About this file

This federal contract opportunity solicits bids for repair and construction work on bridges and culverts within Denali National Park in Alaska. The work includes minor bridge repairs with painting of bridge rails, replacing a concrete box culvert at milepost 52, conducting rockfall mitigation such as scaling and installing dowels and bolts at milepost 52.9, and other minor items. The project length is 0.3 miles and has a tentative fixed completion date of Fall 2020. The estimated price range for the work is $2 million to $3 million. The project sites are located approximately 145 miles southwest of Fairbanks at mileposts 23, 52, 52.9 and 61 within the park. The solicitation number is 69056718B000028 and is issued by the National Park Service under the Department of Transportation Federal Highway Administration.

View the file

Other files

Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"O

OJ

u

OJ

.c u

"O

OJ

C:

en "iii

OJ

N N

Project Location

I I

I LAKE CLA

\ NAT'L

SOUTH CENTRAL

ALASKA KEY MAP

TYPE O F CONSTRUCTION:

Minor bridge repair, excavation, drainage, aggregate, rock scaling and concrete box culvert

DESIGN DESIGNATION:

ADT (2019)

ADT(2039)

V e (max)

<100 <100

35MPH

6%

SPECIFICATION:

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14

PLANS PREPARED BY

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

VANCOUVER, WASHINGTON

� PROJECT MANAGER

�1-----------l

B. STOKES

I

I

U. S. DEPARTMENT OF THE INTERIOR

NATIONAL PARK SERVICE

DENALI NATIONAL PARK AND PRESERVE

PLANS FOR PROPOSED PROJECT

AK NPS DENA 10(47) & 10(48)

NPS PMIS NO. 164258A, 242398A & 242400A

REPAIR TWO DENALI PARK ROAD BRIDGES

AND CULVERT REPLACEMENT MP 52

N

& ROCKFALL MITIGATION MP 52.9

DENALI BOROUGH

ALASKA

SITE WORK - 5 LOCATIONS - TOTAL LENGTH = APPROX. 1 MILE

25 0

SCALE IN MILES

25 50 75 100

STATE PROJECT

SHEET

NUMBER

AK NPS DENA 10(47) & 10(48) A.1

SE C T I O N IND EX

A. GENERAL INFORMATION

B. SUMMARY OF QUANTITIES

C . TYPICAL SECTIONS

D. PLAN-PROFILE

E. BRIDGES

F. EROSION CONTROL

G. GEOTECHNICAL DETAILS

H. DRAINAGE

I. TEMPORARY TRAFFIC CONTROL PLAN

J . PERMANENT TRAFFIC CONTROL PLAN

See Sheet A.2 for Index to Sheets

APPROVED:

Chief of Engineering, Western Federal Lands Highway Division

Superintendent, Denali National Park and Preserve

Regional Director, Alaska Region, National Park Service

DATE ____ _

DATE ____ _

DATE ____ _

/s/ Brooke Merrell

/s/ Donald Striker

2/24/2021

2/24/2021

Sheet and Description

SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J -

TYPICAL

SECTIONS PLAN-PROFILE BRIDGES EROSION

CONTROL

GEOTECHNICAL

DETAILS DRAINAGE

TEMPORARY

TRAFFIC

CONTROL

PERMANENT

TRAFFIC

CONTROL

ALLOWANCE Bid Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND

STAKING LPSM ALL

A0060 15301-0010 CONTRACTOR QUALITY CONTROL

AND ASSURANCE LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15702-1000 SOIL EROSION CONTROL,

TEMPORARY DIVERSION CHANNEL LPSM All ALL

A0140 15705-1400 SOIL EROSION CONTROL, FIBER

ROLL LNFT 40 2,365 95 2,500

A0160 15705-1800 SOIL EROSION CONTROL,

TEMPORARY DIVERSION BERM LNFT 700 700

A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.6 0.1 0.7

A0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1

A0220 20304-1000 REMOVAL OF STRUCTURES AND

OBSTRUCTIONS (GABION

BASKET/REVETMENT MATTRESS) LPSM All ALL

A0240 20304-1000 REMOVAL OF STRUCTURES AND

OBSTRUCTIONS (RAILROAD TIES) LPSM All ALL

A0260 20401-0000 ROADWAY EXCAVATION CUYD 1,574 226 1,800

A0280 20701-0300 SEPARATION-STABILIZATION

GEOTEXTILE, CLASS 1, TYPE C SQYD 60 60

A0300 20702-0300 GEOTEXTILE FILTER, CLASS 1,

TYPE C SQYD 500 50 550

A0320 25101-0100 PLACED RIPRAP, METHOD A,

CLASS 1 (GOVERNMENT FURNISHED) CUYD 10 10

A0340 25101-0200 PLACED RIPRAP, METHOD A,

CLASS 2 (GOVERNMENT FURNISHED) CUYD 475 25 500

A0360 25101-0300 PLACED RIPRAP, METHOD A,

CLASS 3 (GOVERNMENT FURNISHED) CUYD 40 40

A0380 30201-2000 ROADWAY AGGREGATE, METHOD 2

(GOVERNMENT FURNISHED) CUYD 1,087 113 1,200

A0400 55101-1100 STEEL H-PILE, IN PLACE LNFT 53 53

A0420 55103-1000 SHEET PILE, IN PLACE SQYD 975 975

A0440 55222-0000 REPAIR CONCRETE (SANCTUARY

RIVER BRIDGE JOINTS) LPSM All ALL

A0460 56301-2000 PAINTING, STEEL STRUCTURE

(SANCTUARY RIVER BRIDGE RAILS) LPSM All ALL

MileStone: 100% Date Completed: In Progress Report Date: 02/26/21

A M E N D

Line Item No.

Pay Item Number

SUMMARY OF QUANTITIES - Schedule A

-F eb

-2

:5

A M

Remarks and/or Determination of Estimated

Quantity Pay Item Description Unit

Estimated Quantities

C

TW

_O

R D

\A K N

PS

D

EN

A

(4

8) B ug S tu ff er

\E st im at es su m m ar y1 3.

xl sm

]S he et

STATE PROJECT

B.1NPS DENA 10(47)&10(48)AK

SHEET

NUMBER

NPS PMIS No. 242398A, 242400A & 164258A NPS Drwg No.184/80301 & 187/80300

TYPICAL

SECTIONS PLAN-PROFILE BRIDGES EROSION

CONTROL

GEOTECHNICAL

DETAILS DRAINAGE

TEMPORARY

TRAFFIC

CONTROL

PERMANENT

TRAFFIC

CONTROL

ALLOWANCE Bid Schedule

A0480 56301-2000 PAINTING, STEEL STRUCTURE

(STONY CREEK BRIDGE) LPSM All ALL

A0500 57501-0000 MINOR BRIDGE WORK (STONY

CREEK BRIDGE) LPSM All ALL

A0520 60220-2950 10 FEET SPAN, 4 FEET RISE

PRECAST REINFORCED CONCRETE

BOX CULVERT LNFT 60 60

A0540 60403-0000 INLET (RISER) EACH 1 1

A0560 62201-0250 DUMP TRUCK, 10 CUBIC YARD

MINIMUM CAPACITY HOUR 40 40

A0580 62201-1000 WHEEL LOADER, 4 CUBIC YARD

MINIMUM RATED CAPACITY HOUR 40 40

A0600 62201-2050 ROLLER HOUR 40 40

A0620 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM

BLADE HOUR 40 40

A0640 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC

YARD MINIMUM CAPACITY WITH

THUMB ATTACHMENT HOUR 40 40

A0660 62302-0100 SPECIAL LABOR, SLOPE SCALING Quantity is individual scaler

HOUR 2,000 100 2,100 hours.

A0680 62406-0300 PLACING CONSERVED TOPSOIL,

4-INCH DEPTH ACRE 0.6 0.1 0.7

A0700 63308-2000 OBJECT MARKER, TYPE 2 (1V) EACH 8 8

A0720 63501-2000 TEMPORARY TRAFFIC CONTROL,

TRAFFIC SIGNAL SYSTEM LPSM ALL

A0740 63502-0600 TEMPORARY TRAFFIC CONTROL,

BARRICADE TYPE 3 EACH 12 12

A0760 63502-0700 TEMPORARY TRAFFIC CONTROL,

CONE EACH 130 20 150

A0780 63502-1600 TEMPORARY TRAFFIC CONTROL,

WARNING LIGHT TYPE B EACH 12 12

A0800 63503-0400 TEMPORARY TRAFFIC CONTROL,

CONCRETE BARRIER LNFT 160 160

A0820 63504-1000 TEMPORARY TRAFFIC CONTROL,

CONSTRUCTION SIGN SQFT 186 12 198

A0840 63506-0500 TEMPORARY TRAFFIC CONTROL,

FLAGGER HOUR 900 100 1,000

A0860 63507-0700 TEMPORARY TRAFFIC CONTROL,

TRAFFIC CONTROL SUPERVISOR DAY 90 10 100

-F eb -2

:5

A M

MileStone: 100% Date Completed: In Progress Report Date: 02/26/21

C

TW

_O

R D

\A K N

PS

D

EN

A

(4

8) B ug S tu ff er

\E st im at es su m m ar y1 3.

xl sm

]S he et

2) SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.2NPS DENA 10(47)&10(48)AK

SHEET

NUMBER

TYPICAL

SECTIONS PLAN-PROFILE BRIDGES EROSION

CONTROL

GEOTECHNICAL

DETAILS DRAINAGE

TEMPORARY

TRAFFIC

CONTROL

PERMANENT

TRAFFIC

CONTROL

ALLOWANCE Bid Schedule

A0880 63713-0000 FIELD OFFICE SERVICES MO 3 3

A0900 64704-1600 MITIGATION, STREAMBED CHANNEL

RECONSTRUCTION CUYD 1,052 1,052

A0920 65602-0000 TEMPORARY ROADWAY ROCKFALL

PROTECTION LPSM All ALL

-F eb -2

:5

A M

MileStone: 100% Date Completed: In Progress Report Date: 02/26/21

C

TW

_O

R D

\A K N

PS

D

EN

A

(4

8) B ug S tu ff er

\E st im at es su m m ar y1 3.

xl sm

]S he et

3) SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated

Quantity

STATE PROJECT

B.3NPS DENA 10(47)&10(48)AK

SHEET

NUMBER

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

7001 3476913.029 1641257.729 3249.839 63°30'53.928784"N 149°59'41.458221"W 3297.2768 0.99974281 1.

9001 3476777.224 1641447.551 3243.081 63°30'52.591652"N 149°59'37.273753"W 3290.522 0.99974313

BUG1 3475849.084 1643747.283 3320.377 63°30'43.449628"N 149°58'46.581809"W 3367.8504 0.99973946 5/8" IR w/fhwa alum cap

BUG2 3475975.210 1643428.928 3295.384 63°30'44.692258"N 149°58'53.598651"W 3342.8546 0.99974065 5/8" IR w/fhwa alum cap

STONY 3455943.228 1603386.804 3935.483 63°27'26.841808"N 150°13'34.710259"W 3982.8192 0.9997117 5/8" IR w/fhwa alum cap

Y125 3474436.939 1632261.283 3162.047 63°30'29.521317"N 150°02'59.748262"W 3209.4717 0.99974707 Brass Cap

PROJECT : Culvert Replacement MP52 rockfall mitigation MP 52.9 PROJECT UNITS : US Survey Foot

COORDINATE SYSTEM : Alaska zone 4 SPCS NAD83 (2011) VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b

EPOCH DATE : 2010.000

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

C

M yF ile s\

Pr oj ec ts

_2

1\ Al as ka

\B ug st uf fe r\

[A K_

N

PS

_D

EN

A_

(4 8)

_c on tr ol sh ee t.

xl sx ]S he et

-J an -2

8:

A M

W

FL

H D

S ur ve y

W

FL

H D

S ur ve y

D es ig ne d by

C he ck ed b y:

STATE PROJECT

D.5

SHEET

NUMBER

NPS DENA 10(47)&10(48)AK

SURVEY CONTROL

NO. DATE BY REVISIONS NO. DATE BY REVISIONS

9830-007P

REPAIR DETAILS

SANCTUARY RIVER BRIDGE

ELEVATION

PLAN

TYPICAL SECTION

A A

"2 164'-8 65'-2" "2

164'-8

Along centerline

194'-7"

12'-0" 12'-0"2'-3" 2'-3"

(Typ.)

MC8x21.4

Begin bridge End bridge

1" joint seal and filler

Remove existing

SECTION A-A

EXISTING PROPOSED

1"10""

4'-0" 4'-0"8'-0" 8'-0"1'-9" 1'-9"

No scale beads and silicone band

Field applied silicone corner

1 M in silicone

Precompressed

Impregnated foam both sides

Epoxy adhesive N

(Typ.)

elastomeric concrete joint header with

Remove and recast

Legend:

S a n c tu a ry R iv e r

Note:

BAO

(Typ.)

(To remain) reinforcement

Existing

Footnote:

391 LNFT (Information Only Quantity) [2]

65 LNFT (Information Only Quantity)[1] welded to angle

" Support bar 8

30°

(Typ.)

recast joint headers.

joints. Remove and remove and reseal pier

Repair Concrete;

Type 2 (1V)

Object Marker, C Abutment 2LLC Abutment 1L C Pier 1 LC Pier 2

(See Note 2) welded stud anchor @ 1'-0"

" Ø 4 1"x4

1 with 24 1L2x2x

(Typ.)

mounting brackets repaint steel railing and remove existing paint and

Painting, Steel Structure;

(Typ.)

mounting brackets repaint steel railing and remove existing paint and

Painting, Steel Structure;

Continue new joint seal up curb line face to exterior face of curb.

to ASTM A123. Install angle between curbs matching bridge deck crown.

Provide steel angle conforming to ASTM A36. Galvanize angle according2.

mounting bracket details.

Field verify all dimensions. Refer to as-builts for steel railing layout and 1.

C StructureL

E.1

Structure Number

PROJECT TEAM LEADER BRIDGE DRAWING

of

DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY

STATE PROJECT

SHEET

NO.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

DRAWING NO.

DENALI NATIONAL PARK AND PRESERVE

2B. OLTMANNAF AF

AK

NPS Drwg. No. 184/80301

NPS Drwg. No. 184/80300

NPS PMIS No. 164258A

NPS PMIS No. 242398A & 242400A

NPS DENA 10(47) & 10(48)

MARCH 2021

D e fa u lt c p w w o r k d E

D E

N A P

E .D

G N

P

M

J a n u a r y

NO. DATE BY REVISIONS NO. DATE BY REVISIONS

9830-015P

REPAIR DETAILS

STONY CREEK BRIDGE

ELEVATION

PLAN

TYPICAL SECTION

12'-0" 12'-0"2'-3" 2'-3"

Begin bridge

End bridge

4'-0" 4'-0"8'-0" 8'-0"1'-9" 1'-9"

104'-7"

"2 134'-8 35'-2" "2

134'-8

DETAIL A

B

B

O v e rl a p

(Typ.)

21WF59

N

S to n y C r e e k

"4

Legend:

VIEW B-B

Note:

No Scale

(Typ.)

See Detail A

BAO

Control, Fiber Roll

Place Soil Erosion

Footnote:

3,000 SQFT (Information Only Quantity)[1] as directed by the CO

Riprap, Method A, Class 1

Repair erosion with Placed

AT INTERMEDIATE AND PIER DIAPHRAGM AT ABUTMENT DIAPHRAGM

14WF30 MC12x25

Existing scupper

Type 2 (1V)

Object Marker, bent plate

" Three-sided16

C Abutment 2C Abutment 1L LC Pier 1 LC Pier 2 L repair to no more than 5".

Concrete repair area to be determined by CO. Limit depth of3.

Paint scupper extensions after installation.

Furnish steel for scupper extensions conforming to ASTM A36.2.

layout and bearing assembly details.

Field verify all dimensions. Refer to as-builts for steel superstructure1.

(Typ.)

and all bearing assemblies repaint steel superstructure remove existing paint and

Painting, Steel Structure;

approx. 3'-0" x 2'-6" deck surface, repair deteriorated

Minor Bridge Work;

(See Detail A)

8 locations extend scupper, Minor Bridge Work;

C StructureL

E.2

Structure Number

PROJECT TEAM LEADER BRIDGE DRAWING

of

DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY

STATE PROJECT

SHEET

NO.

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

DRAWING NO.

DENALI NATIONAL PARK AND PRESERVE

2B. OLTMANNAF AF

AK

NPS Drwg. No. 184/80301

NPS Drwg. No. 184/80300

NPS PMIS No. 164258A

NPS PMIS No. 242398A & 242400A

NPS DENA 10(47) & 10(48)

MARCH 2021

D e fa u lt c p w w o r k d E

D E

N A P

E .D

G N

P a r c h

10.4 x 16 20301 -1900

20701 -0300

25101 -3000

60220 -2950

60403 -0000

Station

ES

TI

M

A

TE

D M

A X

IM

U M

C O

V

ER

S

TR

U C

TU

R A L

EX

C

A V A

TI

O N

R

EM

O V A L

O F

PI

PE

C U

LV

ER

T

EA

R

TH

W O

R K G

EO

TE

X

TI

LE

TY

PE

I-

C

PL

A C

ED

R

IP

R A P, C

LA

S S

(G ov er nm en t Fu rn is he d)

F

EE

T

S

PA

N

FE

ET

R

IS

E

PR

EC

A S T

R

EI

N

FO

R

ED

O

N C

R

ET

E B O

X C

U

LV

ER

T

IN

LE

T (R

IS

ER

S K

EW

A N

G

LE

A llo w ab le P ip e

M at er ia l (S ee k ey b el ow

B

EV

EL

S

1V :n

H

B

EV

EL

S

1V :n

H

REMARKS

See below for numbered notes

FEET CUYD EACH SQYD CUYD LNFT EACH Lt Rt

103+77 3 45 1 60 40 60

104+85 1 RIGHT

PROJECT TOTAL 45 1 60 40 60 1

Allowable Pipe Material A Aluminum AS Aluminized steel

NOTE: C Concrete

1. Culvert locations are approximate, field locate per Subsection 152.05(g) GS Galvanized steel

P Plastic (blank) Any appropriate material x/__ Any appropriate material except __

PAY ITEM NUMBER

TABULATION OF DRAINAGE QUANTITIES

Note: The quantities shown hereon are approximate and are subject to field adjustments.

STATE PROJECT

H.1

C

TW

_O

R D

\A K N

PS

D

EN

A

0(

B ug

S tu ff er

\S ub m itt al s\

Q A R ev ie w de na

8_ hy d.

xl sx ]S he et

-J an -2

:3

L.

T O

W N

S

EN

D

/2

B

S to ke s

D es ig ne d by

C he ck ed b y:

NUMBER

SHEET

NPS DENA 10(48)&10(47)AK

NPS PMIS No. 2423984 & 242400A NPS Drwg. No. 184/80301

NPS PMIS No. 164258A NPS Drwg. No. 184/80300

AK NPS DENA 10(47) & 10(48 I.2

AK NPS DENA 10(47) & 10(48 I.3

AK NPS DENA 10(47) & 10(48 I.4

AK NPS DENA 10(47) & 10(48 I.5

AK NPS DENA 10(47) & 10(48 I.6

AK NPS DENA 10(47) & 10(48 J.1

2021-03-15T10:06:03-0700
BRENT L COE

File details come from the government source that posted it. Updated .