This is a Price Schedule for a firm-fixed-price contract to provide operation, maintenance, repairs, testing, training, monitoring, and reporting services for the Water and Wastewater Treatment Facility located at the U.S. Coast Guard Station Milford Haven, 63 Mill Point Road, Hudgins, Virginia 23061. The contract consists of a base year (July 1, 2026 – June 30, 2027) and two option years (July 1, 2027 – June 30, 2028 and July 1, 2028 – June 30, 2029), each priced at $2,500.00 annually for a total contract value of $7,500.00 across all periods. The primary scope of work includes all labor, materials, and equipment necessary to maintain wastewater treatment operations, with additional maintenance services as specified in Section 13 of the Statement of Work.
This solicitation (30287RFQ260000066) is a 100% small business set-aside using NAICS code 221310 (Water Supply and Irrigation Systems) with a small business size standard of $41 million. Quotes must be submitted via SF-18 form by 5:00 PM Eastern Time on June 22, 2026, to frank.r.burton@uscg.mil and keven.d.weaver@uscg.mil. A mandatory site visit is scheduled for June 16, 2026, at 10:00 AM Eastern Time at the facility location, with interested parties required to arrange visits with MK1 Michael Aguirre (804-725-7330). Prospective quoters must complete visitor access request forms and present valid Real ID or Passport identification, along with full name, date of birth, and last four digits of social security number. This is a replacement for a previous award (70Z02723PPORT0018), and the Department of Homeland Security U.S. Coast Guard is the procuring federal agency.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
PERFORMANCE PERIOD TOTAL COST
| BASE YEAR | $2,500.00 | |
| OPTION YEAR ONE | $2,500.00 | |
| OPTION YEAR TWO | $2,500.00 |
TOTAL ALL PRICE (BASE PLUS TWO OPTION YEARS) $7,500.00
BASE YEAR
| LINE ITEM | DESCRIPTION OF SERVICES | QUANTITY | UNIT | UNIT COST | TOTAL COST |
| 0001 | In accordance with the Statement of Work, provide operation, maintenance, repairs, testing, training, monitoring and reporting services for the Water and Waste Water Treatment Facility located at the U.S. Coast Guard Station Milford Haven, 63 Mill Point Road, Hudgins, Virginia 23061. |
| Period of Performance: 7/1/26 - 6/30/27 | 12 | MO | $0.00 |
| 0001 | Additional Maintenance Services |
In accordance with Section 13 of the Statement of Work, the contractor shall provide any and all maitenance required.
| Period of Performance: 7/1/26 - 6/30/27 | 1 | EA | $2,500.00 | $2,500.00 | ||
| TOTAL COST BASE YEAR | $2,500.00 |
OPT YR ONE
| LINE ITEM | DESCRIPTION OF SERVICES | QUANTITY | UNIT | UNIT COST | TOTAL COST |
| 0002 | In accordance with the Statement of Work, provide operation, maintenance, repairs, testing, training, monitoring and reporting services for the Water and Waste Water Treatment Facility located at the U.S. Coast Guard Station Milford Haven, 63 Mill Point Road, Hudgins, Virginia 23061. |
| Period of Performance: 7/1/27 - 6/30/28 | 12 | MO | $0.00 |
| 0002 | Additional Maintenance Services |
In accordance with Section 13 of the Statement of Work, the contractor shall provide any and all maitenance required.
| Period of Performance: 7/1/27 - 6/30/28 | 1 | EA | $2,500.00 | $2,500.00 | ||
| TOTAL COST BASE YEAR | $2,500.00 |
OPT YR TWO
| LINE ITEM | DESCRIPTION OF SERVICES | QUANTITY | UNIT | UNIT COST | TOTAL COST |
| 0003 | In accordance with the Statement of Work, provide operation, maintenance, repairs, testing, training, monitoring and reporting services for the Water and Waste Water Treatment Facility located at the U.S. Coast Guard Station Milford Haven, 63 Mill Point Road, Hudgins, Virginia 23061. |
| Period of Performance: 7/1/28 - 6/30/29 | 12 | MO | $0.00 |
| 0003 | Additional Maintenance Services |
In accordance with Section 13 of the Statement of Work, the contractor shall provide any and all maitenance required.
| Period of Performance: 7/1/28 - 6/30/29 | 1 | EA | $2,500.00 | $2,500.00 | ||
| TOTAL COST BASE YEAR | $2,500.00 |