PILE SCHEDULE.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
Solicitation number
FA813727R0002
Issued by

About this file

This is a Pile Schedule technical specification document that outlines structural design requirements for foundation support systems. The schedule specifies two pile cap configurations (P1 and P2), both measuring 24"x24"x2'-0" and reinforced with eight #4 vertical bars and six #4 ties. Load specifications are provided in both Allowable Stress Design (ASD) and Load and Resistance Factor Design (LRFD) methodologies. P1 is designed to support axial loads of 33K (ASD) or 45K (LRFD), with minimal shear (0.1K/0.2K) and moment (0.4K-FT/0.9K-FT) forces. P2 accommodates lower axial loads of 21K (ASD) or 29K (LRFD) but significantly higher moment loads of 15K-FT (ASD) or 21K-FT (LRFD), with equivalent shear values to P1. Both configurations are designed to support helical pier foundations and include detailed reinforcement specifications for structural integrity.

This technical schedule is associated with Air Force solicitation FA813727R0002 for the installation of a REACT VII facility at Building 9001, Post V19. The solicitation is restricted to SBA Certified Women Owned Small Businesses (WOSB) only and requires mandatory attendance at an initial site visit scheduled for October 15, 2026, at 0900 CST at the Northwest Parking lot of Building 9001 (coordinates 35°23'43.9"N 97°23'56.8"W). Interested WOSB contractors must submit RSVPs within five calendar days to SSgt Isaac Demmers and CC Tamra Torres, with Entry Access Lists provided if base access is required for attending personnel.

View the file

Other files

File Type Posted
250063_ATT 13_Prebid RFI Responses Round 1.pdf PDF
250063_ATT 8_Liquidated Damages.pdf PDF
250063_ATT 4_ODS.pdf PDF
2026 TAFB Mechanical Standard_signed.pdf PDF
2026 TAFB FIRE PROTECTION STANDARD.pdf PDF
SOW Att 04_Automated Casting Cell.pdf PDF
SOW Att 02a_Controlled Area Training.pptx PPTX presentation
250063_ATT 10_Submittal Register.pdf PDF
23 00 00.pdf PDF
08 11 13.pdf PDF
08 33 23.pdf PDF
10 22 13.pdf PDF
10 44 16.pdf PDF
07 21 16.pdf PDF
00 71 00.pdf PDF
01 33 00.pdf PDF
01 50 00.pdf PDF
ufc_3_260_01_2019_c1.pdf PDF
EM_385-1-1.pdf PDF
dafi21-101_afmcsup_afmcgm2023-01.pdf PDF
ufc_3_601_02_2021.pdf PDF
tinkerafbi13-204.pdf PDF
afman32-7003.pdf PDF
afman91-203_oc-alcsup.pdf PDF
afi48-104.pdf PDF
dodio-2000.16v1_afi10-245-o.pdf PDF
007200_Attch7b_Monthly Hazardous Usage Report.pdf PDF
007200_Attch9_EMS Awareness Training.pdf PDF
JOIST SPECIAL INSPECTIONS.xlsx XLSX spreadsheet
250063_ Redline A-502.pdf PDF
HE05IN_Dimension_Drawing.pdf PDF
lrad331965pd_spec.pdf PDF
ELECTRICAL COMBINED.pdf PDF
4500-MUG.pdf PDF
220042 As Built Drawings.pdf PDF
Site Visit Meet Up Location.png PNG image
SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx XLSX spreadsheet
250063_ATT 10_Submittal Register.xlsx XLSX spreadsheet
23 08 00.pdf PDF
21 13 13.pdf PDF
23 07 00.pdf PDF
23 36 00.00 40.pdf PDF
23 05 48.00 40.pdf PDF
10 14 00.10.pdf PDF
08 81 00.pdf PDF
28 31 76.pdf PDF
06 41 16.00 10.pdf PDF
01 42 00.pdf PDF
01 33 16.00 10.pdf PDF
HAZMAT Reporting at Tinker AFB FEB 2025.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PILE SCHEDULE
PILE CAPHELICAL PIER LOADS
LOADASDLRFD
P124"X24"X2'-0" REINF W/ (8)-#4 VERTS AND (6)-#4 TIESP33K45K
V0.1K0.2K
M0.4K-FT0.9K-FT
P224"X24"X2'-0" REINF W/ (8)-#4 VERTS AND (6)-#4 TIESP21K29K
V0.1K0.2K
M15K-FT21K-FT