUIPMENT WITH MINIMUM ACCESS CLEARANCE AS RECOMMENDED
BY CODE AND MANUFACTURERS.
I. GENERAL CONTRACTOR SHALL PROVIDE ALL ACCESS PANELS IN NON-
ACCESSIBLE SUSPENDED CEILINGS AND WALLS FOR ACCESS TO EQUIPMENT
SUCH AS VAV BOXES, VALVES, DAMPERS, AND CONTROLS, ETC. SEE
MECHANICAL PLANS FOR COORDINATED DAMPER LOCATIONS. IF MORE
ACCESS PANELS ARE REQUIRED, COORDINATE LOCATIONS WITH OWNER. ALL
CEILING PANELS SHALL BE 24”X24”. PROVIDE PER 08 31 13 ACCESS DOORS AND
FRAMES.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\c ra ig \D o cu m e n ts
\R e vi t
L o ca l M o d e ls \M e ch a n ic a l ( cr a ig
.li e g ib e l@ ff e
-s e rv .c o m
.r vt
/1
/2
:0
:3
P
M
MH-101
HVAC SUPPLY NEW WORK PLAN -
FIRST FLOOR
03/24/2020 GC KG/CL03/24/2020
1/8" = 1'-0"
1 HVAC NEW WORK PLAN - FIRST FLOOR - AREA A
1/8" = 1'-0"
2 HVAC NEW WORK PLAN - FIRST FLOOR - AREA B
DRAWING NOTES:
1 PROVIDE NEW SUPPLY DUCT SIZED AND REBALANCE TO ORIGINAL AIRFLOW
AS SHOWN. HEAPY PRE-TAB REPORT SHOWS AIRFLOW AT ZONE #1 SHOULD
BE AROUND 1,230 CFM FOR HOT DECK AND 1,525 CFM FOR COLD DECK.
REBALANCE TO AIRFLOWS AND STATIC PRESSURES FOR HOT AND COLD
DECK AS SHOWN ON TAB SHEET MH-504.
2 PROVIDE NEW AIR DEVICE SIZED AS SHOWN.
3 PROVIDE NEW SUPPLY DUCT AND AIR DEVICE SIZED AS SHOWN.
4 PROVIDE NEW THERMOSTAT WHICH SHALL BE COMPATIBLE WITH EXISTING
JCI CONTROLS AND ADJUSTABLE BY OCCUPANTS. TYPICAL.
5 PROVIDE NEW SUPPLY DUCT TO EXISTING VAV TERMINALS.
KEY PLAN
N
AREA B
AREA A
NJHG
T T
T
T
T T
T 7
NMLKJHGF
5.
O P Q R
34"x24" EA
24"x24"
44"x12" RA UP
TO RTU-14
155 CFM
RG-6
410 CFM
RG-5
140 CFM
RG-6
50 CFM
RG-2
125 CFM
RG-6 125 CFM
RG-4
35 CFM
RG-1
435 CFM
RG-5
50 CFM
RG-2
50 CFM
RG-2
180 CFM
RG-4
400 CFM
RG-3
400 CFM
RG-3
100 CFM
RG-6
70 CFM
RG-2
95 CFM
RG-4
100 CFM
RG-6
25 CFM
RG-2
65 CFM
RG-2
65 CFM
RG-2
130 CFM
RG-6
55 CFM
RG-2
50 CFM
RG-1
60 CFM
RG-2
75 CFM
EG-1
75 CFM
EG-1
95 CFM
EG-1
105 CFM
EG-1
105 CFM
EG-1
75 CFM
EG-175 CFM
EG-1
75 CFM
EG-1
75 CFM
EG-1
75 CFM
EG-1
85 CFM
EG-1
85 CFM
EG-1
85 CFM
EG-1
200 CFM
EG-1
75 CFM
EG-1
150 CFM
EG-195 CFM
EG-1
95 CFM
EG-1
80 CFM
EG-1
PRIVATE
A132
PRIVATE
A131
PRIVATE
A130
PRIVATE
A127
PRIVATE
A126
PRIVATE
A122
PRIVATE
A121
PRIVATE
A120
SEMI-PRIVATE
A129
SEMI-PRIVATE
A128
TOILET
A130ATOILET
A131A
TOILET
A132A
TOILET
A127A
TOILET
A126A
TOILET
A124A
TOILET
A122A
TOILET
A121A
TOILET
A120A
GROUP
ROOM
A143
TOILET
A128A
TOILET
A129A
SECLUSION
ANTEROOM
A136A
TOILET
A136B
SECLUSION
ROOM
A136
CONSULT
A137
STAFF
STATION
A141
EXAM ROOM
A108
CLEAN
UTILITY
A109
SOILED
UTILITY
A110
GROUP
ROOM
A111
LAB SOILED
A107
LAB CLEAN
ROOM
A105
PATIENT
TOILET
A112
CLOSET
A113
TOILET
A103
TOILET
A102
ELECTRICAL
AU104
OFFICE:
PROGRAM
MGR.
A133
OFFICE:
HEAD
NURSE
A134
SEMI-PRIVATE
A124
LAUNDRY
A123
MULTI-PURPOSE
ROOM
A115
BREAK
ROOM
A119
JAN.
A117
CORRIDOR
A116
DAY/DINING
ROOM
A125
SALLY PORT
ENTRY
A101
STAIR
AS101
MED ROOM
A142
ELEC.
A114
ANTEROOM
A106A
TOILET
A106
STAFF
TOILET
A118
CORRIDOR
ELEC
AU101
ELEC
AU102
ELEC
AU103
WAITING
A100
SEROLOGY
LAB
A139
PCR 3
A139C
IFA SCOPE
A139D
SRL OFFICE
A138
PCR 1
A139A PCR 2
A139B
SRL
TESTING
B111
70 CFM
RG-6
75 CFM
EG-1
315 CFM
EG-2
4"ø EA
DRYER
WALL
VENT
DRYER
WALL BOX
280 CFM
RG-3
270 CFM
RG-3
270 CFM
RG-3
275 CFM
RG-3
275 CFM
RG-3
22"x14" RA
12"x10" RA8"x8" RA6"x6" RA
6"x6"
6"x6"
6"x6"
6"x6"
8"x6"
10"x8"
10"x8"
12"x8" RA
10"x8" RA 6"x6"6"x6"
6"x6"
8"x8" RA
6"x6"
6"x6"
8"x6" RA
6"x6"
16"x10" RA
18"x12" RA 8"x8"
8"x6"
6"x6"
6"x6"
10"x10"
6"x6"
6"ø
8"ø EA
6"ø
10"ø EA 8"ø
6"ø
12"ø EA 10"ø
6"ø
12"ø EA 14"x10" EA
6"ø
6"ø
12"ø EA
12"ø EA
6"ø
6"ø
6"ø
6"ø
10"ø EA 12"ø EA
10"ø EA
6"ø
6"ø
6"ø 8"ø EA
6"x6"
14"x10"
RP-2
EXHAUST AIR
UP TO EF-MH
12"ø EA
8"x6"
RP-1
20"x12" RA
10"x8"
150 CFM
RG-7
310 CFM
RG-7
12"ø EA
12"ø EA
(E) FUME HOOD
100 CFM
8"ø EA
1519 CFM
150 CFM
6"x6"
8"x6"
8"x8" EA
8"ø 8"x6"
10"x8" RA
8"x8" EA
22"x12" RA
8"x8"
8"ø EA
6"ø
N
N
N
8"x8"
8"x8"
7 7
6"x6"
7 7
8"x8"
10"x8" RA
20"x12" RA
14"x8" RA
10"x8"
10"x6" RA
6"ø RA
12"x10"
6"ø
6"x6"
8"x6"
8"x6"
16"x10" RA
12"x10" RA
8"x8"
6"ø
8"x8" EA
8"ø EA
FSD-8 FSD-6
FSD-36"ø 120 CFM
EG-1
8"ø 6"ø RA
10"ø
16"x8" EA
6"ø
36"x14" RA
16"x12" EA
MHU ARCHITECTURAL
RENOVATION AREA
MHU ARCHITECTURAL
RENOVATION AREA
MHU ARCHITECTURAL
RENOVATION AREA
FSD-16
FSD-17
FSD-14
FSD-15
FSD-18
6"ø
FSD-19
MHU ARCHITECTURAL
RENOVATION AREA
2-HR FIRE BARRIER
SEE G-103
1-HR FIRE BARRIER
SEE G-103
2-HR FIRE BARRIER
SEE G-103
2-HR FIRE BARRIER
SEE G-103
1-HR FIRE BARRIER
SEE G-103
2-HR FIRE BARRIER
SEE G-103
A. NEW WORK IS INDICATED WITH HEAVY LINE WEIGHT.
B. LOCATE VOLUME DAMPERS AS FAR AWAY FROM AIR DEVICES AND AS CLOSE
TO TAKEOFFS FROM MAINS AS POSSIBLE TO PREVENT NOISE (MINIMUM OF
FIVE FEET AWAY FROM AIR DEVICES WHEREVER POSSIBLE). LOCATE VOLUME
DAMPERS SO THEY CAN BE ACCESSED THROUGH LAY-IN CEILING TILE OR WITH
REMOTE LIGATURE RESISTANT VOLUME DAMPER ADJUSTMENT DEVICE WITH
CABLE LOCATED INSIDE THE DUCT AND ADJUSTMENT DEVICE INSIDE
PERFORATED AIR DEVICE COVER (LIGATURE RESISTANT ACCESS BEHIND
PERFORATED AIR DEVICE COVER SECURED BY TAMPER RESISTANT
FASTENERS). FOR VOLUME DAMPERS ACCESSIBLE FROM LAY-IN CEILINGS,
PROVIDE HANDLE WITH LOCKING QUADRANT AND INSULATION STAND-OFF
DEVICE TO PREVENT HANDLE FROM CONFLICTING WITH EXTERNAL DUCT
INSULATION. SEE VOLUME DAMPER DETAIL.
C. INSTALL ALL EQUIPMENT AND ACCESSORIES IN ACCORDANCE WITH
MANUFACTURERS’ RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE
CODES, REGULATIONS, AND OWNER STANDARDS.
D. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT AND
PIPING INSULATION IS APPLIED.
E. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN
ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND
DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR OPTIMUM
PERFORMANCE.
F. THE LOCATIONS OF ITEMS SHOWN ON THE DRAWINGS OR REQUIRED BY THE
SPECIFICATIONS NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE
ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST RESULTS
MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE
THE APPROVAL OF THE OWNER AND ENGINEER BEFORE BEING INSTALLED. DO
NOT SCALE DRAWINGS.
G. LOCATE BALANCE VALVES SO THEY CAN BE ACCESSED THROUGH THE CEILING
TILE OR PROVIDE ACCESS PANEL(S).
H. INSTALL EQUIPMENT WITH MINIMUM ACCESS CLEARANCE AS RECOMMENDED
BY CODE AND MANUFACTURERS.
I. GENERAL CONTRACTOR SHALL PROVIDE ALL ACCESS PANELS IN NON-
ACCESSIBLE SUSPENDED CEILINGS AND WALLS FOR ACCESS TO EQUIPMENT
SUCH AS VAV BOXES, VALVES, DAMPERS, AND CONTROLS, ETC. SEE
MECHANICAL PLANS FOR COORDINATED DAMPER LOCATIONS. IF MORE
ACCESS PANELS ARE REQUIRED, COORDINATE LOCATIONS WITH OWNER. ALL
CEILING PANELS SHALL BE 24”X24”. PROVIDE PER 08 31 13 ACCESS DOORS AND
FRAMES.
GENERAL NOTES:
HGF
SHARED
OFFICE
B129J
OFFICE
B129H
OFFICE
B129G
OFFICE
B129F
CORRIDOR
B129
STUDENTS
B129L
PANTRY
B129K
OFFICE
B129B
OFFICE
B129C
CLOSET
B129D
OFFICE
B129ECLOSET
B129A
(E)32"x32" EA
(E)16"x14" EA
(E)28"x26" EA
(E)16"x14" EA
(E)14"x12" EA
(E)16"x12" EA
(E )1
4" x1
0" E
A150 CFM
EG-1
175 CFM
EG-1
150 CFM
EG-1
100 CFM
EG-1
100 CFM
EG-1
150 CFM
EG-1
175 CFM
EG-1
300 CFM
EG-1
6"ø EA
(E)6"ø EA (E)6"ø EA
MHU ARCHITECTURAL
RENOVATION AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\c ra ig \D o cu m e n ts
\R e vi t
L o ca l M o d e ls \M e ch a n ic a l ( cr a ig
.li e g ib e l@ ff e
-s e rv .c o m
.r vt
/1
/2
:0
:4
P
M
MH-102
HVAC RETURN & EXHAUST NEW
WORK PLAN - FIRST FLOOR
03/24/2020 GC KG/CL03/24/2020
1/8" = 1'-0"
1 HVAC NEW WORK PLAN - FIRST FLOOR - AREA A
DRAWING NOTES:
1 PROVIDE NEW EXHAUST DUCT SIZED AS SHOWN. CONTRACTOR PERFORMED
PRE-TAB REPORT IS DESCRIBED IN DEMOLITION NOTE 6 ON MD-101. AIRFLOW ON
SHEET M2.1A OF CMTA PROJECT #596-07-101 “REPLACE A/C 3 AND A/C 4, CDD”
SHOWS AIRFLOW FOR HOOD SHOULD BE AROUND 1,520 CFM THROUGH THE
ORIGINAL EXHAUST DUCT SIZE OF 12”X12”. BALANCE HOOD TO GREATER OF
ORIGINAL PRE-TAB FLOW OR 1,520 CFM.
2 PROVIDE NEW RETURN DUCT SIZED AS SHOWN. CONTRACTOR PERFORMED
PRE-TAB REPORT IS DESCRIBED IN DEMOLITION NOTE 10 ON MD-101. AIRFLOW ON
SHEET M2.1B OF CMTA PROJECT #596-07-101 “REPLACE A/C 3 AND A/C 4, CDD”
SHOWS AIRFLOW FOR AIR DEVICE SHOULD BE AROUND 100 CFM. BALANCE TO
GREATER OF ORIGINAL PRE-TAB FLOW OR 100 CFM.
3 PROVIDE NEW EXHAUST DUCT SIZED AS SHOWN. CONTRACTOR PERFORMED
PRE-TAB REPORT IS DESCRIBED IN DEMOLITION NOTE 11 ON MD-101. AIRFLOW ON
SHEET M2.1A OF CMTA PROJECT #596-07-101 “REPLACE A/C 3 AND A/C 4, CDD”
SHOWS AIRFLOW FOR EXHAUST AIR DEVICE SHOULD BE AROUND 250 CFM
THROUGH THE ORIGINAL EXHAUST DUCT SIZE OF 12”X12”. BALANCE TO GREATER
OF ORIGINAL PRE-TAB FLOW OR 250 CFM.
4 PROVIDE NEW AIR DEVICE SIZED AS SHOWN.
5 PROVIDE NEW EXHAUST DUCT AND AIR DEVICE SIZED AS SHOWN.
6 PROVIDE NEW RETURN DUCT MOUNTED MOISTURE (RELATIVE HUMIDITY) SENSOR
AT THIS LOCATION.
7 PROVIDE NEW RETURN DUCT MOUNTED TEMPERATURE SENSOR AT THIS
LOCATION.
8 PROVIDE NEW RETURN DUCT MOUNTED TEMPERATURE SENSOR AT THIS
LOCATION. (CAV-25)
9 PROVIDE NEW RETURN DUCT MOUNTED TEMPERATURE SENSOR AT THIS
LOCATION. (CAV-26)
10 PROVIDE APPROVED DRYER WALL BOX, DRYER WALL VENT, AND DUCT SIZED AS
SHOWN PER MANUFACTURER'S INSTRUCTIONS AND CODE.
11 PROVIDE NEW EXHAUST DUCT MOUNTED TEMPERATURE SENSOR AT THIS
LOCATION.
1/8" = 1'-0"
2 HVAC NEW WORK PLAN - FIRST FLOOR - AREA B
KEY PLAN
N
AREA B
AREA A
NJHG
T T
T
T
T T
T 7
NMLKJHGF
MH-104
MH-104
5.
O P Q R
PRIVATE
A132
PRIVATE
A131
PRIVATE
A130
PRIVATE
A127
PRIVATE
A126
PRIVATE
A122
PRIVATE
A121
PRIVATE
A120
SEMI-PRIVATE
A129
SEMI-PRIVATE
A128
TOILET
A130ATOILET
A131A
TOILET
A132A
TOILET
A127A
TOILET
A126A
TOILET
A124A
TOILET
A122A
TOILET
A121A
TOILET
A120A
GROUP
ROOM
A143
TOILET
A128A
TOILET
A129A
SECLUSION
ANTEROOM
A136A
TOILET
A136B SECLUSION
ROOM
A136
CONSULT
A137 STAFF
STATION
A141
EXAM ROOM
A108
CLEAN
UTILITY
A109
SOILED
UTILITY
A110
GROUP
ROOM
A111
LAB SOILED
A107
LAB CLEAN
ROOM
A105
PATIENT
TOILET
A112
CLOSET
A113
TOILET
A103
TOILET
A102
ELECTRICAL
AU104
OFFICE:
PROGRAM
MGR.
A133
OFFICE:
HEAD
NURSE
A134 SEMI-PRIVATE
A124
LAUNDRY
A123
MULTI-PURPOSE
ROOM
A115
BREAK
ROOM
A119
JAN.
A117
CORRIDOR
A116
DAY/DINING
ROOM
A125
SALLY PORT
ENTRY
A101
STAIR
AS101
MED ROOM
A142
ELEC.
A114
ANTEROOM
A106A
TOILET
A106
STAFF
TOILET
A118
CORRIDOR
ELEC
AU101
ELEC
AU102
ELEC
AU103
WAITING
A100
SEROLOGY
LAB
A139 PCR 3
A139C
SRL OFFICE
A138
PCR 1
A139A
PCR 2
A139B
SRL
TESTING
B111
RP-2
RP-1
SKYLIGHT
MHU ARCHITECTURAL
RENOVATION AREA
MHU ARCHITECTURAL
RENOVATION AREA
MHU ARCHITECTURAL
RENOVATION AREA
HGF
SHARED
OFFICE
B129J
OFFICE
B129H
OFFICE
B129G
OFFICE
B129F
CORRIDOR
B129
STUDENTS
B129L
PANTRY
B129K
OFFICE
B129B OFFICE
B129C
CLOSET
B129D
OFFICE
B129E
CLOSET
B129A
MHU ARCHITECTURAL
RENOVATION AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\c ra ig \D o cu m e n ts
\R e vi t
L o ca l M o d e ls \M e ch a n ic a l ( cr a ig
.li e g ib e l@ ff e
-s e rv .c o m
.r vt
/1
/2
:0
:5
P
M
MH-103
HVAC DUCT COORDINATION PLAN
- FIRST FLOOR
03/24/2020 GC KG/CL03/24/2020
1/8" = 1'-0"
1 HVAC NEW WORK COORDINATION PLAN - FIRST FLOOR - AREA A
KEY PLAN
N
AREA B
AREA A
NJHG
1/8" = 1'-0"
2 HVAC NEW WORK COORDINATION PLAN - FIRST FLOOR - AREA B
DN
A211
A210
A213
AH204 A211A
B234
B234
B233
B232
B231
B230
B229
B228
B227
B226
B225
B224
EXAMINATION
CLINIC C WAITING
GROUP CLINIC RM
EMS
PATIENT TOILET
CORRIDOR WC STORAGE
MECH RM
WARFARIN CLINIC
NURSE MGR
OFFICE
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
DN7
NMLKJ
MH-104
MH-104
RELOCATED ROOF
DRAIN LOCATION
ROOFING CONTRACTOR
TO RELOCATE EXISTING
ROOF (NOT PLUMBING)
VENT LOCATION
EXISTING VENT
LOCATION
5'
0"
5' - 7"
FUNCTIONING
EXHAUST FAN
TO REMAIN
NMLKJ
APPROXIMATE LOCATION
FOR EXISTING EXHAUST FAN
P-1
P-2
2"ø LPS
2"ø CWR 2"ø CWS
18"x16" EA 3' - 0"
ET-1
HEX-1
2"ø LPC
UH-1
1 1/2"ø HWS
1 1/2"ø HWR
NEW ROOF DRAIN
LOCATION
APPROXIMATE NEW ROOF
(NOT PLUMBING) VENT
LOCATION BY ROOFING
CONTRACTOR
APPROXIMATE NEW ROOF
(NOT PLUMBING) VENT
LOCATION BY ROOFING
CONTRACTOR
OUTSIDE AIR
INTAKE LOUVER
EXHAUST
DISCHARGE DUCTED
25 FT AWAY FROM
OUTSIDE AIR INTAKE
LOCATE EXHAUST
FAN 25 FEET AWAY
FROM OUTSIDE AIR
INTAKE1 1/2"ø LPS
1 1/2"ø LPC
EF-MH
RTU-14 5
RELIEF AIR LOUVER
MORE THAN 10 FT
AWAY FROM OUTSIDE
AIR INTAKE
EXISTING ROOF
DRAIN TO REMAIN
NEW ROOF
DRAIN LOCATION
NMLKJ
26' - 4" 21' - 8" 21' - 8" 21' - 8"
FUNCTIONING
EXHAUST FAN
TO REMAIN
RELOCATED NEW
ROOF DRAIN LOCATION
ROOFING CONTRACTOR
TO RELOCATE EXISTING
ROOF (NOT PLUMBING)
VENT LOCATION
FUNCTIONING
EXHAUST FAN
TO REMAIN
APPROXIMATE FUTURE RTU
LOCATION (NOT PART OF
MENTAL HEALTH PROJECT)
NEW RTU
LOCATION
JOISTS
8" CONCRETE SLAB
MECHANICAL ROOM
EXTERIOR WALL
DROP PANEL AT COLUMN
(UNDERNEATH SLAB)
ROOFING CONTRACTOR
TO RELOCATE EXISTING
ROOF (NOT PLUMBING)
VENT LOCATION
APPROXIMATE NEW
ROOF (NOT PLUMBING)
VENT LOCATION BY
ROOFING CONTRACTOR
APPROXIMATE NEW
ROOF (NOT PLUMBING)
VENT LOCATION BY
ROOF CONTRACTOR
NEW ROOF DRAIN
LOCATION
NEW ROOF DRAIN
LOCATION
EXISTING AC-3
EXHAUST LOUVER
LOCATION
EF-MH
RTU-14
OUTSIDE AIR
INTAKE LOUVER
R 2 5'
- 0
R 25' - 0
25 FT RADIUS FROM
RTU-14 AIR INTAKE
RELIEF AIR LOUVER
MORE THAN 10 FT
AWAY FROM OUTSIDE
AIR INTAKE
EXISTING CURB TO
REMAIN
EXISTING VENT
LOCATION
SECOND FLOOR
114' - 8"
76 8
MH-104
(E) 4" V
RA
SA
ROOF DRAIN
ROOF DRAIN
2" SAN
16"x18" EA
(E) 4" V
1' - 0"
FIELD VERIFY
1' - 8" 1' - 0"
1' - 8"0' - 4"
(E)12"x24" EA
RTU-14
SECOND FLOOR
114' - 8"
ML3
MH-104
ROOF
DRAIN APPROXIMATE
VENT LOCATION
(E)24"x12" EA
16"x12" EA
18"x16" EA
18"x18" EA
EF-MH
2'
0"
RTU-14
ROOF
DRAIN
A. NEW WORK IS INDICATED WITH HEAVY LINE WEIGHT.
B. INSTALL ALL EQUIPMENT AND ACCESSORIES IN ACCORDANCE WITH
MANUFACTURERS’ RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE
CODES, REGULATIONS, AND OWNER STANDARDS.
C. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT AND
PIPING INSULATION IS APPLIED.
D. LOCATED ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN
ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND
DOWNSTREAM AS RECOMMENDED BY THE MANUFACTURER FOR OPTIMUM
PERFORMANCE.
E. THE LOCATIONS OF ITEMS SHOWN ON THE DRAWINGS OR REQUIRED BY THE
SPECIFICATIONS NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE
ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST RESULTS
MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE
THE APPROVAL OF THE OWNER AND ENGINEER BEFORE BEING INSTALLED. DO
NOT SCALE DRAWINGS.
F. LOCATE BALANCE VALVES SO THEY CAN BE ACCESSED THROUGH THE CEILING
TILE OR PROVIDE ACCESS PANEL(S).
G. INSTALL EQUIPMENT WITH MINIMUM ACCESS CLEARANCE AS RECOMMENDED
BY CODE AND MANUFACTURERS.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\c ra ig \D o cu m e n ts
\R e vi t
L o ca l M o d e ls \M e ch a n ic a l ( cr a ig
.li e g ib e l@ ff e
-s e rv .c o m
.r vt
/1
/2
:0
:0
P
M
MH-104
HVAC NEW WORK PLAN - FIRST
FLOOR ROOF
03/24/2020 GC KG/CL03/24/2020
1/8" = 1'-0"
1 NEW WORK PLAN - FIRST FLOOR ROOF
1/8" = 1'-0"
2 ROOF PLAN CALLOUT
DRAWING NOTES:
1 PROVIDE EXHAUST DUCT EXTENSION SIZED AS SHOWN FOR EXISTING EXHAUST FAN
TO EXTEND EXHAUST DISCHARGE BEYOND 25 FEET FROM THE NEW RTU-14 AND
FUTURE RTU OUTDOOR INTAKES AS SHOWN IN DETAIL 2 ROOF PLAN CALLOUT.
PROVIDE EQUIPMENT CURBS, BASE PLATES, DUCT SUPPORT FRAMES OF STANCHIONS
OR STRUTS A MAXIMUM OF EVERY 10 FEET APART. DISCHARGE END OF DUCT SHALL
HAVE A CUT WITH OPEN END DOWN TOWARDS ROOF NO GREATER THAN 45 DEGREES
FROM THE HORIZONTAL. SEE EQUIPMENT CURB DETAIL 1 ON SHEET MH-503.
2 APPROXIMATE LOCATION OF ROOF PENETRATION.
3 ROOFING CONTRACTOR TO MOVE ROOF (NOT PLUMBING) VENTS.
4 PROVIDE NEW EF-MH AND CURB
5 PROVIDE NEW RTU-14 AND CURB
6 CONTRACTOR SHALL FIELD VERIFY SUPPLY AIR DUCT DROP LOCATION SO
PENETRATION IS CENTERED IN BETWEEN CONCRETE JOISTS.
7 SEE STRUCTURAL DRAWING FOR REQUIRED STRUCTURAL RETURN AIR DUCT DROP
PENETRATION MODIFICATIONS.
1/4" = 1'-0"
RTU-14 ELEVATION - NORTH
1/4" = 1'-0"
4 RTU-14 ELEVATION - WEST
KEY PLAN
N
AREA B
AREA A
NJ
W
W1
W
"D"
45°M
AX.
W
1/2" 1/2" 1 1/2"
SE
E
NO
TE
SEE NOTE 3
SEE NOTE 2
SEE NOTE 1
A B1"
NTS
DUCTWORK SQUARE VANE ELBOWS
NOTE:
1. ALL VANE ELBOWS SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
2. WHEN W1 DOES NOT EQUAL W2, VANE SHALL BE SINGLE THICKNESS VANE TYPE REGARDLESS OF
W DIMENSION.
3. ALL SINGLE THICKNESS VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE BETWEEN VANES AND A 3/4" [20mm] TRAILING EDGE.
4. WHEN W EQUALS W2 AND W1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE TYPE.
NTS
SUPPLY DUCTWORK TAKE-OFFS
AIR SPLIT DUCT TAKE-OFF PLAN VIEW BRANCH DUCT TAKE-OFF PLAN VIEW
AIR FLOW
AIR FLOW
AI
R
FL
O
W
SUPPLY REGISTER OR
BRANCH DUCT
TURNING VANES
MAIN SUPPLY
DUCT
SEE FLOOR PLAN FOR SPLIT
DIMENSION
PROVIDE VOLUME DAMPER
PROVIDE
VOLUME
DAMPER
1/4 W OR 4" [100mm] MIN.
AIR FLOW
MAIN SUPPLY DUCT
AI
R
FL
O
W
NTS
SUPPLY DUCT TAKEOFF - AIR TERMINAL UNIT
RIGID DUCT TO AIR TERMINAL UNIT.
ROUND SHEET METAL DUCT.
MAIN SUPPLY
PLAN VIEW
NTS
EXHAUST OR RETURN BRANCH DUCTWORK
MAIN EXHAUST OR RETURN
PLAN VIEW
AIR FLOW
AIR FLOW
PROVIDE VOLUME
DAMPER
AT EACH BRANCH DUCT
1/4W OR 4" [100mm] MIN.
BRANCH DUCT
VD
NTS
VOLUME DAMPER DETAIL
NOTE:
1. DELETE INSULATION STAND-OFF ON DUCTWORK WITHOUT EXTERIOR INSULATION.
2. DETAIL SHOWS SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR MULTI-BLADE DAMPERS
& ROUND DAMPERS.
3. SEE GENERAL NOTES ON MECHANICAL NEW WORK SHEETS REGARDING VOLUME DAMPER LOCATIONS AND
ABOUT REMOTE ADJUSTMENT DEVICE OPTION FOR INACCESSIBLE CEILINGS.
INSULATION SEE
SPECIFICATION
DAMPER BLADE
1/8" [6mm]
CLEARANCE ALL
AROUND
OUTSIDE END BEARING
INSIDE END BEARING
HANDLE WITH
LOCKING
QUADRANT
INSULATION
STAND-OFF
1/2" [15mm] ROUND ROD PIN
DUCT
STIFFEN BLADE AS
REQUIRED
SIDE ELEVATION SECTION
SECTION "A-A"
"B" "B"
2 DUCTWORK ACCESS PANEL AND DOOR DETAIL
NTS
NOTES:
1. LATCHES SHALL BE OF THE WEDGE TYPE TO CLOSE DOORS TIGHTLY.
2. HINGES ON THE ACCESS DOORS SHALL HAVE NON-CORROSIVE PINS.
3. SEE SMACNA 2005, FIGURE 9-15
DUCTWORK ACCESS PANEL
DUCTWORK ACCESS DOOR
CASING
GASKET
HANDLE INSIDE
FLEXIBLE
WASHER
FACTORY
FABRICATED
LATCH
SECTION "B-B"
INSULATION
DUCT
GASKET
INSULATION
INSULATION
"A"
"A"
NTS
FLEXIBLE DUCT CONNECTIONS
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION ON
FAN SIDE
WASHER 1-1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" [25x3mm] DRAW BAND
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
5/16" [8mm] FLANGE
DUCT
SHEET METAL SCREWS ON 12"
[300mm] CENTERS
RIVET ON 4" [100mm]
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" [25x3mm] BAND IRON
BOLT ON 4" [100mm] CENTERS
1" [25mm] FLANGE & HEMALTERNATE
POSITION OF
BOLT 1 1/2" [40mm] POCKET
SLIP
DUCT
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
[15mm] [15mm] [40mm]
1 1/2" [40mm] MIN. TO 3" [75mm] MAX. INSTALLED. 6" [150mm] NOMINAL WITH MATERIAL TAUTFLANGED
CONNECTION ON
FAN SIDE
WASHER
FLEXIBLE MATERIAL AS
SPECIFIED
NTS
DUCT CONNECTIONS - AIR TERMINAL UNITS
NOTE:
1. RIGID STRAIGHT TERMINAL UNIT INLET LENGTH SHALL BE A MINIMUM OF 3 TIMES THE DIAMETER
OF INLET
2. A FLEXIBLE AIR DUCT CONNECTOR IS NOT MANDATORY FOR INLET TO THIS BOX, BUT ALLOWED TO ACCOMMODATE MINOR OFFSETS. MAXIMUM LENGTH 3'-0" [900mm].
3. A BRANCH DUCT SERVING AN INDIVIDUAL BOX MAY BE THE SAME SIZE AS THE BOX INLET, PROVIDED THE EQUIVALENT LENGTH OF THE BRANCH DUCT, AS SHOWN, DOES NOT EXCEED 10
FEET (3 METERS). FOR LONGER LENGTHS, INCREASE THE DUCT SIZE AND PROVIDE A DUCT
TRANSITION TO MAINTAIN THE DUCT STATIC PRESSURE DROP AT OR BELOW 0.2"/100' [1.64Pa/m].
4. FLEXIBLE AIR DUCT CONNECTORS, WHEN USED FROM TERMINAL UNIT SUPPLY AIR DUCT TO
DIFFUSER, SHALL NOT EXCEED 3'-0" [915 mm]. USE RIGID ELBOWS FOR CHANGE OF DIRECTION
GREATER THAN 45°.
5. COMPONENT ARRANGEMENT MAY VARY BY MANUFACTURER. PROVIDE INSULATION W/VAPOR
BARRIER FOR CONNECTING DUCT SECTIONS.
6. COORDINATE LOCATION OF ALL AIR TERMINAL UNITS (CV OR VAV) SO ACCESS PANEL DOORS
(HINGED WITH SECURE LATCH) ARE DIRECTLY IN FRONT OF THE CONTROL BOX WITH REHEAT
CONTROL VALVE ON THE SAME SIDE AS THE CONTROL BOX FOR EASE OF ACCESS.
7. THIS DETAIL IS FOR A SINGLE DUCT SYSTEM. REFER TO MANUFACTURER'S INSTRUCTIONS FOR
WORK ON DUAL DUCT SYSTEMS WHICH SHOULD BE SIMILAR IN NATURE.
AIR TERMINAL UNIT
(CV OR VAV)
REHEAT COIL
FLEXIBLE AIR DUCT
CONNECTOR. SEE
DETAIL
DIFFUSER (TYP.)
SEE SPECIFICATIONS FOR CLAMPS
AND SEALANT (TYP.)
SEE NOTE 5
MANUAL
BALANCE
DAMPER
AI
R
FL
O
W
NTS
FIRE DAMPER INSTALLATION
SECTION THRU
SLEEVE, NOTE 2
DUCT
CONNECTION
NOTE 4
DAMPER, NOTE 1
DAMPER COLLAR
EXTENSION
INTEGRAL PART OF SLEEVE
SLEEVE, NOTE 2
NOTE 6FIRE BARRIER PARTITION
OR CHASE
TYPICAL
DUCT
INSULATION
PERIMETER ANGLE, NOTE 3 (NOTE
FASTENED TO PARTITION)
DUCTWORK
ACCESS
PANEL NOTE
[2 5m m
10 AIR HANDLING UNIT DRAIN TRAP DETAIL
NTS
DRAW THRU
BLOW THRU
2" [50mm] PLUS X
1" [25mm]
MINIMUM
X
2X
UNIT TYPE A B
WHERE X = STATIC PRESSURE IN PAN
DRAIN LINE SHALL BE AT LEAST THE SAME SIZE AS THE
NIPPLE ON THE DRAIN PAN
PIPING SHALL BE RIGID COPPER TYPE L OR TYPE M UNLESS
NOTE BELOW IS MET
PITCH DOWN
TOWARD DRAIN
CLEAN OUT
ROUTE TO FLOOR
SINK OR ROOF
DRAIN
DRAIN PAN
NOTE:
1. CPVC PIPE MAY BE USED ONLY IF APPROVED BY LOCAL VA AND IS INDOORS AND DOES
NOT PASS THROUGH RATED BARRIERS.
2. DIELECTRIC FITTING TO BE USED WHEN TWO DISSIMILAR METALS ARE TO BE
CONNECTED.
3. SIZE CONDENSATE PER ADOPTED IMC TABLE 307.2.2
[2 5m m
DIELECTRIC
FITTING
WATER COILS - PIPING CONNECTIONS11
NTS
WATER COIL
AIR VENT WHEN
COIL IS NOT
SELF-VENTING
TEST PLUG
(TYP.)
PIPE HANGER SHALL SUPPORT
PIPING INDEPENDENT OF COIL
WATER COIL
REDUCER, IF REQUIRED
FLOW ELEMENT
DRAIN WHEN COIL
IS NOT SELF-DRAINING
DRAIN
DOUBLE COIL
NOTES:
1. WHEN COIL IS INCLUDED IN CASING MOUNTED ON VIBRATION ISOLATORS THE FIRST 2 HANGERS FOR EACH PIPE SHALL BE SPRING & NEOPRENE TYPE. TYPE "H" FOR 100mm [4"] PIPE & SMALLER. TYPE "H-P" FOR 125mm [5"] PIPE & LARGER.
2. PIPING SHALL BE INSTALLED IN SUCH MANNER THAT IT WILL NOT BLOCK THE SWING OR USE OF ACCESS DOORS OR PANELS;
NEITHER SHALL IT BLOCK THE SERVICING OF FILTERS, VALES, OR EQUIPMENT.
3. THE FLOW ELEMENT MAY BE INSTALLED IN THE SUPPLY PIPING IF THE REQUIRED MINIMUM UPSTREAM AND DOWNSTREAM
DIMENSIONS CANNOT BE OBTAINED IN THE RETURN PIPING.
MV
MV
MV
FE
TI
MV
CALIBRATED BALANCING
VALVE (TYP.)
NTS
RTU-14 CURB SECTION DETAIL
PREFAB ROOF CURB
W/ 2X4 NAILER
CAP FLASHING
BASE MEMBRANE
TO BE EXTENDED
BEYOND CAP FLASH
ROOF MEMBRANE
RIGID INSUL
ROOFING INSUL
CONCRETE ROOF
WOOD BLOCKING AS REQ'D
L4"X4"X1/4"
2'- 0"
M
IN
MOUNTED
MECH EQUIP
VARIES
STEEL
FRAME
DAMPER
CONTROL BOX
SEE NOTE 6
2X2' ACCESS PANEL DOOR
(HINGED WITH SECURE
LATCH) - SEE NOTE 6
SEE
ARCHITECTURAL
CURB SECTION
DETAIL
NOTE:
1. A VERTICAL DAMPER IS SHOWN. HORIZONTAL DAMPER INSTALLATION, IS SIMILAR. FOLLOW DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAGES FOR SLEEVE AND PERIMETER ANGLES. FIRE DAMPERS MUST
BE INSTALLED IN THE PARTITION OR FLOOR AND NOT OUTSIDE THE PENETRATION.
2. GALVANIZED SLEEVE: GAGE NOT LESS THAN CONNECTING DUCT. FASTEN SLEEVE TO DAMPER FRAME AND TO
PERIMETER ANGLES.
3. PERIMETER ANGELS: GALVANIZED STEEL, NOT LESS THAN 1 1/2"x1 1/2" [40x40mm], 14 GAGE, TO PROVIDE 1" [25mm]
MINIMUM OVERLAP OF OPENING ON ALL 4 SIDES.
4. BREAKAWAY DUCT CONNECTION: CONTRACTOR'S OPTION OF TYPES SHOWN IN SMACNA. ACCESS PANELS: SIZE AND
LOCATION TO PERMIT SERVICING THE FUSIBLE LINK OR LINKS.
5. PROVIDE 1/4" TO 1/2" [6 TO 15mm] CLEARANCE ON HEIGHT AND WIDTH. FILL OPEN SPACE WITH ROCK WOOL FIRESTOP
FIBER.
6. ALL DUCT WORK RISERS WHICH ARE RUN EXPOSED, SUCH AS THRU ATTIC FLOORS AND MECHANICAL ROOM FLOORS, SHALL BE PROVIDED WITH 3" [75mm] HIGH CONCRETE CURB AROUND OPENING FOR DUCT.
7. PLACE ACTUATOR IN ROOM WITH LAY-IN CEILING.
MOTORIZED SHUT-OFF DAMPER
PER CONTROL SCHEMATIC
RIGID CONDUIT TO
ACCOMMODATE
ELECTRICAL WIRES
SEE NOTE 2
PREFABRICATED
ROOF CURB BY
MANUFACTURER
OF FAN
WOOD NAILING
STRIP
ELECTRICAL
CONDUIT GUIDE
MOTOR HOUSING
DUCT
TRANSITION DUCT TO FULL
SIZE OF DAMPER
ROOF
SEE NOTE 2
SEE NOTE 1
CURB CAP
NOTE:
1. SECURE CURB CAP TO WOOD NAILING STRIP WITH 3/8" [10mm] CADMIUM PLATED LAG BOLTS NOT OVER 12" [300mm] ON CENTER.
2. SECURE ROOF CURB, DUCTWORK AND DAMPER TO ROOF WITH EXPANSION
BOLTS (CONCRETE ROOF) OR RUST RESISTANT BOLTS (METAL DECK AND BAR
JOIST ROOF).
NTS
POWER ROOF VENTILATOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\c ra ig \D o cu m e n ts
\R e vi t
L o ca l M o d e ls \M e ch a n ic a l ( cr a ig
.li e g ib e l@ ff e
-s e rv .c o m
.r vt
/1
/2
:0
:0
P
M
MH-501
DETAILS
STEAM TRAP ASSEMBLY
STEAM LINE DRIP POCKET
m m 1"
M A
X
[6 "M
IN
(T Y
P m m
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(200mm [8"] MIN.)
BAND
43mm [1-5/8"] 12 GAUGE CHANNEL OR 50x50x6.4mm
[2"X2"X1/4"] ANGLE
15mm [1/2"] DIA.
HANGER RODS WITH
900mm [36"] MAX.
SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF MIN.
DENSITY) UNDER INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
NOTE:
SEE SPECIFER FOR DETAILED HANGER REQUIREMENTS
2m m [6
M
IN
m m
[1 2"
2m m [6
M
IN
[1
2"
M
IN
5m m m m [6
M
IN
m m [1
M
IN
D
D
NTS
SIDE VIEW TRAPEZE HANGER FOR UP TO
453KG [1000 LB.] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 -
SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 -
SEE SPECIFICATIONS
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
PIPE HANGERS
mm
[IN]
mm
[FT]
mm
[FT]
THRU 20
[THRU 3/4]
[7]
[5]
[1]
[7]
[6]
[11/4]
[7]
[7]
[11/2]
[9]
[8]
[2]
[10]
[8]
[21/2]
[11]
[9]
[3]
[12]
[10]
[4]
[14]
[12]
[5]
[16]
[13]
[6]
[17]
[14]
[8]
[19]
[16]
[10]
[22]
[12]
[23]
[14]
[25]
[16]
[27]
[18]
[28]
[20]
[30]
[24]
[32]
WITH 3-WAY…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .