Pages from 561-20-101 Bid Documents-3.pdf

PDF 18 MB Posted

Attached to
IFB 561-20-101 Upgrade Heating Distribution System Federal contract opportunity
Solicitation number
36C24225B0003-1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M-001

GENERAL MECHANICAL SYMBOLS & NOTES

F.R.O.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE HEATING SYSTEM

PHASE 1

561-20-101

03/07/2024Revisions: Date:

VA NEW JERSEY HEALTH CARE SYSTEM

K.J.M.

385 TREMONT AVE,

EAST ORANGE, NJ 07018

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

N/A

AutoCAD SHX Text

NOTE: NOT ALL SYMBOLS USED

AutoCAD SHX Text

NOTE: NOT ALL SYMBOLS USED

AutoCAD SHX Text

%%UGENERAL MECHANICAL

AutoCAD SHX Text GENERAL MECHANICAL PIPING WORK SCHEDULING/PHASING NOTES 1. ALL MEANS OF EGRESS SHALL BE MAINTAINED AND ACCESSIBLE. ICRA BARRIERS (IF ALL MEANS OF EGRESS SHALL BE MAINTAINED AND ACCESSIBLE. ICRA BARRIERS (IF REQUIRED), SHALL BE ERECTED AND TAKEN DOWN AS REQUIRED TO MEET THE VA SCHEDULING REQUIREMENTS. 2. ALL WORK REQUIRED WITHIN CORRIDORS SHALL BE PERFORMED TO MAINTAIN ALL WORK REQUIRED WITHIN CORRIDORS SHALL BE PERFORMED TO MAINTAIN ACCESSIBILITY THROUGH THE MEANS OF EGRESS IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND VA CONSTRUCTION POLICY AND PERFORMED OVERNIGHT AS DIRECTED BY VA. 3. WORK ON THE PATIENT TOILET/SHOWER ROOMS SHALL BE LIMITED TO A MAXIMUM WORK ON THE PATIENT TOILET/SHOWER ROOMS SHALL BE LIMITED TO A MAXIMUM OF (2)TOILET/SHOWERS ROOMS ON ANY GIVEN FLOOR AT A TIME. NO BATHROOM SHALL BE LEFT IN AN INOPERATIVE CONDITION OVER A WEEKEND. 4. WORK IN OFFICES AND EXAM ROOMS SHALL BE LIMITED TO (3) ROOMS AT A TIME WORK IN OFFICES AND EXAM ROOMS SHALL BE LIMITED TO (3) ROOMS AT A TIME UNLESS OTHERWISE NOTED. 5. CONTRACTOR SHALL COORDINATE CLOSELY WITH THE VA ON ANY PATIENT CONTRACTOR SHALL COORDINATE CLOSELY WITH THE VA ON ANY PATIENT RELOCATIONS FROM PROPOSED WORK AREA, PRIOR TO CONTRACTOR'S WORK IN PATIENT AREAS. 6. DENTAL AREA, OPERATION ROOM, AND SANITARY AND PHYTO-SANITARY (SPS) DENTAL AREA, OPERATION ROOM, AND SANITARY AND PHYTO-SANITARY (SPS) AREAS SHALL UNDERGO CONSTRUCTION SIMULTANEOUSLY. 7. ACCESS PANELS TO BE ADDED AS NECESSARY FOR AREAS OF WORK ABOVE HARD ACCESS PANELS TO BE ADDED AS NECESSARY FOR AREAS OF WORK ABOVE HARD CEILINGS. 8. ALL CEILING MOUNTED DEVICES ARE TO BE REMOVED FOR CONSTRUCTION AND ALL CEILING MOUNTED DEVICES ARE TO BE REMOVED FOR CONSTRUCTION AND REINSTALLED. ADDITIONAL COORDINATION AND EQUIPMENT VERIFICATION WILL BE COMPLETED TO VERIFY. IN CASE EXISTING EQUIPMENT IS DAMAGED, CONTRACTOR SHALL FURNISH AND INSTALL NEW EQUIPMENT TO MATCH EXISTING CONDITIONS NO ADDITIONAL COST TO THE VA. 9. CONTRACTOR SHALL PRESERVE AND STORE PATIENT LIFTS IN AREA COORDINATED CONTRACTOR SHALL PRESERVE AND STORE PATIENT LIFTS IN AREA COORDINATED WITH THE STATION WHILE WORK IS COMPLETED IN AFFECTED ROOMS. IF ANY LIFT SYSTEM IS DAMAGED IT WILL BE REPLACED AT NO ADDITIONAL COST TO THE VA. 10. THE SHUTDOWN OF ANY AREA MUST BE COORDINATED WITH THE VA PROJECT THE SHUTDOWN OF ANY AREA MUST BE COORDINATED WITH THE VA PROJECT COR AT LEAST TWO WEEKS PRIOR TO THE START OF WORK. 11. AFTER HOURS WORK IS DEFINED AS ANY WORK OUTSIDE OF THE NORMAL AFTER HOURS WORK IS DEFINED AS ANY WORK OUTSIDE OF THE NORMAL BUSINESS HOURS BETWEEN 6:00AM AND 6:00PM MONDAY THROUGH FRIDAY. WORK STARTED AT 6:00PM OR LATER MUST BE COMPLETED BY 6:00AM.

AutoCAD SHX Text MECHANICAL PIPING GENERAL DEMOLITION NOTES 1. REMOVE ALL EQUIPMENT, PIPING, INSULATION, HANGERS, CONTROLS, PADS, AND REMOVE ALL EQUIPMENT, PIPING, INSULATION, HANGERS, CONTROLS, PADS, AND SUPPORTS UNLESS OTHERWISE INDICATED TO REMAIN. PIPING REMOVED FROM THE EXISTING MECHANICAL PIPING SYSTEM SHALL NOT BE USED IN THE INSTALLATION OF THE NEW SYSTEM. 2. DEMOLITION INCLUDES, BUT IS NOT LIMITED TO, REMOVAL AND LEGAL DISPOSAL OF DEMOLITION INCLUDES, BUT IS NOT LIMITED TO, REMOVAL AND LEGAL DISPOSAL OF EQUIPMENT AND SYSTEMS MADE OBSOLETE AND/OR REPLACED BY NEW WORK. DEMOLITION INCLUDES RELOCATION OR REINSTALLATION, DISCONNECTIONS AND RECONNECTIONS OF SERVICES, SUPPORTS, AND SUBSEQUENT FINAL SUPPORTS, TEMPORARY CAPPING, AND REROUTING OF TEMPORARY SERVICES TO PERMIT NEW OR RENOVATION WORK TO PROCEED. 3. THE DEMOLITION WORK INDICATED ON THE DRAWING IS INTENDED TO ASSIST THE THE DEMOLITION WORK INDICATED ON THE DRAWING IS INTENDED TO ASSIST THE CONTRACTOR AND GIVE GENERAL INFORMATION. NOT ALL DEMOLITION OR TEMPORARY CONNECTIONS ARE SHOWN. PRIOR TO SUBMITTING BID, THE CONTRACTOR SHALL VISIT THE PROJECT SITE AND REVIEW EXISTING CONDITIONS. PRIME CONTRACTOR IS RESPONSIBLE TO DETERMINE THE FULL EXTENT OF DEMOLITION, FOR ALL TRADES, AND INCLUDE ALL REQUIRED DEMOLITION WORK, FOR ALL TRADES, IN HIS BID, WHETHER OR NOT SPECIFICALLY SHOWN ON DRAWINGS. NO ADDITIONAL COST WILL BE GRANTED FOR DEMOLITION. LEGALLY DISPOSE OF ALL ITEMS AND MATERIALS, EXCEPT ANY ITEMS SPECIFICALLY DESIGNATED BY THE VA TO BE SALVAGED. REMOVE AND PLACE THE DESIGNATED SALVAGED EQUIPMENT IN A LOCATION DIRECTED BY THE VA AT NO ADDITIONAL EXPENSE. 4. CONTRACTOR IS RESPONSIBLE FOR CUTTING AND PATCHING. THE CONTRACTOR SHALL CONTRACTOR IS RESPONSIBLE FOR CUTTING AND PATCHING. THE CONTRACTOR SHALL CUT AND PATCH THE EXISTING WALLS TO MATCH EXISTING FINISH AND FIRE RATING. CONTRACTOR SHALL REMOVE/REPLACE EXISTING CEILING TILES AND GRID AS REQUIRED TO ACCOMPLISH INDICATED MECHANICAL PIPING WORK, UNLESS SPECIFICALLY INDICATED OTHERWISE. 5. CONTRACTOR SHALL COORDINATE ALL DEMOLITION AND NEW WORK WITH THE PHASING CONTRACTOR SHALL COORDINATE ALL DEMOLITION AND NEW WORK WITH THE PHASING AS OUTLINED IN DRAWINGS AND SPECIFICATIONS. THE CONTRACTOR SHALL PROVIDE LABOR AND MATERIALS AS REQUIRED TO MAINTAIN CONTINUED OPERATION OF THE MECHANICAL PIPING SYSTEM THROUGH THE PHASES OF WORK AS INDICATED IN THE CONTRACT DOCUMENTS. 6. BEFORE COMMENCING ANY DEMOLITION ACTIVITIES, CONTRACTOR SHALL THOROUGHLY INVESTIGATE THE SITE, THE PIPING/EQUIPMENT AND SYSTEM BEING DEMOLISHED, AND ALL OTHER SYSTEMS AND EQUIPMENT TO REMAIN IN OPERATION. CONTRACTOR SHALL ENSURE THAT NO SYSTEM NOR ELEMENT THEREOF IS DAMAGED, SHUTDOWN, OR OTHERWISE ADVERSELY AFFECTED BY THE DEMOLITION ACTIVITIES. CONTRACTOR SHALL NOT CUT ANY LIVE PIPE. SHOULD A LIVE PIPE BE CUT, THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR ALL CLEAN-UP, REPAIRS, RESTORATION, EQUIPMENT REPLACEMENT, AND ANY/ALL COSTS ASSOCIATED WITH THE CUTTING OF THE LIVE PIPE.

AutoCAD SHX Text GENERAL MECHANICAL PIPING NOTES 1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL PIPING SYSTEM AS INDICATED ON THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE. 2. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATIVE OF WORK TO BE THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND INDICATIVE OF WORK TO BE PERFORMED. THE DRAWINGS ARE NOT INTENDED TO SHOW EVERY PIPE, FITTING, VALVE OR APPURTENANCE REQUIRED FOR A COMPLETE INSTALLATION. DO NOT SCALE LOCATION DIMENSIONS FROM THESE DRAWINGS. DRAWINGS ARE NOT TO BE SCALED FOR THE ACCURATE CUTTING OF PIPE OR ITS EXACT LOCATION. BEFORE ANY PIPING IS INSTALLED, CONFER WITH ALL OTHER CONTRACTORS IN ORDER TO ESTABLISH THE LOCATION OF THEIR PIPING, CONDUIT, DUCTWORK, GRILLES, FOUNDATIONS, STRUCTURAL STEEL, LIGHTING FIXTURES AND OTHER EQUIPMENT SO AS TO AVOID INTERFERENCE. FAILURE TO COORDINATE SHALL NOT RESULT IN ANY ADDITIONAL EXPENSE TO THE OWNER. 3. THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND MAY NOT BE REPRESENTATIVE THE DRAWINGS ARE GENERALLY DIAGRAMMATIC AND MAY NOT BE REPRESENTATIVE OF ALL APPURTENANCES REQUIRED FOR PROPER INSTALLATION OF ASSOCIATED EQUIPMENT. CONTRACTOR SHALL ENSURE THAT ALL REQUIRED PIPING, FITTINGS, VALVES, AND ASSOCIATED APPURTENANCES ARE PROVIDED AND INSTALLED WITH ALL DETAILS ASSOCIATED WITH EQUIPMENT INSTALLATIONS AND MANUFACTURERS RECOMMENDED INSTALLATION INSTRUCTIONS. 4. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL CONDITIONS THE CONTRACTOR IS RESPONSIBLE FOR CHECKING AND VERIFYING ALL CONDITIONS AND DIMENSIONS AND FOR COORDINATION OF THEIR WORK WITH THAT OF ALL OTHER TRADES. PERFORM WORK IN A NEAT, ORDERLY MANNER AND WITH THE LEAST POSSIBLE INTERFERENCES. 5. THE CONTRACTOR SHALL PROVIDE SENSORS, CONTROLLERS, WIRING, ETC. THE CONTRACTOR SHALL PROVIDE SENSORS, CONTROLLERS, WIRING, ETC. NECESSARY TO INTEGRATE MONITORING POINTS WITH THE FACILITY BUILDING MANAGEMENT SYSTEM (SEE SPECIFICATIONS AND DRAWINGS). 6. CONTRACTOR SHALL PROTECT THE MECHANICAL PIPING FROM STRESS AND STRAIN. CONTRACTOR SHALL PROTECT THE MECHANICAL PIPING FROM STRESS AND STRAIN. 7. ALL MATERIALS, EQUIPMENT AND DEVICES SHALL, AS A MINIMUM, MEET THE ALL MATERIALS, EQUIPMENT AND DEVICES SHALL, AS A MINIMUM, MEET THE REQUIREMENTS OF UL WHERE UL REQUIREMENTS ARE ESTABLISHED FOR THOSE ITEMS. ALL ITEMS SHALL BE CLASSIFIED BY UL AS SUITABLE FOR THE PURPOSE OF THE CODE. 8. WHERE PIPES PENETRATE FIRE RATED OR SMOKE RATED BARRIERS (WALLS, FLOORS WHERE PIPES PENETRATE FIRE RATED OR SMOKE RATED BARRIERS (WALLS, FLOORS AND CEILINGS). SEAL PENETRATIONS IN ACCORDANCE WITH NFPA 90A WITH UL LISTED FIRE STOPPING SYSTEM. UTILIZE HILTI FIRESTOPPING PRODUCTS PER VA REQUIREMENTS. 9. REFER TO SCHEMATIC DIAGRAMS FOR ALL PIPE SIZES AND PIPING LOCATIONS NOT REFER TO SCHEMATIC DIAGRAMS FOR ALL PIPE SIZES AND PIPING LOCATIONS NOT SHOWN ON THE PLANS UNLESS NOTED OTHERWISE ON THE DRAWINGS. 10. COORDINATE LOCATION OF PIPING ABOVE CEILING WITH ELECTRICAL PANELS BY COORDINATE LOCATION OF PIPING ABOVE CEILING WITH ELECTRICAL PANELS BY CONTRACTOR. DO NOT INSTALL PIPING IN DEDICATED SPACE FOR ELECTRIC PANEL. 11. ALL EQUIPMENT AND MATERIALS INCORPORATED IN THIS WORK SHALL BE NEW ALL EQUIPMENT AND MATERIALS INCORPORATED IN THIS WORK SHALL BE NEW UNLESS NOTED OTHERWISE AND SHALL BE CURRENT PRODUCTS BY MANUFACTURERS REGULARLY ENGAGED IN THE PRODUCTION OF SUCH PRODUCTS. 12. ALL FACTORY APPLIED COATINGS AND FINISHES SHALL BE PROVIDED WITHOUT RUST, ALL FACTORY APPLIED COATINGS AND FINISHES SHALL BE PROVIDED WITHOUT RUST, SCRATCHES OR DENTS. 13. PROVIDE VA COR WITH CERTIFICATES OF FINAL INSPECTION AND ACCEPTANCE FROM PROVIDE VA COR WITH CERTIFICATES OF FINAL INSPECTION AND ACCEPTANCE FROM THE AUTHORITY HAVING JURISDICTION. 14. CONTRACTOR SHALL REPLACE ALL CEILING TILES AND SPRINKLER HEADS THAT HAVE CONTRACTOR SHALL REPLACE ALL CEILING TILES AND SPRINKLER HEADS THAT HAVE BEEN REMOVED TO PERFORM ASSOCIATED WORK AT THE END OF EACH WORKDAY. THIS IS ESSENTIAL FOR THE PROPER PERFORMANCE OF THE AUTOMATIC SPRINKLER SYSTEM. 15. THE CONTRACTOR SHALL NOT CORE DRILL THROUGH ANY FLOOR PRIOR TO THE CONTRACTOR SHALL NOT CORE DRILL THROUGH ANY FLOOR PRIOR TO PERFORMING A (NON-RADIOACTIVE SOURCE) SCAN ON THE FLOOR. THE FLOORS HAVE LIVE ELECTRICAL CAST INTO THE FLOOR AND THE DRAWINGS DO NOT REFLECT THE LOCATIONS. PROVIDE SUBMITTAL OF SOURCE TO SCAN FLOOR TO VA COR FOR APPROVAL FOR ALL ASSOCIATED AREAS OF WORK. COORDINATE WITH VA COR FOR ALL FLOOR SCANS. IN ADDITION, SOME FLOORS HAVE HAZARDOUS MATERIALS IN THE FLOOR (ASBESTOS) AND WILL REQUIRE ASBESTOS AIR MONITORING TO DRILL THROUGH THE FLOOR. COORDINATION REQUIREMENTS 1. COORDINATE LOCATIONS AND INSTALLATION OF MECHANICAL PIPING WORK TO AVOID COORDINATE LOCATIONS AND INSTALLATION OF MECHANICAL PIPING WORK TO AVOID CONFLICTS AND INTERFERENCES, MODIFICATIONS DUE TO FIELD CONDITIONS SHALL BE COMPLETELY RESOLVED BY CONTRACTOR IN ACCORDANCE WITH RECOMMENDATIONS OF THE VA. 2. THERE MAY BE PERMIT REQUIRED CONFINED SPACES LOCATED THROUGHOUT THE THERE MAY BE PERMIT REQUIRED CONFINED SPACES LOCATED THROUGHOUT THE PROJECT BUILDINGS WHERE CONTRACT WORK SHALL BE PERFORMED. CONTRACTOR SHALL VISIT THE SITE AND FULLY INFORM HIMSELF OF ANY LOCATIONS OF PERMIT REQUIRED CONFINED SPACES FOUND AND THE WORK REQUIRED THEREIN. CONTRACTOR SHALL PROVIDE COPIES OF CONFINED SPACE TRAINING AND ACCESS PLAN TO COR FOR APPROVAL AT LEAST 21 DAYS IN ADVANCE OF ENTRY. 3. IF A CONTRACTOR WILL HAVE PERSONNEL WORKING AT HEIGHTS AND/OR EXPOSED IF A CONTRACTOR WILL HAVE PERSONNEL WORKING AT HEIGHTS AND/OR EXPOSED TO FALL HAZARDS, A FALL PROTECTION AND PREVENTION PLAN SHALL BE DEVELOPED AND SUBMITTED TO PUBLIC SAFETY FOR REVIEW AND APPROVAL. THIS PLAN MAY BE DEVELOPED BY EITHER A COMPETENT PERSON TRAINER OR A QUALIFIED PERSON TRAINER (SEE ANSI/ASSE Z359.2). IF THE PLAN INCLUDES FALL PROTECTION COMPONENTS OR SYSTEMS REQUIRING DIRECTION, SUPERVISION, DESIGN CALCULATIONS, OR DRAWINGS BY A CP OR QP, THE NAME, QUALIFICATIONS, AND RESPONSIBILITIES OF THE CP OR QP SHALL BE ADDRESSED. IT SHALL DESCRIBE, IN DETAIL, THE SPECIFIC PRACTICES, EQUIPMENT, AND CONTROL METHODS USED TO PROTECT WORKERS FROM FALLING TO LOWER LEVELS. MECHANICAL PIPING INSTALLATION REQUIREMENTS 1. INSTALL ALL EQUIPMENT AND MATERIAL IN ACCORDANCE WITH MANUFACTURER INSTALL ALL EQUIPMENT AND MATERIAL IN ACCORDANCE WITH MANUFACTURER PRINTED INSTALLATION INSTRUCTIONS AND RECOMMENDATIONS. MAINTAIN CLEARANCES FOR ACCESS TO MAINTAIN AND SERVICE EQUIPMENT, VALVES AND CONTROLS. 2. ALL WORK SHALL BE PERFORMED IN A NEAT, WORKMANLIKE MANNER SO AS NOT ALL WORK SHALL BE PERFORMED IN A NEAT, WORKMANLIKE MANNER SO AS NOT TO DAMAGE ANY SURFACES, EQUIPMENT OR MATERIALS. 3. ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED IN AN APPROVED MANNER ALL EQUIPMENT AND PIPING SHALL BE SUPPORTED IN AN APPROVED MANNER FROM THE BUILDING STRUCTURE AND INCLUDE HANGERS AND RESTRAINTS IN ACCORDANCE WITH ALL APPLICABLE CODES. 4. PROVIDE PIPE ESCUTCHEONS AT ALL EXPOSED PENETRATIONS OF FLOORS, WALLS PROVIDE PIPE ESCUTCHEONS AT ALL EXPOSED PENETRATIONS OF FLOORS, WALLS AND CEILINGS. 5. THE MANUFACTURERS AND MODEL NUMBERS LISTED ON THE SCHEDULES AND THE MANUFACTURERS AND MODEL NUMBERS LISTED ON THE SCHEDULES AND DETAILS ARE THE BASIS OF DESIGN FOR THIS PROJECT. THIS INFORMATION IS PROVIDED FOR REFERENCE PURPOSE ONLY AND IS NOT INTENDED TO PRECLUDE SUBMITTAL OF OTHER MANUFACTURERS OF EQUAL QUALITY SUBJECT TO APPROVAL BY THE VA PROJECT ENGINEER.

AutoCAD SHX Text

6. RUNOUTS TO EQUIPMENT SHALL BE SIZED AS INDICATED AND INCREASED OR RUNOUTS TO EQUIPMENT SHALL BE SIZED AS INDICATED AND INCREASED OR REDUCED AT POINT OF FINAL CONNECTION TO EQUIPMENT. 7. ALL SYSTEMS SHALL BE TESTED FOR PROPER OPERATION IN ACCORDANCE WITH ALL SYSTEMS SHALL BE TESTED FOR PROPER OPERATION IN ACCORDANCE WITH APPLICABLE CODE OR REGULATION. 8. CONTRACTOR SHALL SEAL ALL PIPE PENETRATIONS THROUGH WALL, FLOORS AND CONTRACTOR SHALL SEAL ALL PIPE PENETRATIONS THROUGH WALL, FLOORS AND WATERTIGHT. SEAL ALL PIPE PENETRATION THROUGH FIRE-RATED PARTITIONS WITH UL RATED FIRE RETARDANT CAULKING COMPOUND. FIRESTOPPING SHALL BE AS MANUFACTURED BY HILTI PRODUCTS. (SEE FIRESTOPPING NOTES IN GENERAL PLUMBING NOTES) 9. ALL STEAM STRAINERS, REGARDLESS OF SYMBOLS OR DIAGRAMMATIC DEPICTIONS, ALL STEAM STRAINERS, REGARDLESS OF SYMBOLS OR DIAGRAMMATIC DEPICTIONS, SHALL BE INSTALLED IN THE HORIZONTAL POSITION TO PREVENT THE ACCUMULATION OF STEAM CONDENSATE AND REDUCTION IN STEAM FLOW AREA. 10. ALL HIGH PRESSURE STEAM MAIN STOP-VALVES SHALL BE PROVIDED IN THE ALL HIGH PRESSURE STEAM MAIN STOP-VALVES SHALL BE PROVIDED IN THE DOUBLE-BLOCK AND BLEED CONFIGURATION, EITHER AS THREE VALVES FIELD ASSEMBLY OR AS A SINGLE FACTORY ASSEMBLY TO SERVE THE SAME FUNCTION.

AutoCAD SHX Text

%%UPIPING SYMBOLS

AutoCAD SHX Text

BALL VALVE

AutoCAD SHX Text

CHECK VALVE

AutoCAD SHX Text

ANGLE GLOBE VALVE

AutoCAD SHX Text

BUTTERFLY VALVE

AutoCAD SHX Text

MODULATING CONTROL VALVE

AutoCAD SHX Text

TWO POSITION CONTROL VALVE

AutoCAD SHX Text

THREE-WAY MODULATING CONTROL VALVE

AutoCAD SHX Text

AUTOMATIC BALANCING CONTROL VALVE

AutoCAD SHX Text

PRESSURE SAFETY VALVE

AutoCAD SHX Text

PRESSURE REGULATING VALVE

AutoCAD SHX Text

THREE-WAY TWO POSITION CONTROL VALVE

AutoCAD SHX Text

FLEXIBLE CONNECTION

AutoCAD SHX Text

WATER BALANCE DEVICE

AutoCAD SHX Text

MODULATING CONTROL BUTTERFLY VALVE

AutoCAD SHX Text

CIRCUIT SETTER VALVE

AutoCAD SHX Text

GATE VALVE WITH GLOBE-VALVED BYPASS

AutoCAD SHX Text

PLUG VALVE

AutoCAD SHX Text

CONTROL VALVE (CV) - FLOAT-OPERATED

AutoCAD SHX Text

PRESSURE REDUCING VALVE (PRV)

AutoCAD SHX Text

WATER LEVEL CONTROLLER

AutoCAD SHX Text

LC

AutoCAD SHX Text

FLOW METER

AutoCAD SHX Text M

AutoCAD SHX Text

WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE HOSE CONNECTOR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SIDE CONNECTION

AutoCAD SHX Text BOTTOM CONNECTION, 45%%d OR 90%%d

AutoCAD SHX Text TOP CONNECTION, 45%%d OR 90%%d

AutoCAD SHX Text

CHANGE OF ELEVATION ON PIPE

AutoCAD SHX Text

CAPPED OUTLET

AutoCAD SHX Text

PRESSURE GAGE

AutoCAD SHX Text

THERMOMETER

AutoCAD SHX Text

STRAINER

AutoCAD SHX Text

AutoCAD SHX Text

PIPE RISES TO NEXT FLOOR

AutoCAD SHX Text

PIPE DROPS

AutoCAD SHX Text

CAP OR PLUG

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

PIPE RISES AND DROPS TO NEXT FLOORS

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

PRS

AutoCAD SHX Text

PRESSURE REDUCING STATION

AutoCAD SHX Text

PIPE REDUCER

AutoCAD SHX Text

GATE VALVE

AutoCAD SHX Text

PIPE ANCHOR

AutoCAD SHX Text

STEAM TRAP

AutoCAD SHX Text

DIRECTION OF FLOW

AutoCAD SHX Text

PUMP

AutoCAD SHX Text

VALVE ON PIPE DROP

AutoCAD SHX Text

VALVE ON RISE

AutoCAD SHX Text

%%UMECHANICAL PIPING

AutoCAD SHX Text

CHILLED WATER RETURN

AutoCAD SHX Text

CHILLED WATER SUPPLY

AutoCAD SHX Text

SANITARY PIPING

AutoCAD SHX Text

HEATING HOT WATER SUPPLY

AutoCAD SHX Text

LOW PRESSURE STEAM PIPING

AutoCAD SHX Text

MEDIUM PRESSURE STEAM PIPING

AutoCAD SHX Text

HIGH PRESSURE STEAM PIPING

AutoCAD SHX Text

LOW PRESSURE CONDENSATE PIPING

AutoCAD SHX Text

MEDIUM PRESSURE CONDENSATE PIPING

AutoCAD SHX Text

HIGH PRESSURE CONDENSATE PIPING

AutoCAD SHX Text

ATMOSPHERIC VENT

AutoCAD SHX Text

FEEDWATER PUMP DISCHARGE

AutoCAD SHX Text

CHEMICAL FEED

AutoCAD SHX Text

VENT PIPING

AutoCAD SHX Text

HEATING HOT WATER RETURN

AutoCAD SHX Text

PUMPED CONDENSATE PIPING

AutoCAD SHX Text

EXHAUST DUCT (UP & DOWN)

AutoCAD SHX Text

SUPPLY DUCT (UP & DOWN)

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

DN

AutoCAD SHX Text

EXISTING DUCT TO REMAIN

AutoCAD SHX Text

EXHAUST LOUVER

AutoCAD SHX Text

EXISTING DUCT TO BE REMOVED

AutoCAD SHX Text

DUCTWORK SYMBOLS

AutoCAD SHX Text

RADIUS 90%%D ELBOW

AutoCAD SHX Text

CEILING SUPPLY DIFFUSER

AutoCAD SHX Text

STANDARD 90° ELBOW

AutoCAD SHX Text

DIRECTION OF AIR FLOW

AutoCAD SHX Text

WALL DIFFUSER

AutoCAD SHX Text

WALL DIFFUSER DIRECTION OF AIR FLOW

AutoCAD SHX Text

EXISTING FINNED TUBE RADIATOR

AutoCAD SHX Text

MECHANICAL SYMBOLS

AutoCAD SHX Text X

AutoCAD SHX Text

X-XX

AutoCAD SHX Text

X-XX

AutoCAD SHX Text X

AutoCAD SHX Text

DETAIL NUMBER

AutoCAD SHX Text

DRAWING NUMBER WHERE SHOWN

AutoCAD SHX Text

SECTION LETTER

AutoCAD SHX Text

DRAWING NUMBER WHERE DRAWN

AutoCAD SHX Text

DRAWING SYMBOLS

AutoCAD SHX Text

EQUIPMENT TAG REFER TO SCHEDULES

AutoCAD SHX Text

XX

AutoCAD SHX Text

XX

AutoCAD SHX Text

LIMIT OF DEMOLITION

AutoCAD SHX Text

POINT OF CONNECTION BETWEEN NEW

AutoCAD SHX Text

AND EXISTING WORK

AutoCAD SHX Text

XX

AutoCAD SHX Text

XXX

AutoCAD SHX Text

DIFFUSER TAG

AutoCAD SHX Text

DIFFUSER TYPE

AutoCAD SHX Text

CFM

AutoCAD SHX Text

(CUBIC FEET PER MINUTE)

AutoCAD SHX Text

SD = SUPPLY DIFFUSER

AutoCAD SHX Text

RD = RETURN DIFFUSER

AutoCAD SHX Text

SG = SUPPLY GRILLE

AutoCAD SHX Text

RG = RETURN GRILLE

AutoCAD SHX Text

ED = EXHAUST DIFFUSER

AutoCAD SHX Text

EG = EXHAUST GRILLE

AutoCAD SHX Text

DIFFUSER ABBREVIATIONS

AutoCAD SHX Text

DIRECTION OF AIRFLOW

AutoCAD SHX Text

30 MIN SMOKE BARRIER

AutoCAD SHX Text

1 HOUR SMOKE BARRIER

AutoCAD SHX Text

1 HOUR FIRE BARRIER

AutoCAD SHX Text

2 HOUR FIRE BARRIER

AutoCAD SHX Text

FIRE/SMOKE BARRIER LINETYPES

AutoCAD SHX Text

EQUIPMENT ABBREVIATIONS

AutoCAD SHX Text

HWP = HOT WATER PUMP = HOT WATER PUMP= HOT WATER PUMP

AutoCAD SHX Text

ST = STEAM TRAP

AutoCAD SHX Text

SPRV = STEAM PRESSURE REDUCING VALVE

AutoCAD SHX Text

TU = TERMINAL UNIT = TERMINAL UNIT= TERMINAL UNIT

AutoCAD SHX Text

HX = HEAT EXCHANGER = HEAT EXCHANGER= HEAT EXCHANGER

AutoCAD SHX Text

FT = FINNED TUBE RADIATOR = FINNED TUBE RADIATOR= FINNED TUBE RADIATOR

AutoCAD SHX Text

FL = FLASH TANK = FLASH TANK= FLASH TANK

AutoCAD SHX Text

FCU = FAN COIL UNIT

AutoCAD SHX Text

ET = EXPANSION TANK = EXPANSION TANK= EXPANSION TANK

AutoCAD SHX Text

CV = CV TERMINAL UNIT

AutoCAD SHX Text

CP = CONDENSATE PUMP = CONDENSATE PUMP= CONDENSATE PUMP

AutoCAD SHX Text

AS = AIR SEPARATOR

AutoCAD SHX Text

AHU = AIR HANDLING UNIT

AutoCAD SHX Text

V = VAV TERMINAL UNIT = VAV TERMINAL UNIT= VAV TERMINAL UNIT

AutoCAD SHX Text

DTM

AutoCAD SHX Text

DUCT TRAVERSE MEASUREMENT

AutoCAD SHX Text

PIPE TRAVERSE MEASUREMENT

AutoCAD SHX Text

PTM

AutoCAD SHX Text T

AutoCAD SHX Text

THERMOSTAT

AutoCAD SHX Text

DRAIN PIPING

AutoCAD SHX Text

SLOT DIFFUSER

AutoCAD SHX Text

FLOOR DRAIN

AutoCAD SHX Text

DEMOLITION

AutoCAD SHX Text

EXISTING

AutoCAD SHX Text

NEW WORK

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

CEILING EXHAUST DIFFUSER

AutoCAD SHX Text

WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)

AutoCAD SHX Text

NEW FINNED TUBE RADIATOR

AutoCAD SHX Text

DAMPER

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text

MECHANICAL CONTROLS SYMBOLS

AutoCAD SHX Text

24V TRANSFORMER

M-002

GENERAL MECHANICAL ABBREVIATIONS

F.R.O.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE HEATING SYSTEM

PHASE 1

561-20-101

03/07/2024Revisions: Date:

VA NEW JERSEY HEALTH CARE SYSTEM

K.J.M.

385 TREMONT AVE,

EAST ORANGE, NJ 07018

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

N/A

AutoCAD SHX Text UC UNDER CUT UNDER CUT UC UNIT COOLER UNIT COOLER UH UNIT HEATER UNIT HEATER U UNDERWRITERS LABORATORY UNDERWRITERS LABORATORY URV UPBLAST UNIT VENTILATOR UPBLAST UNIT VENTILATOR V VALVE VALVE VAF VANE-AXIAL FAN VANE-AXIAL FAN VAV VARIABLE AIR VOLUME VARIABLE AIR VOLUME VD VOLUME DAMPER (MANUAL OPPOSED VOLUME DAMPER (MANUAL OPPOSED BLADE) VFD VARIABLE FREQUENCY DRIVE VARIABLE FREQUENCY DRIVE VHA VETERANS HEALTH ADMINISTRATION VETERANS HEALTH ADMINISTRATION VI VIBRATION ISOLATOR VIBRATION ISOLATOR VP VACUUM PUMP VACUUM PUMP VPS VARIABLE PRIMARY SYSTEM VARIABLE PRIMARY SYSTEM VR VACUUM (STEAM CONDENSATE) RETURN VACUUM (STEAM CONDENSATE) RETURN VSD VARIABLE SPEED DRIVE VARIABLE SPEED DRIVE VUH VERTICAL UNIT HEATER VERTICAL UNIT HEATER W WATTS WATTS WAG WASTE ANETHESIA GAS WASTE ANETHESIA GAS Wb WET-BULB (TEMPERATURE) WET-BULB (TEMPERATURE) WC WATER COOLED WATER COOLED WCCH WATER COOLED CHILLER WATER COOLED CHILLER WCCU WATER COOLED CONDENSING UNIT WATER COOLED CONDENSING UNIT WCHP WATER COOLED HEAT PUMPS WATER COOLED HEAT PUMPS WCPU WATER COOLED PACKAGED UNIT WATER COOLED PACKAGED UNIT WEF WALL EXHAUST FAN WALL EXHAUST FAN WF WATER FILTER WATER FILTER WFCV WATER FLOW CONTROL VALVE WATER FLOW CONTROL VALVE WFM WATER FLOWMETER WATER FLOWMETER WFMD WATER FLOW MEASURING DEVICE WATER FLOW MEASURING DEVICE WG WATER GAGE WATER GAGE WPD WATER SIDE PRESSURE DROP WATER SIDE PRESSURE DROP YR YEARYEAR

AutoCAD SHX Text A/E ARCHITECT / ENGINEER ARCHITECT / ENGINEER AAHX AIR TO AIR HEAT EXCHANGER AIR TO AIR HEAT EXCHANGER AAV AUTOMATIC AIR VENT AUTOMATIC AIR VENT AB AIR BLENDER AIR BLENDER ACC AIR COOLED CONDENSER AIR COOLED CONDENSER ACCH AIR COOLED CHILLER AIR COOLED CHILLER ACCU AIR COOLED CONDENSING UNIT AIR COOLED CONDENSING UNIT ACD AUTOMATIC CONTROL DAMPER, MODULATING AUTOMATIC CONTROL DAMPER, MODULATING MODULATING ACD-TP AUTOMATIC CONTROL DAMPER,TWO POSITION AUTOMATIC CONTROL DAMPER,TWO POSITION ACU AIR CONDITIONING UNIT AIR CONDITIONING UNIT AD ACCESS DOOR ACCESS DOOR AF AFTER FILTER AFTER FILTER AFCV AIR FLOW CONTROL VALVE AIR FLOW CONTROL VALVE AFF ABOVE FINISHED FLOOR ABOVE FINISHED FLOOR AFMS AIR FLOW MEASURING STATION AIR FLOW MEASURING STATION AFW AIR FOIL WHEEL (FAN) AIR FOIL WHEEL (FAN) AHU AIR-HANDLING UNIT AIR-HANDLING UNIT AMP AMPERE AMPERE AP ACCESS PANEL ACCESS PANEL APD AIR PRESSURE DROP AIR PRESSURE DROP AQST AQUASTAT AQUASTAT ARI AIR CONDITIONING AND REFRIGERATION INSTITUTE AIR CONDITIONING AND REFRIGERATION INSTITUTE AS AIR SEPARATOR AIR SEPARATOR ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING ENGINEERS ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS AMERICAN SOCIETY OF MECHANICAL ENGINEERS ATV ATMOSPHERIC VENT ATMOSPHERIC VENT AW AIR WASHER AIR WASHER AXF AXIAL FLOW AXIAL FLOW B BOILER BOILER B-AAC BACNET ADVANCED APPLICATION CONTROLLER BACNET ADVANCED APPLICATION CONTROLLER B-ASC BACNET APPLICATION SPECIFIC CONTROLLER BACNET APPLICATION SPECIFIC CONTROLLER B-AWC BACNET ADVANCED WORKSTATION BACNET ADVANCED WORKSTATION B-BC BACNET BUILDING CONTROLLER BACNET BUILDING CONTROLLER BD BUTTERFLY DAMPER BUTTERFLY DAMPER BDD BACKDRAFT DAMPER BACKDRAFT DAMPER BDR BASE BOARD RADIATOR BASE BOARD RADIATOR BFP BACKFLOW PREVENTER BACKFLOW PREVENTER BFT BOILER PLANT FIRE TUBE BOILER PLANT FIRE TUBE BG BOTTOM GRILLE BOTTOM GRILLE BHP BRAKE HORSEPOWER BRAKE HORSEPOWER BHW HOT WATER HEATING BOILER HOT WATER HEATING BOILER BHX BOILER BLOWDOWN HEAT EXCHANGER BOILER BLOWDOWN HEAT EXCHANGER BIW BACKWARD INCLINED WHEEL (FAN) BACKWARD INCLINED WHEEL (FAN) BMT BONE MARROW TRANSPLANT BONE MARROW TRANSPLANT BR BOTTOM REGISTER BOTTOM REGISTER BSC BIOLOGICAL SAFETY CABINETS BIOLOGICAL SAFETY CABINETS BT BLOWOFF TANK BLOWOFF TANK BTC BLOWOFF TANK CONTROL VALVE BLOWOFF TANK CONTROL VALVE BTU BRITISH THERMAL UNIT BRITISH THERMAL UNIT BTUH BRITISH THERMAL UNIT PER HOUR BRITISH THERMAL UNIT PER HOUR BWT BOILER PLANT WATER TUBEBOILER PLANT WATER TUBE

AutoCAD SHX Text C CENTIGRADE (CELSIUS) CENTIGRADE (CELSIUS) CAV CONSTANT AIR VOLUME CONSTANT AIR VOLUME CC COOLING COIL COOLING COIL CCD COOLING COIL CONDENSATE DRAIN COOLING COIL CONDENSATE DRAIN CD CEILING DIFFUSER CEILING DIFFUSER CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1) CONSTRUCTION DOCUMENTS (SUBMISSION1) CD-2 CONSTRUCTION DOCUMENTS (SUBMISSION2) CONSTRUCTION DOCUMENTS (SUBMISSION2) CENT CENTRIFICAL CENTRIFICAL CF CHEMICAL FEED CHEMICAL FEED CFH CUBIC FEET PER HOUR CUBIC FEET PER HOUR CFM CUBIC FEET PER MINUTE CUBIC FEET PER MINUTE CFT CUBIC FEET CUBIC FEET CFP CHEMICAL FEED PUMP CHEMICAL FEED PUMP CG CEILING GRILLE CEILING GRILLE CH CHILLER CHILLER CHP CHILLED WATER PUMP CHILLED WATER PUMP CHW CHILLER WATER CHILLER WATER CHR CHILLED WATER RETURN CHILLED WATER RETURN CHS CHILLED WATER SUPPLY CHILLED WATER SUPPLY CI CAST IRON CAST IRON CM CARBON MONOXIDE CARBON MONOXIDE CM CUBIC METER CUBIC METER CM/S CUBIC METER PER SECOND CUBIC METER PER SECOND CO CLEAN OUT CLEAN OUT CO2 CARBON DIOXODE CARBON DIOXODE COMP COMPRESSOR UNIT COMPRESSOR UNIT COP COEFFICIENT OF PERFORMANCE COEFFICIENT OF PERFORMANCE CP CONDENSATE PUMP CONDENSATE PUMP CR CEILING REGISTER CEILING REGISTER CS CONDENSATE STORAGE TANK CONDENSATE STORAGE TANK CSG CLEAN STEAM GENERATOR CLEAN STEAM GENERATOR CT COOLING TOWER COOLING TOWER CU CONDENSING UNIT CONDENSING UNIT CUH CABINET UNIT HEATER CABINET UNIT HEATER CV CONSTANT VOLUME CONSTANT VOLUME CW COLD WATER (POTABLE) COLD WATER (POTABLE) CWCC CHILLED WATER COOLING COIL CHILLED WATER COOLING COIL CWP CONDENSER WATER PUMP CONDENSER WATER PUMP CWR CONDENSER WATER RETURN (TO COOLING TOWER) CONDENSER WATER RETURN (TO COOLING TOWER) CWS CONDENSER WATER SUPPLY (FROM COOLING TOWER) CONDENSER WATER SUPPLY (FROM COOLING TOWER) D DAMPER - AUTOMATIC DAMPER - AUTOMATIC Db DRY-BULB TEMPERATURE DRY-BULB TEMPERATURE DB DECIBELS DECIBELS DCW DOMESTIC COLD WATER DOMESTIC COLD WATER DD-1 DESIGN DEVELOPMENT (SUBMISSION 1) DESIGN DEVELOPMENT (SUBMISSION 1) DD-2 DESIGN DEVELOPMENT (SUBMISSION 2) DESIGN DEVELOPMENT (SUBMISSION 2) DDC DIRECT DIGITAL CONTROLS DIRECT DIGITAL CONTROLS DEG DEGREE DEGREE DF DIFFUSER DIFFUSER DHW DOMESTIC HOT WATER DOMESTIC HOT WATER DHWR DOMESTIC HOT WATER RETURN DOMESTIC HOT WATER RETURN DIA DIAMETER DIAMETER DIW DEIONIZED WATER DEIONIZED WATER DP DEW POINT TEMPERATURE DEW POINT TEMPERATURE DP DIFFUSER PLATE DIFFUSER PLATE DPA DIFFERENTIAL PRESSURE ASSEMBLY DIFFERENTIAL PRESSURE ASSEMBLY DPS DIFFERENTIAL PRESSURE SENSOR DIFFERENTIAL PRESSURE SENSOR DTM DUCT TRAVERSE MEASUREMENT DUCT TRAVERSE MEASUREMENT DX DIRECT EXPANSION DIRECT EXPANSION DXCC DIRECT EXPANSION COOLING COILDIRECT EXPANSION COOLING COIL

AutoCAD SHX Text EA EXHAUST AIR EXHAUST AIR EAT ENTERING AIR TEMPERATURE ENTERING AIR TEMPERATURE EC EVAPORATIVE COOLER EVAPORATIVE COOLER ECC ENGINEERING CONTROL CENTER ENGINEERING CONTROL CENTER ECU EVAPORATIVE CONDENSER UNIT EVAPORATIVE CONDENSER UNIT ED EXHAUST DIFFUSER EXHAUST DIFFUSER EDH ELECTRIC DUCT HEATER ELECTRIC DUCT HEATER EER ENERGY EFFICIENCY RATIO ENERGY EFFICIENCY RATIO EF EXHAUST FAN EXHAUST FAN EG EXHAUST GRILLE EXHAUST GRILLE EGS EMERGENCY GAS SHUTOFF EMERGENCY GAS SHUTOFF EGT ENTERING GLYCOL TEMPERATURE ENTERING GLYCOL TEMPERATURE EH EXHAUST HOOD EXHAUST HOOD EJ EXPANSION JOINT EXPANSION JOINT EMD END OF MAIN DRIP (STEAM) END OF MAIN DRIP (STEAM) ENT ENTERING ENTERING ER EXHAUST REGISTER EXHAUST REGISTER ERC ELECTRIC REHEAT COIL ELECTRIC REHEAT COIL ERP ELECTRIC RADIANT PANEL ELECTRIC RADIANT PANEL ESP EXTERNAL STATIC PRESSURE EXTERNAL STATIC PRESSURE ET EXPANSION TANK EXPANSION TANK ETO ETHYLENE OXIDE ETHYLENE OXIDE EUH ELECTRIC UNIT HEATER ELECTRIC UNIT HEATER EWC EVAPORATIVE WATER COOLER EVAPORATIVE WATER COOLER EWT ENTERING WATER TEMPERATURE ENTERING WATER TEMPERATURE EX EXISTING EXISTING F FAHRENHEIT FAHRENHEIT F&T FLOAT AND THERMOSTATIC FLOAT AND THERMOSTATIC F/SDPR COMBINATION FIRE SMOKE DAMPER COMBINATION FIRE SMOKE DAMPER FA FREE AREA FREE AREA FC FLEXIBLE CONNECTION FLEXIBLE CONNECTION FCU FAN COIL UNIT (4 PIPE) FAN COIL UNIT (4 PIPE) FCUC FAN COIL UNIT COOLING ONLY FAN COIL UNIT COOLING ONLY FCUH FAN COIL UNIT HEATING ONLY FAN COIL UNIT HEATING ONLY FCW FORWARD CURVED WHEEL (FAN) FORWARD CURVED WHEEL (FAN) FD FLOOR DRAIN FLOOR DRAIN FD FIRE DAMPER FIRE DAMPER FF FINAL FILTER FINAL FILTER FHX FLUE GAS/FEEDWATER HEAT EXCHANGER FLUE GAS/FEEDWATER HEAT EXCHANGER FM FLOW METER FLOW METER FOP FUEL OIL PUMP FUEL OIL PUMP FOT FUEL OIL TANK FUEL OIL TANK FOHX FUEL OIL HEAT EXCHANGER FUEL OIL HEAT EXCHANGER FPM FEET PER MINUTE FEET PER MINUTE FPS FEET PER SECOND FEET PER SECOND FPTU FAN POWERED TERMINAL UNIT FAN POWERED TERMINAL UNIT FR FLOOR REGISTER FLOOR REGISTER FRP FIBER REINFORCED POLYESTER FIBER REINFORCED POLYESTER FS FLOW SWITCH FLOW SWITCH FSTAT FREEZESTAT FREEZESTAT FT FEET FEET FT WC FEET OF WATER COLUMN FEET OF WATER COLUMN FT-LB FOOT-POUND FOOT-POUND FTR FIN TUBE RADIATION FIN TUBE RADIATION FV FACE VELOCITYFACE VELOCITY

AutoCAD SHX Text GA GAUGE GAUGE GAL GALLONS GALLONS GH GRAVITY HOOD GRAVITY HOOD GPD GALLONS PER DAY GALLONS PER DAY GPH GALLONS PER HOUR GALLONS PER HOUR GPM GALLONS PER MINUTE GALLONS PER MINUTE GPR GAS PRESSURE REGULATOR GAS PRESSURE REGULATOR GS GALVANIZED STEEL GALVANIZED STEEL H HUMIDIFER HUMIDIFER HAC HOUSEKEEPING AID CLOSET HOUSEKEEPING AID CLOSET HB HOSE BIBB HOSE BIBB HC HEATING COIL HEATING COIL HD HOOD HOOD HOA HAND/OFF/AUTOMATIC HAND/OFF/AUTOMATIC HP HEAT PUMP HEAT PUMP HP HORSEPOWER HORSEPOWER HPDT HIGH PRESSURE DRIP TRAP HIGH PRESSURE DRIP TRAP HPR HIGH PRESSURE RETURN (STEAM CONDENSATE) HIGH PRESSURE RETURN (STEAM CONDENSATE) HPS HIGH PRESSURE SUPPLY (STEAM) HIGH PRESSURE SUPPLY (STEAM) HRC HEAT RECOVERY COIL HEAT RECOVERY COIL HRD HEAT RECOVERY DEVICE HEAT RECOVERY DEVICE HRP HYDRONIC RADIANT (CEILING) PANEL HYDRONIC RADIANT (CEILING) PANEL HRW HEAT RECOVERY WHEEL HEAT RECOVERY WHEEL HSTAT HUMIDISTAT HUMIDISTAT HTM HUMIDIFIER TERMINAL HUMIDIFIER TERMINAL HUM HUMIDIFIER UNIT MOUNTED HUMIDIFIER UNIT MOUNTED HVU HEATING AND VENTILATING UNIT HEATING AND VENTILATING UNIT HW HOT WATER HOT WATER HWC HOT WATER COIL HOT WATER COIL HWHC HOT WATER HEATING COIL HOT WATER HEATING COIL HWP HEATING HOT WATER PUMP HEATING HOT WATER PUMP HWR HEATING HOT WATER RETURN HEATING HOT WATER RETURN HWS HEATING HOT WATER SUPPLY HEATING HOT WATER SUPPLY HWUH HOT WATER UNIT HEATER HOT WATER UNIT HEATER HVD HOISTWAY VENT DAMPER HOISTWAY VENT DAMPER HX HEAT EXCHANGER HEAT EXCHANGER HZ HERTZHERTZ

AutoCAD SHX Text I/O INPUT/OUTPUT INPUT/OUTPUT IAQ INDOOR AIR QUALITY INDOOR AIR QUALITY IBT INVERTED BUCKET TRAP INVERTED BUCKET TRAP ICF IN-LINE CENTRIFUGAL FAN IN-LINE CENTRIFUGAL FAN ICU INTENSIVE CARE UNIT INTENSIVE CARE UNIT ID INSIDE DIAMETER INSIDE DIAMETER IFB INTEGRAL FACE AND BYPASS INTEGRAL FACE AND BYPASS IN INCHES INCHES IN HG INCHES OF MERCURY INCHES OF MERCURY IN WC INCH WATER COLUMN INCH WATER COLUMN IN WG INCH WATER GAUGE INCH WATER GAUGE IN-LB INCH-POUND INCH-POUND IPLV INTERGRATED PART LOAD VALUE INTERGRATED PART LOAD VALUE IRH INTRARED HEATER INTRARED HEATER IS INSECT SCREEN INSECT SCREEN IU INDUCTION UNIT INDUCTION UNIT IV INLET VANESINLET VANES

AutoCAD SHX Text M METER, SI UNIT METER, SI UNIT M/S METERS PER SECOND (OR METERS PER SECOND (OR METERS/SECOND) MA MIXED AIR MIXED AIR MAT MIXED AIR TEMPERATURE MIXED AIR TEMPERATURE MAU MAKE-UP AIR UNIT MAKE-UP AIR UNIT MAV MANUAL AIR VENT MANUAL AIR VENT MAX MAXIMUM MAXIMUM MB MIXING BOX MIXING BOX MBH 1,000 BTUH 1,000 BTUH MCA MINIMUM BRANCH CIRCUIT AMPACITY MINIMUM BRANCH CIRCUIT AMPACITY MER MECHANICAL EQUIPMENT ROOM MECHANICAL EQUIPMENT ROOM MERV MINIMUM EFFICIENCY REPORTING VALUE MINIMUM EFFICIENCY REPORTING VALUE MH MANHOLE MANHOLE MHP MOTOR HORSEPOWER MOTOR HORSEPOWER MIN MINIMUM MINIMUM MM MILLIMETER MILLIMETER MOV MOTOR OPERATED VALVE MOTOR OPERATED VALVE MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE) MEDIUM PRESSURE RETURN (STEAM CONDENSATE) MPS MEDIUM PRESSURE STEAM MEDIUM PRESSURE STEAM MRI MAGNETIC RESONANCE IMAGING MAGNETIC RESONANCE IMAGING MTD MEAN TEMPERATURE DIFFERENCE MEAN TEMPERATURE DIFFERENCE MVD MANUAL VOLUME DAMPER MANUAL VOLUME DAMPER MZ MULTI-ZONE MULTI-ZONE NA NOT APPLICABLE NOT APPLICABLE NC NOISE CRITERIA NOISE CRITERIA NC NORMALLY CLOSED NORMALLY CLOSED NG NATURAL GAS NATURAL GAS NGFM NATURAL GAS FLOWMETER NATURAL GAS FLOWMETER Nm NEWTON METER NEWTON METER NO NORMALLY OPEN NORMALLY OPEN NOAA NATIONAL OCEANIC & ATMOSPHERIC NATIONAL OCEANIC & ATMOSPHERIC ADMINISTRATION NOM NOMINAL NOMINAL N.P.E. NEGATIVE PRESSURE ENCLOSURE NEGATIVE PRESSURE ENCLOSURE NPLV NON-STANDARD PART LOAD VALUE NON-STANDARD PART LOAD VALUE NPSH NET POSITIVE SUCTION HEAD NET POSITIVE SUCTION HEAD NPSHA NET POSITIVE SUCTION HEAD AVAILABLE NET POSITIVE SUCTION HEAD AVAILABLE NPSHR NET POSITIVE SUCTION HEAD REQUIRED NET POSITIVE SUCTION HEAD REQUIRED NTS NOT TO SCALE NOT TO SCALE OA OUTSIDE AIR OUTSIDE AIR OAD OUTDOOR AIR DAMPER OUTDOOR AIR DAMPER OAG OUTSIDE AIR GRILLE OUTSIDE AIR GRILLE OAI OUTSIDE AIR INTAKE OUTSIDE AIR INTAKE OD OUTSIDE DIAMETER OUTSIDE DIAMETER OFM OIL FLOWMETER OIL FLOWMETER OR OPERATING ROOMOPERATING ROOM

AutoCAD SHX Text P PUMP PUMP Pa PASCAL PASCAL PC PUMPED CONDENSATE PUMPED CONDENSATE PCF POUNDS PER CUBIC FOOT (FEET) POUNDS PER CUBIC FOOT (FEET) PD PRESSURE DROP PRESSURE DROP PEF PROPELLER (TYPE) EXHAUST FAN PROPELLER (TYPE) EXHAUST FAN PF PRE-FILTER PRE-FILTER PG PRESSURE GAGE PRESSURE GAGE PGW PROPYLENE GLYCOL-WATER (SOLUTION) PROPYLENE GLYCOL-WATER (SOLUTION) PHC PREHEAT COIL PREHEAT COIL PPM PARTS PER MILLION PARTS PER MILLION PRS PRESSURE REGULATING (VALVE) STATION PRESSURE REGULATING (VALVE) STATION PRV PRESSURE REGULATING VALVE PRESSURE REGULATING VALVE PSI POUNDS PER SQUARE INCH POUNDS PER SQUARE INCH PSIA POUNDS PER SQUARE INCH – ABSOLUTE POUNDS PER SQUARE INCH – ABSOLUTE ABSOLUTE PSIG POUNDS PER SQUARE INCH – GAGE POUNDS PER SQUARE INCH – GAGE GAGE PSS PRIMARY SECONDARY SYSTEM PRIMARY SECONDARY SYSTEM PSV PRESSURE SAFETY VALVE PRESSURE SAFETY VALVE PTM PIPE TRAVERSE MEASUREMENT PIPE TRAVERSE MEASUREMENT PTAC PACKAGED TERMINAL AIR CONDITIONERPACKAGED TERMINAL AIR CONDITIONER

AutoCAD SHX Text SA SUPPLY AIR SUPPLY AIR SAD SOUND ATTENUATING DEVICE SOUND ATTENUATING DEVICE SAT SUPPLY AIR TEMPERATURE SUPPLY AIR TEMPERATURE SC SHADING COEFFICIENT SHADING COEFFICIENT SCFM STANDARD CUBIC FEET PER MINUTE STANDARD CUBIC FEET PER MINUTE SCI SPINAL CODE INJURY SPINAL CODE INJURY SCR SILICON CONTROLLED RECTIFIER SILICON CONTROLLED RECTIFIER SD SMOKE DETECTOR SMOKE DETECTOR SD SUPPLY AIR DIFFUSER SUPPLY AIR DIFFUSER SD-1 SCHEMATIC DESIGN (SUBMISSION1) SCHEMATIC DESIGN (SUBMISSION1) SD-2 SCHEMATIC DESIGN (SUBMISSION2) SCHEMATIC DESIGN (SUBMISSION2) SDPR SMOKE DAMPER SMOKE DAMPER SDR SMOKE DAMPER (RETURN) SMOKE DAMPER (RETURN) SDS SMOKE DAMPER (SUPPLY) SMOKE DAMPER (SUPPLY) SEN SENSIBLE HEAT SENSIBLE HEAT SF SUPPLY FAN SUPPLY FAN SG SUPPLY AIR GRILLE SUPPLY AIR GRILLE SH STEAM HUMIDIFIER STEAM HUMIDIFIER SHC STEAM HEATING COIL STEAM HEATING COIL SI SQUARE INCHES SQUARE INCHES SP STATIC PRESSURE STATIC PRESSURE SP GR SPECIFIC GRAVITY SPECIFIC GRAVITY SPD SUPPLY PROCESS AND DISTRIBUTION SUPPLY PROCESS AND DISTRIBUTION SPRV STEAM PRESSURE REDUCING VALVE STEAM PRESSURE REDUCING VALVE SPS STATIC PRESSURE SENSOR STATIC PRESSURE SENSOR SQ FT SQUARE FOOT (FEET) SQUARE FOOT (FEET) SR SUPPLY AIR REGISTER SUPPLY AIR REGISTER SS STAINLESS STEEL STAINLESS STEEL SSHX STEAM TO STEAM HEAT EXCHANGER STEAM TO STEAM HEAT EXCHANGER SSR SOLID SEPARATOR SOLID SEPARATOR ST STEAM TRAP STEAM TRAP SUH STEAM UNIT HEATER STEAM UNIT HEATER SV STEAM PRESSURE REDUCING VALVE STEAM PRESSURE REDUCING VALVE SVS STEAM VENT SILENCER STEAM VENT SILENCER SW SOFTWATER SOFTWATER SWHX STEAM TO WATER HEAT EXCHANGER STEAM TO WATER HEAT EXCHANGER T&PCV TEMPERATURE AND PRESSURE PCV TEMPERATURE AND PRESSURE TEMPERATURE AND PRESSURE CONTROL VALVE TAB TESTING, ADJUSTING, BALANCE TESTING, ADJUSTING, BALANCE TD TEMPERATURE DIFFERENCE TEMPERATURE DIFFERENCE TDH TOTAL DYNAMIC HEAD TOTAL DYNAMIC HEAD TDS TOTAL DISSOLVED SOLIDS TOTAL DISSOLVED SOLIDS TG TRANSFER GRILLE TRANSFER GRILLE TP TRAP TRAP TR TOP REGISTER TOP REGISTER TSP TOTAL STATIC PRESSURE TOTAL STATIC PRESSURE TSTAT THERMOSTAT THERMOSTAT TU TERMINAL UNIT TERMINAL UNIT TWU THRU-WALL UNITTHRU-WALL UNIT

AutoCAD SHX Text J INTENTIALLY LEFT BLANK INTENTIALLY LEFT BLANK KG KILOGRAM KILOGRAM KG/HR KILOGRAM PER HOUR KILOGRAM PER HOUR kPa KILOPASCAL KILOPASCAL KW KILOWATT KILOWATT KWH KILOWATT HOUR KILOWATT HOUR L LITER LITER L/h LITERS PER HOUR (or LITERS/HOUR) LITERS PER HOUR (or LITERS/HOUR) L/m LITERS PER MINUTE (or LITERS/MINUTE) LITERS PER MINUTE (or LITERS/MINUTE) L/s LITERS PER SECOND (or LITERS/SECOND) LITERS PER SECOND (or LITERS/SECOND) LAT LEAVING AIR TEMPERATURE LEAVING AIR TEMPERATURE LBS/HR POUNDS PER HOUR POUNDS PER HOUR LF LINEAR FOOT (FEET) LINEAR FOOT (FEET) LGT LEAVING GLYCOL TEMPERATURE LEAVING GLYCOL TEMPERATURE LH LATENT HEAT LATENT HEAT LPG LIQUEFIED PETROLEUM GAS LIQUEFIED PETROLEUM GAS LPR LOW PRESSURE RETURN (STEAM CONDENSATE) LOW PRESSURE RETURN (STEAM CONDENSATE) LPRC LOW PRESSURE STEAM RETURN (CLEAN) LOW PRESSURE STEAM RETURN (CLEAN) LLHX LIQUID TO LIQUID HEAT EXCHANGER LIQUID TO LIQUID HEAT EXCHANGER LPS LOW PRESSURE STEAM LOW PRESSURE STEAM LPSC LOW PRESSURE STEAM (CLEAN) LOW PRESSURE STEAM (CLEAN) LSD LINEAR SLOT DIFFUSER LINEAR SLOT DIFFUSER LTCP LOCAL TEMPERATURE CONTROL PANEL LOCAL TEMPERATURE CONTROL PANEL LVG LEAVING LEAVING LVR LOUVER LOUVER LWT LEAVING WATER TEMPERATURELEAVING WATER TEMPERATURE

AutoCAD SHX Text REA RELIEF AIR RELIEF AIR RELAD RELIEF AIR DAMPER RELIEF AIR DAMPER RF RETURN FAN RETURN FAN RG RETURN GRILLE RETURN GRILLE RH RELATIVE HUMIDITY RELATIVE HUMIDITY RHC REHEAT COIL REHEAT COIL RHG REFRIGERANT HOT GAS REFRIGERANT HOT GAS RL REFRIGERANT LIQUID LINE REFRIGERANT LIQUID LINE RLA RUN LOAD AMPERE RUN LOAD AMPERE RO REVERSE OSMOSIS REVERSE OSMOSIS RPM REVOLUTIONS PER MINUTE REVOLUTIONS PER MINUTE RR RETURN REGISTER RETURN REGISTER RS REFRIGERANT SUCTION REFRIGERANT SUCTION RTU ROOF TOP UNIT ROOF TOP UNIT RV RELIEF VALVERELIEF VALVE

AutoCAD SHX Text

MECHANICAL ABBREVIATIONS

AutoCAD SHX Text R/E RETURN OR EXHAUST RETURN OR EXHAUST RA RETURN AIR RETURN AIR RAD RETURN AIR DAMPER RETURN AIR DAMPER RAF RADIO FREQUENCY RADIO FREQUENCY RAHX ROTARY AIR HEAT EXCHANGER ROTARY AIR HEAT EXCHANGER RAT RETURN AIR TEMPERATURE RETURN AIR TEMPERATURE RCCH REMOTE CONDENSER CHILLER REMOTE CONDENSER CHILLER RCU RECIPROCATING CHILLER UNIT RECIPROCATING CHILLER UNIT RD RETURN DIFFUSER RETURN DIFFUSER RDS ROOM DATA SHEETSROOM DATA SHEETS

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

NOTE: NOT ALL ABBREVIATIONS USED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

BID DOCUMENTSOffice of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

UPGRADE HEATING SYSTEM

PHASE 1

561-20-101

03/07/2024Revisions: Date:

VA NEW JERSEY HEALTH CARE SYSTEM

K.J.M.

385 TREMONT AVE,

EAST ORANGE, NJ 07018

34 BROWN STREET

HONESDALE, PA 18431

OFFICE : (570) 253-0846

WWW.NEINFRA.COMNortheast Infrastructure, LLC

MD-100

F.R.O.

BUILDING 1 LEVEL C WINGS B & C & LEVEL B

WING B MECHANICAL ROOM DEMOLITION

PLANS

AutoCAD SHX Text

3" LPR

AutoCAD SHX Text

3" MPR

AutoCAD SHX Text

2" LPR

AutoCAD SHX Text

6" LPR

AutoCAD SHX Text

4" LPR

AutoCAD SHX Text

3" LPR

AutoCAD SHX Text

5" LPR

AutoCAD SHX Text

4" ATV

AutoCAD SHX Text

6" LPR

AutoCAD SHX Text

2" LPR

AutoCAD SHX Text

2" LPR

AutoCAD SHX Text

3" LPR

AutoCAD SHX Text

2" LPR

AutoCAD SHX Text

1" LPR

AutoCAD SHX Text

1 1/2" LPR

AutoCAD SHX Text

3" LPR

AutoCAD SHX Text

4" LPR

AutoCAD SHX Text

STEAM TRAP

AutoCAD SHX Text

STEAM TRAP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

C-124 MECH. RM

AutoCAD SHX Text

C-S3 STAIR

AutoCAD SHX Text

C-122F CORR.

AutoCAD SHX Text

C-126 MECH. RM

AutoCAD SHX Text

C-137 CONTROL

AutoCAD SHX Text

C-135A ENGINEERING

AutoCAD SHX Text

3" LPR

AutoCAD SHX Text

4 DIS."

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING PUMP CONTROL PANEL

AutoCAD SHX Text

EXISTING PUMP CONTROL PANEL

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING PUMP CONTROL PANEL

AutoCAD SHX Text

2" LPR

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FL

AutoCAD SHX Text

EX-1

AutoCAD SHX Text

CP

AutoCAD SHX Text

EX-2

AutoCAD SHX Text

CP

AutoCAD SHX Text

EX-1

AutoCAD SHX Text

CP

AutoCAD SHX Text

EX-5

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

5" MPS

AutoCAD SHX Text

5" HPS

AutoCAD SHX Text

3" MPS

AutoCAD SHX Text

8" LPS

AutoCAD SHX Text

8" LPS TO WATER HEATERS

AutoCAD SHX Text

1 1/2" LPS

AutoCAD SHX Text

2" MPS

AutoCAD SHX Text

1 1/2" LPS

AutoCAD SHX Text

5" HPS

AutoCAD SHX Text

3" LPS

AutoCAD SHX Text

3" LPS

AutoCAD SHX Text

STEAM TRAP

AutoCAD SHX Text

STEAM TRAP

AutoCAD SHX Text

PRS

AutoCAD SHX Text

C-124 MECH. RM

AutoCAD SHX Text

C-S3 STAIR

AutoCAD SHX Text

C-122F CORR.

AutoCAD SHX Text

C-135A ENGINEERING

AutoCAD SHX Text

FL

AutoCAD SHX Text

EX-1

AutoCAD SHX Text

CP

AutoCAD SHX Text

EX-2

AutoCAD SHX Text

CP

AutoCAD SHX Text

EX-1

AutoCAD SHX Text

CP

AutoCAD SHX Text

EX-5

AutoCAD SHX Text

EXISTING PUMP CONTROL PANEL

AutoCAD SHX Text

EXISTING PUMP CONTROL PANEL

AutoCAD SHX Text

EXISTING PUMP CONTROL PANEL

AutoCAD SHX Text

PRS

AutoCAD SHX Text

PRS

AutoCAD SHX Text

PRS

AutoCAD SHX Text

PRS

AutoCAD SHX Text

PRS

AutoCAD SHX Text

PRS

AutoCAD SHX Text

PRS

AutoCAD SHX Text

C-110A FEMALE TOILET

AutoCAD SHX Text

C-110 LOCKER ROOM

AutoCAD SHX Text

AutoCAD SHX Text

B-S4 STAIR 4

AutoCAD SHX Text

DETERGENT STORAGE

AutoCAD SHX Text

AutoCAD SHX Text

WING A

AutoCAD SHX Text

WING C

AutoCAD SHX Text

WING D

AutoCAD SHX Text

WING B

AutoCAD SHX Text

WING D

AutoCAD SHX Text

WING A

AutoCAD SHX Text

WING C

AutoCAD SHX Text

WING B

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

STEAM PIPING DEMOLITION PLAN

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 1 LEVEL C WING C MECH ROOM C-124

AutoCAD SHX Text

MD-100

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text L

AutoCAD SHX Text

DALE ENGLEHART

AutoCAD SHX Text

PROFESSIONAL

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text Y

AutoCAD SHX Text S

AutoCAD SHX Text N

AutoCAD SHX Text L

AutoCAD SHX Text V

AutoCAD SHX Text M

AutoCAD SHX Text P

AutoCAD SHX Text C

AutoCAD SHX Text O

AutoCAD SHX Text No. PE045114E

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

REGISTERED

AutoCAD SHX Text M

AutoCAD SHX Text W

AutoCAD SHX Text O

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text F

AutoCAD SHX Text H

AutoCAD SHX Text O

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

CONDENSATE PIPING DEMOLITION PLAN

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 1 LEVEL C WING C MECH ROOM C-124

AutoCAD SHX Text

MD-100

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

1/MD-100 KEYED NOTE

AutoCAD SHX Text

EXISTING FLASH TANK TO REMAIN.

AutoCAD SHX Text

AutoCAD SHX Text

2/MD-100 KEYED NOTES

AutoCAD SHX Text

EXISTING FLASH TANK TO REMAIN.

AutoCAD SHX Text

CONDENSATE RECEIVER PUMP REPLACEMENT SHALL OCCUR ONE AT A TIME.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

GENERAL NOTES

AutoCAD SHX Text 1.

AutoCAD SHX Text CONTRACTOR SHALL ENSURE THAT INTEGRITY OF EXISTING FIRE/SMOKE RATED BARRIER IS MAINTAINED IN ALL LOCATIONS THAT NEW PIPING PENETRATES AN EXISTING FIRE/SMOKE RATED BARRIER.

AutoCAD SHX Text 2.

AutoCAD SHX Text ALL WORK LOCATED WITHIN MECHANICAL ROOMS, UTILITY CLOSETS, AND STORAGE SPACES SHALL BE COMPLETED DURING WEEKDAYS BETWEEN 6:00AM AND 6:00PM. DUE TO SHUTDOWN COORDINATION, SOME WORK WILL HAVE TO BE COMPLETED AFTER TYPICAL WORKING HOURS. ALL WORK SHALL BE COORDINATED WITH THE VA PROJECT COR.

AutoCAD SHX Text 3.

AutoCAD SHX Text ALL WORK LOCATED WITHIN OFFICES, PATIENT, AND CORRIDOR AREAS SHALL BE COMPLETED AFTER HOURS BETWEEN 6:00PM AND 6:00AM DURING THE WEEKDAY OR DURING THE WEEKEND. WORK STARTED AT 6:00PM OR LATER MUST BE COMPLETED BY 6:00AM.

AutoCAD SHX Text 4.

AutoCAD SHX Text CONTRACTOR SHALL DEMOLISH EACH CONDENSATE RECEIVER AND INSTALL PROPOSED CONDENSATE RECEIVER ONE AT A TIME. SEE PHASING NOTES ON 2/MD-100 FOR 2/MD-100 FOR FOR REMOVAL PROCEDURES.

AutoCAD SHX Text 5.

AutoCAD SHX Text CONTRACTOR SHALL REPLACE ALL CEILING TILES THAT HAVE BEEN REMOVED AND ALL SPRINKLER HEADS THAT HAVE BEEN COVERED AND OR MOVED TO PERFORM ASSOCIATED WORK AT THE END OF EACH WORKDAY. THIS IS ESSENTIAL FOR THE PROPER PERFORMANCE OF THE AUTOMATIC SPRINKLER SYSTEM.

AutoCAD SHX Text 6.

AutoCAD SHX Text ALL WORK COMPLETED DURING AFTER HOURS BETWEEN 6:00PM AND 6:00AM DURING WEEKDAYS OR DURING THE WEEKEND SHALL BE COORDINATED WITH VA POLICE DEPARTMENT.

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PLUMBING DEMOLITION PLAN

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 1 LEVEL C WING B

AutoCAD SHX Text

MD-100

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

PLUMBING DEMOLITION PLAN

AutoCAD SHX Text 1/4"=1'-0"

AutoCAD SHX Text

AutoCAD SHX Text

BUILDING 1 LEVEL B WING B

AutoCAD SHX Text

MD-100

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 1/128"=1'-0"

AutoCAD SHX Text

BUILDING 1 LEVEL B

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

3/MD-100 KEYED DEMOLITION NOTE

AutoCAD SHX Text NOTED SINK AND ASSOCIATED PIPING, VALVES, HANGERS, AND FITTINGS SHALL BE REMOVED BACK TO TEE AT SOURCE PIPING. THE EXISTING TEE FITTING SHALL BE REMOVED ENTIRELY AND REPLACED WITH A UNION FITTING AND STRAIGHT RUN OF PIPING SO THE SOURCE PIPING IS ONE UNINTERRUPTED STRETCH OF PIPING.

AutoCAD SHX Text

AutoCAD SHX Text

4/MD-100 KEYED DEMOLITION NOTE

AutoCAD SHX Text NOTED SINK AND ASSOCIATED PIPING, VALVES, HANGERS, AND FITTINGS SHALL BE REMOVED BACK TO TEE AT SOURCE PIPING. THE EXISTING TEE FITTING SHALL BE REMOVED ENTIRELY AND REPLACED WITH A UNION FITTING AND STRAIGHT RUN OF PIPING SO THE SOURCE PIPING IS ONE UNINTERRUPTED STRETCH OF PIPING.

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

SCALE:

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text 1/128"=1'-0"

AutoCAD SHX Text

BUILDING 1 LEVEL C

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text N

AutoCAD SHX Text

2/MD-100 KEYED DEMOLITION NOTES

AutoCAD SHX Text DISCONNECT AND REMOVE PIPING AT NOTED LOCATION. SEE NEW WORK PLAN 2/MP-100 FOR NEW PIPING 2/MP-100 FOR NEW PIPING FOR NEW PIPING ROUTING.

AutoCAD SHX Text CONTRACTOR SHALL REMOVE EXISTING BACKUP CONDENSATE RECEIVER EX-1, PUMP, VALVES, CONTROLS AND ASSOCIATED PIPING. SEE NEW WORK PLAN 2/MP-100 FOR INSTALLATION OF NEW RECEIVER AND FOR INSTALLATION OF NEW RECEIVER AND PUMP.

AutoCAD SHX Text CONTRACTOR SHALL REMOVE EXISTING PRIMARY CONDENSATE RECEIVER EX-2, PUMP, VALVES, CONTROLS, AND ASSOCIATED PIPING. SEE NEW WORK PLAN 2/MP-100 FOR INSTALLATION OF NEW RECEIVER AND FOR INSTALLATION OF NEW RECEIVER AND PUMP.

AutoCAD SHX Text

CONDENSATE RECEIVER PUMP DEMOLITION PHASING:

AutoCAD SHX Text 4.1)

AutoCAD SHX Text REMOVE CONDENSATE RECEIVER PUMP EX-1 INCLUDING ALL ASSOCIATED PIPING AND VALVES DURING PHASE ONE. REPAIR THE PUMP HOUSE PIT PRIOR TO BEGINNING WORK ON CONDENSATE RECEIVER PUMP EX-2. SEE PLAN 2/MP-100 KEYED NOTE 2 FOR CONDENSATE 2/MP-100 KEYED NOTE 2 FOR CONDENSATE KEYED NOTE 2 FOR CONDENSATE KEYED NOTE 2 FOR CONDENSATE FOR CONDENSATE RECEIVER PUMP CP-1 NEW WORK.

AutoCAD SHX Text 4.2)

AutoCAD SHX Text FOLLOWING COMPLETION OF ALL WORK ON CONDENSATE RECEIVER EX-1, REMOVE CONDENSATE RECEIVER PUMP EX-2 INCLUDING…

This is the start of the file's text. The full file is on GovTribe.