03/02/2023
Evan Mizue
FY24 MCAF PROJECT PAF-180500, BOMBER APRON WON 1663847
Royal Australian Air Force Base Tindal, Australia Final Submittal
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 01 15 LIST OF DRAWINGS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 23.13 20 ELECTRONIC CONSTRUCTION AND FACILITY SUPPORT CONTRACT
MANAGEMENT SYSTEM
01 32 17.00 20 COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
01 33 00 SUBMITTAL PROCEDURES
01 33 23.33 AVIATION FUEL SYSTEM SPECIFIC SUBMITTAL REQUIREMENTS
01 33 29 SUSTAINABILITY REQUIREMENTS AND REPORTING
01 35 13.43 10 SPECIAL PROJECT PROCEDURES FOR CONTAMINATED SITES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 35 29.13 HEALTH, SAFETY, AND EMERGENCY RESPONSE PROCEDURES FOR
CONTAMINATED SITES
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 42 15 METRIC MEASUREMENTS
01 45 00.00 20 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 20 FACILITY ELECTRONIC OPERATION AND MAINTENANCE SUPPORT
INFORMATION (eOMSI)
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 41 00 DEMOLITION
02 61 13 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL
DI VI SI ON 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 37 13 SHOTCRETE
DI VI SI ON 05 - METALS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 59 10 ROLLING COVER FOR AVIATION REFUELING VAULTS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
PROJECT TABLE OF CONTENTS Page 1 GSK JV December 2022 SI:v5.3
DI VI SI ON 26 - ELECTRI CAL
26 08 00 APPARATUS INSPECTION AND TESTING
26 24 13 SWITCHBOARDS
26 27 14.00 20 ELECTRICITY METERING
26 42 17 IMPRESSED CURRENT CATHODIC PROTECTION (ICCP) SYSTEM
26 56 00 EXTERIOR LIGHTING
26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS
DI VI SI ON 27 - COMMUNI CATI ONS
27 21 10.00 40 FIBER OPTIC DATA TRANSMISSION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 23 00.00 20 EXCAVATION AND FILL
31 32 19.16 GEOTEXTILE SOIL STABILIZATION
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 13.13 LIME TREATED SUBGRADE
32 11 20 SEPARATION COURSE FOR RIGID AND SUBBASES FOR FLEXIBLE
PAVING
32 11 23 FINE CRUSHED AGGREGATE ROCK BASE COURSE FOR FLEXIBLE PAVING
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 11 33.13 PORTLAND CEMENT-STABILIZED BASE COURSES
32 11 36.13 LEAN CONCRETE BASE COURSE
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 15.13 ASPHALT PAVING FOR AIRFIELDS
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY
PAVEMENTS
32 14 13.13 INTERLOCKING PRECAST CONCRETE UNIT PAVING
32 15 00 AGGREGATE SURFACING
32 17 23 PAVEMENT MARKINGS
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DI VI SI ON 33 - UTI LI TI ES
33 08 53 AVIATION FUEL DISTRIBUTION SYSTEM START-UP
33 40 00 STORMWATER UTILITIES
33 46 16 SUBDRAINAGE PIPING
33 52 23.15 POL SERVICE PIPING WELDING
33 52 43.11 AVIATION FUEL MECHANICAL EQUIPMENT
33 52 43.13 AVIATION FUEL PIPING
33 52 43.14 AVIATION FUEL CONTROL VALVES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DI VI SI ON 40 - PROCESS I NTERCONNECTI ONS
40 60 00 PROCESS CONTROL
DI VI SI ON 44 - POLLUTI ON AND WASTE CONTROL EQUI PMENT
44 41 00 WATER POLLUTION CONTAINMENT AND CLEANUP EQUIPMENT
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
PROJECT TABLE OF CONTENTS Page 3 GSK JV December 2022 SI:v5.3
ATTACHMENTS:
01 32 17.00 20a 01 33 00a 01 33 29a
Project Lifecycle & HOTO Plan Submittal Register Smart Infrastructure Checklist
01 45 00.00 20a Test Requirement List 01 45 35a Statement of Special Inspections 01 45 35b Schedule of Special Inspections 01 58 00a Project Sign Details 01 78 24.00 20a eOMSI FDW 26 56 20a Figure 1 -Isocandela Diagram 33 08 53a Equipment Test 33 08 53b Performance Testing
-- End of Project Table of Contents --
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 4
DOCUMENT 00 01 15
LIST OF DRAWINGS
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET
NO.
DRAWING
NO.
NAVFAC
NO.
DESCRIPTION
01 GENERAL
1 G- 001 17294321 TITLE SHEET, VICINITY MAP, AND LOCATION MAP
2 G- 002 17294322 INDEX OF DRAWINGS
3 G- 101 17294323 KEY MAP
4 G- 102 17294324 OVERALL SITE PLAN
5 G- 105 17294325 CONTRACTORS SITE FACILITIES AND HAUL ROAD
6 G- 301 17294326 TYPICAL APRON SECTIONS - TEMPORARY WORKS
02 CI VI L
7 C- 001 17294327 ABBREVIATIONS AND LEGEND
8 C- 002 17294328 CIVIL GENERAL NOTES
9 C- 003 17294329 AIRCRAFT UNDERCARRIAGE LAYOUT AND LOADS - B-52
10 C- 004 17294330 AIRCRAFT UNDERCARRIAGE LAYOUT AND LOADS - KC-30
11 C- 005 17294331 AIRCRAFT UNDERCARRIAGE LAYOUT AND LOADS - C-17
12 C- 101 17294332 CONTROL LINE SETOUT PLAN AND HORIZONTAL ALIGNMENT
REPORTS
13 C- 102 17294333 HORIZONTAL ALIGNMENT REPORTS
DOCUMENT 00 01 15 Page 1
14 C- 111 17294334 EXISTING SURFACE/SERVICES - SHEET 1
15 C- 112 17294335 EXISTING SURFACE/SERVICES - SHEET 2
16 C- 113 17294336 EXISTING SURFACE/SERVICES - SHEET 3
17 C- 114 17294337 EXISTING SURFACE/SERVICES - SHEET 4
18 C- 115 17294338 EXISTING SURFACE/SERVICES - SHEET 5
19 C- 116 17294339 EXISTING SURFACE/SERVICES - SHEET 6
20 C- 117 17294340 EXISTING SURFACE/SERVICES - SHEET 7
21 C- 118 17294341 EXISTING SURFACE/SERVICES - SHEET 8
22 C- 119 17294342 EXISTING SURFACE/SERVICES - SHEET 9
23 C- 120 17294343 EXISTING SURFACE/SERVICES - SHEET 10
24 C- 121 17294344 EXISTING SURFACE/SERVICES - SHEET 11
25 C- 122 17294345 EXISTING SURFACE/SERVICES - SHEET 12
26 C- 161 17294346 GENERAL CONSTRUCTION PLAN - SHEET 1
27 C- 164 17294347 GENERAL CONSTRUCTION PLAN - SHEET 4
28 C- 165 17294348 GENERAL CONSTRUCTION PLAN - SHEET 5
29 C- 166 17294349 GENERAL CONSTRUCTION PLAN - SHEET 6
30 C- 167 17294350 GENERAL CONSTRUCTION PLAN - SHEET 7
31 C- 168 17294351 GENERAL CONSTRUCTION PLAN - SHEET 8
32 C- 181 17294352 FINAL SURFACE CONTOURS - SHEET 1
33 C- 184 17294353 FINAL SURFACE CONTOURS - SHEET 4
34 C- 185 17294354 FINAL SURFACE CONTOURS - SHEET 5
35 C- 186 17294355 FINAL SURFACE CONTOURS - SHEET 6
36 C- 187 17294356 FINAL SURFACE CONTOURS - SHEET 7
DOCUMENT 00 01 15 Page 2
37 C- 188 17294357 FINAL SURFACE CONTOURS - SHEET 8
38 C- 401 17294358 SEALED ACCESS ROAD PLAN AND PROFILE
39 C- 402 17294359 UNSEALED ACCESS TRACK "A" PLAN AND PROFILE - 1
40 C- 403 17294360 UNSEALED ACCESS TRACK "A" PLAN AND PROFILE - 2
41 C- 404 17294361 UNSEALED ACCESS TRACK "A" PLAN AND PROFILE - 3
42 C- 405 17294362 UNSEALED ACCESS TRACK "B" PLAN AND PROFILE
43 C- 406 17294363 UNSEALED ACCESS TRACK "C" PLAN AND PROFILE - 1
44 C- 407 17294364 UNSEALED ACCESS TRACK "C" PLAN AND PROFILE - 2
45 C- 408 17294365 UNSEALED ACCESS TRACK "C" PLAN AND PROFILE - 3
46 C- 410 17294366 DETAIL PLANS
47 C- 501 17294367 ACCESS ROAD AND TRACK DETAILS
48 C- 502 17294368 FENCE DETAILS
49 C- 503 17294369 PAVEMENT MARKING DETAILS
50 C- 504 17294370 SERVICES CORRIDOR DETAIL
03 CI VI L DEMOLI TI ON
51 CD 101 17294371 DEMOLITION PLAN - SHEET 1
52 CD 104 17294372 DEMOLITION PLAN - SHEET 4
53 CD 105 17294373 DEMOLITION PLAN - SHEET 5
54 CD 106 17294374 DEMOLITION PLAN - SHEET 6
55 CD 107 17294375 DEMOLITION PLAN - SHEET 7
56 CD 108 17294376 DEMOLITION PLAN - SHEET 8
57 CD 109 17294377 DEMOLITION PLAN - SHEET 9
58 CD 501 17294378 DEMOLITION DETAILS - 1
DOCUMENT 00 01 15 Page 3
59 CD 502 17294379 DEMOLITION DETAILS - 2
04 CI VI L PAVI NG
60 CP 107 17294380 PAVEMENT PLAN - SHEET 7
61 CP 108 17294381 PAVEMENT PLAN - SHEET 8
62 CP 501 17294382 PAVEMENT DETAILS - DRAINAGE LAYER
63 CP 502 17294383 PAVEMENT DETAILS - LEAN MIX CONCRETE DEDUCTIVE ITEM
64 CR 107 17294384 RIGID PAVEMENT JOINTING PLAN - SHEET 7
65 CR 108 17294385 RIGID PAVEMENT JOINTING PLAN - SHEET 8
66 CR 127 17294386 SUBSOIL DRAINAGE PLAN - SHEET 7
67 CR 128 17294387 SUBSOIL DRAINAGE PLAN - SHEET 8
68 CR 301 17294388 TYPICAL SUBSOIL CROSS SECTIONS
69 CR 501 17294389 RIGID PAVEMENT JOINTING PLAN DETAILS - SHEET 1 OF 3
70 CR 502 17294390 RIGID PAVEMENT JOINTING PLAN DETAILS - SHEET 2 OF 3
71 CR 503 17294391 RIGID PAVEMENT JOINTING PLAN DETAILS - SHEET 3 OF 3
72 CR 505 17294392 JOINTING DETAILS - SHEET 1 OF 2
73 CR 506 17294393 JOINTING DETAILS - SHEET 2 OF 2
74 CR 507 17294394 AGL DEEP BASE CAN IN RIGID PAVEMENT AND FOOTING
DETAIL - DUAL LIGHT INSTALLATION
75 CR 509 17294395 RIGID PAVEMENT JOINTING DETAILS - DOWEL SUPPORT
ASSEMBLY FOR DSJ
76 CR 511 17294396 RIGID PAVEMENT JOINTING SLAB REINFORCEMENT DETAILS
AT DEEP BASE CAN BLOCKOUTS - SHEET 1 OF 2
77 CR 512 17294397 RIGID PAVEMENT JOINTING SLAB REINFORCEMENT DETAILS
AT DEEP BASE CAN BLOCKOUTS - SHEET 2 OF 2
78 CR 513 17294398 CONCRETE SURROUND TO FUEL HYDRANTS, HPV AND LPD IN
BLOCK OUTS
79 CR 514 17294399 AGL DEEP BASE CAN IN RIGID PAVEMENT AND FOOTING
DETAILS - LEAN MIX CONCRETE - DEDUCTIVE ITEM 1
80 CR 515 17294400 AGL DEEP BASE CAN IN RIGID PAVEMENT AND FOOTING
DETAILS - DRAINAGE LAYER
DOCUMENT 00 01 15 Page 4
81 CR 516 17294401 CONCRETE SURROUND TO AGL DEEP BASE CAN IN BLOCKOUT
82 CR 517 17294402 AGL DEEP BASE CAN IN RIGID PAVEMENT - CONSTRUCTION
SEQUENCE - DRAINAGE LAYER
83 CR 518 17294403 AGL DEEP BASE CAN IN RIGID PAVEMENT - CONSTRUCTION
SEQUENCE - LEAN MIX CONCRETE - DEDUCTIVE ITEM 1
84 CR 519 17294404 AGL DEEP BASE CAN IN FLEXIBLE PAVEMENT AND FOOTING
DETAILS
85 CR 520 17294405 AGL DEEP BASE CAN IN FLEXIBLE PAVEMENT -
CONSTRUCTION SEQUENCE
86 CR 521 17294406 SUBGRADE TREATMENT DETAILS
87 CR 522 17294407 SQID COVER SLAB DETAILS
88 CL 107A 17294408 RIGID PAVEMENT FINISH SURFACE LEVELS - SHEET 7A
89 CL 107B 17294409 RIGID PAVEMENT FINISH SURFACE LEVELS - SHEET 7B
90 CL 107C 17294410 RIGID PAVEMENT FINISH SURFACE LEVELS - SHEET 7C
91 CL 107D 17294411 RIGID PAVEMENT FINISH SURFACE LEVELS - SHEET 7D
92 CL 108A 17294412 RIGID PAVEMENT FINISH SURFACE LEVELS - SHEET 8A
93 CL 108B 17294413 RIGID PAVEMENT FINISH SURFACE LEVELS - SHEET 8B
94 CL 108C 17294414 RIGID PAVEMENT FINISH SURFACE LEVELS - SHEET 8C
95 CL 108D 17294415 RIGID PAVEMENT FINISH SURFACE LEVELS - SHEET 8D
96 CL 301 17294416 TYPICAL CROSS SECTIONS - APRON TAXILANE - SHEET 1
OF 3
97 CL 302 17294417 TYPICAL CROSS SECTIONS - APRON TAXILANE - SHEET 2
OF 3
98 CL 303 17294418 TYPICAL CROSS SECTIONS - APRON TAXILANE - SHEET 3
OF 3
99 CL 501 17294419 CROSS SECTIONS - APRON TAXILANE - CH 120 TO CH 150
- SHEET 1 OF 10
100 CL 502 17294420 CROSS SECTIONS - APRON TAXILANE - CH 160 TO CH 190
- SHEET 2 OF 10
101 CL 503 17294421 CROSS SECTIONS - APRON TAXILANE - CH 200 TO CH 230
- SHEET 3 OF 10
102 CL 504 17294422 CROSS SECTIONS - APRON TAXILANE - CH 240 TO CH 270
- SHEET 4 OF 10
103 CL 505 17294423 CROSS SECTIONS - APRON TAXILANE - CH 280 TO CH 310
- SHEET 5 OF 10
DOCUMENT 00 01 15 Page 5
104 CL 506 17294424 CROSS SECTIONS - APRON TAXILANE - CH 320 TO CH 350
- SHEET 6 OF 10
105 CL 507 17294425 CROSS SECTIONS - APRON TAXILANE - CH 360 TO CH 390
- SHEET 7 OF 10
106 CL 508 17294426 CROSS SECTIONS - APRON TAXILANE - CH 400 TO CH 430
- SHEET 8 OF 10
107 CL 509 17294427 CROSS SECTIONS - APRON TAXILANE - CH 440 TO CH 470
- SHEET 9 OF 10
108 CL 510 17294428 CROSS SECTIONS - APRON TAXILANE - CH 480 TO CH 510
- SHEET 10 OF 10
109 CM 107 17294429 PAVEMENT MARKING PLAN - SHEET 7
110 CM 108 17294430 PAVEMENT MARKING PLAN - SHEET 8
111 CM 503 17294431 PAVEMENT MARKING DETAILS
112 CM 504 17294432 PAVEMENT MARKING DETAILS
05 CI VI L STORMWATER
113 CS 101 17294433 DRAINAGE PLAN - SHEET 1
114 CS 104 17294434 DRAINAGE PLAN - SHEET 4
115 CS 107 17294435 DRAINAGE PLAN - SHEET 7
116 CS 108 17294436 DRAINAGE PLAN - SHEET 8
117 CS 301 17294437 DRAINAGE LONGITUDINAL SECTIONS - SHEET 1 OF 8
118 CS 302 17294438 DRAINAGE LONGITUDINAL SECTIONS - SHEET 2 OF 8
119 CS 303 17294439 DRAINAGE LONGITUDINAL SECTIONS - SHEET 3 OF 8
120 CS 304 17294440 DRAINAGE LONGITUDINAL SECTIONS - SHEET 4 OF 8
121 CS 305 17294441 DRAINAGE LONGITUDINAL SECTIONS - SHEET 5 OF 8
122 CS 306 17294442 DRAINAGE LONGITUDINAL SECTIONS - SHEET 6 OF 8
123 CS 307 17294443 DRAINAGE LONGITUDINAL SECTIONS - SHEET 7 OF 8
124 CS 308 17294444 DRAINAGE LONGITUDINAL SECTIONS - SHEET 8 OF 8
125 CS 401 17294445 DRAINAGE PIT SCHEDULES
DOCUMENT 00 01 15 Page 6
126 CS 501 17294446 STORMWATER DRAINAGE DETAILS - GRATED TRENCH DRAIN
DETAILS AND SETOUT POINTS
127 CS 502 17294447 STORMWATER DRAINAGE DETAILS - FLAME TRAP DETAILS
AND SECTIONS
128 CS 503 17294448 STORMWATER DRAINAGE DETAILS - BEDDING AND
BACKFILLING OF CULVERTS
129 CS 504 17294449 STORMWATER DRAINAGE DETAILS - STORMWATER TREATMENT
LAYOUT AND SECTION
130 CS 506 17294450 STORMWATER DRAINAGE DETAILS - SWALE DETAIL
131 CS 508 17294451 STORMWATER DRAINAGE DETAILS - TYPICAL HEADWALL
OUTLET
132 CS 509 17294452 STORMWATER DRAINAGE DETAILS - WEIR AND PENSTOCK
DETAILS
133 CS 510 17294453 STORMWATER DRAINAGE DETAILS - PENSTOCK 1 SECTIONS
134 CS 511 17294454 STORMWATER DRAINAGE DETAILS - PENSTOCK 2 SECTIONS
06 CI VI L FUELI NG
135 CX 101 17294455 HYDRANT PIPELINE PLAN 1
136 CX 104 17294456 HYDRANT PIPELINE PLAN 2
137 CX 107 17294457 HYDRANT PIPELINE PLAN 3
138 CX 108 17294458 HYDRANT PIPELINE PLAN 4
139 CX 201 17294459 HYDRANT PIPELINE PROFILE 1
140 CX 204 17294460 HYDRANT PIPELINE PROFILE 2
141 CX 207 17294461 HYDRANT PIPELINE PROFILE 3
142 CX 208 17294462 HYDRANT PIPELINE PROFILE 4
143 CX 501 17294463 CIVIL POL DETAILS 1
144 CX 502 17294464 CIVIL POL DETAILS 2
07 ELECTRI CAL
145 E- 105 17294465 LOW VOLTAGE INFRASTRUCTURE - SHEET 5
146 E- 107 17294466 LOW VOLTAGE INFRASTRUCTURE - SHEET 7
DOCUMENT 00 01 15 Page 7
147 E- 108 17294467 LOW VOLTAGE INFRASTRUCTURE - SHEET 8
148 E- 157 17294468 AERONAUTICAL GROUND LIGHTING - SETOUT DETAILS -
SHEET 7
149 E- 158 17294469 AERONAUTICAL GROUND LIGHTING - SETOUT DETAILS -
SHEET 8
150 E- 160 17294470 AERONAUTICAL GROUND LIGHTING - SETOUT DETAILS -
SHEET 10
151 E- 161 17294471 AERONAUTICAL GROUND LIGHTING - SETOUT DETAILS -
SHEET 11
152 E- 175 17294472 AERONAUTICAL GROUND LIGHTING - CABLE DETAILS -
SHEET 5
153 E- 177 17294473 AERONAUTICAL GROUND LIGHTING - CABLE DETAILS -
SHEET 7
154 E- 178 17294474 AERONAUTICAL GROUND LIGHTING - CABLE DETAILS -
SHEET 8
155 E- 179 17294475 AERONAUTICAL GROUND LIGHTING - CABLE DETAILS -
SHEET 9
156 E- 180 17294476 AERONAUTICAL GROUND LIGHTING - CABLE DETAILS -
SHEET 10
157 E- 181 17294477 AERONAUTICAL GROUND LIGHTING - CABLE DETAILS -
SHEET 11
158 E- 182 17294478 AERONAUTICAL GROUND LIGHTING - CABLE DETAILS -
SHEET 12
159 E- 501 17294479 MAIN DISTRIBUTION BOARD DETAIL
160 E- 502 17294480 MAIN DISTRIBUTION BOARD SCHEMATIC
161 E- 506 17294481 TYPICAL FLOODLIGHTING INSTALLATION DETAILS
162 E- 507 17294482 APRON FLOODLIGHTING CONTROL PANEL
163 E- 508 17294483 APRON FLOODLIGHTING CONTROL PANEL
164 E- 511 17294484 PENSTOCK DISTRIBUTION BOARD DETAIL
165 E- 512 17294485 PENSTOCK DISTRIBUTION BOARD SCHEMATIC
166 E- 516 17294486 EARTH PIT AND STATIC EARTH POINT DETAIL
167 E- 517 17294487 LOW VOLTAGE ELECTRICAL PIT DETAILS
168 E- 550 17294488 AERONAUTICAL GROUND LIGHTING - LEGEND AND DETAILS
169 E- 551 17294489 AERONAUTICAL GROUND LIGHTING - GENERAL DETAILS -
SHEET 1 OF 3
DOCUMENT 00 01 15 Page 8
170 E- 552 17294490 AERONAUTICAL GROUND LIGHTING - GENERAL DETAILS -
SHEET 2 OF 3
171 E- 553 17294491 AERONAUTICAL GROUND LIGHTING - GENERAL DETAILS -
SHEET 3 OF 3
172 E- 554 17294492 AERONAUTICAL GROUND LIGHTING - MAGS INSTALLATION
DETAILS SHEET 1 OF 2
173 E- 555 17294493 AERONAUTICAL GROUND LIGHTING - LIGHT AIMING DETAILS
174 E- 556 17294494 AERONAUTICAL GROUND LIGHTING - SIT & EARTH PIT
DETAILS
175 E- 557 17294495 AERONAUTICAL GROUND LIGHTING - CABLE MARKER DETAILS
176 E- 558 17294496 AERONAUTICAL GROUND LIGHTING - ALER ACCESS DETAIL
177 E- 559 17294497 AERONAUTICAL GROUND LIGHTING - MAGS INSTALLATION
DETAILS SHEET 2 OF 2
08 ELECTRI CAL FUELI NG
178 EK 101 17294498 CATHODIC PROTECTION SITE PLAN 1
179 EK 104 17294499 CATHODIC PROTECTION SITE PLAN 2
180 EK 107 17294500 CATHODIC PROTECTION SITE PLAN 3
181 EK 108 17294501 CATHODIC PROTECTION SITE PLAN 4
182 EK 501 17294502 ANODE GROUNDED INSTALLATION DETAILS
183 EK 502 17294503 CATHODIC PROTECTION DETAILS 2
184 EK 503 17294504 CATHODIC PROTECTION DETAILS 3
09 COMMUNI CATI ONS
185 T- 100 17294505 ICT INFRASTRUCTURE KEY MAP
186 T- 101 17294506 ICT INFRASTRUCTURE - SHEET 1
187 T- 102 17294507 ICT INFRASTRUCTURE - SHEET 2
188 T- 105 17294508 ICT INFRASTRUCTURE - SHEET 5
189 T- 107 17294509 ICT INFRASTRUCTURE - SHEET 7
190 T- 108 17294510 ICT INFRASTRUCTURE - SHEET 8
DOCUMENT 00 01 15 Page 9
191 T- 401 17294511 FUEL FARM - SITE PLAN
192 T- 402 17294512 FIRE STATION - SITE PLAN
193 T- 601 17294513 ICT SERVICES - BLOCK DIAGRAMS
194 T- 602 17294514 ICT SERVICES - BLOCK DIAGRAM - ESD SYSTEM I/O
CONTROLS
195 T- 603 17294515 ESD FUEL CONTROL STATION GENERAL ARRANGEMENT
196 T- 604 17294516 PENSTOCK FIRE STATION CONTROLS
197 T- 605 17294517 PENSTOCK FIELD CONTROLS
10 STRUCTURAL
198 S- 001 17294518 STRUCTURAL NOTES - SHEET 1
199 S- 002 17294519 STRUCTURAL NOTES - SHEET 2
200 S- 003 17294520 STRUCTURAL NOTES - SHEET 3
201 S- 501 17294521 PIT DETAILS - PENSTOCK 01 & 02
202 S- 502 17294522 PIT DETAILS - WEIR PITS
203 S- 503 17294523 PIT DETAILS - FLAME TRAPS AND CHANNELS
204 S- 504 17294524 PIT DETAILS - JUNCTION PITS
205 S- 505 17294525 PIT DETAILS - PIT T01
206 S- 506 17294526 PIT DETAILS - SQID PITS PLANS
207 S- 507 17294527 PIT DETAILS - TYPICAL SQID PIT REINFORCMENT SECTIONS
208 S- 508 17294528 FUEL SYSTEM UPGRADE - HYDRANT PIPELINE - VALVE PIT
VP-002 STRUCTURAL DETAILS
209 S- 509 17294529 CULVERT BASE SLAB
210 S- 510 17294530 NOT USED
211 S- 512 17294531 FLOODLIGHTING FOOTING DETAILS
11 STRUCTURAL FUELI NG
DOCUMENT 00 01 15 Page 10
212 SP 001 17294532 STRUCTURAL NOTES, LEGEND, AND ABBREVIATIONS
213 SP 501 17294533 NOT USED
214 SP 502 17294534 HIGH POINT VENT AND LOW POINT DRAIN PITS - DETAILS
215 SP 503 17294535 VAULT ROLLING COVER - DETAILS 1
216 SP 504 17294536 PIT DETAILS
217 SP 505 17294537 ISOLATION VALVE PIT - DETAILS
218 SP 506 17294538 VAULT ROLLING COVER - DETAILS 2
219 SP 507 17294539 VAULT ROLLING COVER - DETAILS 3
220 SP 508 17294540 VAULT ROLLING COVER - DETAILS 4
221 SP 509 17294541 VAULT ROLLING COVER - DETAILS 5
12 EXPLOSI VE ORDNANCE
222 X- 107 17294542 EO - EXPLOSIVE ARCS
223 X- 117 17294543 EO - MAIN APRON - SHEET 7
224 X- 118 17294544 EO - MAIN APRON - SHEET 8
225 X- 127 17294545 HAZARDOUS AREAS - MAIN APRON - SHEET 7
226 X- 128 17294546 HAZARDOUS AREAS - MAIN APRON - SHEET 8
227 X- 501 17294547 HAZARDOUS AREAS - FUEL PIT ZONE DETAILS
228 X- 502 17294548 HAZARDOUS AREAS - FUEL PIT ZONE DETAILS
229 X- 503 17294549 HAZARDOUS AREAS - FUEL PIT ZONE DETAILS
230 X- 504 17294550 HAZARDOUS AREAS - INTERCEPTOR ZONE DETAILS
231 X- 505 17294551 HAZARDOUS AREAS - STORMWATER DRAINS ZONE DETAILS
232 X- 506 17294552 HAZARDOUS AREAS - PENSTOCK ZONE DETAILS
233 X- 520 17294553 HAZARDOUS AREAS - B-52 AIRCRAFT ZONES
DOCUMENT 00 01 15 Page 11
234 X- 521 17294554 HAZARDOUS AREAS - C-17A AIRCRAFT ZONES
235 X- 522 17294555 HAZARDOUS AREAS - KC-30A AIRCRAFT ZONES
13 MECHANI CAL FUELI NG
236 MP 001 17294556 MECHANICAL NOTES, ABBREVIATIONS, AND LEGENDS
237 MP 011 17294557 HYDRANT LOOP CROSSOVER VALVE PIT AND HYDRANT LOOP
FLOW DIAGRAM
238 MP 501 17294558 MECHANICAL DETAILS 1
239 MP 502 17294559 HYDRANT LOOP CROSSOVER VALVE PIT
240 MP 503 17294560 HYDRANT OUTLET PIT 1
241 MP 504 17294561 PIT CABLE PENETRATION AND PIT FLANGE EARTHING
242 MP 505 17294562 HYDRANT LOOP ISOLATION VALVE PIT
243 MP 506 17294563 HIGH POINT VENT AND LOW POINT DRAIN PITS
-- End of Document --
DOCUMENT 00 01 15 Page 12
SECTION 01 11 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety -- Safety and Health Requirements Manual
1.2 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00
SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
List Of Contact Personnel ; G
Personnel List
Vehicle List
Entry Approval For Employees (DCAC) ; G
Conduct Works/Interrupt Base Services (CWIBS) ; G
Environmental Clearance Certificate (ECC) ; G
Accident Prevention Plan (APP) ; G
EO Cooperation Consultation and Coordination Plan (EO CCC) ; G
1.3 GENERAL REQUIREMENTS
The Contractor acknowledges and agrees that:
a. the Contractor is a party to the contract with the Naval Facilities Engineering Systems Command, Pacific (NAVFAC) to carry out the Contractor's Activities and Works on the Royal Australian Air Force (RAAF) Base Tindal;
b. the Contracting Officer is an employee of the Naval Facilities Engineering Systems Command who NAVFAC Pacific has assigned administration and enforcement authority and responsibility for this
SECTION 01 11 00 Page 1 contract;
c. Australian Requirements are laws, codes, decrees, labor standards, and regulations of the host country, Commonwealth, State and Territory, currently in effect, that the Contractor is required to comply with, including but not limited to the Australian Requirements Schedule attached at the end of this section;
d. the Contractor is responsible for ensuring it complies with all requirements of the contract, including the Division 01 (General Requirements), Australian Requirements, and any other laws, codes, decrees, labor standards, and regulations of the host country, Commonwealth, State and Territory; Federal Acquisition Regulation (FAR) 52.236-7, Permits and Responsibilities; Defense Federal Acquisition Regulation Supplement (DFARS) 252.222-7002, Compliance with Local Labor Laws (Overseas) of the Request For Proposal, Document 00700;
e. if the Contractor identifies any ambiguity, discrepancy or inconsistency between the requirements of the contract, including the requirements of Division 01, Australian Requirements, and any other laws, codes, decrees, labor standards, and regulations of the host country, Commonwealth, State and Territory, the Contractor must immediately submit a Request for Information (RFI) to the Contracting Officer clearly describing the ambiguity, discrepancy and inconsistency and offer a proposed solution;
f. immediately notify the Contracting Officer if the Commonwealth or any person authorised by the Commonwealth impedes, disrupts, or frustrates the Contractor's performance of the Contract, or otherwise causes potential Contractor delay; and
g. when an Australian standard or requirement is offered as an equivalent to a U.S. standard or requirement, the Contractor must furnish documentation proving equivalency.
h. Contractor to provide a list of contact personnel , personnel list , vehicle list and Entry Approval For Employees (DCAC) prior to access to site as set out in the Site Management Plan requirements as outlined in Section 01 14 00.
1.4 MANUAL OF FIRE PROTECTION ENGINEERING (MFPE) AND NATIONAL CONSTRUCTION
CODE (NCC) CERTIFICATION
The Contractor must provide to the Contracting Officer written certification from an Accredited Building Surveyor as a condition precedent to completion, that the Works comply or the Stage complies (as the case may be) with the MFPE and the NCC, except to the extent of any dispensation or performance solution granted by the Australian Defence Assistant Secretary of Environment and Engineering Branch (ASEE) and identified in the certification. To the extent that there is any inconsistency between the MFPE and the NCC, the MFPE prevails.
1.5 APPLICABLE STANDARDS
a. Subject to paragraph (b) and without limiting the Contractor's obligations under this Contract, the Contractor must comply with the Applicable Standards in performing the Contractor's Activities and executing the Works.
SECTION 01 11 00 Page 2
Without limiting the Conditions of Contract, the Contract includes published documents adduced by reference (to the whole or part), and the Contractor (itself or through its agents) is deemed to have adequate knowledge of them. Responsibilities and duties of the Commonwealth, Contractor and Contracting Officer are not altered by requirements in such published documents referenced in the Works Description. Unless otherwise specified in the Works Description and, where applicable, materials and workmanship shall be in accordance with the latest version of the Technical Specification, Drawings and the applicable Australian Standards and Codes. Site Copies: Keep copies on Site of those referenced documents in the Works Description that are cited or referenced or that specify Site work.
b. Where there is an ambiguity, discrepancy or inconsistency between any Applicable Standard. American Standard, the Contract, any other Project Document, the MFPE or the National Construction Code, the higher standard, quality or quantum will prevail.
(1) The Contracting Officer may, at any time, request that the Contractor provides a certificate from each relevant subcontractor which certifies that (to the extent then applicable) all design carried out by that subcontractor or the Works or any Stage executed by that subcontractor (as the case may be) complies with the Applicable Standards.
c. The Contractor acknowledges that the Government may exercise any of its rights under this Contract to carry out periodic auditing of the Contractor's compliance.
1.6 WORK COVERED BY CONTRACT DOCUMENTS
1.6.1 Project Description
The work includes construction of a United States Air Force (USAF) Bomber Apron at RAAF Base, Tindal, Northern Territory.
The apron will provide parking for six B-52 aircraft to support aircraft participating in training exercises launching from RAAF Base Tindal. The project scope includes the demolition of the existing Air Movements Apron and Air Movements Terminal facilities, construction of a new apron for six B52 bombers to be parked and licensed for explosive ordnance loading, construction of a new hydrant fuel line from new fuel farm (fuel farm construction will be completed by others), six refueling points, apron stormwater collection and treatment, apron floodlighting, aeronautical Ground Lighting (AGL) including Movement Area Guidance Signs (MAGS) to the new apron. Civil works include excavation in PFAS impacted soil.
In addition to the requirements specified in the Contract Documents, all work must also be conducted in accordance with the applicable Australian legislation, Australian codes of practice, applicable AS/NZS standards, Australian Defence policies, and relevant Australian Defence authorization.
1.6.2 Location
The work is located at the Royal Australian Air Force (RAAF) Base Tindal, Northern Territory, Australia, approximately as indicated. The exact location will be shown by the Contracting Officer.
SECTION 01 11 00 Page 3
1.7 OCCUPANCY OF PREMISES
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
The Contractor must prepare a Conduct Works/Interrupt Base Services (CWIBS) prior to obtaining access to the construction area. The Contractor must allow up to 25 working days for the Contracting Officer to obtain CWIBS approvals from RAAF Base Tindal.
1.8 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
1.9 LOCATION OF UNDERGROUND UTILITIES
Complete the Contractor's digging permits prior to start of excavation, and comply with RAAF Base Tindal requirements for locating and marking underground utilities. Contact the Contracting Officer to coordinate with the RAAF Base Tindal Security and Estate Group (SEG), Base Support Services and the Estate Maintenance and Operation Services (EMOS) Contractor a minimum of 10 working days prior to excavating, to mark utilities. Verify existing utility locations indicated on contract drawings, within area of work.
Identify and mark all other utilities not managed and located by the local utility companies. Request potentially existing utility information from the Site Master Plan which can be obtainted from the Contracting Officer. The Contractor may also obtain existing utility information from 'Dial Before You Dig Services'. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground or paved surface where existing underground utilities are discovered. Verify the elevations of existing piping, utilities,and any type of underground or encased obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made.
1.9.1 Notification Prior to Excavation
Prior to conducting excavation works, ensure that approval to commence general construction works has been obtained from the Australian Department of Defence in the form of an approved CWIBS and Environmental Clearance Certificate (ECC) which is further described in the Australian Requirements Schedule.
SECTION 01 11 00 Page 4
The Contractor must allow up to 35 calendar days for the review and approval of the ECC and Construction Environmental Management Plan (CEMP) by the Contracting Officer and the Australian Department of Defence.
PART 2 PRODUCTS
2.1 GENERAL
Unless otherwise specified in the Specifications, the storage, handling and installation of all materials shall be in accordance with the manufacturer's recommendations.
The Works shall be generally of standards of design, construction and finish suitable for heavy industrial and heavy commercial service and resistant to vandalism.
All materials and equipment shall be the best of their respective kinds, complying with the relevant Standards and Local Codes of Practice. Unless otherwise specified, all materials and equipment shall be new and shall be delivered to the site with the maker's label intact.
The Contractor shall be required to transport and deliver to and from the Site all materials, equipment, vehicles, constructional plant and other items to be used in executing the Works.
2.2 PROPRIETY ITEMS
The Specification and drawing make reference to proprietary items or approved equivalent. Mention of a proprietary service, product or material brand name indicates that the item is compliant with the relevant specific description and necessary properties (as may be determined by the Contracting Officer) unless the relevant specific description identifies the item as ASIO-preferred or clearly states that no alternative is allowed, it does not indicate an exclusive preference. Do not proceed to order or use an alternative unless direction to proceed is received by the Contracting Officer.
Substitution is allowed only to the extent that it is compliant with the requirements and equivalent to the Works Description.
If the Contracting Officer deems that use of the alternative constitutes a Variation, the Variation will be dealt with in accordance with the Contract.
Submissions: In proposed alternatives submissions, the Contractor must include sufficient information to permit evaluation, including:
a. Information as for Proposed Product including specifications and drawings, material composition, type test reports, performance and rating tables, compliance with legislation and standards, installation or application methods, serviceability, durability, protection needs, maintenance requirements and recommendations.
b. Any significant differences from specified items, effects on other work and costs.
c. Evidence of consistency with the Contract and equivalence to the required or described item.
SECTION 01 11 00 Page 5
d. If appropriate, samples.
e. Reasons for the proposed substitution.
f. Statement of the extent of revisions to the Contract documents.
g. Statement of the extent of revisions to the approved program.
h. Statement of cost implications comparing both the complying offer and the alternative. Documentary evidence of materials costs shall be included. Certified copies of supplier quotations will be accepted.
The impact on construction and running costs shall be included.
i. Statement of consequent alterations to other parts of the Works.
j. If the required or described item is proven to be unavailable.
k. Evidence of enhanced value to the Government.
If products must comply with product certification schemes, submit evidence of compliance.
The Contractor must bear any additional costs, including fees, charges, and administration costs resulting from submission of non-compliant alternatives.
2.3 FIRE HAZARD PROPERTIES
The Contractor shall ensure that materials and finishes selected comply with fire hazard property limits under Building Code of Australia (BCA) C1.10 and advise the Contracting Officer if a requirement would not comply.
2.4 MANUFACTURERS' OR SUPPLIERS' RECOMMENDATIONS
Obtain all applicable manufacturers' and suppliers' specifications, recommendations and instructions; ensure that each is current; comply with them to the extent that is not in conflict with any requirement under the Contract; advise the Contracting Officer of any conflict with a requirement that might affect any of the objectives listed in the definition of manufacturers' specification, and of any supplementary or contrary action.
Provide, transport, deliver, store, handle, protect, finish, adjust, and prepare for use manufactured items in accordance with the current written recommendations and instructions of the manufacturer or supplier.
Where items are specified or shown on the drawings in generic or non-prescriptive terms, select and provide items that are recommended by the manufacturer as appropriate to the particular service conditions.
Submit the manufacturer's recommendations and instructions to the Contracting Officer and advise of conflicts with other requirements.
Advise the Contracting Officer of specified works that are contrary to manufacturers' or suppliers' written recommendations and instructions.
SECTION 01 11 00 Page 6
2.5 PRODUCT CERTIFICATION
If products must comply with product certification schemes, provide them in accordance with the certification requirements.
2.6 MATERIALS SEPARATION
Prevent direct contact between incompatible metals, and between green hardwood or chemically treated timber and aluminium or coated steel, by either:
a. applying an anti-corrosion, low moisture transmission coating to contact surfaces; or
b. inserting a separation layer.
Any fasteners used to join incompatible materials shall not contribute to the deterioration of any materials being joined.
All dissimilar metals and materials shall be suitably isolated in accordance with industry standards to prevent galvanic corrosion.
2.7 SEALED CONTAINERS
If materials or products are supplied by the manufacturer in closed or sealed containers or packages, bring the materials or products to point of use in the original containers or packages.
2.8 CONSISTENCY
For the whole quantity of each material or product use the same manufacturer or source and provide consistent type, size, quality and appearance.
2.9 COMPATIBILITY
Use only materials that are fully compatible with others in proximity, and will cause no discoloration, corrosion, disfigurement or failure; if any possibility of such detriment exists between required materials, advise the Contracting Officer.
2.10 COLORS
Product colors shall be selected by the Contractor from the material's standard color range, except for paints (which may be non-standard colors). The Contractor must confirm specified colors with the Contracting Officer.
2.11 PROTECTIVE COATINGS
All equipment and materials (including all metal surfaces) supplied under this Contract shall be suitably protected from corrosion (internally and externally, where applicable) or deterioration due to the presence of aggressive soil and the prevailing environment and climatic conditions.
Protective coatings (or additives) shall be types suitable for the surfaces (or materials) to be protected and the prevailing conditions.
SECTION 01 11 00 Page 7
2.12 Aqueous Film Forming Foam
The Contractor shall ensure that supply and installation of any materials under this Contract that requires or contains Aqueous Film Forming Foam (AFFF) complies with the Department of Defence Infrastructure Division Environment and Engineering Branch Pollution Prevention Management Manual.
Procurement of AFFF product must not contain Perfluorooctane Sulfonate (PFOS) or Perfluorooctanoic Acid (PFOA) as the active ingredient.
PART 3 EXECUTION
Not used.
PART 4 AUSTRALIAN REQUIREMENTS SCHEDULE
4.1 DEFINITIONS
For the purposes of this Australian Requirements Schedule:
a. ACM means asbestos containing material.
b. Approvals means any license, permit, consent, approval, determination, certificate, notice or other requirement any authority, body or organisation having any jurisdiction in connection with the Site, the Contractor's Activities or the Works or under any applicable Statutory Requirement, which must be obtained or satisfied to:
(1) carry out the Contractor's Activities or the Works; or
(2) occupy, use, maintain or operate the completed Works.
c. Classified Information includes:
(1) any document marked with a national security classification; and
(2) any information that the Contractor knows or ought to know is subject to, or ought to be treated in accordance with, the provisions of the Defence Security Manual.
d. Code of Federal Regulations (CFR) means the codification of the general and permanent rules and regulations (administrative law) published in the Federal Register by the executive departments and agencies of the U.S. Government.
e. Code of Practice means a code of practice approved in accordance with the WHS Legislation.
f. Commonwealth means the Commonwealth of Australia.
g. Contamination means the presence in, on or under land, air or water of a substance (whether a solid, liquid, gas, odour, heat, sound, vibration or radiation) at a concentration above the concentration at which the substance is normally present in, on or under land, air or water in the same locality, that presents a risk of Environmental Harm, including harm to human health or any other aspect of the Environment, or could otherwise give rise to a risk of non-compliance with any Statutory Requirement for the protection of the Environment.
SECTION 01 11 00 Page 8
h. Contract means the contract awarded for this project formalizing a commercial arrangement between the U.S. Government and the Contractor to perform the construction of the works.
i. Contracting Officer has the meaning given in the Contract.
j. Contractor has the meaning given in the Contract.
k. Contractor's Activities means all things or tasks which the Contractor is, or may be, required to do to comply with its obligations under the Contract.
l. Contractor Handover Takeover (HOTO) Obligation means any task, function, requirement or obligation relating to the HOTO Process (including commissioning of the Works) required to be performed by the Contractor under this Contract or which a HOTO Requirement allocates, or would reasonably be inferred as allocating, to the Contractor, including those that the HOTO Plan and Checklist expressly allocates to the "Contractor Representative" (as that term is used in the HOTO Plan and Checklist).
m. Dangerous Goods has the meaning given by the Dangerous Goods Act 1998.
n. Defence means the Commonwealth Department of Defence.
o. Defence Environmental Requirements means the Defence Environmental Management System (EMS) and Defence Environmental Plan applicable to the Site, the Contractor's Activities or the Works, including any procedures, instructions, requirements and standing orders which have been developed or issued under the Defence EMS or Defence Environmental Plan.
p. Defence Environmental Management System means the environmental management system applicable to the Site (if any).
q. Defence Environmental Plan means the environmental plan applicable to the Site (if any).
r. Defence Requirements means all policies, plans, manuals, guidelines, instructions (including departmental procurement policy instructions) and other Commonwealth or Defence requirements which are, or may become, applicable to the Site, the Contractor's Activities or the Works. To the extent that any of the requirements would require or suggest the insertion of provisions into the Contract, then those provisions will be incorporated by reference into the Contract.
s. Defence Security Principles Framework (DSPF) is a reference to that document available at https://www.defence.gov.au/dsvs/dspf.asp, as amended from time to time.
t. Defense Federal Acquisition Regulation Supplement means the Department of Defense supplement to the Federal Acquisition Regulation (FAR) that contains requirements of U.S. law, DoD-wide policies, delegations of FAR authorities, deviations from FAR requirements, and DoD policies/procedures.
u. DEQMS means the Defence Estate Quality Management System website available at www.defence.gov.au/estatemanagement.
SECTION 01 11 00 Page 9
v. eDEOP 101 means the document titled "Defence Explosive Ordnance Publication (DEOP) 101 - Department of Defence Explosives Regulations" as amended from time to time.
w. Effective Date means the date shown in Block 31C. AWARD DATE of the Standard Form (SF) 1442, SOLICITATION, OFFER, AND AWARD.
x. EM 385-1-1 means the latest version of the U.S. Army Corps of Engineers manual in effect on the date the solicitation was issued (refer to Block 3. DATE ISSUED on the SF1442) and prescribing the safety and health requirements for construction contract work.
y. Environment includes:
(1) ecosystems and their constituent parts, including people and communities;
(2) natural and physical resources;
(3) the qualities and characteristics of locations, places and areas;
and
(4) the social, economic, aesthetic and cultural aspects of a thing mentioned in paragraphs (i), (ii) or (iii).
z. Environmental Clearance Certificate means the Environmental Clearance Certificate issued by the Commonwealth relating to the Contractor's Activities or the Works and any conditions incorporated in that certificate.
aa. Environmental Harm means any actual or threatened adverse impact on, or damage to, the Environment.
bb. Environmental Incident means any Environmental Harm or Contamination arising out of or in connection with the Contractor's Activities or the Works.
cc. Environmental Requirements includes the:
(1) Environmental Clearance Certificate; and
(2) Defence Environmental Requirements.
dd. EO CCC Plan has the meaning given in clause 4.3.
ee. Federal Acquisition Regulation means the primary document of the United States Government Federal Acquisition Regulations System for the codification and publication of uniform policies and procedures for acquisition.
ff. GHS means the Globally Harmonised System of Classification and Labelling of Chemicals published by the United Nations, (Rev.8) (2019), as modified by the relevant WHS Legislation.
https://www.unece.org/trans/danger/publi/ghs/ghs_rev08/08files_e.html
gg. GHS Material means material suspected of containing or likely to contain a substance defined or listed in the GHS.
SECTION 01 11 00 Page 10
hh. GST the tax payable on taxable supplies under the GST Legislation.
ii. GST Legislation means A New Tax System (Goods and Services Tax) Act 1999 (Cth) and any related Act imposing such tax or legislation that is enacted to validate, recapture or recoup such tax.
jj. Hazardous Chemical has the meaning given in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth) and includes:
(1) prohibited carcinogen, as defined in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth);
(2) restricted carcinogen, as defined in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth);
(3) hazardous chemicals the use of which is restricted under regulation 382 of the Work Health and Safety Regulations 2011 (Cth), including polychlorinatedbiphenyls;
(4) Schedule 11 Hazardous Chemicals;
(5) hazardous chemicals listed in Table 14.1 of Schedule 14 of the Work Health and Safety Regulations 2011(Cth);
(6) Schedule 15 Chemicals; and
(7) lead as defined in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth).
kk. Hazardous Substances means Ozone Depleting Substances (ODS), Synthetic Greenhouse Gases, Hazardous Chemicals or Dangerous Goods.
ll. HOTO Plan and Checklist means the worksheets contained within the excel workbook titled "HOTO Plan & Checklist" available at https://defence.gov.au/estatemanagement/lifecycle/ PlanHandoverTakeover/Default.asp , as updated, superseded or replaced from time to time.
mm. HOTO Process means the process for handover and takeover of the Works to the Contracting Officer and the Commonwealth to enable the occupation, use, operation and maintenance of the Works by the Commonwealth and other users including the:
(1) commissioning of the Works (including the inspection and testing process);
(2) handover of the Works; and
(3) occupation, use, operation and maintenance of the Works by the Commonwealth and other users, in accordance with the HOTO Requirements.
nn. HOTO Requirements means the requirements published on DEQMS in respect of the commissioning, handover and takeover of projects on the Defence Estate, including:
(1) the documents set out at https://defence.gov.au/estatemanagement/lifecycle/ PlanHandoverTakeover/Default.asp , and all applicable requirements
SECTION 01 11 00 Page 11 referred to therein; and
(2) any other requirement published on DEQMS expressed as applying to the commissioning, handover and takeover of projects on the Defence Estate, each as updated, superseded or replaced from time to time.
oo. NATA means National Association of Testing Authorities Australia.
pp. MFPE means the Defence Manual of Fire Protection Engineering, as amended from time to time.
qq. National Construction Code means the National Construction Code that applies in the Northern Territory, as amended from time to time, produced and maintained by the Australian Building Codes Board on behalf of the Commonwealth government and each Australian State and Territory government.
rr. Ozone Depleting Substance (ODS) means any substance identified as having ozone depleting potential in the Ozone Protection and Synthetic Greenhouse Gas Management Act 1989 (Cth) or any regulations made under that Act.
ss. Other Contractor means any other contractor, consultant, artist, tradesperson or other person engaged to do work at or in the vicinity of the Site other than the Contractor and its subcontractors.
tt. PFAS means per- and poly-fluoroalkyl substances.
uu. Plant, Equipment and Work means those things used, or work undertaken, by the Contractor to construct the Works but which will not form part of the Works.
vv. Project Documents includes:
(1) Design documentation (shop drawings), Project Plans;
(2) Approvals;
(3) any other data, documents, drawings, records, information, and material produced or provided (or required to be provided) to the Contracting Officer, under or in connection with the Contract, the Contractor's Activities or the Works by, for or on behalf of the Contractor (including by subcontractors); and
(4) all material at any time derived (under or in connection with the Contract, the Contractor's Activities or the Works) from, or based on, the material described in subparagraphs (1) and(3).
ww. Project Lifecycle and HOTO Plan means the plan prepared by the Contractor in accordance with, and for the purposes of, the HOTO Requirements and finalised under clause 3.2, which must:
(1) be prepared in accordance with the latest revision of the HOTO Plan and Checklist;
(2) meet all applicable HOTO Requirements and Statutory Requirements;
and
SECTION 01 11 00 Page 12
(3) include any other matters required by:
A. the Contract; or
B. the Contracting Officer or the Commonwealth.
xx. Request for Information (RFI) is a written request for information submitted by the Contractor to the Contracting Officer. The RFI NAVFAC form is available from the Contracting Officer.
yy. Schedule 11 Hazardous Chemical has the meaning given in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth).
zz. Schedule 15 Chemical has the meaning given in subregulation 5(1) of the Work Health and Safety Regulations 2011 (Cth).
aaa. Site means the site or sites for the Works as set out in the Contract.
bbb. Smart Infrastructure Handbook means the Defence Smart Infrastructure Handbook: Planning, Design and Construction available on DEQMS, as amended from time to time.
ccc. Statutory Requirements means:
(1) any law applicable to the Contractor's Activities or the Works (including Acts, ordinances, regulations, by-laws and other subordinate legislation) including those of the Commonwealth and the Northern Territory;
(2) Approvals (including any condition or requirement under an Approval);
(3) Defence Requirements; and
(4) Environment Requirements.
ddd. Synthetic Greenhouse Gas means any gas identified as a Synthetic Greenhouse Gas in the Ozone Protection and Synthetic Greenhouse Gas Management Act 1989 (Cth) or in any regulations made under that Act.
eee. U.S. Government means the Federal Government of the United States.
fff. WHS Legislation means:
(1) Work Health and Safety (National Uniform Legislation) Act 2011 (NT) and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .