This federal solicitation and related project opportunity involve road and bridge repairs for the National Park Service in Denali Borough, Alaska. The solicitation seeks bids for minor bridge repairs including painting bridge rails, replacing a concrete box culvert, conducting rockfall mitigation work such as slope scaling and installing dowels and bolts, and some minor additional tasks. The project work sites are located along approximately 0.3 miles of road at mileposts 52, 52.9, 23, and 61. The estimated price range for the contract is $2 million to $3 million. The tentative fixed completion date is Fall 2020. The soliciting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A002 04/21/2021 N/A See Block 10
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X 69056718B000028
9B. DATED (SEE ITEM 11)
04/07/2021
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK NPS DENA 10(47) & 10(48), Repair Two Denali Park Bridges and Culvert Replacement MP 52 & Rockfall Mitigation
MP 52.9
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A002, dated ??-??-0? Project No: AK NPS DENA 10(47) & 10(48) Solicitation No. DTFH70-0?-?-000?? Project Name: Repair Two Denali Park Bridges and
Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-7 through A-11.
Replaces, Bid Schedule pages A-7 through A-11 and revises pay item description REMOVAL OF STRUCTURES AND OBSTRUCTIONS (RAILROAD TIES) to REMOVAL OF STRUCTURES AND OBSTRUCTIONS (RAILROAD RAILS) of Line Item No. A0240, pay item number 20304-1000.
CONTRACT CLAUSES
PLANS
Plan sheet # B.1 through B.3 Revises: Summary of Quantity Plan Sheets
Plan sheet # G.15 Adds: callout for location of railroad rail locations
Plan sheet #G.16 Revises: SCOUR MITIGATION QUANTITIES table, item no.
20304-1000 Description from REMOVAL OF STRUCTURES AND OBSTRUCTION (RAILROAD TIES) to REMOVAL OF
STRUCTURES AND OBSTRUCTION (RAILROAD RAILS)
Adds: Callout for location of railroad rails in SECTION A of plan sheet
ENCLOSURES
Pages:
A-7 through A-11
Plan Sheets:
B.1 through B.3 G.15 G.16
Notice to Bidders: Please submit revised pages A-7 through A-11 with your bid.
A - 7
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:AK NPS DENA 10(47) & 10(48)
Project Name:Repair Two Denali Park Road Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 Revised by Amendment A002
A - 8
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0120 15702-1000 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
ALL LPSM $___LPSM_____ $____________
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
2,500 LNFT $____________ $____________
A0160 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
700 LNFT $____________ $____________
A0180 20101-0000 CLEARING AND GRUBBING
0.7 ACRE $____________ $____________
A0200 20301-1900 REMOVAL OF PIPE CULVERT
1 EACH $____________ $____________
A0220 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (GABION
BASKET/REVETMENT MATTRESS)
ALL LPSM $___LPSM_____ $____________
A002 A0240 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (RAILROAD RAILS)
ALL LPSM $___LPSM_____ $____________
A0260 20401-0000 ROADWAY EXCAVATION
1,800 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Repair Two Denali Park Road Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 Revised by Amendment A002
A - 9
A0280 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C
60 SQYD $____________ $____________
A0300 20702-0300 GEOTEXTILE FILTER, CLASS 1, TYPE C
550 SQYD $____________ $____________
A0320 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1 (GOVERNMENT FURNISHED)
10 CUYD $____________ $____________
A0340 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (GOVERNMENT FURNISHED)
500 CUYD $____________ $____________
A0360 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (GOVERNMENT FURNISHED)
40 CUYD $____________ $____________
A0380 30201-2000 ROADWAY AGGREGATE, METHOD 2 (GOVERNMENT FURNISHED)
1,200 CUYD $____________ $____________
A0400 55101-1100 STEEL H-PILE, IN PLACE
53 LNFT $____________ $____________
A0420 55103-1000 SHEET PILE, IN PLACE
975 SQYD $____________ $____________
A0440 55222-0000 REPAIR CONCRETE (SANCTUARY RIVER BRIDGE JOINTS)
ALL LPSM $___LPSM_____ $____________
A0460 56301-2000 PAINTING, STEEL STRUCTURE (SANCTUARY RIVER BRIDGE RAILS)
ALL LPSM $___LPSM_____ $____________
A0480 56301-2000 PAINTING, STEEL STRUCTURE (STONY CREEK BRIDGE)
ALL LPSM $___LPSM_____ $____________
A0500 57501-0000 MINOR BRIDGE WORK (STONY CREEK BRIDGE)
ALL LPSM $___LPSM_____ $____________
A0520 60220-2950 10 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX
CULVERT
60 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Repair Two Denali Park Road Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 Revised by Amendment A002
A - 10
A0540 60403-0000 INLET (RISER)
1 EACH $____________ $____________
A0560 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
40 HOUR $____________ $____________
A0580 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
40 HOUR $____________ $____________
A0600 62201-2050 ROLLER
40 HOUR $____________ $____________
A0620 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE
40 HOUR $____________ $____________
A0640 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
40 HOUR $____________ $____________
A0660 62302-0100 SPECIAL LABOR, SLOPE SCALING
2,100 HOUR $____________ $____________
A0680 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
0.7 ACRE $____________ $____________
A0700 63308-2000 OBJECT MARKER, TYPE 2 (1V)
8 EACH $____________ $____________
A0720 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
ALL LPSM $___LPSM_____ $____________
A0740 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
12 EACH $____________ $____________
A0760 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE
150 EACH $____________ $____________
A0780 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
12 EACH $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Repair Two Denali Park Road Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 Revised by Amendment A002
A - 11
A0800 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
160 LNFT $____________ $____________
A0820 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
198 SQFT $____________ $____________
A0840 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
1,000 HOUR $____________ $____________
A0860 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
100 DAY $____________ $____________
A0880 63713-0000 FIELD OFFICE SERVICES
3 MO $____________ $____________
A0900 64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION
1,052 CUYD $____________ $____________
A0920 65602-0000 TEMPORARY ROADWAY ROCKFALL PROTECTION
ALL LPSM $___LPSM_____ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Repair Two Denali Park Road Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9 Revised by Amendment A002
Sheet and Description
SECTION C SECTION D SECTION E SECTION F SECTION G SECTION H SECTION I SECTION J -
TYPICAL
SECTIONS
PLAN-PROFILE BRIDGES
EROSION
CONTROL
GEOTECHNICAL
DETAILS
DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE
Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND
STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL
AND ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15702-1000 SOIL EROSION CONTROL,
TEMPORARY DIVERSION CHANNEL LPSM All ALL
A0140 15705-1400 SOIL EROSION CONTROL, FIBER
ROLL LNFT 40 2,365 95 2,500
A0160 15705-1800 SOIL EROSION CONTROL,
TEMPORARY DIVERSION BERM LNFT 700 700
A0180 20101-0000 CLEARING AND GRUBBING ACRE 0.6 0.1 0.7
A0200 20301-1900 REMOVAL OF PIPE CULVERT EACH 1 1
A0220 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS (GABION
BASKET/REVETMENT MATTRESS) LPSM All ALL
A002 A0240 20304-1000 REMOVAL OF STRUCTURES AND
OBSTRUCTIONS (RAILROAD RAILS) LPSM All ALL
A0260 20401-0000 ROADWAY EXCAVATION CUYD 1,574 226 1,800
A0280 20701-0300 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE C SQYD 60 60
A0300 20702-0300 GEOTEXTILE FILTER, CLASS 1,
TYPE C SQYD 500 50 550
A0320 25101-0100 PLACED RIPRAP, METHOD A,
CLASS 1 (GOVERNMENT FURNISHED) CUYD 10 10
A0340 25101-0200 PLACED RIPRAP, METHOD A,
CLASS 2 (GOVERNMENT FURNISHED) CUYD 475 25 500
A0360 25101-0300 PLACED RIPRAP, METHOD A,
CLASS 3 (GOVERNMENT FURNISHED) CUYD 40 40
A0380 30201-2000 ROADWAY AGGREGATE, METHOD 2
(GOVERNMENT FURNISHED) CUYD 1,087 113 1,200
A0400 55101-1100 STEEL H-PILE, IN PLACE LNFT 53 53
A0420 55103-1000 SHEET PILE, IN PLACE SQYD 975 975
A0440 55222-0000 REPAIR CONCRETE (SANCTUARY
RIVER BRIDGE JOINTS) LPSM All ALL
A0460 56301-2000 PAINTING, STEEL STRUCTURE
(SANCTUARY RIVER BRIDGE RAILS) LPSM All ALL
A002 Revised by Amendment A002 Date Completed: 04/21/21 Report Date: 04/21/21
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES - Schedule A -A p r-
:0 P
M
Remarks and/or Determination of
Estimated Quantity Pay Item Description Unit
Estimated Quantities
C
T W
O
R D
\A K N
P S D
E N
A
(4
B u g S tu ff er
\O R D
E xp o rt su m m a ry xl sm
]S h ee t
STATE PROJECT
B.1NPS DENA 10(47)&10(48)AK
SHEET
NUMBER
TYPICAL
SECTIONS
PLAN-PROFILE BRIDGES
EROSION
CONTROL
GEOTECHNICAL
DETAILS
DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE
Bid
Schedule
A0480 56301-2000 PAINTING, STEEL STRUCTURE
(STONY CREEK BRIDGE) LPSM All ALL
A0500 57501-0000 MINOR BRIDGE WORK (STONY
CREEK BRIDGE) LPSM All ALL
A0520 60220-2950 10 FEET SPAN, 4 FEET RISE
PRECAST REINFORCED CONCRETE
BOX CULVERT LNFT 60 60
A0540 60403-0000 INLET (RISER) EACH 1 1
A0560 62201-0250 DUMP TRUCK, 10 CUBIC YARD
MINIMUM CAPACITY HOUR 40 40
A0580 62201-1000 WHEEL LOADER, 4 CUBIC YARD
MINIMUM RATED CAPACITY HOUR 40 40
A0600 62201-2050 ROLLER HOUR 40 40
A0620 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM
BLADE HOUR 40 40
A0640 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC
YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT HOUR 40 40
A0660 62302-0100 SPECIAL LABOR, SLOPE SCALING Quantity is individual scaler
HOUR 2,000 100 2,100 hours.
A0680 62406-0300 PLACING CONSERVED TOPSOIL,
4-INCH DEPTH ACRE 0.6 0.1 0.7
A0700 63308-2000 OBJECT MARKER, TYPE 2 (1V) EACH 8 8
A0720 63501-2000 TEMPORARY TRAFFIC CONTROL,
TRAFFIC SIGNAL SYSTEM LPSM ALL
A0740 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 EACH 12 12
A0760 63502-0700 TEMPORARY TRAFFIC CONTROL,
CONE EACH 130 20 150
A0780 63502-1600 TEMPORARY TRAFFIC CONTROL,
WARNING LIGHT TYPE B EACH 12 12
A0800 63503-0400 TEMPORARY TRAFFIC CONTROL,
CONCRETE BARRIER LNFT 160 160
A0820 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 141 9 198
A0840 63506-0500 TEMPORARY TRAFFIC CONTROL,
FLAGGER HOUR 900 100 1,000
A0860 63507-0700 TEMPORARY TRAFFIC CONTROL,
TRAFFIC CONTROL SUPERVISOR DAY 90 10 100
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
C
T W
O
R D
\A K N
P S D
E N
A
(4
B u g S tu ff er
\O R D
E xp o rt su m m a ry xl sm
]S h ee t (2
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A p r-
:0 P
M
A002 Revised by Amendment A002 Date Completed: 04/21/21 Report Date: 04/21/21
STATE PROJECT
B.2NPS DENA 10(47)&10(48)AK
TYPICAL
SECTIONS
PLAN-PROFILE BRIDGES
EROSION
CONTROL
GEOTECHNICAL
DETAILS
DRAINAGE
TEMPORARY
TRAFFIC
CONTROL
PERMANENT
TRAFFIC
CONTROL
ALLOWANCE
Bid
Schedule
A0880 63713-0000 FIELD OFFICE SERVICES MO 3 3
A0900 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 1,052 1,052
A0920 65602-0000 TEMPORARY ROADWAY ROCKFALL
PROTECTION LPSM All ALL
SUMMARY OF QUANTITIES - Schedule A
A M E N D
Line Item No.
Pay Item Number
C
T W
O
R D
\A K N
P S D
E N
A
(4
B u g S tu ff er
\O R D
E xp o rt su m m a ry xl sm
]S h ee t (3
Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
-A p r-
:0 P
M
A002 Revised by Amendment A002 Date Completed: 04/21/21 Report Date: 04/21/21
STATE PROJECT
B.3NPS DENA 10(47)&10(48)AK
15 30015
SCALE IN FEET
A
A
B
B
N
TO
K
LA
T R
IV
ER
G.15
STATE PROJECT
NUMBER
SHEET
AK NPS DENA 10(47) & 10(48)
:0
P
M
J a n u a r y
C h e c k e d b y
D e s ig n e d b y
Temporary diversion berm
G.17, Detail A pile. See Sheet existing sheet and connect to
Install king pile bridge abutment
Existing
Existing sheet pile wall
Existing roadway edge
Existing bridge structure
Install sheet pile
(government furnished)
Placed riprap, method A, class 2
180'-0" of old abutment
Approx. location
NPS Drwg. No. 187/80300
NPS PMIS No. 164258A
NPS Drwg. No. 184/80301
NPS PMIS 242398A & 242400A
rails) obstructions (railroad structures and of removal of
Approximate location mattress) basket/revetment and obstructions (gabion removal of structures
Approximate location of 2
2 Revised by Amendment A002 PLAN
SCOUR MITIGATION
TOKLAT RIVER BRIDGE
SECTION B
NO SCALE
DESCRIPTIONITEM NO. UNIT QUANTITY
SECTION A
SHEET PILE SECTIONS
SCOUR MITIGATION
TOKLAT RIVER BRIDGE
Existing roadway edge
Bridge abutment
Bridge structure
Bridge low chord revetment mattress) obstructions (gabion baskets/
Removal of structures and
Approximate location of
Existing grade
Existing stream bottom
SCOUR MITIGATION QUANTITIES
See Note 5.
diversion berm.
Temporary
See Note 5.
diversion berm.
Temporary
Existing stream bottom
G.16
STATE PROJECT
NUMBER
SHEET
AK NPS DENA 10(47) & 10(48)
D e c e m b e r
:2
A M
C h e c k e d b y
D e s ig n e d b y
See Notes 1-4.
pile to existing sheet pile.
Install and connect king
Existing grade
See Notes 1-4.
Install sheet pile.
Geotextile filter, class 1, type C
(government furnished)
Placed riprap, method A, class 2
5) Construct temporary diversion berm as needed to complete the work.
4) Design based on minimum embedment of 25'-0". Contact CO if greater than 8'-0" exposed height.
3) Connect king pile to existing sheet pile. See Sheet G.17, Detail A.
2) Installed sheet pile and king pile length of 33'-0".
1) Match existing sheet pile top elevation.
Notes:
55103-1000
55101-1100
25101-0200
20702-0300
20304-1000
20304-1000
15705-1800
SHEET PILE, IN PLACE
STEEL H-PILE, IN PLACE
PLACED RIPRAP, METHOD A, CLASS 2 (GOVERNMENT FURNISHED)
GEOTEXTILE FILTER, CLASS 1, TYPE C
REMOVAL OF STRUCTURES AND OBSTRUCITONS (RAILROAD TIES) RAILS
REMOVAL OF STRUCTURES AND OBSTRUCTIONS (GABION BASKET/REVETMENT MATTRESS)
SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
SQYD
LNFT
CUYD
SQYD
LPSM
LPSM
LPSM [1]
[3]
[2]
[3] 50 LNFT
[2] 3,500 SQFT
[1] 700 LNFT
(INFORMATION ONLY)
ESTIMATED QUANTITIES
15'-0"
15'-0"
Geotextile filter, class 1, type C furnished)
(government method A, class 2
Placed riprap, 2 Revised by Amendment A002 obstructions (railroad rails) removal of structures and
Approximate location of
(min.)
4'-0" m in m in
(min.)
4'-0"
2'-0"
6'-0" min.
6'-0" min.
A p p r o x
A p p r o x
A p p r o x
File details come from the government source that posted it. Updated .