This document contains questions and answers related to a federal solicitation for bridge and culvert repair work in Denali National Park, Alaska. The solicitation involves repairing two bridges, replacing a concrete box culvert, and conducting rockfall mitigation such as scaling, installing dowels and bolts. The work sites are located along 0.3 miles of the Denali Park Road between mile markers 52 and 52.9. The estimated price range for the contract is $2-3 million. Questions addressed include clarification on bid items, dimensions for contractor housing facilities, approval of temporary rockfall protection systems, and identification of applicable trade agreement terms. Responses provide additional specification details or instruct bidders to submit proposals according to the solicitation requirements.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No: AK NPS DENA 10(47) & 10(48) Project Name: Repair Two Denali Park Road Bridges and Culvert Replacement MP 52 & Rockfall Mitigation MP 52.9
# General Technical Question Answer Date 1 X Bid Item A0240 refers to railroad ties. Drawing B.1 shows it as well under
Section G, Geotechnical Details. Could you clarify this, I don’t see railroad ties on the drawings or provided photos.
Will Be addressed under Amendment A002 20‐Apr‐21
2 X Do you have the sheet pile designation of the existing Toklat River Bridge sheet pile where we are to fasten the king pile to it, shown on G.17?
No, please bid accordingly 20‐Apr‐21
3 X Is there any coating required on the sheet pile or king pile that we are to provide and install per G.17
No, please bid accordingly 20‐Apr‐21
4 X The completion date is predicated on a July 1 NTP date, with a performance period of just over 2 months. Would it be possible to get a limited NTP earlier to start procurement on fabricated steel and concrete items?
No, please bid accordingly 20‐Apr‐21
5 X What is the height of the highest General Scaling Limit for the scaling operation?
(As depicted on SHEET NUMBER G2 ‐ G14) the anticipated max vertical height (from the existing roadway elevation) for the General Scaling is approximately 300 feet.
22‐Apr‐21
6 X What is the height of the highest Intensive Scaling Limit for the scaling operation?
(As depicted on SHEET NUMBER G2 ‐ G14) the anticipated max vertical height (from the existing roadway elevation) for the General Scaling is approximately 300 feet.
22‐Apr‐21
7 X Division 100 Section 107.12 Page E‐21
Toklat Road Camp: What are the dimensions for the 8 spaces with power and 8 spaces without power at Toklat Road Camp?
The dimensions of the spaces will be dependent on the contractors proposed configuration of the construction camp/housing facility. See SCR 107.12.
Please bid appropriately.
22‐Apr‐21
Check General or Technical
8 X For 65602‐0000 TEMPORARY ROADWAY ROCKFALL PROTECTION
We don’t see the energy estimate in either foot tons or kilo Joules that describes the kinetic energy these scaled rocks may impact the barrier with.
Could you provide the energy and bounce height estimates for the temporary barrier?
Will Be addressed under Amendment A003 3‐May‐21
9 X Sheet Number G 15. Was it anticipated from design for the pile driving crane to be stationed on the road way for installation of the sheet piles?
Stationing of the driving crane during Installation of the sheet pile is dependent upon the contractors anticipated operations. Please bid accordingly.
3‐May‐21
10 X Is there a profile sheet for the install of the new sheet piles? No, please bid accordingly 3‐May‐21
11 X
A0140 ‐ Soil Erosion Control, Fiber Roll” provides for erosion control on the downward slope of new sheet pile installation or is erosion control for sheet pile installation incidental to bid item A0420 – Sheet Pile, In Place
Soil Erosion Control shall be installed in accordance with Section 157 – SOIL EROSION AND SEDIMENT CONTROL and as indicated on sheet E.2 and sheets F.1 through F.7. Please bid accordingly
4‐Mar‐21
12 X
Will a Geobrugg T35 System on concrete roadway barriers be approved as a Temporary Roadway Rockfall Protection system the rockfall protection system will be evaluated as proposed by the contractor in accordance with Sub‐Section 656.02.
Please bid accordingly
4‐May‐21
13 X
Within the specifications Section “Solicitation Provisions” pages B‐9/B‐10, the Government references FAR 52.225‐9 and FAR 52.225‐11. These are significantly different FAR’s in that “‐9” only allows for the supply of US materials and “‐11” allows for the supply of US and other countries we have fair trade agreements with. Is the Government invoking the “9” or “11” FAR?
will be addressed under Amendment A004 4‐May‐21