Past Performance Questionnaire.pdf

PDF 455 KB Posted

Attached to
Raul Hector Castro Douglas AZ Land Port of Entry Design-Build
Solicitation number
47PK0125R0002
Issued by

About this file

This is a PBS (Probable Best Sourced) Past Performance Questionnaire template issued by GSA in July 2014, designed to collect contractor performance evaluations from clients on completed contracts.

The questionnaire is divided into two primary sections: contractor-completed blocks (1-4) capturing firm information, contract details, and project description; and a client-completed evaluation section assessing performance across seven rating categories. Contractors provide their firm name, UEI number, contact details, contract number, contract type (Firm Fixed Price or Cost Reimbursement), contract location, award and completion dates, original and final contract prices, and project complexity and relevance. The client evaluation section uses a standardized six-point rating scale (Exceptional, Very Good, Satisfactory, Marginal, Unsatisfactory, Not Applicable) to assess Quality (technical data preparation, quality standards, problem resolution, quality assurance); Schedule/Timeliness of Performance (delivery schedules, resource utilization); Customer Satisfaction (end-user satisfaction, contractor cooperation, overall satisfaction); Management/Personnel/Labor (on-site management, workforce qualification, government property control, personnel expertise, small business utilization, multi-project management, requirement changes, overall management); Cost/Financial Management (price compliance, cost innovation, invoice accuracy for government contracts, accounting system adequacy, termination history, financial stability); Safety/Security (safety plan adherence, security compliance); and General (emergency response, contractual compliance). The questionnaire concludes with sustainability assessment, a summary recommendation on rehiring, and an open comments section for narrative feedback on strengths, weaknesses, and performance risk factors. Clients are instructed to submit completed questionnaires directly to the contractor, who then includes them in GSA solicitation proposals, with GSA reserving verification rights.

View the file

Other files

File Type Posted
Amendment 007 - 47PK0125R0002 CO Signed.pdf PDF
Amendment 006 - 47PK0125R0002 CO Signed.pdf PDF
Amendment 005 - 47PK0125R0002 CO Signed.pdf PDF
Amendment 004 - 47PK0125R0002 CO Signed.pdf PDF
4. RHC LPOE DB Site Walk Sign In Sheet - Amdmt 003.pdf PDF
5. RHC LPOE DB Virtual Pre-Proposal Conf RSVPs - Amdmt 003.pdf PDF
1. 2026.02.17 DB Pre Proposal Google Attendance - Amdmt 003.pdf PDF
Amendment 003 - 47PK0125R0002 CO Signed.pdf PDF
Amendment 002 - 47PK0125R0002 CO Signed.pdf PDF
Pre Proposal Conference and Site Visit RSVP Form RHC LPOE DB - Amendment 002.pdf PDF
Amendment 001 - 47PK0125R0002 CO Signed.pdf PDF
Pre Proposal Conference and Site Visit RSVP Form RHC LPOE DB - Amendment 001.pdf PDF
RHC LPOE RFP Price Form.xlsx XLSX spreadsheet
Solicitation RHC LPOE DB 1 Phase .pdf PDF
GSA527-21a.pdf PDF
SF25B-23a.pdf PDF
47PK0125R0002 1442 Form .pdf PDF
CBP Vetting Form (Contains Personal Identifiable Information - PII).xlsx XLSX spreadsheet
Individual Model_Subk_Plan - Dec 2025 - 508 Compliant (1).docx DOCX document
SF25-23a.pdf PDF
Agreement RHC LPOE DB.pdf PDF
Proprietary Information Agreement - Template 120825 (1).docx DOCX document
GACA Instructions.pdf PDF
Cochise WD.pdf PDF
Pre-Proposal Conference and Site Visit RSVP Form RHC LPOE DB.pdf PDF
SF25A-23a.pdf PDF
SF28-23a.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PBS PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Contractor/Offeror to complete Blocks 1-4)

1. CONTRACTOR/OFFEROR INFORMATION

Firm Name:

Address:

Phone Number: UEI Number:

Contact Name Email Address: : Contact Phone Number:

2. GENERAL WORK INFORMATION

Work performed as:☐ Prime Contractor ☐ Sub Contractor ☐ Joint Venture ☐ Other (Please explain):

Percent (%) of project work performed:

If a subcontractor, who was the prime (Name/Phone #):

3. CONTRACT INFORMATION

Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: ☐ Firm Fixed Price ☐ Cost Reimbursement ☐ Other (Please explain) Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. PROJECT DESCRIPTION

Complexity of Work: ☐ High ☐ Med ☐ Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

INSTRUCTIONS FOR CLIENTS COMPLETING THIS QUESTIONNAIRE: PBS requests that the client completes this questionnaire and submits it directly back to the offeror. The offeror will submit the completed questionnaire to PBS with their proposal, and may duplicate this questionnaire for future submission on PBS solicitations. Clients are highly encouraged to submit questionnaires directly to the offeror. However, questionnaires may be submitted

PBS Past Performance Questionnaire July 2014 directly to PBS. Please contact the offeror for PBS POC information. The government reserves the right to verify any and all information on this form.

Use the following adjective ratings and definitions in your evaluation of the Contractor’s performance.

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

CLIENT INFORMATION

Client Point of Contact Information Name:

Title:

Phone Number:

Email Address:

Project Information Contract Type:

Contract Title:

Contract Location:

Describe your role in the project:

Date Questionnaire was completed (mm/dd/yy):

Client’s Signature:

Instructions: Please select the adjective rating that best reflects your evaluation of the contractor’s performance.

1. QUALITY: E VG S M U N

(a) Quality of technical data/report preparation efforts. ☐ ☐ ☐ ☐ ☐ ☐

(b) Ability to meet quality standards specified for technical performance. ☐ ☐ ☐ ☐ ☐ ☐

(c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance. ☐ ☐ ☐ ☐ ☐ ☐

(d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance).

2. SCHEDULE/TIMELINESS OF PERFORMANCE: E VG S M U N

(a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below.)

(b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract. ☐ ☐ ☐ ☐ ☐ ☐

3. CUSTOMER SATISFACTION: E VG S M U N

(a) To what extent were the end users satisfied with the project? ☐ ☐ ☐ ☐ ☐ ☐

(b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;

responsiveness to administrative reports, businesslike and communication).

(c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? ☐ ☐ ☐ ☐ ☐ ☐

(d) Overall customer satisfaction. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR E VG S M U N

(a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force? ☐ ☐ ☐ ☐ ☐ ☐

(b) Ability to hire, apply, and retain a qualified workforce to this effort. ☐ ☐ ☐ ☐ ☐ ☐

4. MANAGEMENT/ PERSONNEL/LABOR - Continued E VG S M U N

(c) Government Property Control. ☐ ☐ ☐ ☐ ☐ ☐

(d) Knowledge/expertise demonstrated by contractor personnel. ☐ ☐ ☐ ☐ ☐ ☐

(e) Utilization of Small Business concerns. ☐ ☐ ☐ ☐ ☐ ☐

(f) Ability to simultaneously manage multiple projects with multiple disciplines. ☐ ☐ ☐ ☐ ☐ ☐

(g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes.

(h) Effectiveness of overall management (including ability to effectively lead, manage and control the program). ☐ ☐ ☐ ☐ ☐ ☐

5. COST/FINANCIAL MANAGEMENT E VG S M U N

(a) Ability to meet the terms and conditions within the contractually agreed price(s)? ☐ ☐ ☐ ☐ ☐ ☐

(b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client.

(c) If this is/was a Government cost type contract, or a CMc/CMc at Risk Contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns).

(d) Is the Contractor’s accounting system adequate for management and tracking of costs? (If no, please explain in comment section below.) ☐ Yes ☐ No

(e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? (Indicate if show cause or cure notices were issued, or any default action in comment section below.)

☐ Yes ☐ No

(f) Have there been any indications that the contractor has had any financial problems? (If yes, please explain in the comment section below.) ☐ Yes ☐ No

6. SAFETY/SECURITY E VG S M U N

(a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?

(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.).

(b) Contractor complied with all security requirements for the project and personnel security requirements. ☐ ☐ ☐ ☐ ☐ ☐

7. GENERAL E VG S M U N

(a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

(b) Compliance with contractual terms/provisions (If there were specific issues, please explain in the comments sections below ☐ ☐ ☐ ☐ ☐ ☐

(c) In summary, provide an overall rating for the work performed by this contractor. ☐ ☐ ☐ ☐ ☐ ☐

8. SUSTAINABILITY

Did this project include sustainable methods, materials, processes or certifications? (See Whole Building Design Guide for acceptable requirements. Link to guide WBDG Green Building Standards and Certification Systems.) (If yes, please explain in the comments section below.)

☐ Yes ☐ No

9. SUMMARY

Would you hire or work with this firm again? (If no, please explain in the comments section below.) ☐ Yes ☐ No

COMMENTS SECTION

Please provide additional information below, and attach additional pages if necessary.

Please provide responses to the above questions (if applicable) and/or additional remarks. Also please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

PBS Past Performance Questionnaire July 2014 http://www.wbdg.org/resources/gbs.php#rcas http://www.wbdg.org/resources/gbs.php#rcas