Past_3_Year_Pricing.csv
CSV file 2 KB Posted
- Attached to
- Electrical Services State and local contract opportunity
- Solicitation number
- 26035-RFP-MST
- Issued by
- Florida
About this file
This is a pricing history document related to an Electrical Services solicitation issued by Hillsborough County Public Schools (HCPS) in Florida. The file contains three years of historical pricing data for various labor rates, equipment rentals, and materials cost multipliers used in service delivery contracts. The services encompassed include commercial electrical work covering high-voltage systems, new installations, maintenance, repairs, electrical upgrades, circuit breaker installations, panel upgrades, troubleshooting, and diagnostics. The pricing data reflects standard labor rates, overtime rates, call-out fees, and equipment costs such as air compressors, demolition equipment, electric scissor lifts, light towers, and portable generators, establishing baseline pricing benchmarks for contractor proposals.
The historical pricing demonstrates year-over-year rate variations across three separate pricing periods. Standard labor rates ranged from $50.00 to $51.98 per hour, with overtime rates between $60.00 and $77.96 per hour, and call-out fees ranging from $89.60 to $120.00 per hour. Equipment rental costs included air compressors at $5.60 to $350.00, demolition equipment at $5.60 to $100.00, electric scissor lifts at $30.00 to $418.00, light towers at $16.80 to $350.00, and portable generators at $5.60 to $173.25. Materials and rental equipment costs were calculated as base cost plus markup percentages ranging from 5% to 15%. Two lump-sum electrical awards were priced at $1.00 each, indicating fixed-price components. This pricing structure establishes cost parameters for evaluating contractor proposals and managing service delivery expenses for HCPS' critical campus security and operational electrical needs.
Text of this file
,ItemNumber,VendorItem,UOM.UnitOfMeasure,ItemDescription,BaseCost,ItemType, ,3032546,"3032546 ",EA,AIR COMPRESSOR 185 CFM, $350.00 ,Itemmast, ,3032545,3032545,HR,CALL OUT FEE 1 WRKER 1HR LABOR, $120.00 ,Itemmast, ,3032547,3032547,EA,DEMOLITION HEAVY DUTY, $100.00 ,Itemmast, ,3032548,3032548,EA,"ELECTRIC SIZZOR LIFT 40""", $418.00 ,Itemmast, ,3032549,3032549,EA,"LIGHT TOWER 30"" DIESEL TOWABLE", $350.00 ,Itemmast, ,3032541,3032541,EA,MATERIALS COST+ 10%, $1.00 ,Itemmast, ,3032544,3032544,HR,OVERTIME LABOR RATE MON FRI, $60.00 ,Itemmast,
| ,3032550,"3032550 | ",EA,PORTABLE 600 WAT GAS GENERATOR, $100.00 ,Itemmast, |
| ,3032542,"3032542 | ",EA,RENTAL EQUIMENT COST+ 10%, $1.00 ,Itemmast, |
| ,3032543,"3032543 | ",HR,STANDARD LABOR RATE, $50.00 ,Itemmast, |
,3032308,3032308,EA,"ELECTRICAL, LUMP SUM AWARD", $1.00 ,Itemmast, ,3032307,3032307,EA,"ELECTRICAL, LUMP SUM AWARD", $1.00 ,Itemmast, ,3032542,3032542,EA,RENTAL EQUIMENT COST+ 10%, $1.00 ,Itemmast,
| ,3032556,"3032556 | ",EA,AIR COMPRESSOR 185 CFM, $5.60 ,Itemmast, |
| ,3032555,"3032555 | ",HR,CALL OUT FEE 1 WRKER 1HR LABOR, $89.60 ,Itemmast, |
| ,3032557,"3032557 | ",EA,DEMOLITION HEAVY DUTY, $5.60 ,Itemmast, |
| ,3032558,"3032558 | ",EA,"ELECTRIC SIZZOR LIFT 40""", $30.00 ,Itemmast, |
| ,3032559,"3032559 | ",EA,"LIGHT TOWER 30"" DIESEL TOWABLE", $16.80 ,Itemmast, |
| ,3032551,"3032551 | ",EA,MATERIALS COST+ 5%, $1.00 ,Itemmast, |
| ,3032554,"3032554 | ",HR,OVERTIME LABOR RATE MON FRI, $72.20 ,Itemmast, |
| ,3032560,"3032560 | ",EA,PORTABLE 600 WAT GAS GENERATOR, $5.60 ,Itemmast, |
| ,3032552,"3032552 | ",EA,RENTAL EQUIMENT COST+ 5%, $1.00 ,Itemmast, |
,3032553,3032553,HR,STANDARD LABOR RATE, $53.00 ,Itemmast, ,3032308,3032308,EA,"ELECTRICAL, LUMP SUM AWARD", $1.00 ,Itemmast, ,3329435,3329435,HR,STANDARD LABOR MON-FRI 6AM-6PM, $51.98 ,Itemmast, ,3329436,3329436,HR,OVERTIME LABOR MON-FRI, $77.96 ,Itemmast, ,3329438,3329438,EA,AIR COMPRESSOR 185 CFM, $173.96 ,Itemmast, ,3329439,3329439,EA,DEMOLITION HEAVY DUTY HAMMER, $86.63 ,Itemmast, ,3329440,3329440,EA,"ELECTRIC SIZZOR LIFT 40""", $231.00 ,Itemmast, ,3329441,3329441,EA,"LIGHT TOWER 30"" DIESEL TOWABLE", $288.75 ,Itemmast, ,3329442,3329442,EA,PORTABLE 600 WATT GAS GENERATR, $173.25 ,Itemmast, ,3329443,3329443,EA,MATERIALS COST + 15%, $1.00 ,Itemmast, ,3329444,3329444,EA,RENTAL EQUIMENT COST+ 15%, $1.00 ,Itemmast, ,3329437,3329437,HR,CALL OUT FEE 1 WRKER 1HR LABOR, $109.73 ,Itemmast,
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Addendum.pdf | ||
| Past_3_Year_Pricing.csv | CSV file | |
| 26035_Price_Sheet.xlsx | XLSX spreadsheet | |
| STATEMENT_OF_NO_BID.pdf | ||
| Vendor_Registration_Form_07.10.25.pdf | ||
| Vendor_Registration_Form_07.10.25.pdf | ||
| CONTRACTING_WITH_ENTITIES_OF_FOREIGN_COUNTRIES_OF_CONCERN_PROHIBITED_AFFIDAVIT.pdf | ||
| VENDOR_AFFIDAVIT_REGARDING_THE_USE_OF_COERCION_FOR_LABOR_AND_SERVICES.pdf | ||
| CONTRACTING_WITH_ENTITIES_OF_FOREIGN_COUNTRIES_OF_CONCERN_PROHIBITED_AFFIDAVIT.pdf | ||
| STATEMENT_OF_NO_BID.pdf | ||
| VENDOR_AFFIDAVIT_REGARDING_THE_USE_OF_COERCION_FOR_LABOR_AND_SERVICES.pdf | ||
| 26035-RFP-MST_Electrical_Services.pdf | ||
| 26035-RFP-MST_Electrical_Services.pdf | ||
| 26035_Price_Sheet.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .