These documents are bid documents for the VA New Jersey Health Care System's Upgrade Heating System Phase 1 project (Project No. 561-20-101), located at 385 Tremont Ave, East Orange, NJ. The comprehensive set of architectural and engineering drawings provides detailed phasing plans and Infection Control Risk Assessment (ICRA) classification plans for Building 1, which spans multiple levels from the basement to the penthouse, including Wings B and C. The drawings include precise floor plans for each level, detailing room layouts, elevator locations, and specific construction phasing requirements, with extensive annotations about work zone management, barrier installation, and construction protocols to minimize disruption to the healthcare facility's operations.
The project involves a systematic upgrade of the heating distribution system, with careful consideration for maintaining hospital functionality during construction. The documents outline specific requirements for infection control, including the use of temporary barriers, smoke barriers, and fire barriers to isolate construction zones. Each floor plan includes detailed ICRA (Infection Control Risk Assessment) classifications, indicating the level of risk and corresponding containment strategies for different areas of the building. The project is being managed by the Department of Veterans Affairs, with Northeast Infrastructure, LLC listed as the consultant, and the bid documents are dated 03/07/2024, suggesting an upcoming construction initiative to modernize the healthcare facility's heating infrastructure.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| 36C24225B0003 0004 Amendment.pdf | ||
| 561-20-101 Prebid Site Visit 2 Sign In Sheet.pdf | ||
| 36C24225B0003 0003 Amendment.pdf | ||
| 36C24225B0003 0002 Amendment.pdf | ||
| Dial In Information Amendment 0001.pdf | ||
| 36C24225B0003 0001 Amendment.pdf | ||
| 561-20-101 Upgrade Heating System-Phase 1 - Prebid Site Visit Sign-in Sheet.pdf | ||
| 36C24225B0003-1.pdf | ||
| Limitation on Subcontracting Certificate.pdf | ||
| Buy American Certificate.pdf | ||
| Pages from 561-20-101 Bid Documents-4.pdf | ||
| 561-20-101 - EOVAMC - Bid Documents - Specifications - Combined - Updated 2-13.pdf | ||
| Pages from 561-20-101 Bid Documents-3.pdf | ||
| Pages from 561-20-101 Bid Documents-2.pdf | ||
| 36C24225B0003-1.pdf | ||
| Pages from 561-20-101 Bid Documents 1.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F.R.O.
COVER SHEET
GI-01
N/A
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE HEATING SYSTEM
PHASE 1
561-20-101
03/07/2024Revisions: Date:
VA NEW JERSEY HEALTH CARE SYSTEM
K.J.M.
385 TREMONT AVE,
EAST ORANGE, NJ 07018
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS
AutoCAD SHX Text
EAST ORANGE, NEW JERSEY
AutoCAD SHX Text D
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text T
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text M
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text E
AutoCAD SHX Text
UPGRADE HEATING SYSTEM PHASE 1
AutoCAD SHX Text
PROJECT NO. 561-20-101
AutoCAD SHX Text
NEW YORK
AutoCAD SHX Text
TRENTON
AutoCAD SHX Text
PHILADELPHIA
AutoCAD SHX Text
LOCATION MAP SCALE: NOT TO SCALE
AutoCAD SHX Text
PROJECT LOCATION EAST ORANGE, NJ
AutoCAD SHX Text GENERAL GI-01 COVER SHEET COVER SHEET CIVIL CS-01 CAMPUS SITE PLAN CAMPUS SITE PLAN PHASING GC-100 BUILDING 1 LEVEL C WINGS B & C PHASING PLAN BUILDING 1 LEVEL C WINGS B & C PHASING PLAN GC-101 BUILDING 1 LEVELS B, A, 1 & 2 WING B PHASING PLANS BUILDING 1 LEVELS B, A, 1 & 2 WING B PHASING PLANS GC-102 BUILDING 1 LEVELS 3, 4, 5 & 6 WING B PHASING PLANS BUILDING 1 LEVELS 3, 4, 5 & 6 WING B PHASING PLANS GC-103 BUILDING 1 LEVEL 7 PHASING PLAN BUILDING 1 LEVEL 7 PHASING PLAN GC-104 BUILDING 1 LEVEL 8 PHASING PLAN BUILDING 1 LEVEL 8 PHASING PLAN GC-105 BUILDING 1 LEVEL 9 PHASING PLAN BUILDING 1 LEVEL 9 PHASING PLAN GC-106 BUILDING 1 LEVELS 10, 11, 12 & 13 WING B PHASING PLANS BUILDING 1 LEVELS 10, 11, 12 & 13 WING B PHASING PLANS GC-107 BUILDING 1 PENTHOUSE LEVELS A & B WING B PHASING PLANS BUILDING 1 PENTHOUSE LEVELS A & B WING B PHASING PLANS ICRA ICRA-00 ICRA GENERAL REQUIREMENTS ICRA GENERAL REQUIREMENTS ICRA-01 BUILDING 1 LEVEL C WINGS B & C ICRA CLASSIFICATION PLAN & DETAILS BUILDING 1 LEVEL C WINGS B & C ICRA CLASSIFICATION PLAN & DETAILS ICRA-02 BUILDING 1 LEVELS B, A, 1 & 2 WING B ICRA CLASSIFICATION PLANS BUILDING 1 LEVELS B, A, 1 & 2 WING B ICRA CLASSIFICATION PLANS ICRA-03 BUILDING 1 LEVELS 3, 4, 5 & 6 WING B ICRA CLASSIFICATION PLANS BUILDING 1 LEVELS 3, 4, 5 & 6 WING B ICRA CLASSIFICATION PLANS ICRA-04 BUILDING 1 LEVEL 7 ICRA CLASSIFICATION PLAN BUILDING 1 LEVEL 7 ICRA CLASSIFICATION PLAN ICRA-05 BUILDING 1 LEVEL 8 ICRA CLASSIFICATION PLAN BUILDING 1 LEVEL 8 ICRA CLASSIFICATION PLAN ICRA-06 BUILDING 1 LEVEL 9 ICRA CLASSIFICATION PLAN BUILDING 1 LEVEL 9 ICRA CLASSIFICATION PLAN ICRA-07 BUILDING 1 LEVELS 10, 11, 12 & 13 WING B ICRA CLASSIFICATION PLANS BUILDING 1 LEVELS 10, 11, 12 & 13 WING B ICRA CLASSIFICATION PLANS ICRA-08 BUILDING 1 PENTHOUSE LEVELS A & B WING B ICRA CLASSIFICATION PLANS BUILDING 1 PENTHOUSE LEVELS A & B WING B ICRA CLASSIFICATION PLANS ASBESTOS ABATEMENT HA-1 GENERAL ASBESTOS NOTES GENERAL ASBESTOS NOTES HA-2 BUILDING 1 LEVEL C NEW MECH ROOM ASBESTOS ABATEMENT PLAN BUILDING 1 LEVEL C NEW MECH ROOM ASBESTOS ABATEMENT PLAN HA-3 BUILDING 1 LEVEL 7 ASBESTOS ABATEMENT PLAN BUILDING 1 LEVEL 7 ASBESTOS ABATEMENT PLAN HA-4 BUILDING 1 LEVEL 8 ASBESTOS ABATEMENT PLAN BUILDING 1 LEVEL 8 ASBESTOS ABATEMENT PLAN HA-5 BUILDING 1 LEVEL 9 ASBESTOS ABATEMENT PLAN BUILDING 1 LEVEL 9 ASBESTOS ABATEMENT PLAN HA-6 BUILDING 1 ACM NOTES BUILDING 1 ACM NOTES STRUCTURAL S-100 BUILDING 1 STRUCTURAL GENERAL NOTES & TYPICAL DETAILS BUILDING 1 STRUCTURAL GENERAL NOTES & TYPICAL DETAILS S-101 BUILDING 1 STRUCTURAL FRAMING PLANS BUILDING 1 STRUCTURAL FRAMING PLANS S-301 BUILDING 1 STRUCTURAL SECTIONS AND DETAILS BUILDING 1 STRUCTURAL SECTIONS AND DETAILS BUILDING 1 STRUCTURAL SECTIONS AND DETAILS
AutoCAD SHX Text ARCHITECTURAL A-001 BUILDING 1 ABBREVIATIONS & GENERAL NOTES BUILDING 1 ABBREVIATIONS & GENERAL NOTES AD-101 BUILDING 1 - LEVEL C - WINGS B & C FLOOR PLAN - REMOVALS BUILDING 1 - LEVEL C - WINGS B & C FLOOR PLAN - REMOVALS AD-102 BUILDING 1 - LEVEL B - WING B FLOOR PLAN - REMOVALS BUILDING 1 - LEVEL B - WING B FLOOR PLAN - REMOVALS AD-103 BUILDING 1 - LEVEL A - WING B FLOOR PLAN - REMOVALS BUILDING 1 - LEVEL A - WING B FLOOR PLAN - REMOVALS AD-104 BUILDING 1 - LEVELS 1-6 FLOOR PLAN/REFLECTED CEILING PLAN - REMOVALS AD-105 BUILDING 1 - LEVEL 7 REFLECTED CEILING PLAN - REMOVALS AD-106 BUILDING 1 - LEVEL 8 REFLECTED CEILING PLAN - REMOVALS AD-107 BUILDING 1 - LEVEL 9 REFLECTED CEILING PLAN - REMOVALS AD-108 BUILDING 1 - LEVELS 8-13 - WING B FLOOR PLANS / REFLECTED CEILING PLAN - REMOVALS BUILDING 1 - LEVELS 8-13 - WING B FLOOR PLANS / REFLECTED CEILING PLAN - REMOVALS A-101 BUILDING 1 - LEVEL C - WING C FLOOR PLAN - NEW BUILDING 1 - LEVEL C - WING C FLOOR PLAN - NEW A-102 BUILDING 1 - LEVEL B - WING B FLOOR PLAN - NEW BUILDING 1 - LEVEL B - WING B FLOOR PLAN - NEW A-103 BUILDING 1 - LEVEL A - WING B FLOOR PLAN - NEW BUILDING 1 - LEVEL A - WING B FLOOR PLAN - NEW A-104 BUILDING 1 - LEVELS 1-6 - WING B FLOOR PLAN - NEW BUILDING 1 - LEVELS 1-6 - WING B FLOOR PLAN - NEW A-105 BUILDING 1 - LEVEL 7 REFLECTED CEILING PLAN - NEW BUILDING 1 - LEVEL 7 REFLECTED CEILING PLAN - NEW A-106 BUILDING 1 - LEVEL 8 REFLECTED CEILING PLAN - NEW BUILDING 1 - LEVEL 8 REFLECTED CEILING PLAN - NEW A-107 BUILDING 1 - LEVEL 9 REFLECTED CEILING PLAN - NEW BUILDING 1 - LEVEL 9 REFLECTED CEILING PLAN - NEW A-108 BUILDING 1 - LEVELS 8-13 - WING B FLOOR PLAN - NEW BUILDING 1 - LEVELS 8-13 - WING B FLOOR PLAN - NEW A-501 BUILDING 1 SECTIONS BUILDING 1 SECTIONS A-601 BUILDING 1 SCHEDULES & DETAILS BUILDING 1 SCHEDULES & DETAILS FIRE PROTECTION FX-001 BUILDING 1 LEVEL 7 FIRE PROTECTION PLAN BUILDING 1 LEVEL 7 FIRE PROTECTION PLAN FX-002 BUILDING 1 LEVEL 8 FIRE PROTECTION PLAN BUILDING 1 LEVEL 8 FIRE PROTECTION PLAN FX-003 BUILDING 1 LEVEL 9 FIRE PROTECTION PLAN BUILDING 1 LEVEL 9 FIRE PROTECTION PLAN MECHANICAL M-001 GENERAL MECHANICAL SYMBOLS & NOTES GENERAL MECHANICAL SYMBOLS & NOTES M-002 GENERAL MECHANICAL ABBREVIATIONS GENERAL MECHANICAL ABBREVIATIONS MD-100 BUILDING 1 LEVEL C WINGS B & C & LEVEL B WING B MECHANICAL ROOM DEMOLITION PLANS BUILDING 1 LEVEL C WINGS B & C & LEVEL B WING B MECHANICAL ROOM DEMOLITION PLANS MD-101 BUILDING 1 LEVEL 7 MECHANICAL HVAC DEMOLITION PLAN BUILDING 1 LEVEL 7 MECHANICAL HVAC DEMOLITION PLAN MD-102 BUILDING 1 LEVEL 8 MECHANICAL HVAC DEMOLITION PLAN BUILDING 1 LEVEL 8 MECHANICAL HVAC DEMOLITION PLAN MD-103 BUILDING 1 LEVEL 9 MECHANICAL HVAC DEMOLITION PLAN BUILDING 1 LEVEL 9 MECHANICAL HVAC DEMOLITION PLAN MD-104 BUILDING 1 LEVEL 7 MECHANICAL PIPING DEMOLITION PLAN BUILDING 1 LEVEL 7 MECHANICAL PIPING DEMOLITION PLAN MD-105 BUILDING 1 LEVEL 8 MECHANICAL PIPING DEMOLITION PLAN BUILDING 1 LEVEL 8 MECHANICAL PIPING DEMOLITION PLAN MD-106 BUILDING 1 LEVEL 9 MECHANICAL PIPING DEMOLITION PLAN BUILDING 1 LEVEL 9 MECHANICAL PIPING DEMOLITION PLAN MH-100 BUILDING 1 LEVEL 7 MECHANICAL HVAC NEW WORK PLAN BUILDING 1 LEVEL 7 MECHANICAL HVAC NEW WORK PLAN MH-101 BUILDING 1 LEVEL 8 MECHANICAL HVAC NEW WORK PLAN BUILDING 1 LEVEL 8 MECHANICAL HVAC NEW WORK PLAN MH-102 BUILDING 1 LEVEL 9 MECHANICAL HVAC NEW WORK PLAN BUILDING 1 LEVEL 9 MECHANICAL HVAC NEW WORK PLAN MP-100 BUILDING 1 LEVEL C WING C MECH ROOM C-124 STEAM & CONDENSATE PIPING NEW WORK PLANS BUILDING 1 LEVEL C WING C MECH ROOM C-124 STEAM & CONDENSATE PIPING NEW WORK PLANS MP-101 BUILDING 1 LEVEL C WING B NEW MECH ROOM STEAM & CONDENSATE PIPING NEW WORK PLANS BUILDING 1 LEVEL C WING B NEW MECH ROOM STEAM & CONDENSATE PIPING NEW WORK PLANS MP-102 BUILDING 1 LEVELS B, A, 1 & 2 WING B MECHANICAL PIPING NEW WORK PLANS BUILDING 1 LEVELS B, A, 1 & 2 WING B MECHANICAL PIPING NEW WORK PLANS MP-103 BUILDING 1 LEVELS 3, 4, 5 & 6 WING B MECHANICAL PIPING NEW WORK PLANS BUILDING 1 LEVELS 3, 4, 5 & 6 WING B MECHANICAL PIPING NEW WORK PLANS MP-104 BUILDING 1 LEVEL 7 MECHANICAL PIPING NEW WORK PLAN BUILDING 1 LEVEL 7 MECHANICAL PIPING NEW WORK PLAN MP-105 BUILDING 1 LEVEL 7 NEW MECHANICAL ROOM MECHANICAL PIPING NEW WORK ENLARGED PLAN BUILDING 1 LEVEL 7 NEW MECHANICAL ROOM MECHANICAL PIPING NEW WORK ENLARGED PLAN ROOM MECHANICAL PIPING NEW WORK ENLARGED PLAN MECHANICAL PIPING NEW WORK ENLARGED PLAN NEW WORK ENLARGED PLAN MP-106 BUILDING 1 LEVEL 8 MECHANICAL PIPING NEW WORK PLAN BUILDING 1 LEVEL 8 MECHANICAL PIPING NEW WORK PLAN MP-107 BUILDING 1 LEVEL 9 MECHANICAL PIPING NEW WORK PLAN BUILDING 1 LEVEL 9 MECHANICAL PIPING NEW WORK PLAN MP-108 BUILDING 1 LEVELS 10, 11, 12 & 13 WING B MECHANICAL PIPING NEW WORK PLANS BUILDING 1 LEVELS 10, 11, 12 & 13 WING B MECHANICAL PIPING NEW WORK PLANS MP-109 BUILDING 1 PENTHOUSE LEVELS A & B WING B MECHANICAL PIPING NEW WORK PLANS BUILDING 1 PENTHOUSE LEVELS A & B WING B MECHANICAL PIPING NEW WORK PLANS MP-110 BUILDING 1 STEAM & CONDENSATE PIPING RISER DIAGRAMSBUILDING 1 STEAM & CONDENSATE PIPING RISER DIAGRAMS
AutoCAD SHX Text MH-500 MECHANICAL DETAILS 1 MECHANICAL DETAILS 1 MH-501 MECHANICAL DETAILS 2 MECHANICAL DETAILS 2 MH-502 MECHANICAL DETAILS 3 MECHANICAL DETAILS 3 MH-503 MECHANICAL DETAILS 4 MECHANICAL DETAILS 4 MH-504 MECHANICAL DETAILS 5 MECHANICAL DETAILS 5 MH-505 MECHANICAL DETAILS 6 MECHANICAL DETAILS 6 MH-506 MECHANICAL SCHEDULES 1 MECHANICAL SCHEDULES 1 MH-507 MECHANICAL SCHEDULES 2 MECHANICAL SCHEDULES 2 MH-508 MECHANICAL SCHEDULES 3 MECHANICAL SCHEDULES 3 MH-509 MECHANICAL SCHEDULES 4 MECHANICAL SCHEDULES 4 MI-510 CONTROLS 1 CONTROLS 1 MI-511 CONTROLS 2 CONTROLS 2 MI-512 CONTROLS 3 CONTROLS 3 MI-513 CONTROLS 4 CONTROLS 4 MI-514 CONTROLS 5 CONTROLS 5 MI-515 CONTROLS 6 CONTROLS 6 MI-516 CONTROLS 7 CONTROLS 7 MI-517 CONTROLS 8 CONTROLS 8 ELECTRICAL E-001 ELECTRICAL SYMBOLS, NOTES, & ABBREVIATIONS ELECTRICAL SYMBOLS, NOTES, & ABBREVIATIONS ED-100 BUILDING 1 LEVEL C WINGS B & C ELECTRICAL DEMOLITION PLAN BUILDING 1 LEVEL C WINGS B & C ELECTRICAL DEMOLITION PLAN ED-101 BUILDING 1 LEVELS A, 1, 2, 3, 4, 5, & 6 WING B ELECTRICAL DEMOLITION PLANS BUILDING 1 LEVELS A, 1, 2, 3, 4, 5, & 6 WING B ELECTRICAL DEMOLITION PLANS ED-102 BUILDING 1 LEVEL 7 ELECTRICAL DEMOLITION PLAN BUILDING 1 LEVEL 7 ELECTRICAL DEMOLITION PLAN ED-103 BUILDING 1 LEVEL 8 ELECTRICAL DEMOLITION PLAN BUILDING 1 LEVEL 8 ELECTRICAL DEMOLITION PLAN ED-104 BUILDING 1 LEVEL 9 ELECTRICAL DEMOLITION PLAN BUILDING 1 LEVEL 9 ELECTRICAL DEMOLITION PLAN ED-500 PARTIAL DEMOLITION ONE-LINE DIAGRAM PARTIAL DEMOLITION ONE-LINE DIAGRAM ED-600 BUILDING 1 DEMOLITION PANELBOARD SCHEDULES BUILDING 1 DEMOLITION PANELBOARD SCHEDULES E-100 BUILDING 1 LEVEL C WINGS B & C ELECTRICAL NEW WORK PLAN BUILDING 1 LEVEL C WINGS B & C ELECTRICAL NEW WORK PLAN E-101 BUILDING 1 LEVEL 7 ELECTRICAL NEW WORK PLAN BUILDING 1 LEVEL 7 ELECTRICAL NEW WORK PLAN E-102 BUILDING 1 LEVEL 7 ENLARGED ELECTRICAL NEW WORK PLAN BUILDING 1 LEVEL 7 ENLARGED ELECTRICAL NEW WORK PLAN E-103 BUILDING 1 LEVEL 8 ELECTRICAL NEW WORK PLAN BUILDING 1 LEVEL 8 ELECTRICAL NEW WORK PLAN E-104 BUILDING 1 LEVEL 9 ELECTRICAL NEW WORK PLAN BUILDING 1 LEVEL 9 ELECTRICAL NEW WORK PLAN E-500 ELECTRICAL DETAILS ELECTRICAL DETAILS E-501 PARTIAL NEW WORK ONE-LINE DIAGRAMS PARTIAL NEW WORK ONE-LINE DIAGRAMS E-600 BUILDING 1 NEW WORK PANELBOARD SCHEDULES 1 BUILDING 1 NEW WORK PANELBOARD SCHEDULES 1 E-601 BUILDING 1 NEW WORK PANELBOARD SCHEDULES 2 BUILDING 1 NEW WORK PANELBOARD SCHEDULES 2 ET-100 BUILDING 1 LEVEL 7 SPECIAL SYSTEMS DEMOLITION PLAN BUILDING 1 LEVEL 7 SPECIAL SYSTEMS DEMOLITION PLAN ET-101 BUILDING 1 LEVEL 8 SPECIAL SYSTEMS DEMOLITION PLAN BUILDING 1 LEVEL 8 SPECIAL SYSTEMS DEMOLITION PLAN ET-102 BUILDING 1 LEVEL 9 SPECIAL SYSTEMS DEMOLITION PLAN BUILDING 1 LEVEL 9 SPECIAL SYSTEMS DEMOLITION PLAN ET-103 BUILDING 1 LEVEL C WINGS B & C SPECIAL SYSTEMS NEW WORK PLAN & PARTIAL CONTROLS WIRING DIAGRAMS BUILDING 1 LEVEL C WINGS B & C SPECIAL SYSTEMS NEW WORK PLAN & PARTIAL CONTROLS WIRING DIAGRAMS ET-104 BUILDING 1 LEVEL 7 SPECIAL SYSTEMS NEW WORK PLAN BUILDING 1 LEVEL 7 SPECIAL SYSTEMS NEW WORK PLAN ET-105 BUILDING 1 LEVEL 7 ENLARGED SPECIAL SYSTEMS NEW WORK PLAN & PARTIAL CONTROLS WIRING DIAGRAM BUILDING 1 LEVEL 7 ENLARGED SPECIAL SYSTEMS NEW WORK PLAN & PARTIAL CONTROLS WIRING DIAGRAM ET-106 BUILDING 1 LEVEL 8 SPECIAL SYSTEMS NEW WORK PLAN BUILDING 1 LEVEL 8 SPECIAL SYSTEMS NEW WORK PLAN ET-107 BUILDING 1 LEVEL 8 PARTIAL CONTROLS WIRING DIAGRAM BUILDING 1 LEVEL 8 PARTIAL CONTROLS WIRING DIAGRAM ET-108 BUILDING 1 LEVEL 9 SPECIAL SYSTEMS NEW WORK PLAN & PARTIAL CONTROLS WIRING DIAGRAM BUILDING 1 LEVEL 9 SPECIAL SYSTEMS NEW WORK PLAN & PARTIAL CONTROLS WIRING DIAGRAM
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
CAMPUS SITE PLAN
CS-01
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE HEATING SYSTEM
PHASE 1
561-20-101
03/07/2024Revisions: Date:
VA NEW JERSEY HEALTH CARE SYSTEM
K.J.M.
385 TREMONT AVE,
EAST ORANGE, NJ 07018
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
N/A
AutoCAD SHX Text
LOT F
AutoCAD SHX Text
LOT D
AutoCAD SHX Text
VAIL STREET
AutoCAD SHX Text
LOT C
AutoCAD SHX Text
MEAGHER ROAD
AutoCAD SHX Text
LOT C
AutoCAD SHX Text
GREGG DRIVE
AutoCAD SHX Text
LOT A
AutoCAD SHX Text
LOT B
AutoCAD SHX Text
MEAGHER ROAD
AutoCAD SHX Text
ORESKO STREET
AutoCAD SHX Text
LOT E
AutoCAD SHX Text
GREGG DRIVE
AutoCAD SHX Text
LOT G
AutoCAD SHX Text
GREGG DRIVE
AutoCAD SHX Text #2
AutoCAD SHX Text #3
AutoCAD SHX Text #5
AutoCAD SHX Text #5A
AutoCAD SHX Text #6
AutoCAD SHX Text #7
AutoCAD SHX Text #8
AutoCAD SHX Text #11
AutoCAD SHX Text #15
AutoCAD SHX Text #17
AutoCAD SHX Text #16
AutoCAD SHX Text #15B
AutoCAD SHX Text #18
AutoCAD SHX Text #6A
AutoCAD SHX Text #15A
AutoCAD SHX Text
TREMONT AVENUE
AutoCAD SHX Text
SOUTH CENTER STREET
AutoCAD SHX Text
FINLAY PLACE
AutoCAD SHX Text
LANARK AVE
AutoCAD SHX Text
BUCHA DRIVE
AutoCAD SHX Text
BUCHA DRIVE
AutoCAD SHX Text
SIGLER LANE
AutoCAD SHX Text
ORESKO STREET
AutoCAD SHX Text
CAFFERATA COURT
AutoCAD SHX Text
ABBOTSFORD AVE.
AutoCAD SHX Text
MCKAY AVENUE
AutoCAD SHX Text
ROSS STREET
AutoCAD SHX Text
JACOB CIRCLE
AutoCAD SHX Text
ELECTRICAL DISTRIBUTION
AutoCAD SHX Text #24
AutoCAD SHX Text #1
AutoCAD SHX Text #4
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CAMPUS SITE PLAN
AutoCAD SHX Text 1"=60'
AutoCAD SHX Text
AutoCAD SHX Text
CS-01
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
AREA OF WORK
AutoCAD SHX Text
%%UKEY SYMBOL
MAIN LEGEND - BUILDING NUMBERS 1. MAIN HOSPITAL MAIN HOSPITAL 2. POLICE/DAY CARE/RES. OFFICE/ 1 APT. POLICE/DAY CARE/RES. OFFICE/ 1 APT. 3. STAFF CAR GARAGE (5) STAFF CAR GARAGE (5) 4. MAIN GATE/HOUSE MAIN GATE/HOUSE 5. ADMIN. OFFICES FISCAL/A.M.M.S. ADMIN. OFFICES FISCAL/A.M.M.S. 5A. ADMIN. OFFICES FACILITIES MANAGEMENT ADMIN. OFFICES FACILITIES MANAGEMENT 6. STATION GARAGE/MOTOR POOL/PAINT SHOP STATION GARAGE/MOTOR POOL/PAINT SHOP 6A. RADIOACTIVE WASTE STORAGE RADIOACTIVE WASTE STORAGE 7. RESEARCH LABS RESEARCH LABS 8. BOILER PLANT BOILER PLANT 11. RESEARCH LABS RESEARCH LABS 15. MENTAL HYGIENE CLINIC/WELLNESS MENTAL HYGIENE CLINIC/WELLNESS 15A. FEE BASIS FEE BASIS 15B. M.I.C.A. BUILDING M.I.C.A. BUILDING 16. SIMULATION LAB SIMULATION LAB 17. CENTER OF HEALTH & WELLNESS CENTER OF HEALTH & WELLNESS 18. INPATIENT/OUTPATIENT PSYCH. INPATIENT/OUTPATIENT PSYCH. 24. SWITCHGEARSWITCHGEAR
GC-100
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE HEATING SYSTEM
PHASE 1
561-20-101
03/07/2024Revisions: Date:
VA NEW JERSEY HEALTH CARE SYSTEM
K.J.M.
385 TREMONT AVE,
EAST ORANGE, NJ 07018
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
BUILDING 1 LEVEL C WINGS B & C
PHASING PLAN
AutoCAD SHX Text
C-ELEV 5
AutoCAD SHX Text
C-ELEV 6
AutoCAD SHX Text
C-124 MECH. RM
AutoCAD SHX Text
C-122E STORAGE
AutoCAD SHX Text
C-122B VOLUNTEER STORAGE
AutoCAD SHX Text
C-122F CORR.
AutoCAD SHX Text
C-126 MECH. RM
AutoCAD SHX Text
C-137 CONTROL
AutoCAD SHX Text
C-122 EMS SUPPLY
AutoCAD SHX Text
UNEXCAVATED
AutoCAD SHX Text
C-121 SUPPLY
AutoCAD SHX Text
C-107 WOMEN LOCKER
AutoCAD SHX Text
C-S4 STAIRS
AutoCAD SHX Text
C-109 STOR.
AutoCAD SHX Text
C-110A FEMALE TOILET
AutoCAD SHX Text
C-110 LOCKER ROOM
AutoCAD SHX Text
C-7 LOCKER ROOM
AutoCAD SHX Text
C-104 WOMEN LOCKER
AutoCAD SHX Text
C-102 STOR.
AutoCAD SHX Text
C-119 SHREDDER
AutoCAD SHX Text
C-111A CORRIDOR
AutoCAD SHX Text
C-118 HALLWAY
AutoCAD SHX Text
C-136 STORAGE
AutoCAD SHX Text
C-122G CORRIDOR
AutoCAD SHX Text
CRAWLSPACE 1
AutoCAD SHX Text
CRAWLSPACE 2
AutoCAD SHX Text
ELEV 7
AutoCAD SHX Text
ELEV 8
AutoCAD SHX Text
C-132 UTILITY SHOP
AutoCAD SHX Text
NEW MECH ROOM
AutoCAD SHX Text
C-140 CORRIDOR
AutoCAD SHX Text
C-122D ELEC. STORAGE
AutoCAD SHX Text
C-122C BMS LIGHT STORAGE
AutoCAD SHX Text
C-E-107 ELEC.
AutoCAD SHX Text
C-E-106 ELEC.
AutoCAD SHX Text
C-111 MECH. ROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WING D
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING B
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text 1/128"=1'
AutoCAD SHX Text
BUILDING 1 LEVEL C
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
PHASING KEYED NOTES
AutoCAD SHX Text
AutoCAD SHX Text
ALL WORK WITHIN NOTED AREA SHALL BE CONDUCTED DURING PHASE ONE.
AutoCAD SHX Text 1.1)
AutoCAD SHX Text SEE DEMOLITION PLANS MD-100 FOR FURTHER MD-100 FOR FURTHER FOR FURTHER PHASING OF DEMOLITION WORK TO BE CONDUCTED WITHIN NOTED AREA.
AutoCAD SHX Text 1.2)
AutoCAD SHX Text SEE NEW WORK PLANS MP-100 & MP-101 FOR MP-100 & MP-101 FOR FOR FURTHER PHASING OF NEW WORK TO BE CONDUCTED WITHIN NOTED AREA.
AutoCAD SHX Text 1.3)
AutoCAD SHX Text SEE ASSOCIATED ARCHITECTURAL PLAN AND ELECTRICAL PLAN FOR ASSOCIATED DEMOLITION AND NEW WORK WITHIN NOTED AREA.
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL C WINGS B & C
AutoCAD SHX Text
GC-100
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text PROVIDE ALL APPLICABLE SUBMITTALS FOR THE PROJECT. THIS INCLUDES BUT IS NOT LIMITED TO SUBMITTALS FOR MATERIALS AND EQUIPMENT.
AutoCAD SHX Text 2.
AutoCAD SHX Text CONTRACTOR SHALL NOT COMMENCE ANY WORK WITHIN PROJECT UNTIL ALL SUBMITTALS ARE APPROVED OR APPROVED AS NOTED. THE PHASE WHERE THIS OCCURS IS REFFERED TO AS PHASE ZERO.
AutoCAD SHX Text 3.
AutoCAD SHX Text
THE APPROXIMATE DURATION TIME FOR PHASE ZERO IS 90 DAYS.
AutoCAD SHX Text 4.
AutoCAD SHX Text
CONTRACTOR SHALL ENSURE CORRIDOR EGRESS IS MAINTAINED AT ALL TIMES.
AutoCAD SHX Text 1.4)
AutoCAD SHX Text SEE ICRA PLANS FOR FURTHER INFORMATION RELATING TO ICRA CLASSIFICATION, TYPES OF BARRIERS, AND PATH FROM THE LOADING DOCK TO THE SERVICE ELEVATOR.
AutoCAD SHX Text
PHASE ONE
AutoCAD SHX Text
PHASE TWO
PHASE THREE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE HEATING SYSTEM
PHASE 1
561-20-101
03/07/2024Revisions: Date:
VA NEW JERSEY HEALTH CARE SYSTEM
K.J.M.
385 TREMONT AVE,
EAST ORANGE, NJ 07018
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
GC-101
F.R.O.
BUILDING 1 LEVELS B, A, 1 & 2 WING B
PHASING PLANS
AutoCAD SHX Text
B-ELEV 8
AutoCAD SHX Text
B-ELEV 7
AutoCAD SHX Text
B-S4 STAIR 4
AutoCAD SHX Text
B-SHAFT4 SHAFTWAY
AutoCAD SHX Text
B-112F LINEN CHUTE
AutoCAD SHX Text
B-110C DISHWASHER
AutoCAD SHX Text
B-173A CORRIDOR
AutoCAD SHX Text
B-137C CORRIDOR
AutoCAD SHX Text
B-173 WALK IN REFRIG.
AutoCAD SHX Text
B-174B MAIL ROOM
AutoCAD SHX Text
B-E-109 ELECTRICAL CLOSET
AutoCAD SHX Text
B-176B CORRIDOR
AutoCAD SHX Text
B-176 REPRODUCTION ROOM
AutoCAD SHX Text
B-128C WALK IN REFRIG.
AutoCAD SHX Text
B-110B MECHANICAL ROOM
AutoCAD SHX Text
B-110A STORAGE
AutoCAD SHX Text
DETERGENT STORAGE
AutoCAD SHX Text
B-E-106 ELECTRICAL
AutoCAD SHX Text
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
WING B
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING B
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING B
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
1-SHAFT4 SHAFTWAY
AutoCAD SHX Text
1-170 BLOOD BANK
AutoCAD SHX Text
1-SHAFT4 SHAFTWAY
AutoCAD SHX Text
1-ELEV 8
AutoCAD SHX Text
1-169 TOILET
AutoCAD SHX Text
1-ELEV 7
AutoCAD SHX Text
1-192B CORR.
AutoCAD SHX Text
1-E-106 ELECTRIC
AutoCAD SHX Text
1-256 WORK ROOM
AutoCAD SHX Text
1-258 UTILITY
AutoCAD SHX Text
1-S4 STAIR 4
AutoCAD SHX Text
1-168A IRM CLOSET
AutoCAD SHX Text
1-167 MALE TOILET
AutoCAD SHX Text
1-257 CORRIDOR
AutoCAD SHX Text
1-261 ANGIO ROOM
AutoCAD SHX Text
1-259A SCRUB
AutoCAD SHX Text
1-259 X-RAY ROOM
AutoCAD SHX Text
1-164 RADIOLOGY STORAGE
AutoCAD SHX Text
1-168 DUMB/ WAITER
AutoCAD SHX Text
1-192 CORRIDOR
AutoCAD SHX Text
1-162 FEMALE TOILET
AutoCAD SHX Text
1-163 CORR.
AutoCAD SHX Text
AutoCAD SHX Text
2-222 HAC CLOSET
AutoCAD SHX Text
2-213 WOMEN'S LOCKER
AutoCAD SHX Text
2-214 WOMEN'S TOILET
AutoCAD SHX Text
2-230A CORRIDOR
AutoCAD SHX Text
2-200 CORR.
AutoCAD SHX Text
2-223 CHUTE CLOSET
AutoCAD SHX Text
2-180 HAC
AutoCAD SHX Text
SHAFT4 4
AutoCAD SHX Text
2-ELEV 8
AutoCAD SHX Text
2-ELEV 7
AutoCAD SHX Text
2-E-106 ELECTRIC
AutoCAD SHX Text
2-179A IRM CLOSET
AutoCAD SHX Text
2-SHAFT9 SHAFT 9
AutoCAD SHX Text
2-212 MECHANICAL ROOM
AutoCAD SHX Text
179A PRE-INDUCTION ROOM
AutoCAD SHX Text
2-S4 STAIR 4
AutoCAD SHX Text
200A CORR.
AutoCAD SHX Text
2-215 CORR.
AutoCAD SHX Text
2-214 MENS TOILET
AutoCAD SHX Text
2-217 MEN'S LOCKER
AutoCAD SHX Text
AutoCAD SHX Text
2-179 DUMB/ WAITER
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
WING B
AutoCAD SHX Text T
AutoCAD SHX Text
A-258/257 AGENT CASH
AutoCAD SHX Text
A-ELEV 7
AutoCAD SHX Text
A-E-106 ELECTRIC
AutoCAD SHX Text
A-256A WAITING AREA
AutoCAD SHX Text
A-254 CALL CENTER
AutoCAD SHX Text
A-SHAFT 4
AutoCAD SHX Text
A-ELEV 8
AutoCAD SHX Text
A-124B STAFF PICK-UP
AutoCAD SHX Text
A-130 BLOOD DRAWING
AutoCAD SHX Text
A-142 CORRIDOR
AutoCAD SHX Text
A-115A CORRIDOR
AutoCAD SHX Text
A-127 LOUNGE
AutoCAD SHX Text
RECEIVING /STORAGE A-124
AutoCAD SHX Text
A-113A I.T ROOM
AutoCAD SHX Text
A-SHAFT9 SHAFT 9
AutoCAD SHX Text
DUMB/ WAITER
AutoCAD SHX Text
STAIR 4
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL B WING B
AutoCAD SHX Text
GC-101
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL B KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL 1 WING B
AutoCAD SHX Text
GC-101
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL 1 KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL 2 WING B
AutoCAD SHX Text
GC-101
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL 2 KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL A WING B
AutoCAD SHX Text
GC-101
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL A KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
PHASING KEYED NOTES
AutoCAD SHX Text
AutoCAD SHX Text
ALL WORK WITHIN NOTED AREA SHALL BE CONDUCTED DURING PHASE ONE.
AutoCAD SHX Text 1.1)
AutoCAD SHX Text ALL DEMOLITION WORK WITHIN DUMB WAITER SHAFT SHALL BE CONDUCTED DURING PHASE ONE. SEE ASSOCIATED ARCHITECTURAL AND ELECTRICAL PLANS FOR RELATED DEMOLITION.
AutoCAD SHX Text 1.2)
AutoCAD SHX Text ALL PROPOSED WORK WITHIN DUMB WAITER SHAFT SHALL BE COMPLETED DURING PHASE ONE. SEE ASSOCIATED ARCHITECTURAL AND MECHANICAL PLANS FOR RELATED NEW WORK.
AutoCAD SHX Text 1.4)
AutoCAD SHX Text SEE ICRA PLANS FOR FURTHER INFORMATION RELATING TO ICRA CLASSIFICATION, TYPES OF BARRIERS, AND PATH FROM THE LOADING DOCK TO THE SERVICE ELEVATOR.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text PROVIDE ALL APPLICABLE SUBMITTALS FOR THE PROJECT. THIS INCLUDES BUT IS NOT LIMITED TO SUBMITTALS FOR MATERIALS AND EQUIPMENT.
AutoCAD SHX Text 2.
AutoCAD SHX Text CONTRACTOR SHALL NOT COMMENCE ANY WORK WITHIN PROJECT UNTIL ALL SUBMITTALS ARE APPROVED OR APPROVED AS NOTED. THE PHASE WHERE THIS OCCURS IS REFFERED TO AS PHASE ZERO.
AutoCAD SHX Text 3.
AutoCAD SHX Text
THE APPROXIMATE DURATION TIME FOR PHASE ZERO IS 90 DAYS.
AutoCAD SHX Text 4.
AutoCAD SHX Text
CONTRACTOR SHALL ENSURE CORRIDOR EGRESS IS MAINTAINED AT ALL TIMES.
AutoCAD SHX Text
PHASE ONE
AutoCAD SHX Text
PHASE TWO
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE HEATING SYSTEM
PHASE 1
561-20-101
03/07/2024Revisions: Date:
VA NEW JERSEY HEALTH CARE SYSTEM
K.J.M.
385 TREMONT AVE,
EAST ORANGE, NJ 07018
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
GC-102
F.R.O.
BUILDING 1 LEVELS 3, 4, 5 & 6 WING B
PHASING PLANS
AutoCAD SHX Text
AutoCAD SHX Text
3-183 MALE TOILET
AutoCAD SHX Text
3-184A REFRIG
AutoCAD SHX Text
3-155 CORRIDOR
AutoCAD SHX Text
3-148 CIRCULAR AREA
AutoCAD SHX Text
3-157 CORRIDOR
AutoCAD SHX Text
3-ELEV7 ELEV 7
AutoCAD SHX Text
3-ELEV8 ELEV 8
AutoCAD SHX Text
3-SHAFT4 SHAFTWAY
AutoCAD SHX Text
3-340 FEMALE TOILET
AutoCAD SHX Text
3-S4 STAIR
AutoCAD SHX Text
3-152 IRM CLOSET
AutoCAD SHX Text
3-339 MECHANICAL ROOM
AutoCAD SHX Text
CANTEEN 3-185 OFFICE
AutoCAD SHX Text
3-SHAFT9 SHAFTWAY
AutoCAD SHX Text
3-184 CANTEEN STORAGE
AutoCAD SHX Text
DUMB/ WAITER
AutoCAD SHX Text
3-E-106 ELECTRIC
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING B
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING B
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING B
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
5-158 MECHANICAL ROOM
AutoCAD SHX Text
5-ELEV7 ELEV
AutoCAD SHX Text
5-ELEV8 ELEV
AutoCAD SHX Text
5-SHAFT4 SHAFTWAY
AutoCAD SHX Text
5-158 MECHANICAL ROOM
AutoCAD SHX Text
5-SHAFT9 SHAFTWAY
AutoCAD SHX Text
5-157 LINEN ROOM
AutoCAD SHX Text
5-S4 STAIR 4
AutoCAD SHX Text
5-156A IRM CLOSET
AutoCAD SHX Text
5-154 DR. OFFICE
AutoCAD SHX Text
5-156 DUMB/ WAITER
AutoCAD SHX Text
5-239C CORRIDOR
AutoCAD SHX Text
5-153 DR. OFFICE
AutoCAD SHX Text
5-253A ROOM LOCKER
AutoCAD SHX Text
5-253 MEDICINE CLASSROOM
AutoCAD SHX Text
5-E106 ELECTRIC
AutoCAD SHX Text
AutoCAD SHX Text
6-ELEV8 ELEV
AutoCAD SHX Text
6-ELEV7 ELEV
AutoCAD SHX Text
6-146 STORAGE
AutoCAD SHX Text
6-SHAFT4 SHAFTWAY
AutoCAD SHX Text
6-S4 STAIR 4
AutoCAD SHX Text
6-143 IRM CLOSET
AutoCAD SHX Text
6-142 STORAGE
AutoCAD SHX Text
6-144 CLOSET
AutoCAD SHX Text
6-140 SPINAL CORD
AutoCAD SHX Text
6-181 CORRIDOR
AutoCAD SHX Text
6-SHAFT9 SHAFTWAY
AutoCAD SHX Text
6-149 UTILITY ROOM
AutoCAD SHX Text
6-149A LINEN SUPPLY
AutoCAD SHX Text
6-150A TOILET
AutoCAD SHX Text
6-160 CORRIDOR
AutoCAD SHX Text
6-145 DUMB WAITER
AutoCAD SHX Text
6-E-106 ELECTRIC
AutoCAD SHX Text
6-182 OFFICE
AutoCAD SHX Text
6-184 LOUNGE
AutoCAD SHX Text
6-186 PHYSICIAN OFFICE
AutoCAD SHX Text
6-187 PHYSICIAN OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING B
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
AutoCAD SHX Text
4-240 PHARM. COUNS.
AutoCAD SHX Text
4-199D CORRIDOR
AutoCAD SHX Text
4-159 CONSULT ROOM
AutoCAD SHX Text
4-159A CLOSET
AutoCAD SHX Text
4-152A OFFICE
AutoCAD SHX Text
4-153 RESIDENTS
AutoCAD SHX Text
4-154 ENTEROSTOMAL
AutoCAD SHX Text
4-243 CORRIDOR
AutoCAD SHX Text
4-156 IRM CLOSET
AutoCAD SHX Text
4-155 IRM CLOSET
AutoCAD SHX Text
4-S4 STAIR 4
AutoCAD SHX Text
4-ELEV 8
AutoCAD SHX Text
4-SHAFT4 SHAFTWAY
AutoCAD SHX Text
4-157 IRM CLOSET
AutoCAD SHX Text
4-ELEV 7
AutoCAD SHX Text
4-E-106 ELECTRIC
AutoCAD SHX Text
4-158 SUPPLY CLOSET
AutoCAD SHX Text
4-SHAFT9 SHAFTWAY
AutoCAD SHX Text
4-241 SURGICAL/ ONCOLOGY
AutoCAD SHX Text
4-242 CONFERENCE ROOM
AutoCAD SHX Text
4-239 PHARM. COUNS.
AutoCAD SHX Text
4-E-106 ELECTRIC
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL 3 WING B
AutoCAD SHX Text
GC-102
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL 3 KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL 5 WING B
AutoCAD SHX Text
GC-102
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL 5 KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL 6 WING B
AutoCAD SHX Text
GC-102
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL 6 KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL 4 WING B
AutoCAD SHX Text
GC-102
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL 4 KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
PHASING KEYED NOTES
AutoCAD SHX Text
AutoCAD SHX Text
ALL WORK WITHIN NOTED AREA SHALL BE CONDUCTED DURING PHASE ONE.
AutoCAD SHX Text 1.1)
AutoCAD SHX Text ALL DEMOLITION WORK WITHIN DUMB WAITER SHAFT SHALL BE CONDUCTED DURING PHASE ONE. SEE ASSOCIATED ARCHITECTURAL AND ELECTRICAL PLANS FOR RELATED DEMOLITION.
AutoCAD SHX Text 1.2)
AutoCAD SHX Text ALL PROPOSED WORK WITHIN DUMB WAITER SHAFT SHALL BE COMPLETED DURING PHASE ONE. SEE ASSOCIATED ARCHITECTURAL AND MECHANICAL PLANS FOR RELATED NEW WORK.
AutoCAD SHX Text 1.3)
AutoCAD SHX Text SEE ICRA PLANS FOR FURTHER INFORMATION RELATING TO ICRA CLASSIFICATION, TYPES OF BARRIERS, AND PATH FROM THE LOADING DOCK TO THE SERVICE ELEVATOR.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text PROVIDE ALL APPLICABLE SUBMITTALS FOR THE PROJECT. THIS INCLUDES BUT IS NOT LIMITED TO SUBMITTALS FOR MATERIALS AND EQUIPMENT.
AutoCAD SHX Text 2.
AutoCAD SHX Text CONTRACTOR SHALL NOT COMMENCE ANY WORK WITHIN PROJECT UNTIL ALL SUBMITTALS ARE APPROVED OR APPROVED AS NOTED. THE PHASE WHERE THIS OCCURS IS REFFERED TO AS PHASE ZERO.
AutoCAD SHX Text 3.
AutoCAD SHX Text
THE APPROXIMATE DURATION TIME FOR PHASE ZERO IS 90 DAYS.
AutoCAD SHX Text 4.
AutoCAD SHX Text
CONTRACTOR SHALL ENSURE CORRIDOR EGRESS IS MAINTAINED AT ALL TIMES.
AutoCAD SHX Text
PHASE ONE
AutoCAD SHX Text
PHASE TWO
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE HEATING SYSTEM
PHASE 1
561-20-101
03/07/2024Revisions: Date:
VA NEW JERSEY HEALTH CARE SYSTEM
K.J.M.
385 TREMONT AVE,
EAST ORANGE, NJ 07018
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
GC-103
F.R.O.
BUILDING 1 LEVEL 7
PHASING PLAN
AutoCAD SHX Text
7-401 TRASH/LINEN
AutoCAD SHX Text
7-180 SECRETARY
AutoCAD SHX Text
7-183 TOILET
AutoCAD SHX Text
7-ELEV 6
AutoCAD SHX Text
7-E-105 ELECTRIC
AutoCAD SHX Text
7-186 ELEVATOR LOBBY
AutoCAD SHX Text
7-132 RESPIRATORY OFFICE
AutoCAD SHX Text
7-133 PHYSICIAN OFFICE
AutoCAD SHX Text
7-137 CHIEF PULMONARY
AutoCAD SHX Text
7-136 TOILET
AutoCAD SHX Text
7-139 TOILET
AutoCAD SHX Text
7-140 CONFERENCE ROOM
AutoCAD SHX Text
7-181 CORRIDOR
AutoCAD SHX Text
7-144 EDUCATION
AutoCAD SHX Text
7-145 VEST.
AutoCAD SHX Text
7-142 ASST CHIEF
AutoCAD SHX Text
7-143 IRM CLOSET
AutoCAD SHX Text
7-S4 STAIR 4
AutoCAD SHX Text
7-SHAFT 4
AutoCAD SHX Text
7-146 CLOSET
AutoCAD SHX Text
7-ELEV 8
AutoCAD SHX Text
7-ELEV 7
AutoCAD SHX Text
7-E-106 ELEC
AutoCAD SHX Text
7-169 CLASSROOM
AutoCAD SHX Text
7-148 NURSING
AutoCAD SHX Text
7-168 COUNS & DIAG
AutoCAD SHX Text
7-167 NURSE EDU.
AutoCAD SHX Text
7-181B CORRIDOR
AutoCAD SHX Text
7-153 NURSING OFFICE
AutoCAD SHX Text
7-154 BIO FEEDBK
AutoCAD SHX Text
7-166 SOCIAL WORKER
AutoCAD SHX Text
7-149 NURSING ROOM
AutoCAD SHX Text
7-SHAFT9 SHAFTWAY
AutoCAD SHX Text
7-173 PROGRAM SPECIALIST
AutoCAD SHX Text
7-181A CORRIDOR
AutoCAD SHX Text
7-170 CLASSROOM
AutoCAD SHX Text
7-172 CLINICAL INSTRUCT.
AutoCAD SHX Text
7-175A DIRECTOR CLINICAL
AutoCAD SHX Text
7-175B SECRETARY OFFICE
AutoCAD SHX Text
7-175C ASSOCIATE DIRECTOR
AutoCAD SHX Text
7-176 FILE STORAGE
AutoCAD SHX Text
7-177 CLINICAL PHARMICIST
AutoCAD SHX Text
7-175F EDUCATION SECRETARY
AutoCAD SHX Text
7-175D CLINICAL OFFICE
AutoCAD SHX Text
7-178 FEMALE TOILET
AutoCAD SHX Text
7-179 KITCHEN
AutoCAD SHX Text
7-SHAFT 3
AutoCAD SHX Text
7-182A STOR.
AutoCAD SHX Text
7-182 SECRETARY
AutoCAD SHX Text
7-ELEV 2
AutoCAD SHX Text
7-ELEV 1
AutoCAD SHX Text
7-125A CORRIDOR
AutoCAD SHX Text
7-104 OIF/OEF OFFICE
AutoCAD SHX Text
7-103 OIF/OEF OFFICE
AutoCAD SHX Text
7-102 OFFICE
AutoCAD SHX Text
7-121 OIF/OEF OFFICE
AutoCAD SHX Text
7-117 OFFICE
AutoCAD SHX Text
7-116 OIF/OEF OFFICE
AutoCAD SHX Text
7-122 PANTRY/ STORAGE
AutoCAD SHX Text
7-101 OIF/OEF OFFICE
AutoCAD SHX Text
7-209 FAMILY ROOM
AutoCAD SHX Text
7-124A TOILET
AutoCAD SHX Text
7-123 KITCHEN
AutoCAD SHX Text
7-SHAFT 6
AutoCAD SHX Text
7-124 OIF/OEF OFFICE
AutoCAD SHX Text
7-126A STOR. ROOM
AutoCAD SHX Text
7-126 OIF/OEF OFFICE
AutoCAD SHX Text
7-128 OIF/OEF OFFICE
AutoCAD SHX Text
7-SHAFT 10
AutoCAD SHX Text
7-E-109 ELECTRIC
AutoCAD SHX Text
7-ELEV 14
AutoCAD SHX Text
7-ELEV 15
AutoCAD SHX Text
7-ELEV 13
AutoCAD SHX Text
7-ELEV 12
AutoCAD SHX Text
7-402 ELEVATOR LOBBY
AutoCAD SHX Text
7-401 TRASH/LINEN
AutoCAD SHX Text
7-129 OPMI OFFICE
AutoCAD SHX Text
7-130 OXYGEN STOR.
AutoCAD SHX Text
7-131 RESPIRATORY STORAGE
AutoCAD SHX Text
7-208 PULMINARY LAB
AutoCAD SHX Text
7-200 MECH. ROOM
AutoCAD SHX Text
7-SHAFT 5
AutoCAD SHX Text
7-ELEV 10
AutoCAD SHX Text
7-ELEV 9
AutoCAD SHX Text
7-ELEV 3
AutoCAD SHX Text
7-ELEV 4
AutoCAD SHX Text
7-400 IRM CLOSET
AutoCAD SHX Text
7-SHAFT1 SHAFTWAY
AutoCAD SHX Text
7-SHAFT2 SHAFTWAY
AutoCAD SHX Text
7-SHAFT SHAFTWAY
AutoCAD SHX Text
7-E-100 ELECTRIC
AutoCAD SHX Text
7-125B CORRIDOR
AutoCAD SHX Text
7-207 CASE MANAGER
AutoCAD SHX Text
7-204 EXAM ROOM
AutoCAD SHX Text
7-205H EXAM ROOM
AutoCAD SHX Text
7-205G FELLOW OFFICE
AutoCAD SHX Text
7-205F OFFICE
AutoCAD SHX Text
7-205E PHYSICIAN OFFICE
AutoCAD SHX Text
7-205D STORAGE
AutoCAD SHX Text
7-205C BREAK
AutoCAD SHX Text
7-205B FILE/ STORAGE
AutoCAD SHX Text
7-205A EXAM/ OFFICE
AutoCAD SHX Text
7-203 TOILET
AutoCAD SHX Text
7-202 WAITING ROOM
AutoCAD SHX Text
7-206 TOILET
AutoCAD SHX Text
7-201 TOILET
AutoCAD SHX Text
7-E-103 ELECTRIC
AutoCAD SHX Text
7-210 STOR.
AutoCAD SHX Text
7-205 CORRIDOR
AutoCAD SHX Text
7-175E DIRECTOR CLINICAL
AutoCAD SHX Text
7-174 TOILET
AutoCAD SHX Text
7-ELEV 5
AutoCAD SHX Text
7-191 CHIEF RESPIRATORY CARE
AutoCAD SHX Text
7-189B RESPIRATORY STORAGE
AutoCAD SHX Text
7-189A RESPIRATORY LOUNGE
AutoCAD SHX Text
7-189 RESPIRATORY STORAGE
AutoCAD SHX Text
7-190 TOILET
AutoCAD SHX Text
7-E-104 ELECTRIC
AutoCAD SHX Text
CORRIDOR 7-193
AutoCAD SHX Text
7-193A VESTIBULE
AutoCAD SHX Text
7-134 STOR.
AutoCAD SHX Text
7-165 SOCIAL WORKER
AutoCAD SHX Text
7-155 SOCIAL WORKER
AutoCAD SHX Text
7-135 PHYSICIAN OFFICE
AutoCAD SHX Text
7-195 PULMONARY ASST CHIEF
AutoCAD SHX Text
7-194 PULMONARY STORAGE
AutoCAD SHX Text
7-199 HAC
AutoCAD SHX Text
7-S2 STAIR 2
AutoCAD SHX Text
7-125 CORRIDOR
AutoCAD SHX Text
7-197 PULMONARY FELLOW
AutoCAD SHX Text
7-105 OIF/OEF
AutoCAD SHX Text
7-115 OIF/OEF
AutoCAD SHX Text
7-S1 STAIR 1
AutoCAD SHX Text
7-S3 STAIR 3
AutoCAD SHX Text
7-188 ELEV. LOBBY
AutoCAD SHX Text
7-120 TOILET
AutoCAD SHX Text
7-107 TOILET
AutoCAD SHX Text
7-108 TOILET
AutoCAD SHX Text
7-119 TOILET
AutoCAD SHX Text
7-162 TOILET
AutoCAD SHX Text
7-151 TOILET
AutoCAD SHX Text
7-150 TOILET
AutoCAD SHX Text
7-163 TOILET
AutoCAD SHX Text
7-186 SPINAL CORD
AutoCAD SHX Text
7-185 EQUIP.
AutoCAD SHX Text
7-184 SPINAL CORD
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
7-164 SOCIAL WORKER
AutoCAD SHX Text
7-156 SOCIAL WORKER
AutoCAD SHX Text
7-152 TOILET
AutoCAD SHX Text
7-161 TOILET
AutoCAD SHX Text
7-160 SOCIAL WORKER
AutoCAD SHX Text
7-159 SOCIAL WORKER
AutoCAD SHX Text
7-S5 STAIR 5
AutoCAD SHX Text
7-157 TOILET
AutoCAD SHX Text
7-158 TOILET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OIF/OEF 7-106 OFFICE
AutoCAD SHX Text
7-110 QUIET ROOM
AutoCAD SHX Text
7-111 OIF/OEF OFFICE
AutoCAD SHX Text
7-114 OIF/OEF OFFICE
AutoCAD SHX Text
7-S7 STAIR 7
AutoCAD SHX Text
7-109 TOILET
AutoCAD SHX Text
7-118 TOILET
AutoCAD SHX Text
7-112 TOILET
AutoCAD SHX Text
7-113 TOILET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WING A
AutoCAD SHX Text
WING B
AutoCAD SHX Text
WING C
AutoCAD SHX Text
WING D
AutoCAD SHX Text
WING E
AutoCAD SHX Text L
AutoCAD SHX Text
DALE ENGLEHART
AutoCAD SHX Text
PROFESSIONAL
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text Y
AutoCAD SHX Text S
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text V
AutoCAD SHX Text M
AutoCAD SHX Text P
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text No. PE045114E
AutoCAD SHX Text
ENGINEER
AutoCAD SHX Text
REGISTERED
AutoCAD SHX Text M
AutoCAD SHX Text W
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text H
AutoCAD SHX Text O
AutoCAD SHX Text
MATCHLINE A
AutoCAD SHX Text
MATCHLINE B
AutoCAD SHX Text
MATCHLINE A
AutoCAD SHX Text
MATCHLINE B
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
PHASING PLAN
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
BUILDING 1 LEVEL 7
AutoCAD SHX Text
GC-103
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LEVEL 7 KEY PLAN
AutoCAD SHX Text 1/128"=1'-0"
AutoCAD SHX Text
BUILDING 1
AutoCAD SHX Text N
AutoCAD SHX Text
PROJECT NORTH
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PHASING KEYED NOTES
AutoCAD SHX Text
ALL WORK WITHIN NOTED AREA SHALL BE CONDUCTED DURING PHASE ONE.
AutoCAD SHX Text 1.1)
AutoCAD SHX Text ALL DEMOLITION WORK WITHIN DUMB WAITER SHAFT SHALL BE CONDUCTED DURING PHASE ONE. SEE ASSOCIATED ARCHITECTURAL AND ELECTRICAL PLANS FOR RELATED DEMOLITION.
AutoCAD SHX Text 1.2)
AutoCAD SHX Text ALL PROPOSED WORK WITHIN DUMB WAITER SHAFT AND MECHANICAL ROOM SHALL BE COMPLETED DURING PHASE SHALL BE COMPLETED DURING PHASE ONE. SEE ASSOCIATED ARCHITECTURAL, ELECTRICAL, AND MECHANICAL PLANS FOR RELATED NEW WORK.
AutoCAD SHX Text 1.3)
AutoCAD SHX Text ALL ARCHITECTURAL WORK WITHIN PROPOSED MECHANICAL MECHANICAL ROOM SHALL BE COMPLETED DURING PHASE ONE. SEE SHALL BE COMPLETED DURING PHASE ONE. SEE ASSOCIATED ARCHITECTURAL PLANS.
AutoCAD SHX Text 1.4)
AutoCAD SHX Text INSTALLATION OF PROPOSED STEAM PIPING TO BE ROUTED FROM DUMB WAITER SHAFT TO NEW MECHANICAL MECHANICAL ROOM SHALL BE CONDUCTED DURING PHASE ONE. SEE SHALL BE CONDUCTED DURING PHASE ONE. SEE MECHANICAL PLANS 1/MP-104 AND 1/MP-105 FOR MP-104 AND 1/MP-105 FOR AND 1/MP-105 FOR 1/MP-105 FOR FOR ASSOCIATED NEW WORK.
AutoCAD SHX Text
ALL WORK WITHIN NOTED AREA SHALL BE CONDUCTED DURING PHASE TWO.
AutoCAD SHX Text 2.1)
AutoCAD SHX Text CONTRACTOR SHALL PROVIDE BALANCING REPORT FOR THE CHILLED WATER SYSTEM FLOW RATE. SEE PLAN 1/MD-104. THIS WORK SHALL BE CONDUCTED AFTER . THIS WORK SHALL BE CONDUCTED AFTER THE NORMAL BUSINESS HOURS OF 6:00AM TO 6:00PM. WORK STARTED AT 6:00PM OR LATER MUST BE COMPLETED BY 6:00AM.
AutoCAD SHX Text 2.2)
AutoCAD SHX Text CONTRACTOR SHALL PROVIDE BALANCING REPORT FOR THE HVAC AIR SYSTEM WITHIN NOTED FLOOR. SEE PLAN 1/MD-101. THIS WORK SHALL BE CONDUCTED AFTER . THIS WORK SHALL BE CONDUCTED AFTER THE NORMAL BUSINESS HOURS OF 6:00AM TO 6:00PM. WORK STARTED AT 6:00PM OR LATER MUST BE COMPLETED BY 6:00AM.
AutoCAD SHX Text 2.3.1)
AutoCAD SHX Text INSTALLATION OF HOT WATER PIPING SYSTEM. INSTALLATION SHALL BEGIN IN THE MECHANICAL ROOM. MECHANICAL ROOM. . ALL SUITES SHALL REMAIN OPERATIONAL DURING CONSTRUCTION. ALL WORK WITHIN WING B SHALL BE CONDUCTED AFTER THE NORMAL BUSINESS HOURS OF 6:00AM TO 6:00PM AND COMPLETED IN SECTIONS UNDER THE DIRECTION OF THE VA PROJECT COR. WORK STARTED AT 6:00PM OR LATER MUST BE COMPLETED BY 6:00AM.
AutoCAD SHX Text 2.3.2)
AutoCAD SHX Text REMOVE AND REPLACE FAN COIL UNITS DURING THE HEATING SEASON (OCTOBER-MARCH). INSTALLED FAN COIL UNITS SHALL BE CONNECTED TO THE EXISTING CHILLED WATER SYSTEM, AND CONNECTED TO ALL UNIT CONTROLS AND EXISTING BMS. CONNECT UNITS TO INSTALLED HOT WATER SYSTEM.
AutoCAD SHX Text 2.3.3)
AutoCAD SHX Text ALL WORK SHALL BE COORDINATED WITH ARCHITECTURAL PLANS FOR CEILING REMOVAL AND REINSTALLATION. ALL WORK SHALL BE COORDINATED WITH THE VA PROJECT COR.
AutoCAD SHX Text
ALL WORK WITHIN NOTED AREA SHALL BE CONDUCTED DURING PHASE THREE.
AutoCAD SHX Text 3.1)
AutoCAD SHX Text CONTRACTOR SHALL REMOVE RADIATOR, VALVES, CONTROLS, AND CAP PIPING AT TAKE OFF OF MAIN PIPE RISER IN FLOOR BELOW. SEE MECHANICAL PLAN 1/MD-104 FOR DEMOLITION WORK AND DETAIL FOR DEMOLITION WORK AND DETAIL 8/MH-502 FOR REMOVAL SPECIFICATIONS. STEAM FOR REMOVAL SPECIFICATIONS. STEAM RADIATOR REMOVAL SHALL OCCUR AFTER NORMAL BUSINESS HOURS DURING THE COOLING SEASON (APRIL-SEPTEMBER). RADIATOR REMOVAL SHALL ONLY OCCUR FOLLOWING THE COMPLETED INSTALLATION AND FULL OPERATION OF PROPOSED FAN COIL UNITS.
AutoCAD SHX Text 3.2)
AutoCAD SHX Text CONTRACTOR SHALL REMOVE HEAT SHIELD INSULATION LOCATED BEHIND STEAM RADIATORS. SEE PLAN 1/HA-2.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text PROVIDE ALL APPLICABLE SUBMITTALS FOR THE PROJECT. THIS INCLUDES BUT IS NOT LIMITED TO SUBMITTALS FOR MATERIALS AND EQUIPMENT.
AutoCAD SHX Text 2.
AutoCAD SHX Text CONTRACTOR SHALL NOT COMMENCE ANY WORK WITHIN PROJECT UNTIL ALL SUBMITTALS ARE APPROVED OR APPROVED AS NOTED. THE PHASE WHERE THIS OCCURS IS REFERRED TO AS PHASE ZERO.
AutoCAD SHX Text 3.
AutoCAD SHX Text
THE APPROXIMATE DURATION TIME FOR PHASE ZERO IS 90 DAYS.
AutoCAD SHX Text 4.
AutoCAD SHX Text CONTRACTOR SHALL REFER TO ICRA PLANS FOR INFORMATION REGARDING ICRA CLASSIFICATIONS AND BARRIER TYPES PRIOR TO THE START OF WORK.
AutoCAD SHX Text 5.
AutoCAD SHX Text
CONTRACTOR SHALL ENSURE CORRIDOR EGRESS IS MAINTAINED AT ALL TIMES.
AutoCAD SHX Text 6.
AutoCAD SHX Text CONTRACTOR SHALL COORDINATE REMOVAL OF AFFECTED ROOM'S FURNISHINGS WITH THE FACILITY AT LEAST TWO WEEKS PRIOR TO THE START OF WORK.
AutoCAD SHX Text 7.
AutoCAD SHX Text WORK SHALL START IN WING B AND CONTINUE TO WING C, THEN WING E AND ENDING IN WINGS A & D. ALL WORK SHALL BE COORDINATED WITH THE VA PROJECT COR. WORK WORK AREAS IN A, B, C, AND E WINGS SHALL HAVE A MAXIMUM OF 3 ROOMS AT A TIME SHUT DOWN TO COMPLETE REQUIRED WORK.
AutoCAD SHX Text
BID DEDUCT ALTERNATE GENERAL NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text WORK IN ALL ROOMS LOCATED ON FLOOR 7 SHALL BE INCLUDED IN BID DEDUCT ALTERNATE 2 WITH THE EXCEPTION OF ROOMS 7-199, 7-195, 7-129, 7-185, 7-178, 7-177, 7-176. REFER TO SPECIFICATION SECTION 01 00 00 AND DRAWING MD-104 FOR FURTHER DEDUCT ALTERNATE DETAILS.
AutoCAD SHX Text 2.
AutoCAD SHX Text WORK IN ALL ROOMS LOCATED ON FLOOR 7 SHALL BE INCLUDED IN BID DEDUCT ALTERNATE 3 WITH THE EXCEPTION OF ROOMS 7-199, 7-195, 7-129, 7-185, 7-178, 7-177, 7-176. REFER TO SPECIFICATION SECTION 01 00 00 AND DRAWING MD-104 FOR FURTHER DEDUCT ALTERNATE DETAILS.
AutoCAD SHX Text
PHASE ONE
AutoCAD SHX Text
PHASE TWO
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
BID DOCUMENTSOffice of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
UPGRADE HEATING SYSTEM
PHASE 1
561-20-101
03/07/2024Revisions: Date:
VA NEW JERSEY HEALTH CARE SYSTEM
K.J.M.
385 TREMONT AVE,
EAST ORANGE, NJ 07018
34 BROWN STREET
HONESDALE, PA 18431
OFFICE : (570) 253-0846
WWW.NEINFRA.COMNortheast Infrastructure, LLC
GC-104
F.R.O.
BUILDING 1 LEVEL 8
PHASING PLAN
AutoCAD SHX Text
8-164 VACANT OFFICE
AutoCAD SHX Text
8-156 ORTHO OFFICE
AutoCAD SHX Text
AutoCAD SHX Text
8-S1 STAIR 1
AutoCAD SHX Text
8-E-103 ELECTRIC
AutoCAD SHX Text
8-S2 STAIR 2
AutoCAD SHX Text
8-126 CORRIDOR
AutoCAD SHX Text
8-199A HAC
AutoCAD SHX Text
8-197 PODIATRY WAITING ROOM
AutoCAD SHX Text
8-194B CLERICAL
AutoCAD SHX Text
8-194A EXAM
AutoCAD SHX Text
8-200 ELEVATOR LOBBY
AutoCAD SHX Text
8-189A STORAGE
AutoCAD SHX Text
8-189B CORRIDOR
AutoCAD SHX Text
8-189E EXAM ROOM
AutoCAD SHX Text
8-189F EXAM ROOM
AutoCAD SHX Text
8-189G EXAM ROOM
AutoCAD SHX Text
8-189D EXAM ROOM
AutoCAD SHX Text
8-209 INPATIENT PHARMACY
AutoCAD SHX Text
8-S3 STAIR 3
AutoCAD SHX Text
8-175B CHIEF ENT
AutoCAD SHX Text
8-173 RESIDENTS OFFICE
AutoCAD SHX Text
8-177 EXAM ROOM
AutoCAD SHX Text
8-149A CORRIDOR
AutoCAD SHX Text
8-172 EXAM ROOM
AutoCAD SHX Text
8-178 MENS TOILET
AutoCAD SHX Text
8-171A EXAM ROOM
AutoCAD SHX Text
8-179 ENT STORAGE
AutoCAD SHX Text
8-SHAFT 3
AutoCAD SHX Text
8-180 ENT SECRETARY
AutoCAD SHX Text
8-171B ENT SECRETARY
AutoCAD SHX Text
8-183 TOILET
AutoCAD SHX Text
8-182 ORTHOPEDIC OFFICE
AutoCAD SHX Text
8-184 CHIEF PODIATRY
AutoCAD SHX Text
8-186 CHIEF ORTHOPEDIC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .