PART 4 OF 5 - ITB 26-142-PW Signed Drawings.pdf
PDF 5 MB Posted
- Attached to
- 26-142-PW Hayden Bridge Lower Pond Improvements
- Solicitation number
- S-P00140-00018019
- Issued by
- Lane County, Oregon
About this file
This file contains signed engineering drawings for ITB 26-142-PW, a project managed by the Eugene Water & Electric Board (EWEB) in Eugene, Oregon. The drawings document the Hayden Bridge Filtration Plant Lower Pond Improvements project, which encompasses extensive infrastructure upgrades to the lower pond area. The drawing set includes seven sheets: a cover sheet and location map, legend and abbreviations documentation, a site plan, road and site fencing improvements plan, lower pond improvements plan, and two detailed specification sheets. All drawings are dated April 14, 2021, with revision approval dated September 16, 2026, and bear project number 2100969 and drawing designation D-38339-G1 through D-38339-C5. The drawings have been digitally signed and verified through DocuSign.
The signed drawings serve as the technical specifications and visual documentation for the construction work outlined in the invitation to bid. These plans detail the pipeline installations, overflow structure construction, access road upgrades, fencing improvements, hydrant installations, manhole construction, valve replacements, sludge removal, erosion control measures, and site restoration work required by EWEB for this project. The drawings were prepared by ESR Water Systems under the direction of Stickling and reviewed through EWEB's standard approval process, ensuring compliance with project requirements and local standards for the water utility infrastructure improvements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FUNC BY CHK APP
DES
DWN
EWEB WORK ORDER NO.
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
9/
/2
:3
AM
A
N D
ER
S
LO
VE
N D
AH
L
STD
STANDARDS CHECKEWEB
PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT 2" - SCALE ACCORDINGLY)
REV NO.
2100969
AS NOTED
04/14/21
D-38339-G1
STICKLING/RN
ESR
WATER SYSTEMS
HAYDEN BRIDGE FILTRATION PLANT
LOWER POND IMPROVEMENTS
COVER SHEET & LOCATION MAP
EUGENE WATER & ELECTRIC BOARD
EUGENE, OREGON
EWEB PROJECT 2100969
NORTH
NORTH
HAYDEN BRIDGE FILTRATION PLANT - LOWER POND IMPROVEMENTS
Docusign Envelope ID: 452786E2-A052-8C05-8142-F4BCF03B8EBE
DWN
EWEB WORK ORDER NO.
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
9/
/2
:3
AM
A
N D
ER
S
LO
VE
N D
AH
L
STD
STANDARDS CHECKEWEB
PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT 2" - SCALE ACCORDINGLY)
REV NO.
2100969
NONE
04/14/21
D-38339-G2
STICKLING/RN
ESR
WATER SYSTEMS
HAYDEN BRIDGE FILTRATION PLANT
LOWER POND IMPROVEMENTS
LEGEND, ABBREVIATIONS AND NOTES
₂
DIGITALLY SIGNED
DWN
EWEB WORK ORDER NO.
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB
PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT 2" - SCALE ACCORDINGLY)
REV NO.
2100969
AS NOTED
04/14/21
D-38339-C1
STICKLING
ESR
WATER SYSTEMS
HAYDEN BRIDGE FILTRATION PLANT
LOWER POND IMPROVEMENTS
SITE PLAN
NORTH
NORTH
DES
DWN
EWEB WORK ORDER NO.
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB
PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT 2" - SCALE ACCORDINGLY)
REV NO.
2100969
AS NOTED
04/14/21
D-38339-C2
STICKLING
ESR
WATER SYSTEMS
HAYDEN BRIDGE FILTRATION PLANT
LOWER POND IMPROVEMENTS
ROAD AND SITE FENCING
IMPROVEMENTS PLAN
DES
DWN
EWEB WORK ORDER NO.
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB
PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT 2" - SCALE ACCORDINGLY)
REV NO.
2100969
AS NOTED
04/14/21
D-38339-C3
STICKLING
ESR
WATER SYSTEMS
HAYDEN BRIDGE FILTRATION PLANT
LOWER POND IMPROVEMENTS
LOWER POND IMPROVEMENTS PLAN
DES
DWN
EWEB WORK ORDER NO.
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB
PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT 2" - SCALE ACCORDINGLY)
REV NO.
2100969
AS NOTED
04/14/21
D-38339-C4
STICKLING
ESR
WATER SYSTEMS
HAYDEN BRIDGE FILTRATION PLANT
LOWER POND IMPROVEMENTS
DETAILS - SHEET 1
DWN
EWEB WORK ORDER NO.
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
STD
STANDARDS CHECKEWEB
PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT 2" - SCALE ACCORDINGLY)
REV NO.
2100969
AS NOTED
04/14/21
D-38339-C5
STICKLING
ESR
WATER SYSTEMS
HAYDEN BRIDGE FILTRATION PLANT
LOWER POND IMPROVEMENTS
DETAILS - SHEET 2
| Sheets and Views |
| 38339-G1-D-38339-G1 |
| 38339-G2-D-38339-G2 |
| 38339-C1-38339-C1 |
| 38339-C1-38339-C2 |
| 38339-C1-38339-C3 |
| 38339-C1-38339-C4 |
| 38339-C1-38339-C5 |
| 2026-09-17T14:38:00-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .