PART 3 OF 5 - ITB 26-142-PW Standard Details.pdf

PDF 450 KB Posted

Attached to
26-142-PW Hayden Bridge Lower Pond Improvements
Solicitation number
S-P00140-00018019
Issued by
Lane County, Oregon

About this file

This document comprises Part 3 of 5 of the Invitation to Bid (ITB) 26-142-PW standard details for the Hayden Bridge Lower Pond Improvements project managed by Eugene Water & Electric Board (EWEB) in Oregon. The project encompasses extensive improvements to the lower pond area, including major pipeline installation, overflow structure construction, access road upgrades, fencing, sludge removal, and site restoration. Additional work includes installation of new hydrants, manhole construction, valve replacements, and associated erosion control and grading activities. The standard details section establishes technical specifications and construction requirements that bidders must follow in preparing their proposals and executing the work.

This portion of the ITB contains the technical specifications and construction details necessary for bidders to understand the scope of work and develop accurate cost estimates. The standard details establish quality standards, materials specifications, construction methodologies, and performance requirements for all components of the Hayden Bridge lower pond improvements project. Bidders are required to adhere to these specifications throughout the bidding process and subsequent construction phase.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N/A 25-JUL-2017

15"

GENERAL NOTES FOR ALL DETAILS:

R D

BOLLARDS

RD130

m in

"2

"8

"2

"8

Chain grade

Finish

(See details right)

Base assembly

Conc. footing

7" long schedule 40 steel drain pipe

1" I.D.

draining material

Granular free schedule 40 steel pipe

3" I.D.

(Color as reqd.)

" reflective tape2

"8

" steel cap plate

" dia.2 1"x34

Cap & hinge

Base plate

Pipe sleeve

Top plate

Cover plate

6" length

" grade 30 chain4

"8

Cap & hinge

"8 round or square

Concrete footing

1"

"8

Top plate

7. See project plans for details not shown.

6. Provide lock, if required.

5. Orient lock assembly parallel with pedestrian traffic.

4. All concrete shall be commercial grade concrete.

3. Hot-dip galvanize base assembly after fabrication.

2. Prime and paint bollard safety yellow after fabrication.

1. Grind all edges smooth.

"4 schedule 40 steel pipe

4" I.D.

dia. hole

"4 square plate

"2 1"x88

"8

"8

(Typ.)

" chamfer2 drain hole

" dia.4 square plate

"2 1"x88

"4 3 "4

" dia. hole4 of cap and hinge welded to underside

"x2" square plate8

Cover plate

"8

"8 m in

"8 steel cap plate

" dia.2 1"x34 grade

Finish

(Round or square)

15" drilled hole

" dia.2

Tack weldFRONT VIEW SIDE VIEW

SECTION A-A

PLAN

PLAN

SECTION B-B

FRONT VIEW SIDE VIEW

REMOVABLE

NON-REMOVABLE

TOP PLATE

PIPE SLEEVE

COVER PLATE

CAP & HINGE

hole in center

" dia.2 1corners and

" rad.4 1plate with

"x2" steel2 1"x14 welding hinge full surface heavy

"x2"4 square plate

"x5"8

"8 of cap and hinge welded to underside

"x2" square plate8

5" schedule 40 steel pipe

3" I.D.

(Color as reqd.)

" reflective tape2 dia. bar

"2 17"x

A A

BASE ASSEMBLY

BASE PLATE

B B steel plate

" dia.8 5"x48 r d .d g n

JU

L

The selection and use of this

Standard Drawing, while de-signed in accordance with generally accepted engineer-ing principles and practices, is the sole responsibility of the user and should not be used without consulting a

Registered Professional En-gineer.

CALC. BOOK NO. BASELINE REPORT DATE

the current Oregon Standard Specifications

All material and workmanship shall be in accordance withNOTE:

DATE REVISION DESCRIPTION

OREGON STANDARD DRAWINGS

Effective Date: December 1, 2017 - May 31, 2018

RD130
1
15
22
24

File details come from the government source that posted it. Updated .