PRIME-SUB_FORM_for_Contractors.xls

XLS spreadsheet 47 KB Posted

Attached to
Votran Transfer Plaza Restroom Renovations
Solicitation number
26-B-46LL
Issued by
Volusia County, Florida

About this file

This is a Prime/Subcontractor Form submitted by Volusia County, Florida for Contract No. C-2069, ITB No. 26-B-46LL, related to the renovation of employee restrooms at the VOTRAN Transfer Plaza in Daytona Beach. The project requires complete renovation of two employee restrooms including demolition of existing fixtures, installation of new ADA-compliant plumbing fixtures, improved lighting with occupancy controls, updated ventilation systems, and durable finishes. The solicitation was posted January 29, 2026, with a non-mandatory pre-bid meeting scheduled for February 13, 2026, at 10:00 a.m. and a question submission deadline of February 26, 2026, at 11:59 p.m. Bids must be submitted electronically via the County's eProcurement Portal by March 12, 2026, at 3:00 p.m., with public bid opening the same day at 3:00 p.m. via Microsoft Teams. Substantial completion is required within 60 days of Notice to Proceed, with final completion within 30 days thereafter for a total contract duration of 90 days.

The form requires bidders to identify all proposed subcontractors and their assigned work percentages and dollar values across anticipated disciplines including plumbing, electrical, and HVAC, with all entries in green shaded cells representing the total bid price that must equal 100 percent of work performed. The estimated construction cost is $225,000.00. Bidders must provide bid bonds equal to not less than five percent of the bid amount valid for 120 days, and may be required to provide payment and performance bonds if the contract value exceeds $200,000. A three percent local bid preference is available to prime contractors with permanent business locations in specified Florida counties for at least six months, or two percent if subcontractors represent 51 percent or greater of contracted work. The project includes a 5.2 percent Disadvantaged Business Enterprise participation goal, and all contractors and subcontractors must comply with Federal Transit Administration requirements including Davis-Bacon Act prevailing wage compliance. Insurance requirements mandate $1,000,000 per occurrence commercial general liability coverage, workers' compensation with Florida statutory limits, and $1,000,000 combined single limits auto liability, with the County named as additional insured on all policies.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2069ITB No. 26-B-46LL
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed on Bid Form

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
Plumbing$ - 00.00%
Electric$ - 00.00%
HVAC$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%