Plans - TN NP NATR 1H11 1J16.pdf
PDF 9 MB Posted
- Attached to
- Natchez Trace Parkway Federal contract opportunity
- Solicitation number
- 693C73-25-B-000007
About this file
This file contains construction plans for a road improvement project on the Natchez Trace Parkway in Wayne County, Tennessee (Project TN NP NATR 1H11 1J16). The plans detail a 9.53-mile overlay and improvement project from Mile Post 354.3 to 363.7, including work on three county road bridges (MP 354.79, 358.00, and 359.60).
The plans specify technical requirements for asphalt concrete pavement patching, 1-inch asphalt concrete pavement overlay using Marshall mix Class A with PG 64-22 binder, aggregate-topsoil course installation, and updated pavement markings. The project is divided into multiple schedules (A, B, C, and D) with detailed quantities for materials and work items. The plans include typical sections showing pavement structure details, construction plan sheets, erosion control measures, traffic control requirements, and standard engineering details. Project design specifications include a design speed of 60 MPH, current ADT (2024) of 868 vehicles, and projected ADT (2044) of 1,170 vehicles. The plans were prepared by the Federal Highway Administration's Eastern Federal Lands Highway Division and are dated January 2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - TN NP NATR 1H11 1J16.pdf | ||
| Amendment 0001 - TN NP NATR 1H11 1J16.pdf | ||
| IFB Solicitation - TN NP NATR 1H11 1J16.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| VETS-4212 Form.pdf | ||
| TN NP NATR 1H11 1J16_PVT_Memo_adv.pdf | ||
| 90664 CatEx and AOE1.pdf | ||
| TN NP NATR 1H11 1J16_Bridge_Insp_Rpts_adv.pdf | ||
| FP14_Eng.pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| TN NP NATR 1H11 1J16_RIP_Rpts_adv.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLANS FOR PROPOSED PROJECT
TENNESSEE
WAYNE COUNTY
NATIONAL
PARK
SERVICE
Project Manager
Ramnik Satasiya
Lead Designer
Jeff Johnson
Highway Design Manager
Haylee Milbourne
INDEX TO SHEETS
PLANS PREPARED BY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
JANUARY 2025
ASHBURN, VIRGINIA
EASTERN FEDERAL LANDS HIGHWAY DIVISION
R
E N
O R
A I
N
N
ST F
R
I
D
D E P A
T
NTOFT A SP
T T
O
U
TE
ATESO
AM
E R
IC
A
M
ML Collinwood Access Road
Natchez Trace Parkway
Asphalt concrete pavement patching, asphalt concrete pavement e(max) 6%
C/A None
DESCRIPTION OF PROJECT
IMPROVEMENT:
PROJECT LENGTH: 9.53 Miles
ADT (2024)
ADT (2044)
DHV
%Truck
D
V (MPH)
60/40
1%
SPECIFICATIONS:
DESIGN DESIGNATION:
LANE MILES:
and Bridges on Federal Highway Projects", FP-14.
"Standard Specifications for Construction of Roads
BRIDGE:
ROAD: WIDTH
22'
22'
SURFACE BASE
8" ABC N/A
SUBGRADE
5-9" ACP 8" ABC N/A
5-9" ACP
Know what'sbelow.
before you dig.Call
R
Title Sheet
Symbols and Abbreviations
Location Map
Typical Sections
Summaries and Schedules
Construction Plans
Erosion and Sediment Control Narrative
Standards and Details
DESCRIPTION
SHEET
NO
A01
A02-A03
A04
B01-B04
C05-C12
D01-D18
M01
S01-S10
E01-E03 Ramp and Parking Area Plans
C01-C04 Tabulation of Quantities
TN NP NATR 1H11 1J16
OVERLAY NATCHEZ TRACE PARKWAY FROM MP 354.3 TO MP 363.7
N
SCALE IN MILES
70 70
KEY MAP
STATE OF TENNESSEE
NASHVILLE KNOXVILLE
MEMPHIS
CHATTANOOGA
6524 75
19.29 Miles
SCALE IN MILES
0 3 6
N
PROJECT TN NP NATR 1H11 1J16
overlay, aggregate-topsoil course, signing, pavement markings, and other miscellaneous work.
03/24/20235570-013PCounty Road Bridge at MP 359.60
03/24/20235570-014PCounty Road Bridge at MP 358.00
03/02/20215570-015P County Road Bridge at MP 354.79
Last Date of InspectionStructure No. Structure Name
PROJECT TN NP NATR 1H11 1J16
NATCHEZ TRACE PARKWAY
NATIONAL PARK SERVICE
U.S. DEPARTMENT OF THE INTERIOR
:0
A
M
J a n u a r y
T it le
S h e e t
N P
S
C
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \A
-N A
T R
H
J tt l.
d g n
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 A01
NPS Drwg No. 604/194700 NPS PMIS No. 159694
0.00EL.
BH TP
sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S typ.
Ts
TS
traf.
thd.
TBM
T.
T typical tangent distance (spiraled curve) point of tangent to spiral traffic thread temporary bench mark township tangent distance
VPI
vph var.
V vertical point of intersection vehicles per hour varies design speed
W west mon.
min.
max.
MP
MOD
ML
monument minimum maximum mile post modification main line
No.
NMSA
NC
N number nominal maximum size aggregate normal crown north
OG
OD
o. to o.
ohwm
o. c.
original ground outside diameter out to out ordinary high water mark on center pvmt.
PT
PST
PSC
PS
prop.
POT
POS
POE
POC
POB
pl.
PI
PGL
PCS
PCC
PC
pavement point of tangent point of spiral to tangent point of spiral to curve point of tangent to spiral proposed point on tangent point on spiral point of ending point on curve point of beginning plate point of intersection profile grade line point of curve to spiral point of compound curve point of curve rte.
rt. or RT reqd.
reinf.
RECP
rdwy.
R/W
R.
R route right required reinforcement rolled erosion control product roadway right-of-way range radius sidewalk symmetrical solid white point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent stopping sight distance point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced shoulder section point of spiral to curve seasonal average daily traffic south
S/W sym.
SW or SDW
STS
struc.
stiff.
stgr.
std.
Sta.
ST
SSD
SS
SRS
sqyd sqft spa.
shldr.
sec.
SC
SADT
S
1 6
1 6
SEC.
SEC.
E
N 0
00000
JH
RBAR
NO. DATE BY REVISIONS
OFFICE OF FEDERAL LANDS HIGHWAY
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
HW
hex.
hdwl.
inv.
ID
jt.
high water hexagon headwall invert inside diameter joint ftg.
flg.
fin.
footing flange finish θs Ø ∆c
DY or DTY DW or DTW
DSY
drwg(s).
dist.
diaph.
diag.
dia.
DHV
D ctrs.
CS
cont.
constr. jt.
conn.
conc.
col.
CMP
CL
cc or c. to c.
BW
brg.
br.
BP
BM
bldg.
BL
BK
Asph
ASC
appr.
AMD
AH
Agg
ADT
ACP
abut.
spiral central angle diameter curve central angle total central angle dotted yellow dotted white double solid yellow drawing(s) distance diaphragm diagonal diameter design hourly volume diameter centers curve to spiral continuous construction joint connection concrete column corrugated metal pipe centerline center to center broken white bearing bridge balance point bench mark building baseline back asphalt aggregate surface course approach amendment ahead aggregate average daily traffic asphalt concrete pavement abutment expansion joint excavation existing edge of water equivalent single axle load edge of road equation edge of travel way edge of shoulder edge of pavement embankment elevation electric superelevation rate east exp. jt.
exc.
ex. or exist.
EW
ESAL
ER
EQ or eq.
EOT
EOS
EOP
emb.
elev.
elec.
e E
LW
lt. or LT Ls
LPSM
long.
LOD
lat.
lam.
L low water left length of spiral lump sum longitudinal Limits of Disturbance latitude lamination length of curve gnd or grnd galv.
GAB
ga.
HW
hex.
hdwl.
ground galvanized graded aggregate base gage (gauge) high water hexagon headwall
National Boundary
State Boundary
County Boundary
City Boundary
Township or Range Line
Section Line
Section Corner (Found, Projected)
Section Line4
Section Corner (Found, Projected)4
Section Line16
Section Corner (Found, Projected)16
Property Line w/Found Property Corner
Parcel Number
National Park Boundary
National Forest Boundary
National Wildlife Refuge Boundary
BLM Lands Boundary
Indian Reservation Boundary
Existing Roadway (Road, Paved, Gravel)
Railroad
Trail
Intermittent Drainage or Small Creek
Large Creek or River
Lake, Pond or Reservoir
Spring or Seep
Treeline; Individual Trees
Material Source; Bore Hole; Test Pit
Spot Elevation; Coordinate Grid Tick
Control Point (Terrestrial and GPS); Jump Hub
Sheet 1 of 2
:4
O c to b e r
S H
E E
T
P
R O
J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\A -A
-N
A T
R
H
J s y m
.d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
NUMBER
SHEET
A02
TN NP NATR 1H11 1J16
N
AREA PATTERN
ABC Aggregate Base Course
PCMS Portable Changeable Message Sign
PROJECT SPECIFIC SYMBOLS AND ABBREVIATIONS:
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
Fiber Roll or Wattle
North Arrow
Fence
Gate with Fence
Cattleguard
Guardrail
Retaining Wall
Concrete Barrier
Slope Stake Limits
Delineators
Signs (single, double post; portable)
Transition
Toe of Fill
Top of Cut
Pipe Culvert (arrow shows flow)
Pipe Culvert with End Section
Pipe Culvert with Headwall
Underdrain
Pipe Culvert with Drop Inlet
Box Culvert
Underground Utilities
Overhead/Above Ground Utilities
STEAM = steam, T = telephone, TV = CATV, W = water
P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, Light, Support w/Anchor)
Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features
UP = transformer or junction box, WF = water fountain
EM = electric meter, T = telephone pedestal, TV = CATV pedestal, Building
Right-of-Way Line with Monument
Permanent Easement
Construction Easement
Riprap
EXISTING PROPOSED
DI
Pavement Removal / Roadway Obliteration
Full Depth Pavement
Sidewalk Asphalt/Concrete
Mill and Overlay
Overlay
Silt Fence
Diversion Berm
Drainage Divide
Check Dam
Limits of Disturbance
Sheet 2 of 2
:4
O c to b e r
S H
E E
T
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\A
-A
-N A
T R
H
J s y m .d g n
SYMBOLS AND ABBREVIATIONS
PROJECT
A03
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
100+71.10
BEGIN SCHEDULE A
BEGIN PROJECT
597+05.33
END SCHEDULE C
END PROJECT
364+71.10
BEGIN SCHEDULE B
END SCHEDULE A
SCALE IN MILES
0 1 2
N
Route 0001H
Natchez Trace Parkway
480+88.22
BEGIN SCHEDULE C
END SCHEDULE B
See Note
See Note
Install PCMS at beginning and end of project as directed by the CO.
NOTE:
:2
J a n u a r y
D e s ig n I n tl
F t
H W
Y D
E S
\T N
N P
N A
T R
H
J \C
A D
D \A
-N
A T
R
H
J .d g n
LOCATION MAP
PROJECT
A04
NO SCALE
8%
CL
TANGENT SECTION
NATCHEZ TRACE PARKWAY
5" to 9" depth, ACP
8" depth, Aggregate base
Existing ground (typ.)
topsoil course (typ.)
Existing aggregate
6'
Shoulder
ShoulderTravel laneTravel lane
11' 11'
2%2%
Asphalt tack coat
EXISTING PROPOSED
6'
Limits of Disturbance and turf establishment (typ.)
Aggregate-topsoil course sieve NMSA
No. 4 roughness, PG 64-22
, type IV pavement
1" ACP, Marshall mix, class A, 8%
CL
Existing ground (typ.)
Shoulder Travel laneTravel lane
11' 11' existing Match
8" depth, Aggregate base
5" to 9" depth, ACP topsoil course (typ.)
Existing aggregate
EXISTING PROPOSED
6' -
6'
Limits of disturbance
SUPERELEVATED SECTION
NATCHEZ TRACE PARKWAY
and turf establishment (typ.)
Aggregate-topsoil course
Asphalt tack coat sieve NMSA
No. 4 roughness, PG 64-22
, type IV pavement
1" ACP, Marshall mix, class A, Varies pavement.
inch below the top edge of the asphalt 2
6. Place top of aggregate-topsoil course aggregate-topsoil.
inch or less within 2 days before placing 2
5. Cut grass on shoulders to a height of by the CO.
4. Match existing roadway cross slope (2% min.) and superelevation as directed
3. Install fiber roll for runoff protection as directed by the CO. See Detail E157-04.
adjacent to the shoulder.
2. Remove all vegetation and material off of the existing asphalt pavement
See Detail E414-01A.
as directed by the CO.prior to placing the asphalt overlay1. Seal or fill cracks
NOTES:
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:0
O c to b e r
D e s ig n I n tl
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\B
-B
-N A
T R
H
J ty p
.d g n
TYPICAL SECTIONS
PROJECT
B01
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
Travel lane
2' 2'
8%
BL
existing Match
Turf establishment
Aggregate-topsoil course (typ.)
EXISTING
PROPOSED
Shldr. Shldr.
Limits of Disturbance
16' and varies
Asphalt tack coat exis ting
Match
6" depth Aggregate base
2" to 4" depth ACP
WIDENING
ML COLLINWOOD ACCESS ROAD
No. 4 sieve NMSA type IV pavement roughness, PG 64-22
, 1" ACP, Marshall mix, class A, See Detail A Asphalt concrete pavement patch, type 1
0-3'
Travel lane
2' 2'
8%
BL
existing Match
Turf establishment
Aggregate-topsoil course (typ.)
EXISTING
PROPOSED
Shldr. Shldr.
Limits of Disturbance
16' and varies
Asphalt tack coat exis ting
Match
6" depth Aggregate base
2" to 4" depth ACP
ML COLLINWOOD ACCESS ROAD
sieve NMSA
No. 4 roughness, PG 64-22
, type IV pavement
1" ACP, Marshall mix, class A, pavement.
inch below the top edge of the asphalt 2
6. Place top of aggregate-topsoil course aggregate-topsoil.
inch or less within 2 days before placing 2
5. Cut grass on shoulders to a height of by the CO.
4. Match existing roadway cross slope (2% min.) and superelevation as directed
3. Install fiber roll for runoff protection as directed by the CO. See Detail E157-04.
adjacent to the shoulder.
2. Remove all vegetation and material off of the existing asphalt pavement
See Detail E414-01A.
as directed by the CO.prior to placing the asphalt overlaySeal or fill cracks 1.
NOTES:
ground
Existing ground
Existing
NO SCALE
ASPHALT CONCRETE PAVEMENT PATCH, TYPE 1
DETAIL A
10" depth, Roadway excavation
4" Asphalt concrete pavement, type II
Asphalt tack coat
6" Crushed aggregate
Existing ACP
Existing aggregate base
Separation-stabilization geotextile, Class 2, Type E
Asphalt tack coat
No. 4 sieve NMSA type IV pavement roughness, PG 64-22
, 1" ACP, Marshall mix, class A, pavement Saw cut existing
PROPOSED
:2
D e c e m b e r
D e s ig n I n tl
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\B
-B
-N A
T R
H
J ty p
.d g n
TYPICAL SECTIONS
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 B02
Existing curb
Varies existing Match
EXISTING: PROPOSED:
TAPER MILLING TABLE
(ft) *
Milling width
LC
Limits of Disturbance ground
Existing see Table
Milling width varies
Asphalt tack coat face of curb (inch)
Milling depth at
3 to 4
2 to 3
1 to 2
0 to 1
5" to 7" depth ACP
5" to 8" depth Aggregate Base
See Taper Milling Table designated curb sections.
Taper mill existing roadway along
Asphalt tack coat
6" depth, minimum curb
Match existing Match existing
Travel lane
11'
Travel lane
11'
Limits of disturbance
Shoulder Shoulder
PROPOSED
Variable depth, ACP
Concrete deck
EXISTING
LC
6' -
6'
MILL AND OVERLAY SECTION AT BRIDGES 015P, 014P, 013P
NATCHEZ TRACE PARKWAY
sieve NMSA
No. 4 roughness, PG 64-22
, type IV pavement
1" ACP, Marshall mix, class A, NO SCALE pavement.
inch below the top edge of the asphalt 2
8. Place top of aggregate-topsoil course aggregate-topsoil.
inch or less within 2 days before placing 2
7. Cut grass on shoulders to a height of by the CO.
6. Match existing roadway cross slope (2% min.) and superelevation as directed
5. Install fiber roll for runoff protection as directed by the CO. See Detail E157-04.
adjacent to the shoulder.
4. Remove all vegetation and material off of the existing asphalt pavement the parking areas drain properly.
3. Reestablish a minimum 6-inch curb reveal at parking areas. Ensure that reveal depth.
2. Do not taper mill the existing roadway and ramp to maintain existing curb
See Detail E414-01A.
as directed by the CO.prior to placing the asphalt overlaySeal or fill cracks 1.
NOTES:
MILL AND OVERLAY SECTION
SWEETWATER BRANCH PARKING AREA
sieve NMSA
No. 4 roughness, PG 64-22
, type IV pavement
1" ACP, Marshall mix, class A,
* See Notes 2 & 3
Asphalt pavement milling
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:0
O c to b e r
D e s ig n I n tl
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\B
-B
-N A
T R
H
J ty p
.d g n
TYPICAL SECTIONS
PROJECT
B03
Existing aggregate base pavement
Saw cut existing
Asphalt tack coat
Type II, 2-inch depth (min.)
Asphalt concrete pavement, 2-inch depth (min.)
Mill existing asphalt pavement, Existing asphalt pavement
ASPHALT PAVEMENT PARTIAL DEPTH PATCH, TYPE 3
2. Perform asphalt pavement patching one lane at a time to maintain traffic.
to beginning asphalt pavement patching activities.
1. Coordinate with the CO to identify patching limits along the roadway prior
NOTES:
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:5 o v e m b e r
D e s ig n I n tl
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\B
-B
-N A
T R
H
J ty p
.d g n
TYPICAL SECTIONS
PROJECT
B04
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE A
NATCHEZ TRACE PARKWAY
:4
D e c e m b e r
S c h e d u le
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \C
-C
-N
A T
R
H
J ta b
.d g n
TABULATION OF QUANTITIES
PROJECT
C01
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE B
NATCHEZ TRACE PARKWAY
:2
D e c e m b e r
S c h e d u
B fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\C -C
-N
A T
R
H
J ta b .d g n
TABULATION OF QUANTITIES
PROJECT
C02
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE C
NATCHEZ TRACE PARKWAY
:2
D e c e m b e r
S c h e d u fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\C -C
-N
A T
R
H
J ta b .d g n
TABULATION OF QUANTITIES
PROJECT
C03
U.S. DEPARTMENT OF TRANSPORTATION
SCHEDULE D
NATCHEZ TRACE PARKWAY
:4
D e c e m b e r
S c h e d u fh fl fi le s e rv e .f lh d .f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\C -C
-N
A T
R
H
J ta b .d g n
TABULATION OF QUANTITIES
PROJECT
C04
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:3
D e c e m b e r
S c h e d u
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\C -C
-N
A T
R
H
J s u m
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C05
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:0 o v e m b e r
P a v M a rk
S c h
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\C
-C
-N A
T R
H
J s u m .d g n
SUMMARIES AND SCHEDULES
PROJECT
C06
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:1
D e c e m b e r
S c h e d u fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\C
-C
-N A
T R
H
J s u m .d g n
SUMMARIES AND SCHEDULES
PROJECT
C07
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:0 o v e m b e r
P a v
M a rk
S c
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\C
-C
-N A
T R
H
J s u m .d g n
SUMMARIES AND SCHEDULES
PROJECT
C08
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:1
D e c e m b e r
S c h e d u
H W
Y D
E S
\T N
N P
N A
T R
H
J \C
A D
D \C
-C
-N
A T
R
H
J s u m
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C09
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:3
O c to b e r
P a v
M a rk
S c
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\C
-C
-N A
T R
H
J s u m .d g n
SUMMARIES AND SCHEDULES
PROJECT
C10
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:5 o v e m b e r
S c h e d u
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\C
-C
-N A
T R
H
J s u m .d g n
SUMMARIES AND SCHEDULES
PROJECT
C11
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:0
J a n u a r y
C o n s tr u c ti o n
S ig n S u m m a r y
H W
Y D
E S
\T N
N P
N A
T R
H
J \C
A D
D \C
-C
-N
A T
R
H
J s u m
.d g n
SUMMARIES AND SCHEDULES
PROJECT
C12
BEGIN SCHEDULE A
BEGIN PROJECT
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. See Detail E401-01 for pavement transitions at the beginning and end of project.
3. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
100+71.10
N= 307182.6545
E= 1450138.9894
M A
T C
H L
IN
E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
Construction centerline Proposed edge of pavement
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE ASCALE IN FEET
0 50 100
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e e t]
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\D -D
-N
A T
R
H
J P
L N
.d g n
CONSTRUCTION PLAN
PROJECT
D01
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
R a ilr o a d B e d R d
Natchez Trace Pakway
B r o a d w a y S tr e e t
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
Construction centerline
134+03 to 135+30
Structure No. 5570-015P, County Road Bridge at MP 354.79
Area plans for details
Road, See Ramp & Parking
ML Collinwood Access
Proposed edge of pavementNOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. See Detail E401-01 for overlay pavement transitions for the Parkway, intersections, and ramps.
3. See Detail E413-A for pavement milling transitions on bridges.
4. Install new pavement markings that match the existing pavement markings according to Subsection
634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
5. Reestablish a minimum 6-inch curb reveal at all parking areas and bridges.
6. See Typical Section sheets for scope of work at bridges.
M A
T C
H L I
N E
M A
T C
H L
I N
E
MP
M P
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H) Construction centerline
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE ASCALE IN FEET
0 50 100
:0 o v e m b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\D -D
-N
A T
R
H
J P
L N
.d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D02
T C
H L I
N E
M A
T C
H L I
N E
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
Construction centerline
Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001
H)
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE ASCALE IN FEET
0 50 100
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
D03
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
P3
N
NATCHEZ TRACE PARKWAY (ROUTE 0001
H)
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
0 1
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE ASCALE IN FEET
0 50 100
7 1 8 1
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
D04
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline
Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
1 2
M A
T C
H L
IN
E
0M
A T
C H
L I
N E
N
NATCHEZ T
RACE P
ARKWAY (R
OUTE
1H)
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE A SCALE IN FEET
0 50 100
6 2 7 2 8 2
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D05
T C
H L I
N E
M A
T C
H L I
N E
P3
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
M A
T C
H L
IN
E
M A
T C
H L I
N E
N
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE A SCALE IN FEET
0 50 100
3 2
4 2 5 2
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D06
T C
H L I
N E
0 M
A T
C H
L I
N E
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
M A
T C
H L I
N E
M A
T C
H L I
N E
N
Construction centerline Proposed edge of pavement
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE ASCALE IN FEET
0 50 100
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D07
T C
H L I
N E
M A
T C
H L I
N E ta w b a S t
M P
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
Construction centerline Proposed edge of pavement 304+07 to 305+38
Structure No. 5570-014P, County Road Bridge at MP 358.00
M A
T C
H L I
N E
M A
T C
H L I
N E
Natchez Trace Pakway
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. See Detail E401-01 for overlay pavement transitions for the Parkway, bridges, intersections, and ramps.
3. See Detail E413-A for pavement milling transitions on bridges.
4. For bridges, see Detail E552-A for joint sealing at bridge approaches.
5. Reestablish a minimum 6-inch curb reveal at all parking areas and bridges.
6. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO.
Break Parkway centerline striping at intersections.
7. See Typical Section sheets for scope of work at bridges.
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE ASCALE IN FEET
0 50 100
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
D08
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
NATCHEZ TRACE PARKWAY (ROUTE 0001
H)
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE ASCALE IN FEET
0 50 100
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
D09
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H) Construction centerline
BEGIN SCHEDULE B
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULES A AND BSCALE IN FEET
0 50 100
364+71.10
N= 330299.8685
E= 1459083.9408
:5
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D10
T C
H L I
N E
M A
T C
H L I
N E o u b le B ra n c h R d
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H) Construction centerline
Proposed edge of pavement
384+88 to 386+00
Structure No. 5570-013P, County Road Bridge at MP 359.60
7 3 8 3
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H) Construction centerline
Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. See Detail E401-01 for overlay pavement transitions for the Parkway, bridges, intersections, and ramps.
3. See Detail E413-A for pavement milling transitions on bridges.
4. For bridges, see Detail E552-A for joint sealing at bridge approaches.
5. Reestablish a minimum 6-inch curb reveal at all parking areas and bridges.
6. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO.
Break Parkway centerline striping at intersections.
7. See Typical Section sheets for scope of work at bridges.
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE BSCALE IN FEET
0 50 100
1 3
:5
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
D11
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001
H)
Construction centerline
Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
9 4
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001
H)
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE BSCALE IN FEET
0 50 100
3 4
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\D -D
-N
A T
R
H
J P
L N
.d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D12
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
0 4
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE BSCALE IN FEET
0 50 100
5 4
:5
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
D13
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
Construction centerline
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001
H)
Construction centerline
BEGIN SCHEDULE C
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULES B AND CSCALE IN FEET
0 50 100
480+88.22
N= 337048.2064
E= 1467251.0655
:5
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
D14
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement Construction centerline
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
M A
T C
H L I
N E
M A
T C
H L
IN
E
N
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE CSCALE IN FEET
0 50 100
2 5
3 5 4 5 5 5 6 5
:5
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D15
T C
H L I
N E
M A
T C
H L I
N E
Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
0 5
7 5
8 5 9 5
M A
T C
H L I
N E
M A
T C
H L I
N E
Natchez Trace Pakway
N
Construction centerline Proposed edge of pavement
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE CSCALE IN FEET
0 50 100
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
D16
TN NP NATR 1H11 1J16
M A
T C
H L I
N E
M A
T C
H L I
N E
NATCHEZ T
RACE P
ARKWAY (
ROUTE
1H)
Construction centerline
Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. See Detail E401-01 for overlay pavement transitions for the Parkway, intersections, and ramps.
3. Reestablish a minimum 6-inch curb reveal at all parking areas and bridges.
4. Install new pavement markings that match the existing pavement markings according to Subsection
634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
0 5
4 5 5 5 6 5
M A
T C
H L I
N E
M A
T C
H L I N
E
MP
N
NATCHEZ TRACE PARKWAY (ROUTE 00
01H)
Construction centerline Proposed edge of pavement for details
See Ramp & Parking Area plans
ML Sweetwater Branch Parking, U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE CSCALE IN FEET
0 50 100
:3
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D17
T C
H L I
N E
M A
T C
H L I
N E
Construction centerline Proposed edge of pavement
5 5
M A
T C
H L I
N E
M A
T C
H L I
N E
N
NATCHEZ TRACE PARKWAY (ROUTE 0001H)
END SCHEDULE C
END PROJECT
597+05.33
N= 336922.2381
E= 1477760.9779
Construction centerline Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. See Detail E401-01 for pavement transitions at the beginning and end of project.
3. Install new pavement markings that match the existing pavement markings according to Subsection 634.03 or as directed by the CO. Break Parkway centerline striping at intersections.
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
NATCHEZ TRACE PARKWAY (ROUTE 001H)
SCHEDULE CSCALE IN FEET
0 50 100
:2
O c to b e r
C O
N S
T R
U C
T
IO
N P
L A
N
D
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \D
-D
-N
A T
R
H
J
P L
N .d g n
CONSTRUCTION PLAN
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 D18
T C
H L I
N E
Natchez Trace Pakway
Park A ccess R d
B r o a d w a y S tr e e t
N
NATCHEZ TRACE PARKWAY (ROUTE 001H) See Pavement Widening Detail
ML Collinwood Access Road
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. See Detail E401-01 for overlay pavement transitions for the Parkway, intersections, and ramps.
3. Install new pavement markings that match the existing pavement markings according to Subsection
634.03 or as directed by the CO. Break Parkway centerline at intersections
U.S. DEPARTMENT OF TRANSPORTATION
ML COLLINWOOD ACCESS ROAD
SCHEDULE A
SCALE IN FEET
0 30 60
NATCHEZ TRACE PARKWAY
:5
D e c e m b e r
N
A T
R
E
S h e
H W
Y
D E
S \T
N N
P N
A T
R
H
J
\C
A D
D \E
-E
-N
A T
R
H
J
P L
A N
.d g n
RAMP & PARKING AREA PLANS
PROJECT
E01
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. The widening layout shown in the plans is approximate. Stake the widening for approval by the CO
U.S. DEPARTMENT OF TRANSPORTATION
PAVEMENT WIDENING DETAIL
SCHEDULE A
NATCHEZ TRACE PARKWAY
M L C o ll in w o o d A c c e s s R o a d
Existing EOP
30' R
Saw cut
Natchez Trace Parkway
Sections, Detail A) type 1 (See Note 2 and the Typical
Asphalt concrete pavement patch, N at least 5 days before beginning the work.
2. The widening layout shown in the plans is approximate. Stake the widening for approval by the CO for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed
NOTES:
SCALE IN FEET
0 5 10 an d va r.
m ax
:5
D e c e m b e r
N A
T R
P a v e m e n t
W id e n in g
S h e fh fl fi le s e rv e .f lh d
.f h w a .d o t.
g o v \d a ta
\P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\E
-E
-N A
T R
H
J
P L
A N
.d g n
RAMP & PARKING AREA PLANS
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 E02
N
NATCHEZ TRACE PARKWAY (ROUTE 001H)
See Note 3.
ML Sweetwater Branch Parking
Proposed edge of pavement
NOTES:
1. Plans developed from Parkway's land-use-plans and from as-builts. No survey has been performed for this project. Stationing is approximate. Confirm limits and dimensions at the project site.
2. See Detail E401-01 for overlay pavement transitions for the Parkway, intersections, and ramps.
3. Reestablish a minimum 6-inch curb reveal.
U.S. DEPARTMENT OF TRANSPORTATION
ML SWEETWATER BRANCH PARKING
SCHEDULE C
SCALE IN FEET
0 20 40
NATCHEZ TRACE PARKWAY
:1 e c e m b e r
N
A T
R
E
S h e
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\E -E
-N
A T
R
H
J P
L A
N .d g n
RAMP & PARKING AREA PLANS
PROJECT
E03
Road. The Runoff Coefficient prior to construction is 0.95. The Runoff Coefficient after construction will be 0.95.
Approximately 0.002 acres of new impervious surface will be created by the widening at ML Collinwood Access
The total disturbed area for the project is approximately 0.002 acres.
Soil disturbing activities includes roadway excavation for the widening occurring at ML Collinwood Access Road.
patching, aggregate-topsoil, signing, pavement markings, and other miscellaneous work.
ramps to Broadway Street, parking areas, and bridges. This work also includes asphalt concrete pavement
This project consists of a 1" overlay over Natchez Trace Parkway, including mill and overlay of the access
Project Description
Response Center at 1-800-424-8802.
requirements under 40 CFR 112. Report spills large enough to discharge to surface waters to the National
Develop and implement a Spill Prevention Control and Countermeasures (SPCC) plan following the material according to Federal, State, and local regulations.
waste materials. Do not dispose of hazardous waste materials into the on-site dumpsters. Dispose of
Store all hazardous waste materials in appropriate and clearly marked containers away from other non-battery fluid. If feasible, conduct these activities in a covered area to avoid contact with storm water.
maintenance could generate spills, leaks, and hazardous wastes like motor oil, diesel, gasoline, and
Hazardous waste will not be generated from normal construction activities. Equipment fueling and containers. Collect and store all waste in dumpsters, or in metal or plastic drums, as appropriate.
Solid waste generated from the project will consist of construction debris, garbage, and empty prevent contamination from fuels, lubricants, hydraulic fluids, or other toxic materials.
Inspect and maintain on a regular basis, all mechanized equipment used in or near surface water to
Waste, garbage, sanitary waste
Soaps, solvents used for vehicle washing
Fuels, oils, equipment-related compounds
Wash-water from concrete, paint, curing compounds, and other construction materials
The following discharges are prohibited:
Prohibited Discharges
Direct storm water to vegetated buffer areas and do not discharge directly into surface waters.
measures.
Do not allow any construction equipment to operate on or access the down-slope side of the perimeter control
Do not allow construction vehicles to track sediment outside the project limits.
No construction access will be permitted through a wetland or waterway.
Officer (CO).
Do not modify the type, size, or location of any control or practice without prior approval from the Contracting for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and the Special Contract Requirements.
measures consist of soil erosion control measures which are also defined and outlined in the Standard Specifications sedimentation of rivers, streams, and impoundments such as lakes, reservoirs, bays, and coastal waters. The
The work consists of applying measures throughout the life of the project to control erosion and to minimize the
The Erosion & Sediment Control Narrative is meant as a guideline for preventing erosion and controlling sediment.
General Guidelines construction limits.
does not leave the project site. Perimeter controls include fiber roll and other specified measures outside the
Prior to any clearing, grubbing, or excavation, construct perimeter controls to ensure that disturbed sediment
Phase I Establish Perimeter Controls
Sequence of Construction
Remove all other perimeter controls when directed by the CO.
Remove fiber roll only after all upslope areas are stabilized and vegetation is well established.
Remove all devices used for dewatering.
Inspect, clean, and repair all culvert outlet protection, riprap basins, and stabilized channels.
disturbed areas where vegetation has not established.
Where necessary, replace eroded topsoil and re-apply permanent turf establishment to disturbed areas.
Finish grading, place riprap, and apply permanent turf establishment to any remaining
After completion of roadway construction, do the following as directed by the CO:
Phase III Final Construction / Stabilization and staging areas.
Provide watering for dust control within the construction limits, on active haul roads, and in pits
625.
within 7 days. Apply permanent turf establishment to the finished slopes according to Section
Apply temporary turf establishment in disturbed areas that will remain exposed for over 14 days
Phase II Intermediate Controls
Record the inspection date and summary of findings within 24 hours of completing a site inspection.
when it reaches half the height of the device. Replace damaged fiber roll within 24 hours of inspection.
Fiber roll - Inspect weekly and after each runoff event. Remove sediment deposits from the fiber roll end of the day.
0.25 inches or more, and daily during wet weather. Repair or replace any damaged measures by the
Check and maintain erosion control measures once every 7 days and within 24 hours after a rain of according to Section 157, the details shown in the plans, and the individual permitting requirements.
Unless stated otherwise, construct and maintain all vegetated and structural erosion control practices
Maintenance and Inspection Procedures
U.S. DEPARTMENT OF TRANSPORTATION NATCHEZ TRACE PARKWAY
:2
O c to b e r
M
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\M -N
A T
R
H
J E
S C
N a rr a ti v e .d g n
CONTROL NARRATIVE
EROSION AND SEDIMENT
PROJECT
M01
2%
3%
4%
5%
33'
22'
16'
13'
INLET PROTECTION
set under drain inlet.
Non-woven filter fabricFl ow
FlowFlow
Fl ow
F lo w
F lo w
PLAN VIEW
Area
Undisturbed
Flow
Flow
** Adjust spacing as approved based on site conditions
* Do not install check dams on grades below 2%
50'
33'
25'
20'
PLAN VIEW
FIBER ROLL CHECK DAM
20 ft
15 ft
10 ft1V:2H or Steeper
1V:4H - 1V:2H downslope stakes equidistant between
Upslope stake, place
Flow
8' max
Flow
4' max
Contour line (typ.)
height of roll2 1to
Wood mulch or compost
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
See Note 11 ends and 36" o.c. (typ.)
Gravel bag weights at
See Note 6
Wood stake (typ.)
FIBER ROLL CHECK DAM CROSS SECTIONS
V-DITCH TRAPEZOIDAL DITCH
ENTRENCHED INSTALLATION
FIBER ROLL ISOMETRIC VIEW
requirements of Subsection 713.13.
Provide gravel bag weights meeting the inlet protection view.
use gravel bags to support them as shown on the
When fiber rolls are required on paved surfaces, months after installation.
installation and photodegradable fiber rolls 12
Replace biodegradable fiber rolls 6 months after one-half the height of the exposed fiber roll.
Remove sediment deposits when accumulation is ends 12 inches minimum and stake.
When more than one fiber roll is needed, overlap
Subsection 713.08(a).
wood stakes meeting the requirements of and 3 inches protruding above the roll. Furnish to attain a minimum of 12 inches into the ground section of 2- by 2-inch and of sufficient length
Use wood stakes with a minimum nominal cross alignment.
least 8 feet upslope at 45 degrees to the main contours. Extend both ends of the fiber roll at
Place fiber rolls on level grade and parallel to along the fiber roll.
mulch or compost on uphill side of the slope
For untrenched installation, blow or hand place of the fiber roll.
1-inch that may interfere with proper function including rocks, clods, and debris greater than
Prior to installation, clear all obstructions a minimum 12-inch diameter.
For drain inlet protection, use fiber rolls with
Use fiber rolls with a minimum 8-inch diameter.
Subsection 713.12.
Provide fiber rolls meeting the requirements of
NOTES:
See Note 6
Wood stake (typ.)
See Note 6
Wood stake (typ.)
UNTRENCHED INSTALLATION
SLOPE MAX INTERVAL
1V:4H or Flatter
LENGTH ABOVE FIBER ROLLS
MAXIMUM ALLOWABLE SLOPE
SPACING TABLE
FIBER ROLL CHECK DAM
*GRADE
DITCH SPACING (S)
CHECK DAM
8" HIGH 12" HIGH
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
Upslope stake (typ.)
Downslope stake (typ.)
8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, the diameter of the roll (max.)
1Trench into ground
1' (min.)
12" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 8" dia. (min.)
Fiber roll, 2' (max.)
(typ.)
Fiber roll
FIBER ROLL OVERLAP
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
NO SCALE
APPROVED FOR USEFIBER ROLL
E157-04
FP-14
EFLHD DETAIL
:1
O c to b e r
S h e
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\S td
-D e t\
S E
-0
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
05/2024
PROJECT
S01
K VALUE TABLE (ft/in)
30 35 40 45 50 55 60 65 70 75
30 32.5 35 37.5 40 42.5 45 47.5 50 52.5
* Use a K Value of 30 for speeds less than 30 MPH.
K
(MPH) *
POSTED SPEED
NOTE:
2 inches x 42.5 ft./in. = 85 feet.
Then the minimum transition length =
Effective overlay thickness = 2 inches
If the posted speed is 55 MPH
Example :
(Minimum transition length=30 feet) applies), to obtain the transition length.
Use K*[e -e ]=T, or K*[d -d ]=T (whichever the posted speed of the roadway.
elevations) by the K value from the Table for
(difference between the existing and overlaid the effective overlay thickness in inches less than the value obtained by multiplying
Provide a transition length in feet that is not
Existing asphalt pavement
Existing base course
New asphalt pavement
New base course
Existing asphalt pavement
Existing base course
Remove pavement (mill)
NEW PAVEMENT
(Final course)
Asphalt overlay
(Depth equals overlay thickness)
Saw cut
Existing elevation (e )
Overlaid elevation (e )
(Full depth of existing asphalt pavement) Saw cut
K Transition length variable (See Table)
(For Table e - e = effective overlay thickness)
OVERLAY
d
Existing asphalt pavement
Existing base course d
OVERLAY - DEPTH TRANSITIONS
(depth 2)
Asphalt overlay
(depth 1)
Asphalt overlay
K Transition length (Variable, see Table)
(For Table, d - d = effective overlay thickness) 1 2
1 2
1 2 1 2
NO SCALE
APPROVED FOR USE
FP-14
EFLHD DETAIL
:1
O c to b e r
S h e
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\S td
-D e t\
S
E
-0
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
PAVEMENT TRANSITIONS
E401-01
05/2024
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 S02
pavement asphalt
Existing
E n d o f w in g w a ll
E n d o f w in g w a ll
Full milling depth between ends of bridge wingwalls
Milling depth varies past each wingwall end
Bridge asphalt pavement milling transition length
Milling depth varies past each wingwall end
Bridge asphalt pavement milling transition length
Milling depth
MILLING TRANSITION
the depth
See Typical Sections for
Asphalt surface course
(Bridge only)
Limits of asphalt pavement milling
:3
O c to b e r
B a s e .B
.U S
P R
O J E
C T
S \n a tr
\1 h j1
\H
W Y
D
E S
\C A
D D
\S td
-D e t\
S s t4
-A .d g n
BRIDGES
MILLING TRANSITION AT
E413-A
FP-14
EFLHD DETAIL
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
SPECIFICATION
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 S03
CRACK SEALING AND FILLING
CRACK SEALING CRACK FILLING
NOTES:
from the existing surface
Squeegee excess material
4.
3.
2.
1.
crack width.
See Subsection 414.06 for minimum to ensure adhesion to existing surface.
Force crack repair material into cracks sealing and filling cracks.
manufacturer's recommendations for according to Section 414. Follow
Prepare cracks for sealing and filling
Do not overband cracks.
filling material left above the surface.
Squeegee excess crack sealing and
Greater than 1"
See Note 3
1" or less
" below existing surface 4 " to8
Fill crack with hot applied crack filler to
Seal crack with hot-applied crack sealant below existing surface " 4
" to8
Screed material to
NO SCALE
APPROVED FOR USE
CRACK SEALING AND FILLING
ASPHALT PAVEMENT FP-14
EFLHD DETAIL
:5
D e c e m b e r
S h e e t-
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\S td
-D e t\
S E
-0
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
E414-01
05/2024
PROJECT
S04
Single solid white striping (edge striping) Single solid white striping (edge striping) broken white striping 4" wide
Raised pavement markers (typ.)
Double solid yellow striping (centerline)
N
2N or less
N
Double solid yellow striping (centerline) broken white striping
4" wide
Solid yellow striping
Single solid white striping (edge striping)
Single solid yellow striping
N
See View A
(See Notes 2 and 3)
Raised pavement marker
10' 30' 10' 30'
Edge of pavement (typ.)
broken yellow striping
4" wide
3'
10' 30'
N
Edge of pavement (typ.)
broken yellow striping 4" wide
4" wide dotted white striping
10' 30'
N
3'
M
M
N
9'
9'
DOUBLE SOLID YELLOW STRIPING
BROKEN SINGLE WHITE AND
WITH RAISED PAVEMENT MARKERS
DOUBLE SOLID YELLOW STRIPING
BROKEN SINGLE WHITE AND
WITH RAISED PAVEMENT MARKERS
DOTTED WHITE STRIPING
BROKEN SINGLE YELLOW AND
DOTTED WHITE STRIPING
BROKEN SINGLE YELLOW AND
VIEW A
WITH RAISED PAVEMENT MARKERS
SINGLE SOLID YELLOW STRIPING
NOTES:
required, see Detail E634-02.
When raised pavement markers are
Detail or as directed.
with the MUTCD and as shown in this required, space and install in accordance
When raised pavement markers are
Devices" (MUTCD), latest edition.
"Manual on Uniform Traffic Control
Install striping in accordance with the
3.
2.
1.
Raised pavement markers (typ.)
markers (typ.)
Raised pavement
4" wide dotted white striping
NO SCALE
APPROVED FOR USE
FP-14
EFLHD DETAIL
:1
D e c e m b e r
S h e
P R
O J E
C T
S \n a tr
\1 h j1 \H
W Y
D
E S
\C A
D D
\S td
-D e t\
S E
-0
.d g n
OFFICE OF FEDERAL LANDS HIGHWAY
U.S. DEPARTMENT OF TRANSPORTATION, FHWA
E634-03
06/2024RAISED PAVEMENT MARKERS
WITH AND WITHOUT
PAVEMENT MARKINGS
PROJECT
NUMBER
SHEET
TN NP NATR 1H11 1J16 S05
Bridge Wingwalls
End of bridge
Approach slab
Abutment
Bridge
Bumps
T h e r m o p la s ti c
90 or 120 mils as specified
Shoulder
Travel Lane
Travel Lane
Edge of Pavement
(500 mils)"2
2" to 3"
27"
NOTES:
outside striping edge and the edge of pavement.
2. Place profiled striping with a 4-inch space between the and to 350 feet from the end of the wingwalls.
1. Install profiled pavement markings across all bridges
Profiled pavement markings
PLAN VIEW
TOP VIEW
SID…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .