This file is a price schedule template document that provides sample pricing formats for federal construction contracts issued by the National Park Service (NPS). The primary document addresses a Heat Pump Replacement project at Brown v. Board of Education National Historic Park (BRVB), which is a 100% small business set-aside solicitation (140P6426Q0069) with NAICS code 238220 and a $19 million size standard. The heat pump replacement work includes four base line items: Mobilization/Demobilization costs, Site Demolition/Removals with materials, labor, and equipment components, Installation of New Heat Pumps with associated materials, labor, and equipment, and Installation of a Refrigeration Detection and Mitigation System with materials, labor, and equipment costs. All line items are structured as lump-sum pricing with quantities of one unit.
The document also includes two additional sample price schedule templates: a Design-Bid-Build (DBB) example for a Johnstonian Visitors Center project at Yellowstone National Park featuring unit-priced line items for water lines, sewer lines, and rock excavation plus optional items for geothermal wells and photovoltaic systems, and a Design-Build (DB) sample for a new structure at Yosemite Valley with design and construction as base items and a photovoltaic system option. The anticipated award date for the BRVB Heat Pump Replacement is summer 2026 with performance beginning August 2026. Offerors must provide pricing for all base line items and any applicable option lines, with totals rounded to whole dollars. Contractors must be registered in the System for Award Management (SAM) and maintain active registration through the award and contract performance periods.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_0001.pdf | ||
| Sol_140P6426Q0069_Amd_0001.pdf | ||
| Revised_Specifications_-_Heat_Pump_Replace_0001.pdf | ||
| Site_Visit_Sign-in_Sheet_0001.pdf | ||
| Technical_Questionnaire.pdf | ||
| Wage_Determination_-_Shawnee_Co.pdf | ||
| Sol_140P6426Q0069.pdf | ||
| Attachment_-_Notice_to_Contractors.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Attachment_-_Drawings-Plans.pdf | ||
| Attachment_-_Submittal_List.pdf | ||
| Price_Schedule_-_Heat_Pump_Replace.pdf | ||
| Specifications_-_Heat_Pump_Replace.pdf | ||
| Attachment_-_Construction_Contract_Administration.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule
PRICE SCHEDULE
| US Department of Interior |
| National Park Service |
| Park Location: Brown v. BOE NHP |
| Project Title: Heat Pump Replacement |
NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the quote/bid/proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Price/Unit | Total Price |
| 1 | Base Line Items | 1 | Lump Sum | $ - 0 | $ - 0 |
| 2 | |
| 3 | |
| 4 | |
| Grand Total (Base) | $ - 0 |
Price Schedule Wksht
| Brown v. BOE National Historic Park | |
| U.S. Department of Interior | |
| National Park Service |
PROJECT: Heat Pump Replacement
PRICE SCHEDULE WORKSHEET
Construction Items Unit Quantity Price/ Unit Subtotal
| BASE LINE ITEM: Mobilization/Demobilization | ||||
| - Mob/Demob Costs | LS | 1 | $ - 0 | $ - 0 |
| BASE LINE ITEM: SITE DEMOLITION/REMOVALS and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| BASE LINE ITEM: INSTALLATION OF NEW HEAT PUMPS and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
| BASE LINE ITEM: INSTALLATION OF REFRIGERATION DETECTION and MITIGATION SYSTEM and all associated work/items | ||||
| - Materials | LS | 1 | $ - 0 | $ - 0 |
| - Labor | LS | 1 | $ - 0 | $ - 0 |
| - Equipment | LS | 1 | $ - 0 | $ - 0 |
SUBTOTAL $ - 0
| Overhead | % | $ - 0 |
| Profit | % | $ - 0 |
| Bonds | % | $ - 0 |
Grand Total $ - 0
Printed: &D &T &Z&F
Design-Bid-Build (DBB) Sample
| Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Old Faithful | ||||
| Project Title: | Johnstonian Visitors Center | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Visitors Center | 1 | Lump Sum | $0.00 | |
| 2 | Water Line | 400 | Lineal Feet | - 0 | |
| 3 | Sanitary Sewer Line | 200 | Lineal Feet | - 0 | |
| 4 | Rock Excavation | 150 | Cubic Yards | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Geothermal Wells | 1 | Lump Sum | - 0 | |
| 6 | OPTION B, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) ------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Design-Build (DB) Sample
| Contract Price Schedule - Design-Build (DB) SAMPLE | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | N2011080811 | ||||
| PARK - PMIS: | YELL 012345 | ||||
| (Project Management Information System) | |||||
| Developed Area: | Yosemite Valley | ||||
| Project Title: | Design and Build a New Structure | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Design | 1 | Lump Sum | $0.00 | |
| 2 | Construction | 1 | Lump Sum | - 0 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 and 2) --------------------------------------------------------------------------------------- | $0.00 | ||||
| 3 | OPTION A, Photovoltaic System | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ---------------------------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ---------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |