Price_Schedule_-_Heat_Pump_Replace.pdf

PDF 207 KB Posted

Attached to
Heat Pump Replacement @ BRVB
Solicitation number
140P6426Q0069
Issued by

About this file

This is a Price Schedule for a federal construction contract with the U.S. Department of Interior's National Park Service for a Heat Pump Replacement project at Brown v. Board of Education National Historic Park. The solicitation requires offerors to submit pricing for Base line items and all option lines if applicable, with failure to do so rendering the quote non-responsive. All prices must be rounded to whole dollars.

The contract encompasses four primary Base Line Items: Mobilization/Demobilization; Site Demolition/Removals; Installation of New Heat Pumps; and Installation of Refrigeration Detection and Mitigation System. Each line item requires pricing for Materials, Labor, and Equipment as lump sum (LS) entries with a quantity of one. The Price Schedule Worksheet provides a detailed breakdown structure where offerors must enter unit prices and subtotals for each component, followed by calculations for Overhead, Profit, and Bonds expressed as percentages of the subtotal. The Grand Total represents the complete cost for all Base line items. The document is currently a blank template with all pricing fields showing zero values, requiring offerors to complete the cost proposal during their submission.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Line Item Number

(CLIN)

Contract Line Item (CLI) Title Quantity Unit of Measure Price/Unit Total Price

1 Base Line Items 1 Lump Sum $ - $ -

-$ Grand Total (Base)

NOTICE: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option lines (if applicable). Failure to do so may render the quote/bid/proposal non-responsvive. On lump-sum line items, provide the total price only. Round totals and extended prices to whole dollars.

PRICE SCHEDULE

US Department of Interior National Park Service Park Location: Brown v. BOE NHP Project Title: Heat Pump Replacement

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

LS 1 -$ -$

Construction Items

National Park Service U.S. Department of Interior

Brown v. BOE National Historic Park

PRICE SCHEDULE WORKSHEET

BASE LINE ITEM: SITE DEMOLITION/REMOVALS and all associated work/items

PROJECT: Heat Pump Replacement

BASE LINE ITEM: INSTALLATION OF REFRIGERATION DETECTION and MITIGATION SYSTEM and all associated work/items

BASE LINE ITEM: Mobilization/Demobilization

- Equipment

- Materials

- Labor

- Mob/Demob Costs

BASE LINE ITEM: INSTALLATION OF NEW HEAT PUMPS and all associated work/items

- Materials

- Equipment

- Labor

- Materials

- Labor

- Equipment

SUBTOTAL

Bonds Profit

Grand Total

Overhead

Price Schedule
Price Schedule Wksht

File details come from the government source that posted it. Updated .