This pricing sheet outlines five deduct alternates for the renovation of the first and second floors of Building 58 into a domiciliary at a Veterans Affairs medical center. The base contract and each deduct alternate provide pricing for general construction, electrical, and mechanical work. The deduct alternates specify areas or aspects of work that would be omitted from the base contract scope, such as omitting renovations from certain bedrooms and bathrooms, using alternative piping materials, or connecting building automation controls to the existing campus network rather than providing a standalone system. Pricing is requested to be provided for the base contract and each deduct alternate option. The related federal contract solicitation is for the renovation project with a 100% small business set-aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICING SHEET FOR TOTAL PROJECT AND DEDUCT ALTERNATES

Pricing sheet for total project and deduct alternates and attached Contractor Bid Form must be completed and submitted for Volume 2 – Price Proposal.

CLIN 0001: BASE CONTRACT PRICE for Renovate Building 58 1st & 2nd Floors Domiciliary:

ITEM I: GENERAL CONSTRUCTION: Work includes general construction, building alterations necessary removal of existing structures and construction and certain other items.

ITEM II: ELECTRICAL WORK: Work includes all labor, material, equipment and supervision to perform the required electrical construction work, technology work, fire alarm, security on this project including all materials and labor to fully renovate the first and second floors of Building 58 into a domiciliary, also it includes demolition.

ITEM III: MECHANICAL WORK: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including all materials and labor to fully renovate the first and second floors of Building 58 into a domiciliary.

(copy from SF1442 Block 17) CLIN 0002: DEDUCT ALTERNATE NO.1: Omit the following work on the second floor south-east bedroom 243 and toilet/shower 243a and south-west bedroom 205 and toilet/shower 205a in building 58, as indicated on the drawings. this shall include the following items in the designated area(s):

1. Demolition activities will still be included per the demolition plan ad101.

2. The patient bedroom 205, 243 and toilet/shower 205a, 243a and the new corridor wall (c206, c245 in this specific areas,) doors 205, 205a, 243, & 243a and associated hollow metal frames will not be constructed.

3. Plumbing piping to these spaces will be run to the toilet, sink, & shower locations and terminated and capped below the floor for possible future connection. Sprinkler heads and piping in these spaces will align with the space layout based on the applicable occupancy hazard.

4. HVAC duct work will still be run to these areas for heating and cooling the space(s).

5. A 2x2 ceiling grid will be installed with (8) 2x2 light fixtures. ceiling grid will be at 8’-0” above finish floor gypsum board light wells will be constructed at the 10 window locations.

6. New LVT flooring, (and leveling compound if required) will be installed over the entire floor area(s). this shall also include a new 6” rubber base around the entire perimeter of the room.

7. New furring and 5/8” gypsum board will be run around all exterior walls.

8. Gypsum board returns, with solid surface window stools will be included at all window openings.

9. The demising wall between bedroom 8 and bedroom 19 and the deduct bid area will be furred out with 1-1/2” metal furring and 5/8” gypsum board for the full height and length of the wall(s).

10. Widening of the corridor c206 & c245 opening(s) thru the existing masonry wall will still be included in the project.

11. Bidder shall provide a separate bid price for this work. if the alternate bid deduct is not accepted, the area will be renovated per the drawings and specifications.

Subtract $__________ for work described in CLIN 0002 from Total Price of base project.

CLIN 0002 Adjusted Total Project Price: $_____________________

CLIN 0003: DEDUCT ALTERNATE NO. 2: Work includes Bid Item I, Bid Item II and Bid Item III, except all domestic water piping shall be Type L ASTM B88 copper tubing in lieu of Type K ASTM B88 copper tubing.

Subtract $__________for work described in CLIN 0003 from Total Price of base project.

CLIN 0003 Adjusted Total Project Price: $_____________________

CLIN 0004: DEDUCT ALTERNATE NO. 3: Omit the following work on the second floor in the central corridor bedroom 215 and toilet/shower 215a and adjoining bedroom 216 and toilet/shower 216a in building 58, as indicated on the drawings. This shall include the following items in the designated area(s):

1. Demolition activities will still be included per the demolition plan ad101.

2. The toilet/shower rooms 215a and 216a will not be constructed. This includes removing doors 215a & 216a and the associated hollow metal frames. doors 215 & 216 will still be included in the project, along with associated hollow metal frames. the corridor walls will also be included in the project.

3. Door hardware, as specified in the base bid, will remain in the project for these doors.

4. Plumbing piping to these spaces will be run to the toilet, sink, & shower locations and terminated and capped below the floor for possible future connection. Sprinkler heads and piping in these spaces will align with the space layout based on the applicable occupancy hazard.

5. HVAC duct work will still be run to these areas for heating and cooling the space(s).

6. A 2x2 ceiling grid will be installed in each space (215 & 216) with (4) 2x2 light fixtures in each space (215 & 216). the ceiling grid will be at 9’-0” above finish floor ceiling grid constructed light wells will be provided at the 4 window locations.

7. New LVT flooring, (and leveling compound if required) will be installed over the entire floor area in each space (215 & 216). this shall also include a new 6” rubber base around the entire perimeter of each space (215 & 216).

8. New furring and 5/8” gypsum board will be run at all exterior walls, full height.

9. Gypsum board returns, with solid surface window stools will be included at all window openings.

10. The demising wall between bedroom 215 and bedroom 216 will be included. this will be a 6” metal stud wall (with sound batt insulation) and 5/8” gypsum board (on each side) run to the underside of the attic floor, for the full height and length of the wall.

11. Exposed structural columns shall be furred out and wrapped with 5/8” gypsum board to 8” above the lay-in ceiling. Bidder shall provide a separate bid price for this work. if the alternate bid deduct is not accepted, the area will be renovated per the drawings and specifications.

Subtract $__________for work described in CLIN 0004 from Total Price of base project.

CLIN 0004 Adjusted Total Project Price: $_____________________

CLIN 0005: DEDUCT ALTERNATE NO. 4: Work includes Bid Item I, Bid Item II and Bid Item III, except, if the campus-wide DDC fiberoptic network has been installed, eliminate the standalone Engineering Control Center and Portable Operator’s Terminal for Building 58, and connect DDC network for Building 58 into the campus network. Coordinate location of connection point with the COR.

Subtract $__________for work described in CLIN 0005 from Total Price of base project.

CLIN 0005 Adjusted Total Project Price: $_____________________

CLIN 0006: DEDUCT ALTERNATE NO. 5: Work includes Bid Item I, Bid Item II and Bid Item III, except (1) existing chilled water pump and (1) existing heating hot water pump shall remain. Remove (1) existing chilled water pump and (1) existing heating hot water pump and replace with new pumps with variable frequency drives. Do not provide variable frequency drives for the existing pumps to remain. Pumps to be removed and/or replaced will be at the direction of the COR.

Subtract $__________for work described in CLIN 0006 from Total Price of base project.

CLIN 0006 Adjusted Total Project Price: $_____________________