Price_Schedule_-_Heat_Pump_Replace.pdf
PDF 207 KB Posted
- Attached to
- Heat Pump Replacement @ BRVB Federal contract opportunity
- Solicitation number
- 140P6426Q0069
About this file
This is a Price Schedule for a federal construction contract with the U.S. Department of Interior's National Park Service for a Heat Pump Replacement project at Brown v. Board of Education National Historic Park. The solicitation requires offerors to submit pricing for Base line items and all option lines if applicable, with failure to do so rendering the quote non-responsive. All prices must be rounded to whole dollars.
The contract encompasses four primary Base Line Items: Mobilization/Demobilization; Site Demolition/Removals; Installation of New Heat Pumps; and Installation of Refrigeration Detection and Mitigation System. Each line item requires pricing for Materials, Labor, and Equipment as lump sum (LS) entries with a quantity of one. The Price Schedule Worksheet provides a detailed breakdown structure where offerors must enter unit prices and subtotals for each component, followed by calculations for Overhead, Profit, and Bonds expressed as percentages of the subtotal. The Grand Total represents the complete cost for all Base line items. The document is currently a blank template with all pricing fields showing zero values, requiring offerors to complete the cost proposal during their submission.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Specifications_-_Heat_Pump_Replace_0001.pdf | ||
| Site_Visit_Sign-in_Sheet_0001.pdf | ||
| Sol_140P6426Q0069_Amd_0001.pdf | ||
| Questions_and_Answers_0001.pdf | ||
| Attachment_-_Drawings-Plans.pdf | ||
| Attachment_-_Submittal_List.pdf | ||
| Specifications_-_Heat_Pump_Replace.pdf | ||
| Attachment_-_Construction_Contract_Administration.pdf | ||
| Sol_140P6426Q0069.pdf | ||
| Attachment_-_Notice_to_Contractors.pdf | ||
| Technical_Questionnaire.docx | DOCX document | |
| Price_Schedule_-_Heat_Pump_Replace.xlsx | XLSX spreadsheet | |
| Technical_Questionnaire.pdf | ||
| Wage_Determination_-_Shawnee_Co.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Price/Unit Total Price
1 Base Line Items 1 Lump Sum $ - $ -
-$ Grand Total (Base)
NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the quote/bid/proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.
PRICE SCHEDULE
US Department of Interior National Park Service Park Location: Brown v. BOE NHP Project Title: Heat Pump Replacement
Unit Quantity Price/ Unit Subtotal
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
LS 1 -$ -$
Construction Items
National Park Service U.S. Department of Interior
Brown v. BOE National Historic Park
PRICE SCHEDULE WORKSHEET
BASE LINE ITEM: SITE DEMOLITION/REMOVALS and all associated work/items
PROJECT: Heat Pump Replacement
BASE LINE ITEM: INSTALLATION OF REFRIGERATION DETECTION and MITIGATION SYSTEM and all associated work/items
BASE LINE ITEM: Mobilization/Demobilization
- Equipment
- Materials
- Labor
- Mob/Demob Costs
BASE LINE ITEM: INSTALLATION OF NEW HEAT PUMPS and all associated work/items
- Materials
- Equipment
- Labor
- Materials
- Labor
- Equipment
SUBTOTAL
Bonds Profit
Grand Total
Overhead