This document is a set of construction drawings for a mechanical renovation project at Monroe Elementary, Brown v. Board of Education National Historical Park, a National Park Service facility located in Topeka, Kansas.
The project scope involves replacing existing water-to-water heat pumps and circulation pumps serving the building's heating and domestic hot water systems. The drawings include mechanical demolition plans, HVAC floor plans with equipment layout, equipment schedules, and general notes and specifications. Key equipment to be replaced includes two water-to-water heat pumps (WTW-1 for domestic hot water and WTW-2 for radiant floor heat), circulation pumps, an exhaust fan, and diffuser registers. The schedules specify equipment data including motor horsepower, flow rates, electrical characteristics, and manufacturer information. General notes address coordination requirements between electrical, mechanical, and controls contractors; proper installation of HVAC equipment with auxiliary components; sealing of penetrations; routing of conductors in surface-mounted raceways in finished spaces; and provision of concrete housekeeping pads for floor-mounted equipment. Mechanical symbols and legends define piping systems (hot water supply and return, chilled water supply and return, heat pump loop piping, glycol water piping, and refrigeration lines), control devices, and HVAC distribution components used throughout the drawings.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P6426Q0069_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Revised_Specifications_-_Heat_Pump_Replace_0001.pdf | ||
| Site_Visit_Sign-in_Sheet_0001.pdf | ||
| Sol_140P6426Q0069.pdf | ||
| Attachment_-_Notice_to_Contractors.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Wage_Determination_-_Shawnee_Co.pdf | ||
| Price_Schedule_-_Heat_Pump_Replace.xlsx | XLSX spreadsheet | |
| Technical_Questionnaire.pdf | ||
| Attachment_-_Submittal_List.pdf | ||
| Price_Schedule_-_Heat_Pump_Replace.pdf | ||
| Specifications_-_Heat_Pump_Replace.pdf | ||
| Attachment_-_Construction_Contract_Administration.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NATIONAL
PARK
SERVICE
REPLACE HEAT PUMPS AND CIRC. PUMPS
MONROE ELEMENTARY
BROWN V. BOARD OF EDUCATION
NATIONAL HISTORICAL PARK
REGIONAL LOCATION MAP
BROWN V. BOARD OF EDUCATION
NATIONAL HISTORICAL PARK
(SEE PARK LOCATION MAP)
REPLACE HEAT PUMPS AND CIRC. PUMPS
MONROE ELEMENTARY
BROWN V. BOARD OF EDUCATION
NATIONAL HISTORICAL PARK
NOT TO SCALE
PARK LOCATION MAP
NOT TO SCALE
PROJECT LOCATION MAP
NOT TO SCALE
BROWN V. BOARD OF EDUCATION
NATIONAL HISTORICAL PARK
(SEE PROJECT LOCATION MAP)
PROJECT
LOCATION
NORTH NORTH NORTH
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text Date
AutoCAD SHX Text Mark
AutoCAD SHX Text Sheet
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Initial
AutoCAD SHX Text 462 80015
AutoCAD SHX Text 234468
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text UNITED STATES DEPARTMENT OF THE INTERIOR NATIONAL PARK SERVICE MIDWEST REGIONAL OFFICE
AutoCAD SHX Text
QUALITY DESIGN CERTIFICATION
AutoCAD SHX Text Prepared in Accordance with Design Development (Title I) OR Drawing No. Drawing No. Variance from Design Development (Title I) Approved by Superintendent on OR Date Date Construction Drawing Not Preceded by Design Development (Title I)
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Date
AutoCAD SHX Text \\INPMWROXFS\CADdata\Cadusers\Groups\Maint\Active\BRVB_234468_Heat Pumps - Circ Pumps\11_In-House\BRVB-80010_COVER.dwg 4/16/2026 9:39 AM BY Rohloff, Zev A 4/16/2026 9:39 AM BY Rohloff, Zev A4/16/2026 9:39 AM BY Rohloff, Zev A BY Rohloff, Zev ARohloff, Zev A
AutoCAD SHX Text
TITLE OF PROJECT
AutoCAD SHX Text
LOCATION WITHIN PARK
AutoCAD SHX Text
NAME OF PARK
AutoCAD SHX Text
SHAWNEE
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
MWRO 3,4,5
AutoCAD SHX Text
REGION
AutoCAD SHX Text
KANSAS
AutoCAD SHX Text
STATE
AutoCAD SHX Text
CONSTRUCTION DRAWINGS
AutoCAD SHX Text N E B R A S K A
AutoCAD SHX Text K A N S A S
AutoCAD SHX Text
DRAWING SHEET INDEX
AutoCAD SHX Text SHEET SUB SHEET TITLE OF SHEET SUB SHEET TITLE OF SHEET TITLE OF SHEET MECHANICAL 1 M0.0 GENERAL NOTES, LEGEND, SPECIFICATIONS M0.0 GENERAL NOTES, LEGEND, SPECIFICATIONS GENERAL NOTES, LEGEND, SPECIFICATIONS 2 M1.0 MECHANICAL DEMOLITION M1.0 MECHANICAL DEMOLITION MECHANICAL DEMOLITION 3 M1.1 MECHANICAL SCHEDULES AND LAYOUTM1.1 MECHANICAL SCHEDULES AND LAYOUTMECHANICAL SCHEDULES AND LAYOUT
AutoCAD SHX Text M I S S O U R I
AutoCAD SHX Text I O W A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Zev Rohloff
AutoCAD SHX Text 04/15/2026
AutoCAD SHX Text x
1. MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND SCHEMATIC IN NATURE
ONLY. ROUTINGS AND EQUIPMENT LOCATIONS DEPICTED ARE APPROXIMATE,
UNLESS NOTED OTHERWISE, AND SHALL NOT BE "SCALED" NOR CONSTRUED TO
SHOW EVERY ELBOW, FITTING, TRANSITION, OFFSET, ETC. REQUIRED TO PROVIDE
A COMPLETE AND OPERABLE SYSTEM. CONTRACTOR MUST FIELD COORDINATE
THE INSTALLATION OF ALL CONTRACT WORK.
2. FULLY COORDINATE THE INSTALLATION OF ALL WORK WITH THE WORK OF
OTHER TRADES, ARCHITECTURAL AND STRUCTURAL BUILDING ELEMENTS.
CONTRACTOR SHALL REFER TO THE ARCHITECTURAL AND STRUCTURAL
DRAWINGS TO VERIFY ALL ELEVATIONS, BUILDING SECTIONS, CEILING TYPE AND
HEIGHT REQUIREMENTS AND FLOOR/FOUNDATION ELEVATIONS.
3. COORDINATE THE LOCATION OF ALL EQUIPMENT WITH ARCHITECTURAL
AND STRUCTURAL BUILDING ELEMENTS. EQUIPMENT SHALL BE INSTALLED IN
CONFORMANCE WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE
CLEARANCES AND ANY/ALL STATE/LOCAL CODE CLEARANCE REQUIREMENTS.
CONTRACTOR SHALL COORDINATE EQUIPMENT INSTALLATION WITH
MANUFACTURER'S REPRESENTATIVE(S) AND PROVIDE ALL DEVICES REQUIRED TO
ENSURE SATISFACTORY OPERATION OF ALL SYSTEMS AND EQUIPMENT.
4. CONTRACTOR SHALL PROVIDE A FACTORY START-UP OF ALL EQUIPMENT
BY THE MANUFACTURER'S REPRESENTATIVE(S).
5. CONTRACTOR SHALL PROVIDE "OWNER'S TRAINING" FOR ALL EQUIPMENT
AND SYSTEMS INSTALLED UNDER THIS PROJECT. MINIMUM TRAINING FOR MAJOR
EQUIPMENT SHALL NOT BE LESS THAN 8 HOURS PER EQUIPMENT/COMPONENT
UNLESS NOTED OTHERWISE.
6. ALL MECHANICAL SYSTEMS (AND THE COMPONENTS THEREOF) SHALL BE
INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, THE
CONTRACT DOCUMENTS, AND APPLICABLE STATE/LOCAL CODES. INSTALLING
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND
INSPECTIONS NECESSARY BY STATE/LOCAL/FEDERAL AGENCIES TO PLACE
SYSTEMS INTO OPERATION.
7. SEAL AROUND ALL PENETRATIONS THROUGH WALLS, CEILINGS, ROOF AND
FLOORS TO MAINTAIN REQUIRED RATINGS.
8. WELDING OF MECHANICAL PIPING - WHERE NECESSARY - SHALL BE
PERFORMED BY A CERTIFIED WELDER AND SHALL CONFORM TO ASME B31.1.
OWNER RESERVES THE RIGHT, AT THEIR EXPENSE, TO PROVIDE THIRD PARTY
WELDING INSPECTION SERVICES (VISUAL AND/OR RADIOGRAPHIC) TO INSPECT
ANY/ALL WELDING. ANY WELDING FAILING INSPECTION (VISUAL OR
RADIOGRAPHIC) SHALL BE REMOVED/REPAIRED AT THE CONTRACTOR'S EXPENSE.
9. THE MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 4FT WITH NO 90°
ELBOWS.
10. CONTRACTOR SHALL PROVIDE VIBRATION ISOLATION FOR ALL EQUIPMENT
THAT MEETS THE MANUFACTURER'S RECOMMENDATIONS AND ANY CONTRACT
DOCUMENT REQUIREMENTS.
11. REFRIGERANT PIPING SHALL NOT BE RUN UNDERGROUND UNLESS
SPECIFICALLY NOTED OTHERWISE.
12. REFRIGERANT PIPING SHALL BE PURGED WITH NITROGEN AFTER
COMPLETED BUT PRIOR TO BEING CHARGED WITH REFRIGERANT.
1. PLUMBING DRAWINGS ARE DIAGRAMMATIC AND SCHEMATIC IN NATURE ONLY.
ROUTINGS AND EQUIPMENT LOCATIONS DEPICTED ARE APPROXIMATE, UNLESS
NOTED OTHERWISE, AND SHALL NOT BE "SCALED" NOR CONSTRUED TO SHOW EVERY
ELBOW, FITTING, TRANSITION, OFFSET, ETC. REQUIRED TO PROVIDE A COMPLETE AND
OPERABLE SYSTEM. CONTRACTOR MUST FIELD COORDINATE THE INSTALLATION OF
ALL CONTRACT WORK.
2. FULLY COORDINATE THE INSTALLATION OF ALL WORK WITH THE WORK OF
OTHER TRADES, ARCHITECTURAL AND STRUCTURAL BUILDING ELEMENTS.
3. COORDINATE THE LOCATION OF ALL EQUIPMENT WITH ARCHITECTURAL AND
STRUCTURAL BUILDING ELEMENTS. EQUIPMENT SHALL BE INSTALLED IN
CONFORMANCE WITH THE MANUFACTURER'S RECOMMENDED MAINTENANCE
CLEARANCES AND ANY/ALL STATE/LOCAL CODE CLEARANCE REQUIREMENTS.
CONTRACTOR SHALL COORDINATE EQUIPMENT INSTALLATION WITH
MANUFACTURER'S REPRESENTATIVE(S) AND PROVIDE ALL DEVICES REQUIRED TO
ENSURE SATISFACTORY OPERATION OF ALL SYSTEMS AND EQUIPMENT.
4. CONTRACTOR SHALL PROVIDE A FACTORY START-UP OF ALL EQUIPMENT BY
THE MANUFACTURER'S REPRESENTATIVE(S).
5. CONTRACTOR SHALL PROVIDE "OWNER'S TRAINING" FOR ALL EQUIPMENT AND
SYSTEMS INSTALLED UNDER THIS PROJECT. MINIMUM TRAINING FOR MAJOR
EQUIPMENT SHALL NOT BE LESS THAN 8 HOURS PER EQUIPMENT/COMPONENT
UNLESS NOTED OTHERWISE.
6. ALL PLUMBING SYSTEMS (AND THE COMPONENTS THEREOF) SHALL BE
INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, THE
CONTRACT DOCUMENTS, AND APPLICABLE STATE/LOCAL CODES, INSTALLING
CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS AND
INSPECTIONS NECESSARY BY STATE/LOCAL/FEDERAL AGENCIES TO PLACE SYSTEMS
INTO OPERATION.
7. SEAL AROUND ALL PENETRATIONS THROUGH WALLS, CEILINGS, ROOF AND
FLOORS TO MAINTAIN REQUIRED RATINGS.
8. IN-LINE PUMPS SHALL BE PROPERLY AND ADEQUATELY SUPPORTED FROM THE
SLAB, ROOF OR OTHER SECURED STRUCTURE SO AS TO MITIGATE VIBRATION
TRANSFERENCE TO THE SYSTEM. VIBRATION ISOLATION SHALL BE PROVIDED, REFER
TO DRAWINGS/SPECIFICATIONS.
GENERAL MECHANICAL NOTES GENERAL PLUMBING NOTES
1. FULLY COORDINATE THE INSTALLATION OF ALL ELECTRICAL DEVICES WITH THE WORK OF
OTHER TRADES.
2. UNLESS OTHERWISE NOTED, ELECTRICAL DEVICES ARE TO BE FLUSH MOUNTED AND ALL WIRE
AND CONDUIT IS TO BE ROUTED CONCEALED. COORDINATE INSTALLATION WITH EXISTING
CONDITIONS, AND INCLUDE PATCHING AND REFINISHING OF EXISTING SURFACES TO
ACCOMMODATE THIS REQUIREMENT.
3. COORDINATE THE LOCATION OF ALL HVAC EQUIPMENT WITH THE MECHANICAL AND CONTROLS
CONTRACTORS. PROVIDE ALL DEVICES (I.E. STARTERS, SWITCHES, CONTACTS, ETC.)
REQUIRED TO ENSURE SATISFACTORY OPERATION OF ALL SYSTEMS AND EQUIPMENT.
(CONTROL WIRING TO BE PROVIDED BY MECHANICAL CONTRACTOR.) COORDINATE DEVICE
REQUIREMENTS WITH ACTUAL EQUIPMENT.
4. FOR ALL HVAC CONTROL DEVICES PROVIDED BY THE ELECTRICAL CONTRACTOR, PROVIDE ALL
NECESSARY AUXILIARY COMPONENTS AND CONTACTS TO ENSURE PROPER SYSTEM CONTROL
FUNCTIONS.
5. SEAL AROUND ALL CONDUIT AND CABLE PENETRATIONS THROUGH WALLS, CEILINGS AND
FLOORS TO MAINTAIN CODE REQUIRED RATINGS.
6. IN ADDITION TO THOSE SHOWN ON THE DRAWINGS, PROVIDE ALL NECESSARY SLEEVES
THROUGH WALLS AND FLOORS TO ALLOW FOR THE DISTRIBUTION OF OWNER FURNISHED
TELEPHONE AND DATA CABLING. COORDINATE REQUIREMENTS WITH THE OWNER.
7. PROVIDE NEUTRAL CONDUCTOR FOR MECHANICAL EQUIPMENT IF NECESSARY.
8. PROVIDE 4" CONCRETE HOUSEKEEPING PAD FOR ALL FLOOR MOUNTED POWER PANELBOARDS,
SWITCHBOARDS AND FLOOR MOUNTED TRANSFORMERS.
9. FOR ALL RENOVATION, SURFACE MOUNTED CONDUIT IN FINISHED SPACES IS NOT ALLOWED.
CONTRACTOR SHALL ROUTE CONDUCTORS IN SURFACE MOUNTED RACEWAY. SURFACE
MOUNTED CONDUIT MAY BE USED IN UNFINISHED SPACES SUCH AS MECHANICAL ROOMS.
ENGINEER SHALL HAVE THE FINAL JUDGMENT AS TO WHETHER A ROOM IS FINISHED OR
UNFINISHED. IF A ROOM IS IN QUESTION, THE CONTRACTOR SHALL CONTACT THE ENGINEER.
10. THE CONTRACTOR IS RESPONSIBLE FOR UPDATING ALL PANEL DIRECTORIES OF ALL AFFECTED
PANELS.
11. FOR ALL NEW CONSTRUCTION, ROUTE ALL CONDUIT CONCEALED IN FINISHED SPACES. IN
UNFINISHED SPACES SUCH AS MECHANICAL ROOMS SURFACE CONDUIT MAY BE USED.
12. ALL BRANCH LIGHTING, RECEPTACLE CIRCUITS SHALL HAVE A DEDICATED NEUTRAL
CONDUCTOR. MECHANICAL CIRCUITS SHALL HAVE A NEUTRAL CONDUCTOR WHERE REQUIRED
BY EQUIPMENT.
13. PROVIDE JUNCTION BOX COVER ON ALL JUNCTION BOXES.
MECHANICAL SYMBOLS
SYMBOLSYMBOL DESCRIPTION
TYPICAL PIPING
DESCRIPTION
ELBOW DN / ELBOW UP
PIPE TEE DOWN / PIPE TEE UP
GATE VALVE
ISOLATION VALVE (BALL OR BUTTERFLY)
MANUAL BALANCING VALVE
GLOBE VALVE
UNION
STRAINER WITH BLOWDOWN
CHECK VALVE (ARROW INDICATES FLOW)
AUTOMATIC CONTROL VALVE TWO-WAY / THREE WAY
PRESSURE REGULATING VALVE (PRV)
PRESSURE GAUGE
THERMOMETER
PIPE TEE / PIPE TEE, TOP CONNECTION / PIPE TEE, BOTTOM CONNECTION
CAPPED PIPE
GENERAL
ITEMS SHOWN HALF-TONE INDICATES EXISTING
CONNECTION POINT OF NEW TO EXISTING ITEMS SHOWN FULL-TONE INDICATES NEW
FLAG NOTE AND NUMBER1
AUTOMATIC BALANCING VALVE
CHILLED WATER SUPPLY PIPING
HOT WATER RETURN PIPING
CONDENSER WATER RETURN PIPING
CHILLED WATER RETURN PIPING
CONDENSER WATER SUPPLY PIPING
HOT WATER SUPPLY PIPING
HYDRONIC HVAC PIPING
HWS
HWR
CWR
CWS
CR
CS
COIL CONDENSATE DRAIN (SLOPE TO DRAIN)CD
AIR VENT
GWR
GWS
HPLR
HPLS
GLYCOL WATER RETURN PIPING
GLYCOL WATER SUPPLY PIPING
HEAT PUMP LOOP RETURN PIPING
HEAT PUMP LOOP PIPING SUPPLY PIPING
SOLENOID VALVE
THERMOSTATIC EXPANSION VALVE (TXV)
SIGHT GLASS
REFRIGERATION PIPING
REFRIGERANT HOT GAS DISCHARGE LINE
REFRIGERANT SUCTION LINE
REFRIGERANT LIQUID LINE
RS
RL
RD
AIR FLOW
HVAC
SIDEWALL RETURN OR EXHAUST REGISTER OR GRILLE NECK SIZE (IN), TAG
AIRFLOW (CFM)
6x6 G-1
6x6 R-1
NECK SIZE (IN), TAG
AIRFLOW (CFM)SIDEWALL SUPPLY REGISTER OR GRILLE
6"Ø D-1
100 AIRFLOW (CFM)
NECK SIZE (IN), TAGSUPPLY AIR DIFFUSER
SUPPLY AIR, OUTSIDE AIR OR MIXED AIR DUCT
RETURN AIR, EXHAUST AIR OR RELIEF AIR DUCT
RECTANGULAR DUCTWORK (WIDTH/DEPTH)(IN)12/8
ROUND DUCTWORK (DIAMETER)(IN) (SPIRAL DUCT IN EXPOSED AREAS)12"Ø
TURNING VANES
FIRE DAMPER WITH SLEEVE AND ACCESS DOOR
SMOKE DAMPER WITH SLEEVE AND ACCESS DOOR
FIRE/SMOKE DAMPER WITH SLEEVE AND ACCESS DOOR
MOTORIZED CONTROL DAMPER WITH ACTUATORM
VOLUME DAMPERVD
SUPPLY AIRS.A.
EXHAUST AIRE.A.
RETURN AIRR.A.
CARBON DIOXIDE SENSOR
OUTSIDE AIRO.A.
MIXED AIRM.A.
THERMOSTAT
SWITCH
HUMIDISTAT
S T H
SD
CO₂
RETURN OR EXHAUST GRILLE, CEILING NECK SIZE (IN), TAG
AIRFLOW (CFM)
BRANCH, BELL MOUTH WITH VOLUME DAMPER
BRANCH, STANDARD
SPLITTER DAMPER
2 HR FIRE DAMPER WITH SLEEVE AND ACCESS DOOR2HRBETWEEN JOISTSB.J.
END OR RISER UP / RISER DN
END OR RISER UP / RISER DN
(FIRST NUMBER IS SIDE SHOWN)
CODES AND PERMITS
ALL WORK SHALL BE INSTALLED IN ACCORDANCE WITH LOCAL CODES. ALL FEES AND PERMITS
SHALL BE PAID FOR BY THE CONTRACTOR.
WORKMANSHIP
ALL MATERIALS SHALL BE INSTALLED IN ACCORDANCE WITH ACCEPTED GOOD PRACTICE OF THE
INDUSTRY.
COORDINATION
COORDINATE THE MECHANICAL WORK WITH THE WORK OF ALL OTHER TRADES.
DIMENSIONS
VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD.
SUBMITTALS
CONTRACTOR SHALL SUBMIT THE FOLLOWING TO ENGINEER FOR REVIEW:
1. SHOP DRAWINGS AND PRODUCT DATA FOR
1.1. HEAT PUMP WTW-1
1.2. HEAT PUMP WTW-2
1.3. PUMP P-1
1.4. PUMP P-2
1.5. GRILLE G-1
1.6. EXHAUST FAN EF-1
2. ALL START-UP REPORTS SUPPLIED BY MANUFACTURER FOR ALL EQUIPMENT PROVIDED
HEAT PUMP
HEAT PUMPS SHALL BE REPLACED IN-KIND. REFRIGERANT SHALL BE R-32 OR R-454B
PUMP
PUMPS SHALL BE REPLACED IN-KIND.
DIFFUSERS AND GRILLES
DIFFUSERS AND GRILLES SHALL BE OF TYPE AND SIZE LISTED IN THE SCHEDULE OR EQUAL.
COORDINATE WITH EXISTING EQUIPMENT AS REQUIRED.
DUCTWORK CONSTRUCTION
A. EXHAUST AIR DUCTWORK SHALL BE GALVANIZED STEEL.
B. ALL DUCTWORK SHALL CONFORM TO NFPA AND SMACNA STANDARDS.
C. DUCTWORK SIZES SHOWN ARE NET INSIDE DIMENSIONS.
EXHAUST FAN
EXHAUST FAN SHALL BE OF TYPE AND SIZE LISTED IN THE SCHEDULE OR EQUAL, AS APPROVED BY
THE ENGINEER
FACTORY START-UP OF EQUPMENT
HEAT PUMPS SHALL BE STARTED UP BY A FACTORY AUTHORIZED REPRESENTATIVE. START-UP
REPORTS SHALL BE SUBMITTED TO
ENGINEER / OWNER.
TESTING, ADJUSTING, AND BALANCING
A. ALL BALANCING WORK SHALL COMPLY WITH NEBB “PROCEDURAL STANDARDS FOR TESTING,
ADJUSTING, AND BALANCING OF ENVIROMENTAL SYSTEMS”.
COMPLETION
ALL SYSTEMS SHALL BE COMPLETE, FULLY FUNCTIONAL, AND READY FOR OPERATION BY OWNER.
SYSTEMS OPERATION INSTRUCTION
IN ADDITION TO WRITTEN OPERATION AND MAINTENANCE INFORMATION, THE EQUIPMENT SUPPLIER
AND CONTRACTOR SHALL FULLY AND CAREFULLY INSTRUCT THE OWNER'S REPRESENTATIVE
REGARDING THE PROPER OPERATION, CARE, AND MAINTENANCE OF EACH PIECE OF EQUIPMENT
PROVIDED BY THE CONTRACTOR.
GUARANTEE
ALL MATERIALS AND WORKMANSHIP SHALL BE GUARANTEED FOR ONE (1) YEAR FROM DATE OF
ACCEPTANCE.
MECHANICAL SPECIFICATIONS
GENERAL ELECTRICAL NOTES
\\I
N
PM
W R
O
XF
S\ C
AD
da ta \C ad us er s\
G ro up s\
M ai nt \A ct iv e\
BR
VB
_2
8_ H ea t P um ps
C irc P um ps
\1 1_
In -H ou se
\2
8M
.d w g 4/
/2
9:
A M
B Y
R oh lo ff, Z ev
A
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text Date
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text 80015
AutoCAD SHX Text
AutoCAD SHX Text 234468
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M0.0
AutoCAD SHX Text 04/15/2026
AutoCAD SHX Text
ZAR
AutoCAD SHX Text
ZAR
AutoCAD SHX Text
AMM
GENERAL NOTES, LEGEND, SPECIFICATIONS
EXISTING WATER TO WATER HEAT
PUMP WTW-1 (DOMESTIC HOT WATER)
EXISTING DOMESTIC
WATER HEATER
EXISTING DOMESTIC HOT
WATER STORAGE TANK
EXISTING AIR HANDLER
EXISTING WATER TO WATER HEAT
PUMP WTW-2 (RADIANT FLOOR HEAT)
EXISTING HIGH
TEMPERATURE GLYCOL
FEED SYSTEM
EXISTING
EXPANSION TANK
FILTER
CHEMPOT FEEDER
P-2 P-1
DISCONNECTS
(NOT ALL SHOWN)
2 2
FLAG NOTES
SCALE: 1/4" = 1'-0"
FLOOR PLAN - HVAC
NORTH
REMOVE EXISTING WATER TO WATER HEAT PUMP.
REMOVE EXISTING PUMP.
\\I N
PM
W
R O
XF
S\
C
AD
da ta
\C ad us er s\ G ro up s\ M ai nt
\A ct iv e\
BR
VB
_2
8_
H ea t P um ps
C irc
P um ps \1
1_ In
-H ou se \2
8M .d w g
4/
/2
9:
A
M B
Y R oh lo ff, Z ev A
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text Date
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text 80015
AutoCAD SHX Text
AutoCAD SHX Text 234468
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M1.0
AutoCAD SHX Text 04/15/2026
AutoCAD SHX Text
ZAR
AutoCAD SHX Text
ZAR
AutoCAD SHX Text
AMM
MECHANICAL DEMOLITION
EXISTING DOMESTIC
WATER HEATER
EXISTING DOMESTIC HOT
WATER STORAGE TANK EXISTING AIR HANDLER
EXISTING HIGH
TEMPERATURE GLYCOL
FEED SYSTEM
EXISTING
EXPANSION TANK
FILTER
CHEMPOT FEEDER
DISCONNECTS
(NOT ALL SHOWN)
6"Ø6"Ø
3 3
5 100 G-1
P-2P-1
WTW-1
WTW-2
EF-1
FLAG NOTES
SCALE: 1/4" = 1'-0"
FLOOR PLAN - HVAC
NORTH
EXHAUST FAN SHALL CYCLE ON REFRIGERANT DETECTION ALARM BY ANY HEAT PUMP.
6" EXHAUST SHALL GOOSENECK OUT OF EXISTING PIT, TERMINATING BEYOND PIT WALL,
ABOVE GRADE.
KANSAS LICENSED ELECTRICAL CONTRACTOR TO VERIFY CONDUIT AND CONDUCTOR SIZE
IS APPROPRIATE FOR NEW PUMPS, AND PROVIDE ALL NECESSARY CONNECTIONS.
KANSAS LICENSED ELECTRICAL CONTRACTOR TO PROVIDE ALL NECESSARY
CONNECTIONS FOR HEAT PUMP.
INSTALL STANDALONE REFRIGERANT DETECTION SYSTEM (RDS) FOR THE A2L
REFRIGERANT OF THE NEW WATER SOURCE HEAT PUMPS AT GROUND LEVEL. RDS SHALL
INITIATE THE EXHAUST FAN UPON DETECTION OF GREATER THAN 10% OF REFRIGERANT
LOWER FLAMMABILITY LIMIT AND SHALL REMAIN ON FOR 10 MINUTES AFTER DETECTION
BELOW 10% OF REFRIGERANT LOWER FLAMMABILITY LIMIT. CONTRACTOR SHALL INSTALL
A SHUNT TRIP AT THE MECHANICAL ROOM ELECTRICAL PANEL. RDS SHALL TRIP
MECHANICAL ROOM PANEL AT 25% OF REFRIGERANT LOWER FLAMMABILITY LIMIT. SHUNT
TRIP SHALL BE MANUALLY RESET.
SEAL EXTERIOR PENETRATION AIR AND WATER TIGHT.
\\I N
PM
W
R O
XF
S\
C
AD
da ta
\C ad us er s\ G ro up s\ M ai nt
\A ct iv e\
BR
VB
_2
8_
H ea t P um ps
C irc
P um ps \1
1_ In
-H ou se \2
8M .d w g
4/
/2
9:
A
M B
Y R oh lo ff, Z ev A
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text Date
AutoCAD SHX Text Mark
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text 80015
AutoCAD SHX Text
AutoCAD SHX Text 234468
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M2.0
AutoCAD SHX Text 04/15/2026
AutoCAD SHX Text
ZAR
AutoCAD SHX Text
ZAR
AutoCAD SHX Text
AMM
MECHANICAL SCHEDULES AND LAYOUT
| BRVB-80010_COVER-COVER |
| COVER |
| 234468M-M0 |
| M0 |
| 234468M-M1 |
| M1 |
| 234468M-M2 |
| M2 |
File details come from the government source that posted it. Updated .