Price_Schedule_-_Heat_Pump_Replace.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
Heat Pump Replacement @ BRVB Federal contract opportunity
Solicitation number
140P6426Q0069
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This file is a price schedule template document that provides sample pricing formats for federal construction contracts issued by the National Park Service (NPS). The primary document addresses a Heat Pump Replacement project at Brown v. Board of Education National Historic Park (BRVB), which is a 100% small business set-aside solicitation (140P6426Q0069) with NAICS code 238220 and a $19 million size standard. The heat pump replacement work includes four base line items: Mobilization/Demobilization costs, Site Demolition/Removals with materials, labor, and equipment components, Installation of New Heat Pumps with associated materials, labor, and equipment, and Installation of a Refrigeration Detection and Mitigation System with materials, labor, and equipment costs. All line items are structured as lump-sum pricing with quantities of one unit.

The document also includes two additional sample price schedule templates: a Design-Bid-Build (DBB) example for a Johnstonian Visitors Center project at Yellowstone National Park featuring unit-priced line items for water lines, sewer lines, and rock excavation plus optional items for geothermal wells and photovoltaic systems, and a Design-Build (DB) sample for a new structure at Yosemite Valley with design and construction as base items and a photovoltaic system option. The anticipated award date for the BRVB Heat Pump Replacement is summer 2026 with performance beginning August 2026. Offerors must provide pricing for all base line items and any applicable option lines, with totals rounded to whole dollars. Contractors must be registered in the System for Award Management (SAM) and maintain active registration through the award and contract performance periods.

View the file

Other files for this federal contract opportunity

Other files attached to Heat Pump Replacement @ BRVB, newest first.
File Type Posted
Questions_and_Answers_0001.pdf PDF
Sol_140P6426Q0069_Amd_0001.pdf PDF
Revised_Specifications_-_Heat_Pump_Replace_0001.pdf PDF
Site_Visit_Sign-in_Sheet_0001.pdf PDF
Technical_Questionnaire.pdf PDF
Wage_Determination_-_Shawnee_Co.pdf PDF
Sol_140P6426Q0069.pdf PDF
Attachment_-_Notice_to_Contractors.pdf PDF
Technical_Questionnaire.docx DOCX document
Attachment_-_Drawings-Plans.pdf PDF
Attachment_-_Submittal_List.pdf PDF
Price_Schedule_-_Heat_Pump_Replace.pdf PDF
Specifications_-_Heat_Pump_Replace.pdf PDF
Attachment_-_Construction_Contract_Administration.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

PRICE SCHEDULE

US Department of Interior
National Park Service
Park Location: Brown v. BOE NHP
Project Title: Heat Pump Replacement

NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the quote/bid/proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.

Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasurePrice/UnitTotal Price
1Base Line Items1Lump Sum$ - 0$ - 0
2
3
4
Grand Total (Base)$ - 0

Price Schedule Wksht

Brown v. BOE National Historic Park
U.S. Department of Interior
National Park Service

PROJECT: Heat Pump Replacement

PRICE SCHEDULE WORKSHEET

Construction Items Unit Quantity Price/ Unit Subtotal

BASE LINE ITEM: Mobilization/Demobilization
- Mob/Demob CostsLS1$ - 0$ - 0
BASE LINE ITEM: SITE DEMOLITION/REMOVALS and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
BASE LINE ITEM: INSTALLATION OF NEW HEAT PUMPS and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0
BASE LINE ITEM: INSTALLATION OF REFRIGERATION DETECTION and MITIGATION SYSTEM and all associated work/items
- MaterialsLS1$ - 0$ - 0
- LaborLS1$ - 0$ - 0
- EquipmentLS1$ - 0$ - 0

SUBTOTAL $ - 0

Overhead%$ - 0
Profit%$ - 0
Bonds%$ - 0

Grand Total $ - 0

Printed: &D &T &Z&F

Design-Bid-Build (DBB) Sample

Contract Price Schedule - Design-Bid-Build (DBB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Old Faithful
Project Title:Johnstonian Visitors Center
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Visitors Center1Lump Sum$0.00
2Water Line400Lineal Feet- 0
3Sanitary Sewer Line200Lineal Feet- 0
4Rock Excavation150Cubic Yards- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ---------------------------------------------------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum- 0
6OPTION B, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 and 6) -------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

Design-Build (DB) Sample

Contract Price Schedule - Design-Build (DB) SAMPLE
National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18
Solicitation Number:N2011080811
PARK - PMIS:YELL 012345
(Project Management Information System)
Developed Area:Yosemite Valley
Project Title:Design and Build a New Structure
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all
option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced
line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related
item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts
govern. Round totals and extended prices to whole dollars.
Contract Line Item Number (CLIN)Contract Line Item (CLI) TitleQuantityUnit of MeasureUnit PriceTotal Price
1Design1Lump Sum$0.00
2Construction1Lump Sum- 0
TOTAL BASE PRICE (Contract Line Item Number 1 and 2) ---------------------------------------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3) ----------------------------------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 3) ----------------------------$0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.

image1.png

File details come from the government source that posted it. Updated .