Project Drawings_5 of 8.pdf
PDF 10 MB Posted
- Solicitation number
- 36C24920R0075
About this file
This package includes construction drawings and specifications for a project to renovate space for a new mental health unit at a Department of Veterans Affairs medical center. The project involves renovating existing space on the ground and first floors to accommodate new plumbing fixtures, medical gas outlets, and domestic water piping. Drawings show demolition plans, new work plans, fixture schedules, plumbing details, and piping diagrams. Temporary piping will be installed to maintain existing services during construction. All work must comply with VA standards and be completed while minimizing disruptions to facility operations.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W/D
FD
FD FD
FD FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
ELECTRICAL
AU104
TOILET
A102
TOILET
A103
SALLY PORT
ENTRY
A101
CONSULT
A137
TOILET
A136B
SECLUSION
ROOM
A136
SECLUSION
ANTEROOM
A136A
OFFICE: HEAD
NURSE
A134
OFFICE:
PROGRAM MGR.
A133
TOILET
A131A
TOILET
A132A
PRIVATE
A132
PRIVATE
A131
PRIVATE
A130
TOILET
A130A
SEMI-PRIVATE
A129
TOILET
A128A
TOILET
A129A
SEMI-PRIVATE
A128
PRIVATE
A127
PRIVATE
A126
TOILET
A127A
TOILET
A126A
DAY/DINING
ROOM
A125
STAFF STATION
A141
MED ROOM
A142
STAIR
AS101
GROUP ROOM
A143
TOILET
A124A
SEMI-PRIVATE
A124
LAUNDRY
A123
PRIVATE
A122
PRIVATE
A121
TOILET
A122A
TOILET
A121A
PRIVATE
A120
TOILET
A120A
MULTI-PURPOSE
ROOM
A115
JAN.
A117
STAFF TOILET
A118
BREAK ROOM
A119
CORRIDOR
A116
ELEC.
A114
CLOSET
A113
PATIENT TOILET
A112
LAB SOILED
A107
ANTEROOM
A106A
TOILET
A106
LAB CLEAN
ROOM
A105
GROUP ROOM
A111SOILED UTILITY
A110
CLEAN UTILITY
A109
EXAM ROOM
A108
(E) 6" FP STANDPIPE
(SPRINKLER ZONE A RISER)
FP1
FP1 FP1 FP1
FP1
FP1FP1
FP1 FP1
FP1
FP1
FP1
FP1 FP1 FP1
FP1
FP1 FP1 FP1
FP1
FP1
FP1
FP1
LH
OH-IOH-II
LH
LH
LH LH
LH LH
LH
LH
LH
LH
LH LH
LH LH
LH LH
LH
LH
OH-ILH
LH
LH
LH
LH
LH
LH
LH
LH
LH
LHOH-I
LH
LHLH
LH
OH-II
LH
LH
LH
LH
LH
OH-I
LH LH
LH OH-II OH-II
LH
OH-II
LH
LH
OH-II
LH
OH-II
OH-I LH
LH
LH
LH
5.
NMLKJHG
RQPO
FP1
CORRIDOR
CORRIDOR
SPRINKLER
ZONE B
SPRINKLER
ZONE A
SPRINKLER
ZONE B
SPRINKLER
ZONE A
SPRINKLER
ZONE B
SPRINKLER
ZONE A
STUDENTS
B129L OFFICE
B129F
OFFICE
B129B
OFFICE
B129C
CLOSET
B129D
OFFICE
B129E
OFFICE
B129G
OFFICE
B129H
SHARED OFFICE
B129J
FP1
FP1
FP1
FP1
LH
LH
LH
LH
LH
LH
LH
OH-II
LH LH
HG
(E) 6" FP STANDPIPE
(SPRINKLER ZONE B RISER)
SPRINKLER
ZONE B
FIRE SPRINKLER HAZARD SCHEDULE
CLASSIFICATION CRITERIA HOSE DURATION SPRINKLER NOTES
LIGHT HAZARD
ORDINARY HAZARD
GROUP I
ORDINARY HAZARD
GROUP II
0.10 GPM/SF OVER
1500 SF
0.15 GPM/SF OVER
1500 SF
0.20 GPM/SF OVER
1500 SF
100 GPM
250 GPM
250 GPM
30 MIN
60 MIN
90 MIN
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
QR; K = 5.6 OR K = 8.0
BASE AREA
BASE AREA
BASE AREA
SPRINKLER DENSITY
1 SPRINKLER PER
225 SF
1 SPRINKLER PER
130 SF
1 SPRINKLER PER
130 SF
A PROVIDE COMPLETE AUTOMATIC FIRE SPRINKLER SYSTEMS
IN RENOVATED AREAS IN ACCORDANCE WITH NFPA 13. THE
AREA RENOVATED IS CURRENTLY PROTECTED WITH
AUTOMATIC FIRE SPRINKLERS. REWORK SPRINKLER HEADS
AND PIPING AS NECESSARY TO ACCOMMODATE NEW FLOOR
PLAN.
B PROVIDE AUTOMATIC SPRINKLER SYSTEMS IN ACCORDANCE
WITH VA FIRE PROTECTION MANUAL.
C INSTALL SPRINKLER SYSTEM OVER AND UNDER DUCTS,
PIPING, AND PLATFORMS WHEN SUCH EQUIPMENT CAN
NEGATIVELY EFFECT OR DISRUPT THE SPRINKLER
DISCHARGE PATTERN AND COVERAGE.
D FURNISH PIPING OFFSETS, FITTINGS, AND ANY OTHER
ACCESSORIES AS REQUIRED TO PROVIDE A COMPLETE
INSTALLATION AND TO ELIMINATE INTERFERENCE WITH
OTHER CONSTRUCTION.
E PIPE SIZES SHALL BE DETERMINED BY HYDRAULIC
CALCULATION.
F COMPLETELY COORDINATE WITH STRUCTURAL,
ARCHITECTURAL, AND ALL OTHER TRADES. EQUIPMENT,
SPRINKLERS, AND PIPING SHOWN ON THESE PLANS IS TO
CONVEY DESIGN INTENT AND DOES NOT DICTATE THE
MEANS AND METHODS OF IMPLEMENTATION. ADHERE TO
ALL HAZARD CLASSIFICATIONS SHOWN.
G REFER TO ARCHITECTURAL AND FIRE ALARM DRAWINGS FOR
FIRE ALARM ZONES, SMOKE PARTITIONS, AND FIRE
EXTINGUISHER CABINETS.
H CONTRACTOR TO CONDUCT FIRE WATER FLOW TEST AND
SUBMIT RESULTS AND SPRINKLER DESIGN.
GENERAL NOTES:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\g re g p
\D o cu m e n ts \P lu m b in g
F P g re g .p e a rs o n ff e
-s e rv .c o m
.r vt
/2
/2
:0
:3
A
M
FX-101
FIRST FLOOR FIRE SUPPRESSION
PLAN
03/24/2020 GP GP
1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN
- AREA A
1/8" = 1'-0"
FIRST FLOOR FIRE SUPPRESSION PLAN
- AREA B
DRAWING NOTES:
FP1 EXISTING FIRE PROTECTION SPRINKLERS AND PIPING IN THIS
ROOM TO BE RE-USED AS IS.
SPRINKLER HAZARDS:
LH LIGHT HAZARD
OH-I ORDINARY HAZARD GROUP I
OH-II ORDINARY HAZARD GROUP II
03/24/2020 Revisions: Date:
PLUMBING VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENTAV
GENERAL PLUMBING SYMBOLS
LIMIT OF DEMOLITION
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
AND EXISTING WORK
POINT OF CONNECTION BETWEEN NEW
PRESSURE GAGE
THERMOMETER
STRAINER
FLOW ELEMENT
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES
PIPING ACCESSORIES
INVERTED BUCKET TRAP SET INCLUDING
FE
PIPE UP
PIPE DOWN
CO CLEAN OUT
HOSE BIB
DRAWING SYMBOLS
PL101
A
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
PL105
PIPING CONTINUATION
PLUMBING ABBREVIATIONS
REVISION NUMBER
PIPING SYMBOLS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
LABORATORY VACUUM
LABORATORY AIR
MEDICAL VACUUM
MEDICAL AIRMA
VENT (SANITARY)
DCW
DHW
DHWR
MV
LA
LV
OXYGENO
SANITARY SEWERSAN
SANITARY SEWER, BELOW GRADESAN
STORM WATERSW
STORM WATER, BELOW GRADESW
V
DIALYSIS WATER SUPPLYDWS
FILTERED COLD WATERFCW
FUEL OIL DISCHARGEFOD
FUEL OIL RETURNFOR
FUEL OIL SUPPLYFOS
FUEL OIL VENTFOV
NATURAL GASNG
NATURAL GAS, BELOW GRADENG
NITROGENN2
NITROUS OXIDEN2O
SOFTEN COLD WATERSCW
TEMPERED WATER RETURNTWR
TEMPERED WATER SUPPLYTWS
PLUMBING GENERAL NOTES
A. THE FOLLOWING NOTES APPLY EQUALLY TO THE FULL SET OF PLUMBING
DOCUMENTS.
B. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. REFER TO SCHEDULES, DETAILS, AND DIAGRAMS FOR PIPING, PIPE SIZES
AND PIPELINE DEVICES NOT INDICATED ON FLOOR PLAN.
D. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE
BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE
INVESTIGATION WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING
CONDITIONS. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND
THE WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY IMPACT THE
PROGRESS OF WORK SHALL BE BROUGHT TO THE ATTENTION OF THE VA IN
WRITING BEFORE PROCEEDING WITH THE WORK.
E. ALL WORK MUST BE COORDINATED TO MAINTAIN OPERATION OF FACILITY.
F. EACH CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF
OTHERS.
G. ALL WORK SHALL BE IN COMPLIANCE WITH GOVERNING CODES AND VA
STANDARDS.
H. PROVIDE ACCESS PANELS IN NON-ACCESSIBLE SUSPENDED CEILINGS FOR
VALVES, CLEANOUTS, CONTROLS, ETC.
I. ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE
PROTECTED AND/OR FIRESTOPPED AS REQUIRED TO MAINTAIN FIRE
RATINGS. REFER TO ARCHITECTURAL PLANS FOR LOCATIONS OF FIRE-RATED
ASSEMBLIES.
J. CONTRACTOR TO IMMEDIATELY INFORM THE COR IN THE EVENT THAT
MATERIALS OBSERVED ARE SUSPECTED TO CONTAIN ASBESTOS.
K. PROVIDE OFFSETS AS NECESSARY TO COMPLETE SYSTEMS AND
COORDINATE WORK WITH OTHER TRADES.
L. LIGATURE RESISTANT EQUIPMENT WITH TAMPER PROOF SCREWS TO BE USED
ZV ZONE VALVE
UG UNDERGROUND
YCO YARD CLEANOUT
YH YARD HYDRANT
W WASTE
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT
WH WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER
WM WALL MOUNTED
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TD TRENCH DRAIN
TDH TOTAL DYNAMIC HEAD
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
SAN SANITARY SEWER
SMACNA SHEET METAL AND AIR
CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SCFM STANDARD CUBIC FOOT/MINUTE
SCW SOFTENED COLD WATER
SDMH STORM DRAIN MANHOLE
SH SHOWER
SMH SANITARY MANHOLE
SP SUMP PUMP
SPR SPRINKLER LINE
SQFT/SF SQUARE FEET
SS STAINLESS STEEL
ST STORAGE TANK
SW STORM WATER
RCP RECIRCULATING PUMP
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS WATER
RWL RAIN WATER LEADER
PA PASCAL
PD PRESSURE DROP OR DIFFERENCE
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PP PLUMBING PUMP
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAGE
PTRV PRESSURE TEMPERATURE RELIEF
VALVE
PW POTABLE WATER
GAL GALLON
GCO GRADE CLEANOUTS
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GRS GAS REGULATOR STATION
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HB HOSE BIBB
HD HUB DRAIN
HEX HEAT EXCHANGER
HP HORSEPOWER
HS HAND SINK
HST HOT WATER STORAGE TANK
(DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWP HOT WATER PUMP
HYD HYDRANT
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KW KILOWATT
KWH KILOWATT-HOUR
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
N2 NITROGEN
N20 NITROUS OXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NOMA NOMINAL
NPW NON POTABLE WATER
NTS NOT TO SCALE
M METER
MA MEDICAL AIR
MAV MANUAL AIR VENT
MBH 1000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT
ROOM
MH MANHOLE
MOU MEMORANDUM OF
UNDERSTADING
MS MOP SINK
MSB MOP SERVICE BASIN
MV MEDICAL VACUUM
L/S LITER PER SECOND
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LV LABORATORY VACUUM
LW LOW WATER
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISH GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER
ASD ADJUSTABLE SPEED DRIVES
ASD AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING,
REFRIGERATION, AIR CONDITIONING
ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING
ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
BFP REDUCED PRESSURE BACKFLOW
PREVENTER
BHP BREAK HORSEPOWER
BPW BEDPAN WASHER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CELSIUS
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CM COUNTER MOUNTED
CO CLEANOUT
COMP COMPARTMENT
CS CLINICAL SINK
CV CONTROL VALVE
D DRAIN
DCW DOMESTIC COLD WATER
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DHWS DOMESTIC HOT WATER SUPPLY
DI DEIONIZED WATER
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWS DIALYSIS WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EMCS ENERGY MONOSERRAT
AND CENTRAL SYSTEM
EPA ENVIROMENTAL PROTECTION
AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
(E) EXISTING
F FAHRENHEIT
FCO FLOOR CLEANOUT
FCW FILTERED COLD WATER
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE)
CONNECTION
FM FLOW METER
FM FLOOR MOUNTED
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FS FLOOR SINK
FS FLOW SWITCH
FU FIXTURE UNITS
MEDICAL AIR OUTLET
OXYGEN OUTLET
MEDICAL VACUUM OUTLET
A
O
V
IN PATIENT ACCESSIBLE AREAS.
PIPING PENETRATION THROUGH FLOOR/ROOF
M. CONTRACTOR TO SCAN FOR STRUCTURAL REBAR PRIOR TO CORE DRILLING.
N. WORK IN GROUND FLOOR AND AREAS OUTSIDE OF PROJECT AREA TO BE
COMPLETED DURING AFTER HOURS.
ALL CORE DRILLING TO BE COMPLETED AFTER HOURS.
O. ADHERE TO VHA DIRECTIVE 1061 FOR PREVENTION OF HEALTHCARE-ASSOCIATED
LEGIONELLA DISEASE AND SCALD INJURY FROM POTABLE WATER DISTRIBUTION
SYSTEMS.
P. INTERNAL PARTS OF ALL PLUMBING FIXTURES, WATER PIPING, FITTINGS, AND
ACCESSORIES SHALL BE ABLE TO WITHSTAND DISINFECTING OPERATIONS OF
CHEMICAL AND THERMAL TREATMENT OF WATER TEMPERATURES UP TO 82°C
(180°F) FOR 30 MINUTES OR 50 MG/L (50 PPM) CHLORINE RESIDUAL
CONCENTRATION FOR 24 HOURS.
Q. COORDINATE UTILITY OUTAGES AND HOT WORK PERMITS WITH VA COR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\g re g p
\D o cu m e n ts \P lu m b in g
F P g re g .p e a rs o n ff e
-s e rv .c o m
.r vt
/2
/2
:5
:1
P
M
P-100
PLUMBING LEGEND AND GENERAL
NOTES
03/24/2020 GP GP
OT CLINIC
A044
OT OFFICE
A043
OT OFFICE
A043A
RECEPTION AREA
A050
CORRIDOR
AH007
A026A
TOILET & SHOWERS
A046
TOILET FEMALE
A045
EXAM
A041
EXAM
A040
PROVIDER
A039
PROVIDER
A038
EXAM/EMG
A038
CORRIDOR
A030A
CORRIDOR
AH006
WAITING AREA
A042
OUTPATIENT
A036
PHYSICAL THERAPY
STAIRWELL
AS001
ELECTRICAL
AU003
ELECTRICAL
AU002
ELECTRICAL
AU001
CORRIDOR
AH004
EMS
A026
TOILET
A024
TELEPHONE EQUIP RM
A022
LOCKERS
A026B
RECEPTION
A030
CORRIDOR
AH004
HYDROTHERAPY
A034
PHYSICAL THERAPY
A035
CORRIDOR
AH005
ASST CHIEF
A027
DIETICIANS OFFICE
A025
DIETICIANS OFFICE
A025A
SECY
A028
EMS
A023
ELECTRIC CLOSET
AU004
DISH WASHING
A020
BREAK RM
A021
ELEV
P1
ELEV
P2
ELEV
P3
IT CLOSET
A002C
TOILETS & SHOWERS
A002B
ELEVATOR LOBBY
A000
ELEV
AE004
ELEV
AE005
ELEVATOR LOBBY
A001
OFFICE SUPVS
B036F
DAIRY & EGG REFRIG
B036G
STORAGE
B035A
OFFICE
B035
STORAGE & ISSUE
B034
CORRIDOR
BH004
STAIRWELL
BS003
EMS
B005A
WOMENS TOILET
B002
MANUAL CART WASH
B005B
(E) 4" SAN
(E) 5" SAN
4" SAN
4" SAN4" SAN UP
1 1/2" SAN1 1/2" SAN UP
1 1/2" SAN1 1/2" SAN UP
2" V2" V UP
1 1/2" SAN1 1/2" SAN UP
4" SAN
1 1/2" SAN1 1/2" SAN UP
2" SAN2" SAN UP2" SAN2" SAN UP
3" SAN3" SAN UP3" SAN3" SAN UP
4" SAN
3" SAN3" SAN UP
1 1/2" SAN1 1/2" SAN UP1 1/2" SAN1 1/2" SAN UP
3" SAN3" SAN UP3" SAN3" SAN UP
3" SAN3" SAN UP
(E) 4" SAN
3" SAN3" SAN UP
4" SAN4" SAN UP
4" SAN4" SAN UP
(E) 4" DCW(E) 4" DCW UP
(E) 3" DCW(E) 3" DCW DN
(E) 2" DHW(E) 2" DHW UP(E) 2" DHW DN(E) 2" DHW UP & DN
(E) 1" DHWR(E) 1" DHWR UP(E) 1" DHWR DN(E) 1" DHWR UP & DN
(E) 3" MV(E) 3" MV UP(E) 3" MV DN(E) 3" MV UP & DN
(E) 1 1/2" MA(E) 1 1/2" MA UP(E) 1 1/2" MA DN(E) 1 1/2" MA UP & DN
(E) 8" SW(E) 8" SW UP(E) 8" SW DN(E) 8" SW UP & DN
(E) 1 1/4" O(E) 1 1/4" O UP(E) 1 1/4" O DN(E) 1 1/4" O UP & DN
(E) 4" SAN
1 1/2" SAN1 1/2" SAN UP
1 1/2" SAN1 1/2" SAN UP
(E) 4" SAN
(E) 4" SAN
(E) 4" SAN
(E) 2" SAN
1 1/2" SAN1 1/2" SAN UP
1 1/2" SAN1 1/2" SAN UP
(E) 5" V(E) 5" V UP(E) 5" V DN(E) 5" V UP & DN
(E) 6" SAN(E) 6" SAN UP(E) 6" SAN DN(E) 6" SAN UP & DN
PD1
PD3
PD1 PD1
PD3
PD3
PD3
PD3
PD1
PD3
PD3
PD3
PD1
PD3
PD1
PD1
PD3
PD1
NMLKJHG
RQPO
PD3
PD3
PD3
PD3
PD2
PD1
PD3
PD3
PD3
(E) 10" SW(E) 10" SW UP(E) 10" SW DN(E) 10" SW UP & DN
(E) 6" SAN(E) 6" SAN UP(E) 6" SAN DN(E) 6" SAN UP & DN
(E) 5" V(E) 5" V UP(E) 5" V DN(E) 5" V UP & DN
(E) 5" SAN
(E) 4" SAN
(E) 3" SAN
(E) 4" SAN
HG
1 1/2" SAN1 1/2" SAN UP
PD3
PD1
GENERAL NOTES:
A REFER TO DRAWING P-100 FOR LEGEND,
ABBREVIATIONS, AND GENERAL PROJECT NOTES.
B LOCATIONS AND SIZES OF PIPING AND EQUIPMENT HAVE
BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS
AND/OR SITE INVESTIGATION WHERE POSSIBLE. ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE
WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY
IMPACT THE PROGRESS SHALL BE BROUGHT TO THE
ATTENTION OF THE VA PROJECT ENGINEER/COR IN WRITING
BEFORE PROCEEDING WITH THE WORK.
C ALL WORK ON GROUND FLOOR TO BE COMPLETED AFTER
HOURS.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\g re g p
\D o cu m e n ts \P lu m b in g
F P g re g .p e a rs o n ff e
-s e rv .c o m
.r vt
/2
/2
:0
:4
A
M
PD-101
PLUMBING DEMOLITION PLAN -
GROUND FLOOR
03/24/2020 GP GP
1/8" = 1'-0"
GROUND FLOOR PLUMBING
DEMOLITION PLAN - AREA A
1/8" = 1'-0"
GROUND FLOOR PLUMBING
DEMOLITION PLAN - AREA B
DRAWING NOTES:
PD1 REMOVE SANITARY PIPING BACK TO POINT SHOWN AND CAP.
PD2 REMOVE VENT PIPING BACK TO POINT SHOWN AND CAP.
PD3 PATCH FLOOR PENETRATION TO MATCH EXISTING. REFER TO
DETAIL 9 ON SHEET PL-501.
P-502
P-502
P-414
P-604P-103
P-414
P-414
P-201
P-201
P-103
P-103
P-414 P-414 P-103 P-103 P-103
P-106
P-414
P-103
P-103
P-201 P-414
P-414
P-103
P-418
(E) 8" SW(E) 8" SW UP(E) 8" SW DN(E) 8" SW UP & DN
(E) 1 1/4" O(E) 1 1/4" O UP(E) 1 1/4" O DN(E) 1 1/4" O UP & DN
(E) 1 1/2" MA(E) 1 1/2" MA UP(E) 1 1/2" MA DN(E) 1 1/2" MA UP & DN
(E) 3" MV(E) 3" MV UP(E) 3" MV DN(E) 3" MV UP & DN
(E) 1" DHWR(E) 1" DHWR UP(E) 1" DHWR DN(E) 1" DHWR UP & DN
(E) 2" DHW(E) 2" DHW UP(E) 2" DHW DN(E) 2" DHW UP & DN
(E) 4" DCW(E) 4" DCW UP(E) 4" DCW DN(E) 4" DCW UP & DN
P-604
(E) 1" DHWR
(E) 1 1/2" DHW
(E) 3" DCW
(E) 4" V
(E) 4" V
1/2" DHWR
3/4" DHW
1 1/2" DCW
1 1/2" DCW
3/4" DHW
1/2" DHWR
3/4" DHWR
1 1/2" DHW
3" DCW
2 1/2" DCW
1" DHW
3/4" DHWR
1 1/2" V
(E) 4" V
(E) 4" V
(E) 4" V
1 1/2" V
4" V
3/4" DHWR
1" DHW
2 1/2" DCW
3/4" DCW
3/4" DHW
3/4" DHWR
4" V
(E) 6" SW
(E) 8" SW
(E) 5" SW
(E) 5" SW(E) 5" SW UP
(E) 6" SAN(E) 6" SAN UP(E) 6" SAN DN(E) 6" SAN UP & DN
(E) 5" V(E) 5" V UP(E) 5" V DN(E) 5" V UP & DN
PD5
PD2PD5
PD5
PD5
PD5
PD5
PD5 PD5
PD5 PD5
PD6
PD6
PD6
PD6
PD6
PD5 PD5
PD2
PD4
PD4
PD2
PD2PD2
PD4PD4PD4
PD4PD4
PD4
PD4
PD4
PD4
PD4
PD4
PD4
PD2
PD4
PD4
PD4
PD2
PD4
PD2
PD4
PD4
PD4
PD4
PD4
PD4
PD4
PD4
PD2
5.
NMLKJHG
RQPO
(E) FUME HOOD(E) SINK & EYEWASH
(E) SINK & EYEWASH
(E) SINK & EYEWASH
(E) FUME HOOD
(E) 4" SW
PD7
PD8
4" SW
3" V
P-528 PD4
HG
(E) 2" V
(E) 1/2" DHW
(E) 1/2" DCW
PD2
PD5
GENERAL NOTES:
A REFER TO DRAWING P-100 FOR LEGEND,
ABBREVIATIONS, AND GENERAL PROJECT NOTES.
B LOCATIONS AND SIZES OF PIPING AND EQUIPMENT HAVE
BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS
AND/OR SITE INVESTIGATION WHERE POSSIBLE. ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE
WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY
IMPACT THE PROGRESS SHALL BE BROUGHT TO THE
ATTENTION OF THE VA PROJECT ENGINEER/COR IN WRITING
BEFORE PROCEEDING WITH THE WORK.
C ALL WORK ON GROUND FLOOR TO BE COMPLETED AFTER
HOURS.
PLUMBING FIXTURE LEGEND:
P-103 WATER CLOSET, WALL HUNG
P-106 WATER CLOSET, TANK TYPE
P-201 URINAL, WALL HUNG
P-414 LAVATORY, WALL HUNG, WRIST CONTROL
P-502 MOP SINK, FLOOR MOUNTED
P-528 SINK, CRS, COUNTER MOUNTED
P-604 ELECTRIC WATER COOLER, WALL HUNG
NML
NML
PD8
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\g re g p
\D o cu m e n ts \P lu m b in g
F P g re g .p e a rs o n ff e
-s e rv .c o m
.r vt
/3
/2
:4
:5
A
M
PD-102
PLUMBING DEMOLITION PLAN -
FIRST FLOOR
03/24/2020 GP GP
1/8" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION
PLAN - AREA A
1/8" = 1'-0"
FIRST FLOOR PLUMBING DEMOLITION
PLAN - AREA B
DRAWING NOTES:
PD2 REMOVE VENT PIPING BACK TO POINT SHOWN AND CAP.
PD4 REMOVE PLUMBING FIXTURE AND ASSOCIATED PIPING.
PD5 REMOVE DOMESTIC WATER PIPING BACK TO POINT SHOWN.
PD6 PLUMBING FIXTURE TO REMAIN.
PD7 REMOVE STORM DRAIN PIPING BACK TO POINT SHOWN.
PD8 REMOVE ROOF DRAIN ON ROOF ABOVE. PATCH ROOF TO MATCH EXISTING.
03/24/2020 Revisions: Date:
1/8" = 1'-0"
ROOF SANITARY & VENT DEMOLITION
PLAN
OT CLINIC
A044
OT OFFICE
A043
OT OFFICE
A043A
RECEPTION AREA
A050
CORRIDOR
AH007
A026A
TOILET & SHOWERS
A046
TOILET FEMALE
A045
EXAM
A041
EXAM
A040
PROVIDER
A039
PROVIDER
A038
EXAM/EMG
A038
CORRIDOR
A030A
CORRIDOR
AH006
WAITING AREA
A042
OUTPATIENT
A036
PHYSICAL THERAPY
STAIRWELL
AS001
ELECTRICAL
AU003
ELECTRICAL
AU002
ELECTRICAL
AU001
CORRIDOR
AH004
EMS
A026
TOILET
A024
TELEPHONE EQUIP RM
A022
LOCKERS
A026B
RECEPTION
A030
CORRIDOR
AH004
HYDROTHERAPY
A034
PHYSICAL THERAPY
A035
STORAGE
A033
CORRIDOR
AH005
CORRIDOR
BH006
ASST CHIEF
A027
DIETICIANS OFFICE
A025
DIETICIANS OFFICE
A025A
SECY
A028
EMS
A023
ELECTRIC CLOSET
AU004
HALL
A032
PM&RS CHIEF'S OFFICE
A032A
SECY OFFICE
A032B
RESIDENTS OFFICE
A032C
CONFERENCE RM
A032D
CHARTING
A032E
IT
B046
TOILET
B044A
HAS
B044
CONFERENCE M
A029
BREAK RM
B045A
SUPV OFFICE
B045
DISH WASHING
A020
BREAK RM
A021
ELEV
P1
ELEV
P2
ELEV
P3
IT CLOSET
A002C
TOILETS & SHOWERS
A002B
ELEVATOR LOBBY
A000
ELEV
AE004
ELEV
AE005
ELEVATOR LOBBY
A001
OFFICE
A019
EQUIP STORAGE AREA
EMS
A001B
ELECTRIC CLOSET
BU003
MAIN KITCHEN
B036
SURGICAL PACK
B045C
STORAGE
B045B
ENVIRONMENTAL MGMT SUPPLY
B045D
OFFICE SUPVS
B036F
FF:VCT
FF:CERAMIC TILE
B043 B043A
EMSELECTRIC CLOSET
OFFICE SUPVS
B036F
DAIRY & EGG REFRIG
B036G
STORAGE
B035A
OFFICE
B035
STORAGE & ISSUE
B034
CORRIDOR
BH004
STAIRWELL
BS003
EMS
B005A
WOMENS TOILET
B002
LOGISTICS SVC INVENTORY MGMT
B022
OFFICE
B022A
OFFICE
B022B
OFFICE
B022C
MANUAL CART WASH
B005B
4" SAN UP
1 1/2" SAN UP
2" SAN UP
1 1/2" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
1 1/2" SAN UP
4" SAN UP
4" SAN UP
4" SAN UP
4" SAN UP
1 1/2" SAN UP
4" SAN UP
1 1/2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
4" SAN UP
2" SAN UP
1 1/2" SAN UP
4" SAN UP
2" SAN UP2" SAN UP
4" SAN UP
1 1/2" SAN UP
2" SAN UP
2" SAN UP
2" SAN UP
1 1/2" SAN UP
4" SAN UP
2" SAN UP
1 1/2" SAN UP
4" SAN UP
2" SAN UP2" SAN UP2" SAN UP
4" SAN UP
4" SAN UP
2" SAN UP
(E) 8" SW(E) 8" SW UP(E) 8" SW DN(E) 8" SW UP & DN
(E) 1 1/2" MA(E) 1 1/2" MA UP(E) 1 1/2" MA DN(E) 1 1/2" MA UP & DN
(E) 3" MV(E) 3" MV UP(E) 3" MV DN(E) 3" MV UP & DN
(E) 1" DHWR(E) 1" DHWR UP(E) 1" DHWR DN(E) 1" DHWR UP & DN
(E) 2" DHW(E) 2" DHW UP(E) 2" DHW DN(E) 2" DHW UP & DN
(E) 3" DCW(E) 3" DCW DN
(E) 4" DCW(E) 4" DCW UP
(E) 5" SAN
(E) 4" SAN
1 1/2" SAN UP
(E) 4" SAN
4" SAN
4" SAN
4" SAN
4" SAN
2" SAN UP
(E) 4" SAN
(E) 4" SAN
4" SAN
(E) 4" SAN
4" SAN
(E) 4" SAN
(E) 2" SAN
(E) 4" SAN
4" SAN
(E) 5" V(E) 5" V UP(E) 5" V DN(E) 5" V UP & DN
(E) 6" SAN(E) 6" SAN UP(E) 6" SAN DN(E) 6" SAN UP & DN
(E) 10" SW(E) 10" SW UP(E) 10" SW DN(E) 10" SW UP & DN
(E) 6" SAN(E) 6" SAN UP(E) 6" SAN DN(E) 6" SAN UP & DN
(E) 5" V(E) 5" V UP(E) 5" V DN(E) 5" V UP & DN
(E) 4" SAN
2" SAN2" SAN UP
2" SAN2" SAN UP
1 1/2" SAN
2" SAN
4" SAN
2" SAN2" SAN UP
2" SAN2" SAN UP
PL1
PL2
PL2
PL1
PL2
PL2
PL1
PL1
PL26
PL26
PL2
PL2
PL2
PL1
PL26
PL2
PL1
PL2
PL26
PL2
PL1
PL26
PL2
PL2
PL2
PL26
PL2
PL1
PL3
PL26
PL2
PL1
PL26
PL2
PL26
PL2
PL26
PL2
PL26
PL1
PL26
PL2
PL26
PL2
PL2
PL2
PL1PL1
PL2
PL2
NMLKJHG
RQPO
4" CO
PL2
1 1/2" V UP
3" SAN UP
PL2
PL2
1 1/2" SAN UP
4" SAN UP PL2
PL1
2" SAN UP PL2
2" SAN UPPL2
2" SAN
4" SAN
1 1/2" SAN UPPL2
PL3
(E) 10" SW(E) 10" SW UP(E) 10" SW DN(E) 10" SW UP & DN
(E) 6" SAN(E) 6" SAN UP(E) 6" SAN DN(E) 6" SAN UP & DN
(E) 5" V(E) 5" V UP(E) 5" V DN(E) 5" V UP & DN
(E) 4" SAN (E) 4" SAN
(E) 3" SAN
1 1/2" SAN
(E) 5" SAN
PL2
HG
1 1/2" SAN UP
(E) 3" SAN
PL1
GENERAL NOTES:
A REFER TO DRAWING P-100 FOR LEGEND, ABBREVIATIONS,
AND GENERAL PROJECT NOTES.
B LOCATIONS AND SIZES OF PIPING AND EQUIPMENT HAVE
BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS
AND/OR SITE INVESTIGATION WHERE POSSIBLE. ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE
WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY
IMPACT THE PROGRESS SHALL BE BROUGHT TO THE
ATTENTION OF THE VA PROJECT ENGINEER/COR IN WRITING
BEFORE PROCEEDING WITH THE WORK.
C MAINTAIN MINIMUM SLOPE OF 1/4" PER LINEAR FOOT OF
SANITARY PIPING LESS THAN 3" AND A MINIMUM SLOPE OF
1/8" PER LINEAR FOOT OF SANITARY PIPING EQUAL TO OR
GREATER THAN 3". PROVIDE OFFSETS AS NECESSARY TO
AVOID EXISTING OBSTRUCTIONS.
D REMOVE AND RE-INSTALL EXISTING HVAC DUCT WITH
OFFSETS IF NECESSARY TO CREATE CLEAR PATH FOR NEW
SANITARY PIPING. COORDINATE INTERRUPTION OF HVAC
SERVICE WITH VA.
E TOILET ROOM A120A WILL BE BUILT AS A MOCK-UP FOR ALL
OTHER PATIENT ROOMS. REFER TO ARCHITECTURAL
DRAWINGS FOR MORE INFORMATION.
F ALL WORK ON GROUND FLOOR IS TO BE COMPLETED DURING
AFTER HOURS.
G CONTRACTOR TO SCAN FLOOR SLAB FOR STRUCTURAL
REBAR PRIOR TO CORE DRILLING.
H ALL CORE DRILLING IS TO BE COMPLETED DURING AFTER
HOURS. SLIGHTLY ADJUST LOCATION OF PENETRATION IF
NECESSARY TO AVOID CORRIDOR WALLS IN GROUND FLOOR
CEILING SPACE. CORE DRILL AFTER LOCATIONS HAVE BEEN
APPROVED BY ARCHITECT, PLUMBING ENGINEER, AND
STRUCTURAL ENGINEER.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\g re g p
\D o cu m e n ts \P lu m b in g
F P g re g .p e a rs o n ff e
-s e rv .c o m
.r vt
/2
/2
:5
:1
P
M
PL-101
PLUMBING NEW WORK PLAN -
GROUND FLOOR
03/24/2020 GP GP
1/8" = 1'-0"
GROUND FLOOR PLUMBING NEW WORK
PLAN - AREA A
1/8" = 1'-0"
GROUND FLOOR PLUMBING NEW WORK
PLAN - AREA B
DRAWING NOTES:
PL1 CONNECT SANITARY PIPING TO EXISTING AT POINT SHOWN.
COORDINATE INTERRUPTION OF SANITARY SERVICE WITH VA.
PL2 CORE DRILL THROUGH CONCRETE FLOOR FOR FLOOR
PENETRATION.
PL3 TEMPORARILY REMOVE HVAC DUCT IN THIS AREA AS
NECESSARY FOR INSTALLATION OF SANITARY PIPING.
COORDINATE INTERRUPTION OF HVAC SERVICE WITH VA.
RE-INSTALL HVAC DUCT AFTER INSTALLATION OF SANITARY
PIPING. PROVIDE DUCT OFFSETS AS NECESSARY.
PL26 CONTRACTOR TO SCAN FOR STRUCTURAL REBAR LOCATIONS
PRIOR TO CORE DRILLING FOR INSTALLATION OF FLOOR
DRAIN. IF NECESSARY, SLIGHTLY ADJUST LOCATION OF
FLOOR DRAIN AND SLOPE OF FLOOR TO NOT CUT MORE THAN
(1) STRUCTURAL REBAR IN EACH DIRECTION OF EACH LAYER
OF REBAR DURING CORE DRILLING. CORE DRILL THROUGH
CONCRETE SLAB AFTER LOCATIONS OF FLOOR DRAINS HAVE
BEEN APPROVED BY ARCHITECT AND STRUCTURAL ENGINEER.
REFER TO DETAIL 7 ON SHEET PL-501.
W/D
FD
FD FD
FD FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
FD
ELECTRICAL
AU104
TOILET
A102
TOILET
A103
SALLY PORT
ENTRY
A101
CONSULT
A137
TOILET
A136B
SECLUSION
ROOM
A136
SECLUSION
ANTEROOM
A136A
OFFICE: HEAD
NURSE
A134
OFFICE:
PROGRAM MGR.
A133
TOILET
A131A
TOILET
A132A
PRIVATE
A132
PRIVATE
A131
PRIVATE
A130
TOILET
A130A
SEMI-PRIVATE
A129
TOILET
A128A
TOILET
A129A
SEMI-PRIVATE
A128
PRIVATE
A127
PRIVATE
A126
TOILET
A127A
TOILET
A126A
DAY/DINING
ROOM
A125
STAFF STATION
A141
MED ROOM
A142
STAIR
AS101
GROUP ROOM
A143
TOILET
A124A
SEMI-PRIVATE
A124
LAUNDRY
A123
PRIVATE
A122
PRIVATE
A121
TOILET
A122A
TOILET
A121A
PRIVATE
A120
TOILET
A120A
MULTI-PURPOSE
ROOM
A115
JAN.
A117 STAFF TOILET
A118
BREAK ROOM
A119
CORRIDOR
A116
ELEC.
A114
CLOSET
A113
PATIENT TOILET
A112
LAB SOILED
A107
ANTEROOM
A106A
TOILET
A106
LAB CLEAN
ROOM
A105
GROUP ROOM
A111
SOILED UTILITY
A110
CLEAN UTILITY
A109
EXAM ROOM
A108
P-101
P-528
P-529
P-930A P-910A
(E) 8" SW(E) 8" SW UP(E) 8" SW DN(E) 8" SW UP & DN
(E) 4" V
2" V 2" V
(E) 4" V
1 1/2" V
2" V
(E) 4" V
2" V
(E) 4" V
1 1/2" V
1 1/2" V
(E) 4" V
2" V
2 1/2" V
2" V
2" V
2 1/2" V
2" V
2" V
4" WCO
4" WCO
4" WCO
P-930B
P-910B FD-CFD-C
P-910A
P-930A
FD-C
P-930A P-910A
FD-C
P-808
P-529
P-930A
FD-CFD-C
P-910A
FD-C FD-C
FD-CFD-C
P-930A
P-910A
P-910A
P-930AFD-C
P-930A
FD-C
P-910A
P-930A
P-910A
FD-C
P-528
FD-C
P-930A
FD-C
FD-C
FD-C
FD-C
P-930A
P-930A
P-910A
P-910A
P-930A
P-910A
P-101
P-418
P-101 P-418
P-528
P-101
(E) SINK & EYEWASH (E) FUME HOOD
(E) SINK & EYEWASH
(E) SINK & EYEWASH
(E) FUME HOOD
(E) 4" SW
(E) 5" SW(E) 6" SW
(E) 6" SW
4" WCO
(E) 5" V(E) 5" V UP(E) 5" V DN(E) 5" V UP & DN
(E) 6" SAN(E) 6" SAN UP(E) 6" SAN DN(E) 6" SAN UP & DN
FD-C
FD-C
FD-CFD-C
4" WCO
P-418
PL4
PL4
PL4
PL4 PL4 PL4
PL4
5.
NMLKJHG
RQPO
4" WCO
PL4
3" V
3" V
(E) 5" SW(E) 5" SW UP
P-418
1 1/2" V
P-502
PL17
3" SW
3" SW 4" SW
3" SW UP
3" SW UP
4" SW UP
PL18
PL18
PL18
(318 SF)
(170 SF)
(1901 SF)
PL15
PL15 PL15
4" WCO
2" SAN
2" V
PL17
(E) 8" SW
SRL OFFICE
A138
PCR 1
A139A
PCR 2
A139B
PCR 3
A139C
IFA SCOPE
A139DSRL TESTING
B111
SEROLOGY LAB
A139
PL26
PL26
PL26
PL26
PL26
PL26
PL26
PL26
PL26 PL26
PL26
PL26
PL26
PL26
2" CO
2" SAN UP
PL23
PL29
PL30
PL30
PL31
P-528
P-528
OFFICE
B129B
OFFICE
B129C
CLOSET
B129D
CORRIDOR
B129 OFFICE
B129E
OFFICE
B129F
OFFICE
B129G
OFFICE
B129H
SHARED OFFICE
B129J
CORRIDOR
B129
(E) 2" V
(E) 8" SW(E) 8" SW UP(E) 8" SW DN(E) 8" SW UP & DN
(E) 6" SAN(E) 6" SAN UP(E) 6" SAN DN(E) 6" SAN UP & DN
(E) 5" V(E) 5" V UP(E) 5" V DN(E) 5" V UP & DN
HG
(E) 2" V
PL4
1 1/2" V
GENERAL NOTES:
A REFER TO DRAWING P-100 FOR LEGEND, ABBREVIATIONS,
AND GENERAL PROJECT NOTES.
B LOCATIONS AND SIZES OF PIPING AND EQUIPMENT HAVE
BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS
AND/OR SITE INVESTIGATION WHERE POSSIBLE. ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE
WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY
IMPACT THE PROGRESS SHALL BE BROUGHT TO THE
ATTENTION OF THE VA PROJECT ENGINEER/COR IN WRITING
BEFORE PROCEEDING WITH THE WORK.
C MAINTAIN MINIMUM SLOPE OF 1/4" PER LINEAR FOOT OF
SANITARY PIPING LESS THAN 3" AND A MINIMUM SLOPE OF
1/8" PER LINEAR FOOT OF SANITARY PIPING EQUAL TO OR
GREATER THAN 3". PROVIDE OFFSETS AS NECESSARY TO
AVOID EXISTING OBSTRUCTIONS.
D REMOVE AND RE-INSTALL EXISTING HVAC DUCT WITH
OFFSETS IF NECESSARY TO CREATE CLEAR PATH FOR NEW
SANITARY PIPING. COORDINATE INTERRUPTION OF HVAC
SERVICE WITH VA.
E TOILET ROOM A120A WILL BE BUILT AS A MOCK-UP FOR ALL
OTHER PATIENT ROOMS. REFER TO ARCHITECTURAL
DRAWINGS FOR MORE INFORMATION.
F ALL WORK ON GROUND FLOOR IS TO BE COMPLETED DURING
AFTER HOURS.
G CONTRACTOR TO SCAN FLOOR SLAB FOR STRUCTURAL
REBAR PRIOR TO CORE DRILLING.
H ALL CORE DRILLING IS TO BE COMPLETED DURING AFTER
HOURS. SLIGHTLY ADJUST LOCATION OF PENETRATION IF
NECESSARY TO AVOID CORRIDOR WALLS IN GROUND FLOOR
CEILING SPACE. CORE DRILL AFTER LOCATIONS HAVE BEEN
APPROVED BY ARCHITECT, PLUMBING ENGINEER, AND
STRUCTURAL ENGINEER.
NML
NML
317 SF
170 SF
1901 SF
RTU-14
(Mk.3)
RTU-14
(Mk.3)
3"
RD-1
4"
RD-1
3"
RD-1
FD-E
PL23PL27
PL27
3" V
PL28
DN
2" SAN
PL29
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\g re g p
\D o cu m e n ts \P lu m b in g
F P g re g .p e a rs o n ff e
-s e rv .c o m
.r vt
/2
/2
:5
:1
P
M
PL-102
PLUMBING SANITARY & VENT NEW
WORK PLAN - FIRST FLOOR
03/24/2020 GP GP
1/8" = 1'-0"
FIRST FLOOR SANITARY & VENT NEW
WORK PLAN - AREA A
1/8" = 1'-0"
FIRST FLOOR SANITARY & VENT NEW
WORK PLAN - AREA B
DRAWING NOTES:
PL4 CONNECT VENT PIPING TO EXISTING AT POINT SHOWN.
PL15 PROVIDE INSULATION ON STORM DRAIN PIPING. REFER TO
FACILITY STORM DRAINAGE SPECIFICATIONS FOR MORE
INFORMATION.
PL17 CONNECT STORM DRAIN PIPING TO EXISTING AT POINT
SHOWN.
PL18 PROVIDE ROOF DRAIN ON ROOF ABOVE. DRAIN SIZE TO
MATCH PIPE SIZE.
PL23 ROUTE 2" SANITARY PIPING UP TO CURB UNDER AIR HANDLING
UNIT (RTU-14).
PL26 CONTRACTOR TO SCAN FOR STRUCTURAL REBAR LOCATIONS
PRIOR TO CORE DRILLING FOR INSTALLATION OF FLOOR
DRAIN. IF NECESSARY, SLIGHTLY ADJUST LOCATION OF
FLOOR DRAIN AND SLOPE OF FLOOR TO NOT CUT MORE THAN
(1) STRUCTURAL REBAR IN EACH DIRECTION OF EACH LAYER
OF REBAR DURING CORE DRILLING. CORE DRILL THROUGH
CONCRETE SLAB AFTER LOCATIONS OF FLOOR DRAINS HAVE
BEEN APPROVED BY ARCHITECT AND STRUCTURAL ENGINEER.
REFER TO DETAIL 7 ON SHEET PL-501.
PL27 ROUTE PIPING IN CURB SPACE UNDER RTU-14. COORDINATE
WITH HVAC PIPING AND CURB STRUCTURAL SUPPORT.
PL28 ROUTE 3" VENT PIPING OUT SIDE OF CURB TO ATMOSPHERE.
PL29 PROVIDE ROOF PENETRATION FOR ALL UTILITIES SERVING
RTU-14.
PL30 PROVIDE 2" HUB DRAIN WITH 4" OPENING FOR DOMESTIC
WATER DRAINAGE. REFER TO DETAIL 8 ON SHEET PL-501.
PL31 ROUTE PIPING IN WALL SPACE.
1/8" = 1'-0"
ROOF SANITARY & VENT NEW WORK
PLAN
STUDENTS
B129L
OFFICE
B129F
OFFICE
B129B
OFFICE
B129C
CLOSET
B129D
OFFICE
B129E
OFFICE
B129G
OFFICE
B129H
SHARED OFFICE
B129J
P-528
HG HG
PL5
1/2" DCW
1/2" DHW
(E) 1/2" DHW
(E) 1/2" DCW
ELECTRICAL
AU104
TOILET
A102
TOILET
A103
SALLY PORT
ENTRY
A101
CONSULT
A137
TOILET
A136B
SECLUSION
ROOM
A136
SECLUSION
ANTEROOM
A136A
OFFICE: HEAD
NURSE
A134
OFFICE:
PROGRAM MGR.
A133
TOILET
A131A
TOILET
A132A
PRIVATE
A132
PRIVATE
A131
PRIVATE
A130
TOILET
A130A
SEMI-PRIVATE
A129
TOILET
A128A
TOILET
A129A
SEMI-PRIVATE
A128
PRIVATE
A127
PRIVATE
A126
TOILET
A127A
TOILET
A126A
DAY/DINING
ROOM
A125
STAFF STATION
A141
MED ROOM
A142 STAIR
AS101
GROUP ROOM
A143
TOILET
A124A
SEMI-PRIVATE
A124
LAUNDRY
A123
PRIVATE
A122
PRIVATE
A121
TOILET
A122A
TOILET
A121A
PRIVATE
A120
TOILET
A120A
MULTI-PURPOSE
ROOM
A115
JAN.
A117
STAFF TOILET
A118
BREAK ROOM
A119
CORRIDOR
A116
ELEC.
A114
CLOSET
A113
PATIENT TOILET
A112
LAB SOILED
A107
ANTEROOM
A106A
TOILET
A106
LAB CLEAN
ROOM
A105
GROUP ROOM
A111
SOILED UTILITY
A110
CLEAN UTILITY
A109
EXAM ROOM
A108
P-101 P-528
P-529
P-930A P-910A
P-930B
P-910B P-910A
P-930A
P-930A
P-910A
P-808
P-529
P-930A
P-910A
P-930A
P-910A P-910A
P-930A
P-930A
P-910A
P-930A
P-910A
P-528
P-930AP-930A
P-930A P-910A
P-910A
P-930A
P-910A
P-101
P-418
P-101
P-418
P-528
P-101
(E) SINK & EYEWASH (E) FUME HOOD
(E) SINK & EYEWASH
(E) SINK & EYEWASH
(E) FUME HOOD
P-418
P-940A P-940A
P-940B
P-940BP-940B
P-940A P-940A
P-940A
P-940A
P-940A
P-940A
2" DCW
1 1/2" DHW
ICE MAKER
1 1/2" DHW1 1/2" DHW
1 1/2" DCW
3" DCW
1 1/2" DHW
3/4" DHWR
1 1/2" DCW
ICE MAKER
3/4" DHW
1 1/2" DCW
1" DHW
1 1/2" DCW
1" DHW
1 1/2" DHW
1 1/2" DCW
1 1/2" DCW
1 1/2" DHW
PL7
PL5
PL5
PL5
PL5
ZV-1 (E) 1" DHWR(E) 1" DHWR UP(E) 1" DHWR DN(E) 1" DHWR UP & DN
(E) 2" DHW(E) 2" DHW UP(E) 2" DHW DN(E) 2" DHW UP & DN
(E) 4" DCW(E) 4" DCW UP(E) 4" DCW DN(E) 4" DCW UP & DN
(E) 1 1/4" O(E) 1 1/4" O UP(E) 1 1/4" O DN(E) 1 1/4" O UP & DN
5.
NMLKJHG
RQPO
3" DCW
(E) 1" DHWR
(E) 1 1/2" DHW
(E) 3" DCW
P-910A
2" DCW
1 1/2" DHW
2" DCW
P-418
P-502
PL8PL8
PL6
PL10
PL11
PL13
PL9
PL12
PL14
PL21
PL21
PL19
1/2" O
1/2" O
PL21
PL16
PL16
2" DCW
3/4" DHW
1 1/2" DCW
1" DHW
1 1/2" DCW
1 1/2" DCW
PL5
3/4" DCW
3/4" DHW
1/2" DHW
1 1/2" DCW
PL19
PL20
PL20PL20
PL20
PL20
PL20
PL20
PL20
PL20
PL20
PL21
3/4" DCW
SRL TESTING
B111
SEROLOGY LAB
A139
PCR 3
A139C
IFA SCOPE
A139D
PCR 2
A139B
PCR 1
A139A
SRL OFFICE
A138
3/4" DCW UPPL24 PL29
PL14
PL31
PL31
PL32
PL32
P-5281/2" DHW
1/2" DCW
GENERAL NOTES:
A REFER TO DRAWING P-100 FOR LEGEND,
ABBREVIATIONS, AND GENERAL PROJECT NOTES.
B LOCATIONS AND SIZES OF PIPING AND EQUIPMENT HAVE
BEEN DETERMINED FROM A REVIEW OF EXISTING DRAWINGS
AND/OR SITE INVESTIGATION WHERE POSSIBLE. ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE
WORK SHOWN ON THE CONTRACT DRAWINGS WHICH MAY
IMPACT THE PROGRESS SHALL BE BROUGHT TO THE
ATTENTION OF THE VA PROJECT ENGINEER/COR IN WRITING
BEFORE PROCEEDING WITH THE WORK.
C REFER TO SHEET PL-602 FOR DOMESTIC WATER ISOMETRIC.
D TOILET ROOM A120A WILL BE BUILT AS A MOCK-UP FOR ALL
OTHER PATIENT ROOMS. REFER TO ARCHITECTURAL
DRAWINGS FOR MORE INFORMATION.
E REFER TO SPECIFICATION SECTION 08 31 13 FOR CEILING
ACCESS PANEL SPECIFICATIONS.
F ADHERE TO VHA DIRECTIVE 1061 FOR PREVENTION OF
HEALTHCARE-ASSOCIATED LEGIONELLA DISEASE AND SCALD
INJURY FROM POTABLE DISTRIBUTION SYSTEMS.
G. INTERNAL PARTS OF ALL PLUMBING FIXTURES, WATER
PIPING, FITTINGS, AND ACCESSORIES SHALL BE ABLE TO
WITHSTAND DISINFECTING OPERATIONS OF CHEMICAL AND
THERMAL TREATMENT OF WATER TEMPERATURES UP TO 82°
C (180°F) FOR 30 MINUTES OR 50 MG/L (50 PPM)
CHLORINE RESIDUAL CONCENTRATION FOR 24 HOURS.
NML
NML
RTU-14
(Mk.3)
RTU-14
(Mk.3)
DN
3/4" DCW
BFP-1
PL25
PL27
PL29
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\g re g p
\D o cu m e n ts \P lu m b in g
F P g re g .p e a rs o n ff e
-s e rv .c o m
.r vt
/2
/2
:5
:2
P
M
PL-103
PLUMBING WATER & MEDGAS
NEW WORK PLAN - FIRST FLOOR
03/24/2020 GP GP
1/8" = 1'-0"
FIRST FLOOR DOMESTIC WATER NEW
WORK PLAN - AREA B
1/8" = 1'-0"
FIRST FLOOR DOMESTIC WATER &
MEDGAS NEW WORK PLAN - AREA A
DRAWING NOTES:
PL5 CONNECT DOMESTIC WATER PIPING TO EXISTING AT POINT
SHOWN. COORDINATE INTERRUPTION OF WATER SERVICE
WITH VA.
PL6 CONNECT OXYGEN PIPING TO EXISTING AT POINT SHOWN.
HOT TAPS OR SIMILAR TYPES OF VALVES ARE PROHIBITED
IN MEDICAL GAS SYSTEMS. COORDINATE SHUTDOWN OF
OXYGEN SERVICE WITH VA.
PL7 CORE DRILL THOUGH CONCRETE WALL FOR WALL
PENETRATION.
PL8 INSTALL CHECK VALVE AND CIRCUIT SETTER. SET CIRCUIT
SETTER TO 1.0 GPM.
PL9 MOUNT ZONE VALVE IN WALL. REFER TO ZONE VALVE
SCHEDULE ON SHEET PL501. COORDINATE LOCATION WITH
ARCHITECTURAL PLANS.
PL10 PROVIDE MEDICAL GAS SERVICE VALVE ABOVE CEILING.
PL11 PROVIDE MEDICAL GAS PRESSURE SWITCH ABOVE CEILING.
PL12 MOUNT ALARM PANEL IN WALL. REFER TO MEDICAL GAS
ALARM SCHEDULE ON SHEET PL501. COORDINATE
LOCATION WITH ARCHITECTURAL PLANS.
PL13 ROUTE 1/2" OXYGEN PIPING TO LIGATURE-RESISTANT,
TAMPER-PROOF, RECESSED CONSOLE UNIT. BASIS OF
DESIGN FOR CONSOLE UNIT TO BE AMICO ALERT-1 SERIES
WITH SECURITY CONSOLE BOX. PROVIDE (2) OXYGEN
OUTLETS WITH FLOWMETERS. TOTAL FLOW RATES PER
OUTLET TO BE 57 LITERS/MINUTE.
PL14 WALL MOUNTED RECESSED WATER CONTROLLER TO SERVE
P-101 & P-418 IN TOILET ROOM A103 & A106 AND ANTEROOM
A106A. PROVIDE WITH SOLENOID VALVES FOR WATER
SUPPLY AND DRAINS. CONTROLLER AND VALVES MUST BE
NSF 61 CERTIFIED. USE ISIMET DLA AS BASIS OF DESIGN.
REFER TO DETAIL 8 ON SHEET PL501.
PL16 PROVIDE 1/4" DCW CONNECTION TO ICE MAKER.
PL19 CEILING ACCESS PANEL PROVIDED FOR ELECTRICAL
JUNCTION BOX ACCESS. COORDINATE FOR ACCESS TO
ISOLATION VALVES ABOVE HARD CEILING.
PL20 CEILING ACCESS PANEL PROVIDED FOR VAV BOX CONTROL.
COORDINATE FOR ACCESS TO ISOLATION VALVES ABOVE
HARD CEILING.
PL21 PROVIDE 24"x24"CEILING ACCESS PANEL FOR ACCESS TO
VALVES ABOVE HARD CEILING.
PL24 ROUTE 3/4" DCW PIPING UP TO CURB UNDER AIR HANDLING
UNIT (RTU-14).
PL25 PROVIDE 3/4" REDUCED PRESSURE BACKFLOW PREVENTER
(BFP-1) INSIDE RTU-14 FOR MAKE-UP WATER TO SERVE
HVAC SYSTEMS. REFER TO HVAC DRAWINGS FOR
CONTINUATION.
PL27 ROUTE PIPING IN CURB SPACE UNDER RTU-14.
COORDINATE WITH HVAC PIPING AND CURB STRUCTURAL
SUPPORT.
PL29 PROVIDE ROOF PENETRATION FOR ALL UTILITIES SERVING
RTU-14.
PL31 ROUTE PIPING IN WALL SPACE.
PL32 LOCATION OF SUPPLY AND DRAIN SOLENOID VALVES FOR
WATER CONTROLLER. PROVIDE WALL ACCESS PANEL FOR
ACCESS TO VALVES. REFER TO DETAIL 8 ON SHEET PL-501.
1/8" = 1'-0"
ROOF DOMESTIC WATER NEW WORK
PLAN
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
-1312 14 -16 -
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 241814 16128 1064 532 2 1/21 1/21 1 1/4
[9100] [9600][8500][7600] [8200][7000][5800] [6700][5200][4100] [4900][3700][3000] [3400][2700][2100]
--- --[4900] -[4100][3700] [4000] -[3000][2400][1800][1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm]
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRICTION THIS TYPE SHALL BE USED
ONLY IN SLABS OR BEAMS OF 4" [100mm] MIN
DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1 1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm]
ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
SECURING HANGER RODS IN CONCRETE
NTS NTS
FAUCET SEE
SPECIFICATIONS
LAMINAR FLOW
CONTROL DEVICE
OFFSET
WASTE
TRAP
PARALLEL TO
WALL
ESCUTCHEON (TYP 3)
FINISHED FLOOR
[8 m m
F O
R F
IX
T
U R
E H
E
IG
H T
S S
E E
A R
C H
IT
E
C T
U R
A L D
R A
W
IN
G S
NTS
ELECTRIC
SENSOR
1/2" DCW & DHW
TMV
1/2" TEMPERED
WATER SUPPLY
8"x8" CONTROL BOX
WITH ACCESS COVER
TRANSFORMER
120V SOLENOID VALVE
3/8" CONNECTION TUBE
NTS
YES
ALARM PANEL
AREA (ZONE)STAFF STATION A141 OXYGEN LINE PRESSURE ABNORMAL
GAGES SERVICE INDICATOR LIGHTS
PANEL
TYPE OF
LOCATION
ZV-1
PIPE SIZE (IN)
MARK SERVICE
SEMI-PRIVATE ROOM A129
PEAK FLOW (LITERS/MIN)
OXYGEN MEDICAL
AIR
MEDICAL
VACUUM
1/2 ---- ----
OXYGEN MEDICAL
AIR
MEDICAL
VACUUM
114 ---- ----
BASIS OF DESIGN
MANUFACTURER
BEACONMEDAES
MODEL
ZVB1-A-ENG
BASIS OF DESIGN
MANUFACTURER
BEACONMEDAES
MODEL
M3-A10-O
WATER PIPING DIAGRAM TO SPECIMEN WC & LAV
P-418 P-101
AV
AV
AV
1/2" DHW
1-1/2" DCW 1" DCW
1/2" DCW
1/2" DHW
1-1/2" DCW
SUPPLY SOLENOID VALVE
DRAIN SOLENOID VALVE
2" SAN
PROVIDE MINIMUM AIR GAP 2X
DIAMETER OF WATER PIPE
BETWEEN HUB DRAIN OPENING
AND END OF WATER PIPE
FIRST FLOOR
4" HUB DRAIN
OPENING
PROVIDE AUTOMATIC AIR
VENT AT HIGH POINTS OF
WATER PIPING
WALL MOUNTED
RECESSED WATER
CONTROLLER
LOOSE KEY
STOP (TYP 2)
P-418
TYPICAL PIPE HOLE CLOSURE DETAIL
NTS
SIDE VIEW TRAPEZE HANGER FOR UP
TO 1000 LB. [453KG] UNIFORM LOAD
BAND
WELD
SADDLE
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
PIPE HANGERS
[2 m m
M
A X
SUPPORT/ANCHOR FOR PIPE RISERS
NTS
NOTES:
1.
2.
PROVIDE ANCHORS ONLY
WHERE SHOWN ON
DRAWINGS.
EXTEND SLEEVE ABOVE
FLOOR WHERE SPECIFIED.
INSULATION BOLT (TYPICAL)
FLOOR SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPEPIPE SLEEVE
WHERE SPECIFIED
RISER
CLAMP
RISER
PIPE SLEEVE
WHERE
SPECIFIED
ELEVATION
PLAN
RISER
CLAMP
HANGER ROD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
PROVIDE HIGH
COMPRESSIVE STRENGTH
INSULATION (9 PSF MIN.
DENSITY) UNDER
INSULATION SHIELD
INSULATION SHIELD
AT HANGER
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN.)
ADJUSTABLE CLEVIS
HANGER TYPE 1 - SEE
SPECIFICATIONS
1/2" [15mm] DIA. HANGER RODS WITH 36" [900mm] MAX. SPACING
ON EACH CHANNEL
ADJUSTABLE CLEVIS
HANGER TYPE 43 - SEE
SPECIFICATIONS
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE
NOTES:
SEE SPECIFER FOR DETAILED
HANGER REQUIREMENTS
RISER CLAMP.
BOTTOM CLAMP
REQUIRED AT
ANCHOR POINTS
ONLY.
NTS
LAVATORY MOUNTING DETAIL
MINIMUM 16 GAGE GALVANIZED STEEL
PLATE 12"x48" [300x1200mm] MIN.
SECURED TO A MIN. 4 STUDS PER
LAVATORY
1/4" [6mm]� MOLLY BOLT HOLLOW WALL
ANCHOR (1 EA. SIDE OF LAV)
MIN. (3) 1/4" [6mm]
MACHINE BOLTS
W/DOUBLE LOCK NUTS
ON BACK SIDE
MIN. 5 1/4" [131mm]�
GALV. MACHINE BOLTS
WELDED TO PLATE
1/4" [6mm]
TYP. 1/8"
TYP. [3mm]
A A
PLAN
SECTION A
NOTE:
1.
2.
AT LAVS WITH FOOT PEDAL CONTROLS PROVIDE
AN ADDITIONAL 16 GAGE GALVANIZED STEEL
PLATE 12"x16" [300x600mm] SECURED TO A
MINIMUM OF 2 STUDS PER FOOT PEDAL.
PROVIDE 20 GAGE STUDS WHEN HEIGHT
EXCEEDS 12'-0" [3600mm]
STEEL HANGER BY LAV MFGR
STEEL WALL PLATE
WALL ANCHOR
STUDS
FOR FIXTURE
HEIGHT SEE
ARCHITECTURAL
DRAWINGS
P-418 LAVATORY
WATER CLOSET FLUSH VALVE DETAIL
FINISHED FLOOR
HARD WIRED SENSOR
FLUSH VALVE WITH
PUSH BUTTON
OVERRIDE
ADA GRAB BAR,
SEE ARCH.
DRAWINGS
FD-C DETAIL (LIGATURE RESISTANT)
[2 m m
7-1/2"x8-1/2" [191x216mm]
POLISHED CHROME WALL
PLATE FINISH ACCESSIBLE
DOOR
FLOOR
MOUNTED BACK
OUTLET WATER
CLOSET
LIGATURE RESISTANT
304 STAINLESS STEEL
ADJUSTABLE STRAINER
(FLUSH WITH FINISHED
FLOOR)
CEMENT BED
TILE FLOOR
CONCRETE FILL
EXISTING
STRUCTURAL SLAB
FLASHING
CLAMP WITH
WEEP HOLES
THREADED, CAULKED OR
NO-HUB CONNECTION
LOOSE GRAVEL
AT WEEP HOLES
3mm to 6mm SIZE
WATERPROOF MEMBRANE
PROVIDE A METAL SUPPORT
PLATE WHEN DRAIN IS
INSTALLED IN AN EXISTING
FLOOR - CAULK AROUND DRAIN
PRIOR TO RE-GROUTING
CLAMP WATERPROOF
MEMBRANE INSIDE OF DRAIN
BODY TO DRAIN TO WEEP HOLES
NOTE:
1. SLOPE MEMBRANE LINER 2% TO DRAIN.
2. SCAN CONCRETE SLAB FOR STRUCTURAL REBAR LOCATIONS. SLIGHTLY
ADJUST FLOOR DRAIN LOCATION IF NECESSARY TO MINIMIZE CUTTING
THROUGH ANY REINFORCEMENT. DO NOT CUT MORE THAN ONE REBAR IN
EACH DIRECTION. COORDINATE DRAIN LOCATION WITH SLOPE OF FLOOR.
3. APPLY BONDING AGENT BEFORE PATCHING WITH NEW CONCRETE.
MEDICAL GAS ALARM PANEL SCHEDULE ZONE VALVE SCHEDULE
EXISTING STRUCTURAL
REINFORCEMENT
NOTE:
1. WORK TO BE PERFORMED AFTER HOURS.
NTS
NOTE:
1. SHOWN AS SCHEMATIC DIAGRAM ONLY. REFER TO PLAN DRAWINGS FOR
LOCATIONS OF WATER CONTROLLER, PLUMBING FIXTURES, SOLENOID
VALVES, HUB DRAIN, AND PIPING.
2. PIPING DIAGRAM FOR FIXTURES IN TOILET ROOMS A103 & A106 AND
ANTEROOM A106A ONLY.
3. PROGRAM WATER CONTROLLER SO THAT DRAIN SOLENOID VALVES ARE
CLOSED WHEN SUPPLY SOLENOID VALVES ARE OPEN AND OPEN WHEN
SUPPLY SOLENOID VALVES ARE CLOSED.
2" (TYP.)
NTS
AND FILL WITH 3000 PSI (MIN.)
CONCRETE
APPLY BONDING AGENT TO HOLE
EXISTING CONCRETE SLAB
(4) 1/4" EXP. ANCHORS
W/ 2-1/8" EMBED.
1/8" PLATE
3/4" (TYP.)
SIZED BASED ON DIA. OF HOLE
V A
R
IE
S
'-3
[9 m m
T
O F
L O
O R
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
596A4-18-107RENOVATE SPACE FOR
NEW MENTAL HEALTH UNIT
LEXINGTON, KY, TROY BOWLING
F F E I n c Engineering and Technical Services 110 Boggs Lane, Suite 170 Cincinnati, OH 45215 513-522-0956
JRA Architects 3225 Summit Square Place Lexington KY 40509 859-252-6781
C U se rs
\g re g p
\D o cu m e n ts \P lu m b in g
F P g re g .p e a rs o n ff e
-s e rv .c o m
.r vt
/2
/2
:0
:0
A
M
PL-501
PLUMBING DETAILS & SCHEDULES
03/24/2020 GP GP
PLUMBING FIXTURE SCHEDULE**
MARK QUANTITY DESCRIPTION
SANITARY PIPE VENT PIPE
COLD WATER
PIPE
HOT WATER
PIPE
WASTE
FIXTURE
UNITS
COLD WATER
FIXTURE
UNITS
HOT WATER
FIXTURE
UNITS
WRIST
BLADE
HANDLES
ELECTRIC
SENSOR
REMARKS BASIS OF DESIGN*
IN mm IN mm IN mm IN mm MANUFACTURER MODEL #
FD-C 22 LIGATURE RESISTANT FLOOR DRAIN 2" 50 2 0 0 N/A N/A 1 ACORN WHFD-6RD-2NH
FD-E 1 FLOOR DRAIN 2" 50 2 0 0 N/A N/A 13
Zurn Industries, LLC
Z415B-AR
P-101 4
PUBLIC WATER CLOSET, FLUSH VALVE, FLOOR MOUNTED,
BACK OUTLET
4" 100 2" 50 1" 25 4 10 0 N/A YES 2, 12
Zurn Industries, LLC.
Z5647-BWL
P-418 4 LAVATORY, WALL MOUNT 1 1/4" 32 1 1/2" 40 1/2" 15 1/2" 15 1 1.5 1.5 NO YES 4, 11 Kohler K-2005
P-502 1 MOP SINK 3" 75 1 1/2" 40 1/2" 15 1/2" 15 2 3 3 NO NO 6
Zurn Industries, LLC
Z1996-24
P-528 5
SINK, STAINLESS STEEL, SINGLE COMPARTMENT, COUNTER
TOP
1 1/2" 40 1 1/2" 40 1/2" 15 1/2" 15 2 3 3 YES NO 7, 11 ELKAY LR2521
P-529 2
LIGATURE RESISTANT SINK, STAINLESS STEEL, SINGLE
COMPARTMENT, COUNTER TOP
1 1/2" 40 1 1/2" 40 1/2" 15 1/2" 15 2 3 3 NO NO 8, 11 ELKAY LR2521
P-808 1 WASHING MACHINE WALL BOX 2" 50 1 1/2" 40 1/2" 15 1/2" 15 3 3 3 NO NO OATEY 38980
P-910A 12
LIGATURE RESISTANT WATER CLOSET (PRIVATE), FLUSH
VALVE, STAINLESS STEEL, FLOOR MOUNTED, BACK OUTLET
4" 100 2" 50 1" 25 4 6 0 N/A YES 3, 12 ACORN LR2141
P-910B 1
LIGATURE RESISTANT WATER CLOSET (PUBLIC), FLUSH
VALVE, STAINLESS STEEL, FLOOR MOUNTED, BACK OUTLET
4" 100 2" 50 1" 25 4 10 0 N/A YES 3, 12 ACORN LR2141
P-930A 12 LIGATURE RESISTANT LAVATORY (PRIVATE) 1 1/4" 32 1 1/2" 40 1/2" 15 1/2" 15 1 0.5 0.5 NO YES 5, 11 N/A N/A
P-930B 1 LIGATURE RESISTANT LAVATORY (PUBLIC) 1 1/4" 32 1 1/2" 40 1/2" 15 1/2" 15 1 1.5 1.5 NO YES 5, 11 N/A N/A
P-940A 8 LIGATURE RESISTANT CEILING MOUNTED SHOWERHEAD 1/2" 15 1/2" 15 0 1 1 NO NO 9 GROHE 27816000
P-940B 3
LIGATURE RESISTANT CEILING MOUNTED SHOWERHEAD
(ADA)
1/2" 15 1/2" 15 0 1 1 NO NO 9, 10 GROHE 27816000
REMARKS:
1. 6" ROUND TOP LIGATURE RESISTANT 304 STAINLESS STEEL STRAINER, VANDAL PROOF SCREWS.
2. VITREOUS CHINA BOWL WITH WHITE FINISH AND BACKSPUD/CONCEALED FLUSH VALVE SYSTEM. PROVIDE WITH SLOAN CX 8158-1.28-CP-OR* HARDWIRED SENSOR CONCEALED FLUSHOMETER WITH PUSH BUTTON OVERRIDE, ZURN Z5955SS-EL*
WHITE OPEN FRONT TOILET SEAT, AND CARRIER FOR FLOOR MOUNTED BACK OUTLET WATER CLOSET.
3. STAINLESS STEEL BOWL WITH POWDER COATED WHITE EXTERIOR AND BACKSPUD/CONCEALED FLUSH VALVE SYSTEM. PROVIDE WITH SLOAN CX 8158-1.28-CP-OR* HARDWIRED SENSOR CONCEALED FLUSHOMETER WITH PUSH BUTTON
OVERRIDE, LIGATURE RESISTANT SEAT COVER, AND CARRIER FOR FLOOR MOUNTED BACK OUTLET WATER CLOSET.
4. VITREOUS CHINA BOWL WITH WHITE FINISH. PROVIDE WITH CHROME FINISH SLOAN SF-2200-4-PLG-TEE-CP-0.5GPM-MLM-IR-FCT* HARDWIRED SENSOR FAUCET*** WITH 4" TRIM PLATE, STOP VALVES, DRAIN, P-TRAP, OFFSET TAILPIECE, AND
CARRIER FOR WALL MOUNTED LAVATORY.
5. LAVATORY BOWL INTEGRAL WITH COUNTERTOP. REFER TO ARCHITECTURAL DRAWINGS. PROVIDE WITH WHITEHALL WH3375-SO* LIGATURE RESISTANT HARDWIRED SENSOR FAUCET***, STOP VALVES, DRAIN, AND P-TRAP. ALL EQUIPMENT
UNDER LAVATORY TO BE ACCESSIBLE BY MAINTENANCE STAFF ONLY.
6. PROVIDE WITH KOHLER K-8907* SERVICE SINK FAUCET*** AND ACORN ST70-12* THERMOSTATIC MIXING VALVE IN WALL TO LIMIT HOT WATER TEMPERATURE TO 110 DEGREES F. PROVIDE ACCESS PANEL FOR MIXING VALVE.
7. STAINLESS STEEL BOWL. PROVIDE WITH CHROME FINISH CHICAGO 786-GN2AFCE1ABCP* MANUAL RIGID/SWING GOOSENECK FAUCET***, STOP VALVES, DRAIN, AND P-TRAP.
8. STAINLESS STEEL BOWL. PROVIDE WITH WHITEHALL WH3377-8IN* LIGATURE RESISTANT HOT & COLD PUSH BUTTON FAUCET***, STOP VALVES, DRAIN, AND P-TRAP. ALL EQUIPMENT UNDER SINK TO BE ACCESSIBLE BY MAINTENANCE STAFF ONLY.
9. PROVIDE WITH ACORN SV16* LIGATURE RESISTANT THERMOSTATIC SHOWER MIXING VALVE. DRAINS TO FD-C.
10. PROVIDE WITH WHITEHALL WHDIV* LIGATURE RESISTANT DIVERTER VALVE AND LIGATURE RESISTANT WALL CONNECTOR WITH QUICK DISCONNECT ADAPTOR FOR HAND HELD SHOWER WAND.
11. PROVIDE WITH WATTS LFUSG-B-M2* THERMOSTATIC MIXING VALVE UNDER BOWL TO LIMIT HOT WATER TEMPERATURE TO 110 DEGREES F.
12. WATER CLOSET TO BE INSTALLED AT ADA HEIGHT
13. PROVIDE WITH ACID RESISTING EPOXY COATING.
*MANUFACTURER AND MODEL NUMBERS PROVIDED AS BASIS OF DESIGN. PROVIDE BASIS OF DESIGN OR EQUIVALENT.
**ALL LIGATURE RESISTANT FIXTURES MUST USE TAMPER PROOF SCREWS.
***PER VA PLUMBING DESIGN MANUAL, AERATORS ARE PROHIBITED FOR USE IN FAUCETS.
(E) 4" SAN
(E) 4" V
(E) 4" V
(E) 4" V
2" V
2" V
P-101
P-418
P-101
P-418
P-528
1 1/2" V
1 1/2" V
1 1/2" V
2" V
P-101
4" SAN
4" SAN
1 1/2" SAN
2" SAN
2" V
1 1/2" SAN
P-910A
P-930A
4" SAN
2" V
4" WCO
FD-C
P-910A
P-930A
FD-CFD-C
P-910A
FD-C
P-930A
4" SAN
1 1/2" SAN
2" SAN
2" V
2" V 2" V
1 1/2" V
4" SAN
P-930A
FD-C
4" SAN
2" SAN
2" V
2" V
1 1/2" V
1 1/2" SAN
1 1/2" V
P-528
(E) 4" SAN
(E) 4" V
2" V
(E) 5" SAN
(E) 4" V
2" V
1 1/2" V
FD-C
P-930A
FD-C
2" SAN
FD-C
2" SAN
4" SAN
P-910A
4" WCO
P-930A
1 1/2" V 2" V
2" V
4" WCO
4" SAN
P-910A
2" V
2" V
2" V
1 1/2" V
1 1/2" V P-930A
P-910A
FD-CFD-C
FD-C
P-910A
P-930A
FD-C
1 1/2" SAN4" SAN
1 1/2" SAN
4" SAN
4" WCO
P-930A
P-910A P-529
FD-C
1 1/2" SAN
1 1/2" V
2" V
1 1/2" V
FD-C
2" V
P-930B
P-910B
4" SAN
4" WCO
2 1/2" V
4" SAN
4" SAN
2" V
4" WCO
4" SAN
2" SAN
2" SAN
FD-CFD-CFD-C FD-C
P-930A
P-910A
2" V
1 1/2" SAN
2" V
1 1/2" V
1 1/2" V
P-808
2" SAN2" SAN
1 1/2" SAN
2" V
P-930A
P-910A
2" SAN
2" V
1 1/2" V
4" SAN
4" SAN
1 1/2" SAN
P-910A
P-930A
1 1/2" V
P…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .