G-001
FY24 MCAF PROJECT PAF-180500,
BOMBER APRON
ROYAL AUSTRALIAN AIR FORCE (RAAF) BASE TINDAL, AUSTRALIA
RAAF BASE
TINDAL
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
NORTHERN
TERRITORY
QUEENSLAND
WESTERN
AUSTRALIA
SOUTH
AUSTRALIA
NEW SOUTH
WALES
C O R A L S E A
A R A F U R A S E A
I N D I A N O C E A N
VICTORIA
TASMANIA
HOBART
MELBOURNE
CANBERRA SYDNEY
BRISBANE
DARWIN
PERTH
KATHERINE
PROJECT VICINITY
PROJECT
VICINITY
PROJECT
VICINITY
VICINITY MAP
LOCATION MAP
MAP OF AUSTRALIA
331 Jan 2023
DATE: 03/02/2023
Evan Mizue
G-002
INDEX OF DRAWINGS
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
G
Air V alve
Air V
Air V alve
Air V alve
W M
Ø200 STEEL
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
G-101
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
TN
PLAN
NORTH
A1KEY MAP
SCALE: 1:2500m
1250 250m
1:2500
HYD
FOD CONTROL
FOD CONTROL
12-4
3-4
A3
C
C
J
A332
A3
C
C
J
C17 C30J
A3
C
C
J
A3
C
C
J
A332
C17 C30J
A332
C17 C30J
A332
C17 C30J
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PA
RK
IN
G
CL
EA
RA
NC
E
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
PARKING CLEARANCE
B-52H B-52H B-52H B-52H B-52H B-52H B-52H B-52HB-52H B-52H B-52H B-52H
E X X E X
E X
X
E X
X
E X
X E
X X
2 - 6 2 - 61 - 5 1 - 5
B52
A332
C17
B52
A332
C17
B52
A332
C17
B52
A332
C17
B52
A332
C17
B52
A332
C17
STAN
D 6
STAN
D 5
STAN
D 4
STAN
D 3
STAN
D 2
STAND 1
STAND 3
STAND 4
STAND 2
STAND 5
2 3 4 5 61
OLAW
OLAN OLA
E
OLA S OLAW OLA S
OLA
EOLAN
FOD CONTROL
1 2 2 3 3 4 4 5 5 6
1 - 5
G-102
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
1250 250m
1:2500
TN
PLAN
NORTH
A1OVERALL SITE PLAN
SCALE: 1:2500m
AIR MOVEMENTS
TERMINAL
TARAKAN ROAD
WESTERN ACCESS ROAD
RAAF FUEL
FARM (FF2)
RAAF FUEL FARM
AIRCRAFT PARKING
APRON
USAF FUEL
FARM (P200)
USAF OPERATIONS
(P700)
USAF MAINTENANCE
(P400)
TA
XI
W
AY
A
TA
XI
W
AY
A
TAXIWAY A (EMERGENCY RUNWAY)
TAXIWAY A4
RUNWAY 14/32
AI
TA
PE
R
OA
D
TAXIW
AY R (E
MERGENCY RUNWAY)
TA
XI
W
AY
A
LIMIT OF DISTURBANCE
NEW BOMBER APRON
FIGHTER/STRIKE
DISPERSAL AREA
(OLAs)
MARITIME
OLA
C
C
C
C
C
C
C
C
C
C
C
C
C C
LI
LI
LI
LI LI LI LI LILI
LI LI LI LI LI LI LI LI LI
LI LI LI LI LI
LI LI LI
LI LI
LI
LI
S S
S
S
E(
HV
E(
HV
E(
HV
E(
HV
E(
HV
E(
HV
E(
HV
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
FU
LI LI LI LI LI
LI
LI
LI
DD
LI
LI
LI
LI
LI
LI
LI
C C C
FO
E(LV)
E(LV)
E(LV
E(L V)
E(
LV
E(LV)
E(LV)
E(L V)
E(LV)E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
E(LV)E(LV)
E(L V)
E(L V)
E(LV)E(LV)
E(L V)
E(LV)
E(LV)
E(LV)
E(LV)
E(LV)
E(LV)
E(LV)
E(LV)
E(L V)
E(LV)
E(LV)
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
W
UN
UN
UN
C
C
CE(LV
C C
E(LV
UN
UN
W
C
W
C
S S
S S
S
C E(
LV
E(
LV
C
D
D
D
D
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
E(HV)
C
E(
LV
S S
CC
W
W
W
W
W
W
C
C
FU
FU
FU
FU
FU
FU
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
C
C
C
AC
C
C
C C C C C C CC2 C2
C C
C C
C C
C
C
C C
C C
C C
C
C
C
C
C
C
C
C C
C
C
EC
EC
EC
EC
EC
E C
E C
C C
C C C C C C2C2C2 C1
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
C C
LV LV LV LV LV
AGL
AGL
AGL
AGL AGL AGL
AGL
AGL
AGL AGL AGL
AGL
AGL
AGL
AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL
AGLAGLAGL
AG
L
AG
L
AGL AGL AGL
AGL AGL AGL
AG
L
AGL
AGL
AGL
AGL AGL AGL AGL AGL AGL AGL
AGL
AGL
AGL
AGL
AGL
AGL
E E
E E
E E
E
E
E
E
E
E
E
E
HV
HV
HV
HV
HV
HV
HV
HV
HV
HV
HV
EP-HV-10
EP
-H
V-
EP-HV-09
EP-HV-09
EP-HV-10
EP-HV-10
EP-HV-10
SU
B 0
HV
HV
HV
HV
HV
HV
HV
HV
H
HV
HV
HV
HV
HV
HV
C C
C
C C
C
C C
C
C
C
C C
C C
C
C
C
C
C
C
C
C C C C C C
C C
C
C
C
C
C
C
C C C
C C C C
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
P
POL POL POL POL POL POL POL POL
PO
L
PO
L
PO
L
POLPOLPOLPOLPOLPOLPOL
E E E
E
E
E
E
E
E
E
E
EE
E
E
E
E E E
E
S
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL
AGL AGL AGL AGL AGL
AGL
AGL
AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL
AGL
AGL AGL
AGL
AGL
AGL
AGL
S
AL
ER
.14
SUB
LV LV LV LV LV LV LV LV LV LV LV
LV
LV
LV
LV
LV LV LV LV LV LV LV LV LV LV LV LV
LV
LV LV
LV
E
E
E E
E
E
E
E
E
E
E
E
EE
E
E
E E E E
E
S S
S
AL
ER
.14
SUB
G-105
APRON RECLAIMED CRUSHED
CONCRETE STOCKPILE LOCATION
100m
1:1000
APRON RECLAIMED SUBBASE
STOCKPILE (IF APPLICABLE) - 3570m2
APPROX.
APRON RECLAIMED CRUSHED CONCRETE
STOCKPILE- 6500m² APPROX
HAUL ROAD, SHOWN INDICATIVELY ONLY.
HAUL ROUTE TO SUIT CONTRACTOR
REQUIREMENTS AND SITE FACILITIES.
CONTRACTOR TO DETERMINE
REQUIREMENTS AS PART OF
TEMPORARY WORK
CONCRETE BATCHING PLANT,
CRUSHER AND TEMPORARY
CONCRETE MIX STOCKPILE
LOCATION - 4200m² .APPROX.
BATCHING PLANT TO MEET OLS
REQUIREMENTS WITH TAXIWAY R
FUEL HYDRANT LINE
HAUL ROAD TO CONNECT WITH AITAPE
ROAD. MAKE GOOD FOLLOWING
DEMOLITION OF HAUL ROAD
APRON RECLAIMED SUBBASE
STOCKPILE (IF APPLICABLE)
CONCRETE BATCHING PLANT, CRUSHER AND
TEMPORARY CONCRETE MIX STOCKPILE LOCATION
HAUL ROAD
TN
PLAN
NORTH
A1CONTRACTORS SITE FACILITIES AND HAUL ROAD
SCALE: 1:1000m
APRON RECLAIMED SUBBASE
STOCKPILE (IF APPLICABLE)
1700m² APPROX.
POTENTIAL LOCATION FOR CONCRETE BATCH PLANT.
A3SPOIL LOCATION SITE PLAN
NOT TO SCALE
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
APRON RECLAIMED CRUSHED
BLOCK PAVER STOCKPILE -
750m² .APPROX
CONTRACTOR LAYDOWN,
POTENTIAL SITE FACILITIES AREA
CONTRACTOR LAYDOWN, POTENTIAL VEHICLE
AND EQUIPMENT MAINTENANCE AREA
APRON RECLAIMED CRUSHED BLOCK PAVER
STOCKPILE LOCATION
CONTRACTOR LAYDOWN,
POTENTIAL SITE FACILITIES
AREA - 1600m2 APPROX.
CONTRACTOR LAYDOWN, POTENTIAL
VEHICLE AND EQUIPMENT MAINTENANCE
AREA - 1300m2 APPROX.
CONTRACTOR LAYDOWN,
POTENTIAL SITE FACILITIES
AREA - 900m2 APPROX.
SHEET LEGEND:
PROTECT EXISTING SERVICES
INSTALLED BY KC-30 PROJECT
THROUGH TEMPORARY
STOCKPILE AND FACILITIES
AREA
EXISTING CHAINLINK FENCE
TO BE DEMOLISHED.
REFER DEMOLITION PLANS
STOCKPILE NOTES:
ACCOMMODATION NOTES:
SITE-WON MATERIAL SPECIFIED TO BE SALVAGED ON DEMOLITION
DRAWINGS MUST BE RE-USED FOR PURPOSES DEFINED ON CIVIL GENERAL
NOTES DWG C-002 WHERE ACHIEVABLE.
SITE-WON MATERIAL MUST BE TESTED AND ASSIGNED A PFAS
CONTAMINATION CATEGORY IN ACCORDANCE WITH THE TEMPORARY
ENVIRONMENTAL CONTROL SPECIFICATION, PROJECT PFAS CONSTRUCTION
RISK ASSESSMENT. THE ORDER OF PRIORITY FOR REUSE OF MATERIAL
DEPENDS ON CONTAMINATION CATEGORY AND MUST BE IN ACCORDANCE
WITH THIS SPECIFICATION.
THE CONTRACTOR IS RESPONSIBLE FOR DESIGN AND MANAGEMENT OF
STOCKPILE LOCATIONS WITHIN THE AREAS DEFINED ON THIS DRAWING.
HAUL ROAD/ROUTES ARE SHOWN INDICATIVELY ONLY AND ARE TO BE
PROVIDED BY THE CONTRACTOR TO SUIT TEMPORARY WORK
REQUIREMENTS. THESE SHOULD BE COORDINATED WITH BASE.
ENVIRONMENTAL MEASURES FOR STOCKPILING IN ACCORDANCE WITH
BASE AND DEFENCE REQUIREMENTS. THE CONTRACTOR SHALL DEVELOP
THE DRAFT CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN.
EXCESS SPOIL STOCKPILE TO BE LOCATED AT THE KC-30 HIAL SPOIL ZONE
AS NOMINATED ON PLAN. PLACE SPOIL AS GENERAL FILL IN LAYERS NOT
EXCEEDING 150mm, COMPACTED TO 92% MMDD. MAKE ALLOWANCE TO
HYRDO-MULCH STOCKPILE FOLLOWING COMPLETION. CO-ORDINATE
ACCESS AND STOCKPILE REQUIREMENTS WITH THE KC-30 MANAGING
CONTRACTOR. SEPARATE EXCESS SUBBASE MATERIAL STOCKPILE SUCH
THAT IT CAN BE REUSED BY OTHER PROJECTS AS REQUIRED.
MAKE GOOD AND REINSTATE VEGETATION TO TEMPORARY CONTRACTOR
AREAS FOLLOWING COMPLETION.
CONTRACTOR IS RESPONSIBLE TO SETUP CONCRETE BATCHING PLANT AND
CRUSHER AREA SUITABLE TO ACCOMODATE RE-USE OF DEMOLISHED
MATERIAL AS SPECIFIED. MATERIAL WITH PFAS CONTAMINATION IS NOT TO
BE REMOVED FROM SITE.
MAKE ALLOWANCE FOR PROVISION OF CONTRACTOR ACCOMMODATION
FOR THE DURATION OF THE PROJECT. ALLOWANCE TO BE MADE FOR
ACCOMMODATION TO BE BASED OFF-SITE FROM RAAF TINDAL. THE
CONTRACTOR IS RESPONSIBLE FOR ALL COSTS AND ARRANGEMENTS
INCLUDING UTILITIES AS APPLICABLE.
TAXIW
AY R
C L
EXISTING FENCE TO BE DEMOLISHED
ON-SITE CONTRACTOR FACILITIES:
MAKE ALLOWANCE FOR ASSESSMENT OF UTILITY CAPACITY, CONNECTION
TO EXISTING UTILITIES, METERING AND ALL ONGOING COSTS ASSOCIATED
WITH UTILITY USAGE AT MARKET RATES FOR THE DURATION OF THIS
PROJECT. SEEK DETAILS AND APPROVAL OF THE SITE MANAGEMENT PLAN
FROM TINDAL STAKEHOLDERS.
PROTECT EXISTING
SERVICES
UNSEALED
ACCESS
TRACK A
A1 C-165
P500 PROJECT SITE
POTENTIAL HAUL
ROUTE TBC
KC-30 HIAL SPOIL
ZONE, POTENTIAL
FUTURE CAPACITY
POTENTIAL WATER
CONNECTION POINT FOR
TEMPORARY CONTRACTOR
FACILITIES. EXCLUDES
WATER FOR CONSTRUCTION
ACTIVITIES. CONFIRM WITH
BASE STAKEHOLDER
POTENTIAL POWER CONNECTION POINT
FOR CONTRACTOR FACILITIES. EXCLUDES
POWER FOR CONSTRUCTION ACTIVITIES,
CONFIRM WITH BASE STAKEHOLDERS
EXISTING TAXIWAY A.
OPEN TO CODE D AIRCRAFT
(EMERGENCY RUNWAY)
EXISTING APRON
SHOULDER
EXISTING APRON - WIDTH VARIES
PHASE 1 - 2024
P500 APRON - WIDTH VARIES
P500 CENTRAL
OPEN DRAIN
EXISTING APRON DEMOLISHED
STORMWATER AND FUEL
MAIN CONSTRUCTED
EXISTING
BUILDINGS /
TOPSOIL
REMOVED
EXISTING SHOULDER AC
REMOVED
GRADE NATURAL SURFACE TO
DRAIN TO EXISTING SWALE
LI
M
IT
O
F
PA
VE
M
EN
T
W
OR
KS
P500 FLEXIBLE
SHOULDER
DRAINAGE AND HYDRANT
PITS CONSTRUCTED TO
FINISHED SURFACE LEVELS,
PROVIDE PROTECTION
DEMOLITION, INSTALLATION OF STORMWATER
DRAINAGE AND ASSOCIATED INFRASTRUCTURE
AND HYDRANT REFUELING LINE
INSTALL STORMWATER PIPE
AND PIT TO FINISHED SURFACE
LEVELS, PROVIDE PROTECTION.
HORIZONTAL CONTROL LINE
CULVERTS CONSTRUCTED
LI
M
IT
O
F
PA
VE
M
EN
T
W
OR
KS
PHASE 2 - APRIL 2025
P500 APRON - WIDTH VARIES
P500 CENTRAL
OPEN DRAIN
P500 FLEXIBLE
SHOULDER
MAINTAIN CENTRAL OPEN DRAIN FORMATION LEVELS -
EARTHWORKS ONLY, NO PAVEMENT
SUBSOIL DRAINAGE, DEEP BASE CANISTERS AND FLEXIBLE
SHOULDER PAVEMENT CONSTRUCTION
KC-30 TAXIWAY A AND INVERT FILLETS
CONSTRUCTED (BY OTHERS)
JULY 2025 (TAXIWAY CLOSED)
P500 APRON - RIGID PAVEMENT
CONSTRUCTED
EXCAVATION AND FILL, CONSTRUCTION OF
PAVEMENT LAYERS. CONSTRUCT AGL DEEP
BASE CANISTERS, CONSTRUCTION OF RIGID
PAVEMENT. BULK FORMATION OF CENTRAL
OPEN DRAIN
FACE OF RIGID PAVEMENT AT INTERFACE TO KC-30
TAXIWAY THROAT (BEYOND) MUST BE CONSTRUCTED
BY JUNE 2025 TO ENABLE KC-30 PROJECT TO MATCH IN
WITH FLEXIBLE PAVEMENT
HORIZONTAL CONTROL LINE
P500 PROJECT WORKS TO COMMENCE PLAN
SOUTH OF APRON AND PROGRESS TOWARDS
PLAN NORTH, ENABLING KC-30 PROJECT
FLEXIBLE PAVEMENT INTERFACE, AND FOR
P500 WORS TO VACATE THE TEMPORARY
RUNWAY OLS (PHASE 3).
LI
M
IT
O
F
PA
VE
M
EN
T
W
OR
KS
PHASE 3 - 2026
P500 APRON - WIDTH VARIES
P500 CENTRAL
OPEN DRAIN
P500 FLEXIBLE
SHOULDER
CENTRAL SWALE PAVEMENT WORKS LATE 2026
KC-30 TAXIWAY A ,
TAXIWAY OPERATING AS TEMPORARY RUNWAY APPROX.
APRIL 2026. P500 WORKS MUST VACATE THE OLS
HORIZONTAL CONTROL LINE
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
G-301
1. WORK STAGING DRAWING ILLUSTRATES THE CONSTRUCTION
STAGING REQUIREMENTS AND COORDINATION INTERFACES
BETWEEN THE WORKS UNDER THIS PROJECT (P500) AND THE KC-30
PROJECT (BY OTHERS). STAGING IS SUBJECT TO COORDINATION AND
IS BASED ON INDICATIVE CONSTRUCTION PROGRAMS. MAKE
ALLOWANCE WITHIN PROGRAM TO ALIGN WITH KEY PROJECT
STAGING REQUIREMENTS SHOWN.
2. ALL WORKS MUST BE CONSTRUCTED IN ACCORDANCE WITH THE
APPROVED METHOD OF WORKING PLAN.
3. PROVIDE TEMPORARY AND PERMANENT DRAINAGE OF THE WORKS
TO PROTECT PAVEMENTS.
4. REFER TO DRAWING CP501 FOR PAVEMENT DETAILS.
5. REFER TO DRAWING C-101 FOR HORIZONTAL CONTROL LINE DETAILS.
FINISHED DESIGN SURFACE
EXISTING SURFACE
STRIPPED SURFACE
KC-30 PROJECT SURFACE
SHEET GENERAL NOTES:
SHEET LEGEND:
A1TYPICAL APRON SECTIONS - TEMPORARY WORKS
-SCALE: N.T.S
C-001
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
ABBREVIATIONS AND LEGEND
WM
AV
TNK
T
ST
PA
SV
M
W
M
DF
B
S
ST
SHR
WL 0.00
0.00
TP
TG
SO
M
M
LB
GUY
FFL 0.000
FP
FSL 0.000
B
BBQ
VENT
GT
P
ST
SPS
IL 0.00
OF
TS
SH
IP
AP
S
MIR
C
P
TD
GP
0.00
S
G
G
M
IP
GB
VENT
FB
FP
H H
HB
HYD
M
E
FI
M
TFR
TFR
SB
G
E
FB
O
F
M E
GT
GLT
KO
IP
DP
TEL
M CM
A
AV
R P
O
AM
LM
T
AC
FUME
DDAMPERS
DUCTS ABOVE GROUND
DUCTS BELOW GROUND
EXTRACTION HOODS, FUME CUPBOARDS
HEATER
MISCELLANEOUS
PIPE CHILLED WATER
PLANT & EQUIPMENT
VENTS
AIRFIELD BEACON
AIRFIELD LIGHT CABLING
AIRFIELD LIGHT MANHOLE
AIRFIELD REFERENCE POINT
AIRFIELD LIGHTING
EARTHING POINT
GABLE MARKER
GRASS AIRSTRIP/LANDING GROUND
LIGHTNING MAST
RUNWAYS HIGH STRENGTH
SEALED RUNWAYS
TIE DOWN POINT
T-VASIS AND PAPI BOXES
UNSEALED RUNWAYS, TAXIWAYS
AND APRONS
VISUAL APPROACH AIDE
WINDSOCK
MANHOLE
MISCELLANEOUS
OUTLET
PIPE ABOVE GROUND
PIPE UNDER GROUND
REGULATOR
VALVE
CABLE AG
ANTENNA/ AERIAL
CABLE MARKER
CABLE UG
EARTH STAKE
FIBRE OPTIC CABLE UG
JUNCTION BOX PIT
MANHOLE
PILLAR
POLE
PUBLIC TELEPHONE
SATELLITE DISH
TELEPHONE CABLE A/G
TELEPHONE CABLE U/G
TOWER
DOWNPIPE
GABION / ROCK PROTECTION LAYER
GRATED DRAIN
INSPECTION OPENING
KERB OUTLET
MANHOLE
MISCELLANEOUS
PIPE ABOVE GROUND
PIPE UNDER GROUND
GRATED PIT
STONE PITCHING
SUB SURFACE DRAIN
TRAP GULLY
TRAP GREASE
OPEN UNLINED DRAIN
WATER TABLE
BOLLARD LIGHT
CABLE BOX / PILLAR
CABLE MARKER
EARTH STAKE
FLOOD LIGHT
GROUND LIGHT
HIGH VOLTAGE CABLE ABOVE GROUND
HIGH VOLTAGE CABLE UNDER GROUND
LOW VOLTAGE CABLE ABOVE GROUND
LIGHT POLE
LOW VOLTAGE CABLE UNDER GROUND
MANHOLE
OUTLET
POWER/FUSE BOARD
POWER POLE
HIGH VOLTAGE POLE
ELECTRICITY PILLAR
JUNCTION BOX PIT
POLE WITH LIGHT
LOW VOLTAGE POLE
STAY WIRE
SUBSTATION
SWITCHBOARD
TOWER
TRANSFORMER ON GROUND
TRANSFORMER OVERHEAD
CABLE MARKER
EXTINGUISHER
HYDRANT MARKER
HOSE BOX REEL
HYDRANT ABOVE GROUND
HYDRANT UNDER GROUND
JUNCTION BOX PIT
MAIN UNDERGROUND
STOP VALVE
MAIN ABOVE GROUND
EARTH POINT
FILLING POINT
PIPE ABOVE GROUND
PIPE UNDER GROUND
PUMP/BOWSER
SCOUR VALVE
STOP VALVE
TANK
VENT
CATHODE PROTECTION POINT
GAS PIT
INSPECTION POINT
LPG TANK
MARKER
METER
PIPE ABOVE GROUND
PIPE UNDER GROUND
STOP VALVE
BALLAST
PLATFORM
SIGNAGE
SIGNAL
BITUMEN SURFACE
CROWN
EDGE OF BITUMEN
EDGE UNSEALED ROAD
GUARDRAIL / BARRIER
GUIDE POST
SHOULDER
TRACK
PARK TICKET DISPENSER
PARKING METER
PARKING SIGN
STREET NAME SIGN
TRAFFIC CABLE AG
TRAFFIC CABLE UG
TRAFFIC LIGHT
TRAFFIC LIGHT CONTROL BOX
TRAFFIC MIRROR
TRAFFIC SENSOR
TRAFFIC SIGN
ABSORPTION PIT/STRIP
INSPECTION OPENING
MANHOLE
MAINTENANCE SHAFT
TERMINAL MAINTENANCE SHAFT
MARKER POST
MISCELLANEOUS
OUTFALL
OVERFLOW RELIEF GULLY
PIPE ABOVE GROUND
PIPE INVERT RL
PIPE UNDER GROUND GROUND
POND
PUMP STATION
RISING MAIN ABOVE GROUND
RISING MAIN UNDER GROUND
SEPTIC TANK
SEWER HOUSE CONNECTION
SEWERAGE PIT
TRAP GREASE
VENT
AWNING/COVERED WAYS
BARBECUE
BOLLARD
BUILDING
EDGE OF CONCRETE
FENCE POST
FLAG POLE
GATE
BOOM GATE
GRID STOCK
GUY WIRE
LITTER BIN
MAST / PYLON
MONUMENT
MONITORING WELL
PLAYGROUND
POST/POLE
RAILING
RETAINING WALL
ROOF LINE / EAVES
SERVICE DUCT ABOVE GROUND
SERVICE DUCT UNDER GROUND
HOARDING / BILLBOARD
TIDE GAUGE
GEO TEST PIT
TOWER/AERIAL
WINDMILL
UNKNOWN LINE ABOVE GROUND
UNKNOWN LINE UNDER GROUND
BENCHMARK
TEMPORARY BENCHMARK
COORDINATED REFERENCE MARK (CRM)
LOCKSPIT
ORIGINAL CONC BLOCK (OCB)
CADASTRAL PEG (OP)
ENGINEERING PEG
SURVEY PILLAR
REFERENCE MARK
REFERENCE MARK GONE
ORIGINAL CONCRETE POST (OCP)
SURVEY STATION
RESECTION STATION
CHECKSHOT
BANK BOTTOM
CULTURAL HERITAGE REGION
GRADE CHANGE
NATURAL SURFACE
QUARRY / SOIL PIT
ROCK
SANDHILL / DUNE
BANK TOP
EDGE OF WATER
WATERCOURSE INVERT
SWAMP
WATER LEVEL
CULTIVATION / ORCHARD / PLANTATION
EDGE OF VEGETATION
GARDEN BED / LANDSCAPING
LAWN
MANGROVES
PALM TREE
SHRUB
STUMP
TREE
IRRIGATION CONTROL UNIT
IRRIGATION PIPE ABOVE GROUND
IRRIGATION PIPE UNDER GROUND
SPRINKLER
VALVE
BORE / WELL
DRINK FOUNTAIN
WATER MARKER
MANHOLE
MISCELLANEOUS
STOP VALVE MARKER
PIPE ABOVE GROUND
PIPE UNDER GROUND
PUMP STATION
STANDPIPE
TANK
AIR VALVE
REFLUX VALVE
SCOUR VALVE
STOP VALVE
WATER METER
AC
AC
LI
CA
CA
C
C
FO
T
T
D
D
SS
E(HV)
E(HV)
E(LV)
E(LV)
FI
FI
FU
FU
G
G
TL
TL
S
S
RM
RM
SD
SD
UN
UN
IR
IR
W
W
SE
D
A
AC MISC
AIR CONDITIONING
AIRPORT
PIT
MISC
COMPRESSED AIR
COMMUNICATION
MISC
SUMP
DRAINAGE
ELECTRICITY
FIRE CONTROL
FUEL
GAS
TRACK
RAILWAY
ROAD
STREET NAME
TRAFFIC
MISC
TRAFFIC
FENCE LINE
FINISH SURFACE LEVEL
FINISH FLOOR LEVEL
RAMP
SEAT
SILO
WALL
MANHOLE
STRUCTURE
SURVEY
TOPOGRAPHIC
VEGETATION
MISCWS
PIT
TAP
WATER SUPPLY
ABBREVIATIONS
AAPA ABORIGINAL AREAS PROTECTION AUTHORITY
AC ASPHALTIC CONCRETE
ACM ASBESTOS CONTAINING MATERIALS
ADES ASSISTANT DIRECTOR ENVIRONMENT AND SUSTAINABILITY
AFFF AQUEOUS FILM FORMING FOAMS
AFM AIR FORCE MANUAL (USAF)
AGL AERONAUTICAL GROUND LIGHTING
AHD AUSTRALIAN HEIGHT DATUM
ALER AIRFIELD LIGHTING EQUIPMENT ROOM
AMA AIR MOVEMENTS APRON
AMT AIR MOVEMENTS TERMINAL
APPROX APROXIMATE
ASC ASSESSMENT OF SITE CONTAMINATION
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
CBR CALIFORNIA BEARING RATIO
CCL CONSTRUCTION COST LIMITATION
CCR CONSTANT CURRENT REGULATOR
CDR CONCEPT DESIGN REPORT
CEMP CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
CFI CAPITAL FACILITIES AND INFRASTRUCTURE BRANCH
CIOG CHIEF INFORMATION OFFICE GROUP
CL SANDY CLAY (UNIFIED SOIL CLASSIFICATION SYSTEM)
CLSM CONTROLLED LOW STRENGTH MATERIAL
COMM COMMUNICATION
CONC CONCRETE
CONOP CONCEPT OF OPERATIONS
COVID CORONAVIRUS
CPESC CERTIFIED PROFESSIONAL IN EROSION AND SEDIMENT
CONTROL
CSR CONTAMINATED SITE RECORD
DCARM DIRECTORATE OF CONTAMINATION ASSESSMENT,
REMEDIATION AND MANAGEMENT
DCMM DEFENCE CONTAMINATION MANAGEMENT MANUAL
DCR DESIGN CHARRETTE REPORT
DOD DEPARTMENT OF DEFENCE (AUS)
DD DEPARTMENT OF DEFENSE (US)
DDR DETAILED DESIGN REPORT
DEPAC DIRECTOR ENVIRONMENTAL PLANNING, ASSESSMENT AND
COMPLIANCE
DEQMS DEFENCE ESTATE QUALITY MANAGEMENT SYSTEM
DPPM DEFENCE POLLUTION PREVENTION MANUAL
DVN DEFENCE VOICE NETWORK
D/S DOWNSTREAM
EAR ENVIRONMENTAL APPROVAL REPORT
ECC ENVIRONMENTAL CLEARANCE CERTIFICATE
EEGO ENERGY EFFICIENCY IN GOVERNMENT OPERATIONS
EFM ENVIRONMENTAL MANAGEMENT FACTORS
EO EXPLOSIVE ORDNANCE
EOLA EXPLOSIVE ORDNANCE LICENSING AUTHORITY
EPBC ACT ENVIRONMENTAL PROTECTION AND BIODIVERSITY
CONSERVATION ACT
ER ENVIRONMENTAL REPORT
ES EXPOSED SITE
ESD ECOLOGICALLY SUSTAINABLE DEVELOPMENT
ESM ENVIRONMENT AND SUSTAINABILITY MANAGER
EXIST EXISTING
FCF FOREIGN CURRENCY FLUCTUATION
FDR FINAL DESIGN REPORT
FHS FUEL HYDRANT SYSTEM
GDL GEMS DATA LOAD
GEMS GARRISON ESTATE MANAGEMENT SYSTEM
GPR GROUND PENETRATING RADAR
GSE GROUND SUPPORT EQUIPMENT
GSK JV GHD SETIADI KUALA JOINT VENTURE
GW SANDY GRAVEL (UNIFIED SOIL CLASSIFICATION SYSTEM)
HAZOP HAZARDOUS OPERABILITY (STUDY OR WORKSHOP)
HD HAZARD DIVISION
HHT HYDRANT HOSE TRUCKS
HOTO HANDOVER TAKEOVER
HPSB HIGH PERFORMANCE AND SUSTAINABLE BUILDING
HPV HYDRANT PIT VALVE
HST HAWAII STANDARD TIME
HV HIGH VOLTAGE
IBD INHABITED BUILDING DISTANCE
IECA INTERNATIONAL EROSION CONTROL ASSOCIATION
IL INVERT LEVEL
IMB INVESTIGATION AND MANAGEMENT BRANCH
JP JOINT PROJECT
KC-30 KC-30A MULTI-ROLE TANKER TRANSPORT
LED LIGHT-EMITTING DIODE
LV LOW VOLTAGE
MGA MAP GRID OF AUSTRALIA
MOS MANUAL OF STANDARDS
NAVFAC NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC
NEMP PFAS NATIONAL ENVIRONMENTAL MANAGEMENT PLAN
(JANUARY 2018)
NEPA NATIONAL ENVIRONMENTAL POLICY ACT
NEPM NATIONAL ENVIRONMENT PROTECTION MEASURE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NR REACTIVE NITROGEN
NSL NATURAL SURFACE LEVEL
NT NORTHERN TERRITORY
OLA ORDNANCE LOADING APRON
PEMP PROJECT ENVIRONMENTAL MANAGEMENT PLAN
PES POTENTIAL EXPLOSION SITE
PFAS PER- AND POLY-FLUOROALKYL SUBSTANCES
PFHXS PERFLUOROHEXANE SULFONATE
PFOA PERFLUOROOCTANOIC ACID
PFOS PERFLUOROOCTANE SULFONATE
PMAP PFAS MANAGEMENT AREA PLAN
PMCA PROJECT MANAGEMENT CONTRACT ADMINISTRATOR
POAM PLAN OF ACTIONS AND MILESTONES
POL PETROLEUM, OIL, AND LUBRICANTS
PPMM POLLUTION PREVENTION MANAGEMENT MANUAL
PSWG PROTECTIVE SECURITY WORKING GROUP
PTR PUBLIC TRAFFIC ROUTE
QA QUALITY ASSURANCE
QCI QUALITY CONTROL INSPECTION
RAAF ROYAL AUSTRALIAN AIR FORCE
RAAF TDL RAAF BASE TINDAL
RCP REINFORCED CONCRETE PIPE
RESO REGIONAL ENVIRONMENTAL SUSTAINABILITY OFFICE
RPAS REMOTELY PILOTED AIRCRAFT SYSTEMS
RPM REVOLUTIONS PER MINUTE
SAES SCOPE OF ARCHITECT-ENGINEER SERVICES
SCEC SECURITY CONSTRUCTION AND EQUIPMENT COMMITTEE
SDR SCHEMATIC DESIGN REPORT
SE ISITE ENGINEERING INVESTIGATION
SEG SECURITY & ESTATE GROUP
SFL
SID STRUCTURAL INTERIOR DESIGN
SID SAFETY IN DESIGN
SIOH SUPERVISION, INSPECTION AND OVERHEAD
SIT SERIES ISOLATING TRANSFORMER
SM SILTY SAND (UNIFIED SOIL CLASSIFICATION SYSTEM)
SMES SUBJECT MATTER EXPERTS
SQID STORMWATER QUALITY IMPROVEMENT DEVICES
SSB SITE SELECTION BOARD
SW GRAVELLY SAND (UNIFIED SOIL CLASSIFICATION SYSTEM)
TWY TAXIWAY
UFC UNIFIED FACILITIES CRITERIA
UNO UNLESS NOTED OTHERWISE
US UNITED STATES
USAF UNITED STATES AIR FORCE
USD UNITED STATES DOLLAR
USFPI US FORCE POSTURE INITIATIVES
UXO UNEXPLODED ORDNANCE
U/S UPSTREAM
VBD VULNERABLE BUILDING DISTANCE
WAP WIRELESS ACCESS POINT
WH&S WORKPLACE HEALTH AND SAFETY
WOL WHOLE OF LIFE
C-002
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
GENERAL NOTES:
G.1. CONTRACTORS AND SUB-CONTRACTORS TENDERING ON THIS PROJECT ARE TO MAKE THEMSELVES FULLY AWARE OF ALL REQUIREMENTS. IF IN
DOUBT OR FURTHER CLARIFICATION IS REQUIRED, THE CONTRACTOR IS TO OBTAIN CLARIFICATION FROM THE CONTRACTING OFFICER PRIOR TO SUBMITTING TENDER PRICES. SHOULD THE CONTRACTOR FAIL TO OBTAIN CLARIFICATION FROM THE CONTRACTING OFFICER IT IS DEEMED THAT THE CONTRACTOR HAS BEEN PROVIDED SUFFICIENT INFORMATION TO ADEQUATELY PRICE THE ENTIRE WORKS AND THAT THE CONTRACTOR HAS ALLOWED FOR ALL WORKS REQUIRED. IN PROVIDING CLARIFICATION, THE CONTRACTING OFFICER HAS NOT ASSUMED A DUTY OF CARE TO THE
CONTRACTOR OR SUBCONTRACTOR, BUT IS ONLY ACTING AS THE OWNER’S AGENT.
G.2. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL OTHER WORKING DRAWINGS AND SPECIFICATIONS AND WITH SUCH OTHER WRITTEN INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE OF CONSTRUCTION. ALL DISCREPANCIES AND VARIATIONS MUST BE REFERRED TO THE
CONTRACTING OFFICER BEFORE PROCEEDING WITH THE WORK.
G.3. ALL WORK IS TO CONFORM TO STANDARDS AND SPECIFICATIONS UNLESS OTHERWISE SHOWN ON PLANS OR DIRECTED BY THE CONTRACTING
OFFICER.
G.4. ALL 'WORKS AS CONSTRUCTED' INFORMATION MUST BE SUPPLIED IN BOTH HARD COPY AND ELECTRONIC DATA FORMAT AS REQUIRED BY THE
CONTRACT.
G.5. 'U.N.O.' STANDS FOR UNLESS NOTED OTHERWISE.
G.6. ONLY THE LATEST REVISION OF ANY DOCUMENT IS TO BE USED.
G.7. ONLY DRAWINGS WITH APPROVAL SIGNATURE IN THE TITLE BLOCK AND APPROVAL INITIALS AGAINST THE LATEST REVISION IN THE REVISION
HISTORY ARE CURRENT. ANY DRAWINGS WITHOUT SIGNATURES PRESENT AND THAT ARE NOT NOMINATED AS ISSUED FOR CONSTRUCTION ARE
UNCONTROLLED AND ARE NOT TO BE USED FOR CONSTRUCTION.
G.8. CONSTRUCTION USING THESE DRAWINGS MUST NOT COMMENCE UNTIL ALL RELEVANT APPROVAL/PERMITS IN ACCORDANCE WITH ALL STATUTORY REQUIREMENTS HAVE BEEN OBTAINED AND APPROVAL GRANTED BY THE CONTRACTING OFFICER.
G.9. DURING CONSTRUCTION THE CONTRACTOR MUST BE RESPONSIBLE FOR MAINTAINING:
-ALL STRUCTURES IN A SAFE, STABLE CONDITION.
-THE PROTECTION AND SAFETY OF PUBLIC AND WORKERS.
G.10. NO WORKS OUTSIDE THE EXTENT OF WORKS SHOWN ON THE DRAWINGS MAY BE CARRIED OUT WITHOUT PRIOR APPROVAL.
G.11. ALL SURFACES AND SERVICES DAMAGED OR DISTURBED DURING THE PROGRESS OF THE WORKS MUST BE MADE GOOD WITH MATERIALS OF A
SIMILAR NATURE TO MATCH EXISTING CONDITIONS AT THE CONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
G.12. DURING CONSTRUCTION, AND ON COMPLETION OF THE WORK, THE CONTRACTOR MUST CLEAN UP THE SITE AND REMOVE ALL DEBRIS AND
RUBBLE OFF SITE TO THE SATISFACTION OF THE CONTRACTING OFFICER.
G.13. ALL CONSTRUCTION WORK MUST COMPLY WITH THE NT WORKPLACE HEALTH AND SAFETY ACTS (CURRENT VERSION).
G.14. THE CONTRACTOR IS RESPONSIBLE TO ENSURE THERE IS NO CONFLICT WITH THE KC-30 PROJECT.
G.15. COORDINATE WITH THE KC-30 PROJECT REGARDING REUSE OF KC-30 LAYDOWN AREAS, IF CONSTRUCTION AND PROJECT SCHEDULES ALLOW.
G.16. CONSTRUCT AND MANAGE STOCKPILES IN ACCORDANCE WITH THE DEPARTMENT OF DEFENCE ENVIRONMENT AND ENGINEERING BRANCH
DIRECTORATE OF ENVIRONMENTAL REMEDIATION PROGRAMS CONTAMINATION MANAGEMENT MANUAL ANNEX C SOIL STOCKPILES AND REUSE OF
EXCAVATED MATERIAL.
G.17. RE-USE OF SITE WON MATERIAL TO BE IN ACCORDANCE WITH NOTE EW.13. AND IN ACCORDANCE WITH THE PFAS CONSTRUCTION RISK ASSESSMENT REPORT. ENGAGE WITH DEFENCE PFAS BRANCH IN DEVELOPMENT OF THE SITE MANAGEMENT PLAN AND PFAS MANAGEMENT
PROTOCOLS.
G.18. THE CONTRACTOR IS TO INSTALL TAGS OR TAPE TO THE BARBED WIRE FENCE AS MITIGATION TO FAUNA ENTANGLEMENT. MITIGATION CONTROL
TO BE INSTALLED TO THE SATISFACTION OF THE CONTRACTING OFFICER.
G.19. CONTRACTOR IS TO PROVIDE A SEDIMENT AND EROSION CONTROL PLAN PRIOR TO COMMENCEMENT OF ANY EARTHWORKS. PLAN TO BE
APPROVED BY THE CONTRACTING OFFICER.
G.20. CONTROLS UNDER THE RESPONSIBILITY OF THE CONTRACTOR IN THE SAFETY IN DESIGN TO BE ACTIONED. THE SAFETY IN DESIGN IS TO BE
CONSIDERED A LIVE DOCUMENT DURING CONSTRUCTION AND KEPT UP TO DATE.
G.21. FOR DETAILS REGARDING WASTE DISPOSAL REFER TO OPERATIONAL WASTE MINIMISATION AND MANAGEMENT REPORT.
CIVIL:
C.1. ALL NEW KERB RAMPS TO BE INSTALLED IN ACCORDANCE WITH AS1428.1.
C.2. DO NOT OBTAIN DIMENSIONS BY SCALING FROM THE DRAWINGS. ALL DIMENSIONS ARE IN METRES UNLESS OTHERWISE SPECIFIED.
C.3. THE DATUM FOR ALL LEVELS IS THE AUSTRALIAN HEIGHT DATUM IN METRES AND PROJECTIONS ARE BASED ON REAL WORLD MGA 94 ZONE 52
COORDINATES.
C.4. ALL TEMPORARY FENCING MUST BE IN ACCORDANCE WITH AS1725.
C.5. EXCAVATIONS LESS THAN 1.2m DEEP SHOULD BE BATTERED NO STEEPER THAN 1H:1V.
C.6. EXCAVATIONS GREATER THAN 1.2m DEEP SHOULD BE BATTERED NO STEEPER THAN 2H:1V.
C.7. IF CONSTRUCTION IS CARRIED OUT DURING OR SHORTLY FOLLOWING THE WET SEASON, MINOR GROUNDWATER SEEPAGE INTO EXCAVATIONS
MAY BE EXPERIENCED. PUMPING OF THIS SEEPAGE MAY BE REQUIRED
C.8. WHERE THRUST BLOCKS ARE USED, TESTING OF THE FOUNDING SOILS AT EACH THRUST BLOCK LOCATION MUST BE CARRIED OUT AT THE TIME
OF CONSTRUCTION TO CONFIRM THAT AT LEAST STIFF CONDITIONS EXIST BELOW PROPOSED THRUST BLOCKS. OVER EXCAVATION AND
REPLACEMENT USING BLINDING CONCRETE OR FILL MAY BE REQUIRED.
C.9. TEMPORARY FENCE CONSTRUCTED BY KC-30 PROJECT TO REMAIN UNTIL COMPLETION OF P500 AIRSIDE FENCE WORKS AND AIRSIDE PERIMETER IS SECURE. COORDINATE AND ALLOW ACCESS BY KC-30 CONTRACTOR TO UNDERTAKE REMOVAL OF THE TEMPORARY FENCE.
SITE PREPARATION NOTES:
SP.1. PRIOR TO EXCAVATION FOR FOUNDATIONS AND/OR PLACEMENT OF FILLING, ALL DELETERIOUS MATERIAL, INCLUDING UNCONTROLLED FILLING, VEGETATION AND TOPSOIL, MUST BE STRIPPED FROM ALL BUILDING ENVELOPES AND EITHER REMOVED FROM SITE OR STOCKPILED FOR POSSIBLE RE-USE, IF APPLICABLE. TREE ROOTS, IF ENCOUNTERED, MUST BE REMOVED FROM UNDERNEATH FOUNDATION ZONES. TOPSOIL CAN
BE RE-USED FOR LANDSCAPING PURPOSES.
SP.2. IN THE ABSENCE OF LEVEL 1 TESTING (AS 3798), THE FILL ENCOUNTERED ON SITE IS CONSIDERED UNCONTROLLED FILL. REFER TO TEST PIT AND BOREHOLE LOG DRAWINGS. WHERE UNCONTROLLED FILL OF AVERAGE THICKNESS GREATER THAN 200mm IS BELOW PAVEMENT FOOTPRINT, REMOVE AND REPLACE WITH SELECT FILL. WHERE UNCONTROLLED FILL OF AVERAGE THICKNESS LESS THAN 200mm IS BELOW PAVEMENT
FOOTPRINT, COMPACT AS SPECIFIED.
SP.3. ROCK EXCAVATION AND FILLING OF KARSTIC VOIDS ARE EXPECTED TO BE ENCOUNTERED DURING EARTHWORKS. REFER TO GENERAL NOTE 1 ON
DRAWING CR521 FOR TREATMENT REQUIREMENTS.
SP.4. GRAVEL MATERIAL FROM PAVEMENTS IDENTIFIED FOR DEMOLITION SHOULD BE STOCKPILED SEPARATELY AND REUSED FOR PAVEMENT
CONSTRUCTION (IF CONFORMANCE TESTING COMPLIES).
SP.5. SHALLOW GROUND CONDITIONS MAY VARY BETWEEN TEST LOCATIONS.
SP.6. PRIOR TO PLACEMENT OF ANY NEW FILLING OR CONSTRUCTION OF SLABS/FOOTINGS, THE SUBGRADE MUST BE MOISTURE CONDITIONED TO
WITHIN 1.5% OF THE OPTIMUM MOISTURE CONTENT AND COMPACTED TO AT LEAST 98% OF THE MODIFIED MAXIMUM DRY DENSITY (MMDD).
SP.7. REUSE OF CATEGORY 3 AND CATEGORY 4 PFAS MATERIAL STOCKPILES ON RAAF BASE TINDAL MAY BE EMPLOYED AS GENERAL FILL TO WITHIN
0.5m OF THE FINISHED FLOOR LEVEL WHERE PRACTICABLE AND WHERE FILL MEETS THE MINIMUM REQUIREMENTS AS DETAILED IN EW.4.
SP.8. USE OF PFAS CONTAMINATED CATEGORY 3 AND CATEGORY 4 SOILS FROM CFI PROJECTS ON SITE FOR FILL WILL BE IN ACCORDANCE WITH
AUSTRALIAN DOD PFAS CONSTRUCTION MANAGEMENT FRAMEWORK, 2019 AND SUBJECT TO BASE STAFF AND REGIONAL ENVIRONMENT AND
SUSTAINABILITY OFFICER (RESO) APPROVAL AT THE TIME OF WORKS.
SP.9. THE CONTRACTOR MUST OBTAIN AN ENVIRONMENTAL CLEARANCE CERTIFICATE (ECC) FROM AUSTRALIAN DEFENCE RAAF BASE TINDAL REGIONAL ENVIRONMENTAL SUSTAINABILITY OFFICER PRIOR TO CONSTRUCTION OR ANY PHYSICAL WORKS AT THE SITE.
SP.10. PRIOR TO PLACING FILL, ENGAGE A GEOTECHNICAL ENGINEER TO CONFIRM THE SITE PREPARATION.
SP.11. ALL EARTHWORKS TESTING AND INSPECTIONS MUST BE CARRIED OUT IN ACCORDANCE WITH LEVEL 1 (BUILDINGS) OR LEVEL 2 (PAVEMENTS)
SUPERVISION REQUIREMENTS AS PRESENTED IN AUSTRALIAN STANDARD AS3798-2007.
SP.12. THE NATURAL SOILS HAVE A HIGH PROPENSITY TO SIGNIFICANTLY SOFTEN WITH EVEN SMALL INCREASES IN MOISTURE CONTENT. BULK
EARTHWORKS ARE TO BE CARRIED OUT IN THE DRY SEASON AS MUCH AS POSSIBLE (I.E. FROM APRIL / MAY TO SEPTEMBER / OCTOBER).
EARTHWORKS FOR STRUCTURES FOOTPRINT:
EW.1. GROUND WATER:
ALL EXCAVATIONS WILL ENCOUNTER WATER SEEPAGE AND THEREFORE ALL CONTRACTORS MUST MAKE PROVISIONS FOR WATER INGRESS
DURING CONSTRUCTION.
EW.2. SUBGRADES MAY CONTAIN VOIDS, IN-FILLED SOLUTION FEATURES AND WEATHERED ZONES WITH SOIL LIKE PROPERTIES WITHIN THE GENERALLY HIGH STRENGTH ROCK. SUBGRADES SHALL BE INSPECTED BY A GEOTECHNICAL ENGINEER DURING THE EARTHWORKS, TO ASSESS THE
OCCURRENCE OR OTHERWISE OF SIGNIFICANT KARST FEATURES
EW.2. MOISTURE CONDITION (WET OR DRY) THE EXPOSED SUBGRADE SOILS TO APPROXIMATE OPTIMUM MOISTURE CONTENT FOR MODIFIED
COMPACTION.
EW.3. TOP 150mm OF EXPOSED SUBGRADE SOILS SHOULD THEN BE COMPACTED TO 95% RELATIVE TO MAXIMUM MODIFIED DRY DENSITY AT A MOISTURE CONTENT WITHIN 1.5% OF THE OPTIMUM MOISTURE CONTENT. A FINAL TEST ROLL ACCOMPANIED BY CAREFUL VISUAL INSPECTION BY AN EXPERIENCED GEOTECHNICAL PROFESSIONAL MUST BE UNDERTAKEN TO ALLOW DETECTION OF ANY AREAS REQUIRING REMOVAL OR
FURTHER COMPACTION.
EW.4. ANY NEW FILLING MUST COMPRISE A WELL GRADED GRANULAR SOIL WITH SELECT FILL PROPERTIES AS PER DEPARTMENT OF INFRASTRUCTURE, PLANNING AND LOGISTICS STANDARDS. FILL IS TO BE PLACED IN LAYERS OF 250mm MAXIMUM LOOSE THICKNESS WITH EACH LAYER COMPACTED TO AT LEAST 95% OF THE MODIFIED MAXIMUM DRY DENSITY (MMDD) AND WITHIN 2% OF THE OPTIMUM MOISTURE CONTENT FOR MODIFIED
COMPACTION.
EARTHWORKS FOR PAVEMENT SUBGRADE:
EW.5. MOISTURE CONDITION THE EXPOSED EARTHWORKS FOUNDATION SUBGRADE SOILS TO APPROXIMATE MODIFIED OPTIMUM MOISTURE CONTENT, AND TO THE DEPTH AND DENSITY SPECIFIED IN UFGS 31 23 00.00 20 EXCAVATION AND FILL.
EW.6. FOLLOWING RE-COMPACTION OF THE SUBGRADE SOILS, THE SURFACE MUST BE TEST ROLLED USING THE ROLLERS AND COVERAGES SPECIFIED
IN 31 23 00.00 20.
EW.7. WHERE REQUIRED TO RAISE LEVELS, FILL MUST COMPRISE A WELL GRADED GRANULAR SOIL WITH SELECT FILL PROPERTIES AS PER 31 23 00.00
20 AND COMPACTED IN ACCORDANCE WITH THE THICKNESS AND DENSITY REQUIREMENTS OF 31 23 00.00 20. .
EW.8. CONSTRUCT A UNIFORM PAVEMENT SUBGRADE LAYER TO SUPPORT THE PAVEMENT LAYERS, CONSISTING OF IN SITU SUBGRADE OR SELECT
FILL, WHERE REQUIRED, IN ACCORDANCE WITH THE COMPACTION REQUIREMENTS OF 31 23 00.00 20.
EW.9. FINAL INSPECTION MUST BE UNDERTAKEN BY A GEOTECHNICAL ENGINEER. SUBGRADE IS DEEMED ACCEPTABLE IF IT SHOWS NEGLIGIBLE
(MAXIMUM 3mm) DEFLECTION.
EW.10. ANY WET, SOFT OR WEAK AREAS IDENTIFIED DURING TEST ROLLING MUST BE REMOVED AND REPLACED WITH SELECT FILL.
EW.11. THE SUBGRADE SOILS SHOULD NOT BE LEFT EXPOSED AND ALLOWED TO DRY, SHRINK AND CRACK AND MUST BE PROTECTED IN ACCORDANCE
WITH THE REQUIREMENTS OF 31 23 00.00 20.
EW.12. REFER UFGS 32 11 13.13 FOR LIME TREATED SUBGRADE WHERE REQUIRED.
RE-USE OF SITE WON MATERIALS
EW.13. RECLAIMED MATERIAL AS PER THE DEMOLITION DRAWINGS MUST BE CLASSIFIED AND RE-USED AS DEFINED BELOW. THE ORDER OF PRIORITY FOR
RE-USE OF MATERIAL IS DEPENDENT ON PFAS CATEGORY, AS DETERMINED BY ON SITE TESTING, AND SHALL BE IN ACCORDANCE WITH THE TEMPORARY ENVIRONMENTAL CONTROL SPECIFICATION, PROJECT PFAS CONSTRUCTION RISK ASSESSMENT REPORT.
a. RECYCLED AND CRUSHED CONCRETE FROM THE EXISTING APRON SHALL BE USED FOR THE FOLLOWING PURPOSES:
1. AGGREGATE WITHIN LEAN MIX BACKFILL OF SERVICE EXCAVATIONS
2. AGGREGATE WITHIN CEMENT STABILISED SUBBASE OF PAVEMENT TYPE 3 AND PAVEMENT TYPE 5.
3. MIXED AT A 1:2 RATIO OF CONCRETE TO LOCAL SOIL, CLASSIFIED, AND USED AS SELECT FILL FOR BULK EARTHWORKS IN
THE EXISTING CENTRAL SWALE (TO BE FILLED), AND UNDER PAVEMENT TYPE 4 AND TYPE 6.
4. AGGREGATE SURFACING FOR PAVEMENT TYPE 6.
5. INCREASE RATIO OF CRUSHED CONCRETE IN ITEM 3 TO CONSUME SURPLUS CRUSHED CONCRETE AS REQUIRED.
b. AGGREGATE BASE
1. SELECT FILL UNDER PAVEMENT TYPE 1, 2, 3 AND 5.
2. SURPLUS TO BE STOCKPILED AT SPOIL LOCATION AS NOMINATED ON DWG G-105 OR DIVERTED TO OTHER PROJECT SITE AS
DIRECTED.
c. BLOCK PAVERS
1. LINING OF CENTRAL OPEN DRAIN (PRIOR TO SHOTCRETE COVER).
2. CRUSHED, CLASSIFIED USED AS SELECT FILL UNDER ACCESS ROAD PAVEMENT TYPE 5 (MIXED WITH CRUSHED CONCRETE)
EW14. RECLAIMED MATERIAL MUST BE TESTED AND CATEGORISED FOR PFAS CONTAMINATION IN ACCORDANCE WITH THE TEMPORARY ENVIRONMENTAL
CONTROL SPECIFICATION, PROJECT PFAS CONSTRUCTION RISK ASSESSMENT REPORT.
SERVICES LOCATION AND CONFLICTS:
SL.1. THE CONTRACTOR WILL BE SOLELY RESPONSIBLE FOR ANY DAMAGE INCURRED TO EXISTING UTILITY SERVICES AS A RESULT OF THE EXECUTION
OF WORK UNDER THE CONTRACT.
SL.2. THE POINT OF SUPPLY NOMINATED ON THE DRAWINGS IS TO BE INVESTIGATED PRIOR TO CONSTRUCTION.
SL.3. PITS AND SERVICES POSITIONS SHOWN ON DRAWINGS ARE INDICATIVE ONLY.
SL.4. RELOCATION OF SERVICES, BUILDING OVER SERVICES, AND WORKING WITHIN THE VICINITY OF UTILITY SERVICES MUST BE IN ACCORDANCE WITH
THE SERVICE PROVIDERS GUIDELINES AND STANDARDS.
SL.5. THE SERVICES AND THEIR LOCATIONS AS IDENTIFIED ARE INDICATIVE ONLY, SERVICES LOCATION AND ADDITIONAL POTHOLING MUST BE
UNDERTAKEN AT COMMENCEMENT OF CONSTRUCTION, SO THAT ANY CHANGES TO THE EXPECTED LOCATION OF SERVICES CAN BE IDENTIFIED
AND ADDRESSED AS EARLY AS POSSIBLE IN THE CONSTRUCTION PHASE.
SL.6. THIS DESIGN IS NOT INTENDED TO PROVIDE COMPLETE OR ACCURATE INFORMATION CONCERNING THE LOCATION AND EXTENT OF UTILITY
SERVICES.
SL.7. ENQUIRIES MUST BE MADE TO THE SERVICE AUTHORITIES AS TO THE LOCATION, DEPTH AND EXTENT OF UTILITY SERVICES PRIOR TO
COMMENCEMENT OF ANY WORK ON THE SITE.
SL.8. NO WORK IS TO BE CARRIED OUT WITHIN 3m OF ANY EXISTING SERVICES, WITHOUT PRIOR RECORDED CONSULTATION WITH THE RELEVANT SERVICE AUTHORITY. THE CONTRACTOR MUST UNDERTAKE ANY POTHOLING TO POSITIVELY IDENTIFY SERVICES AS DEEMED NECESSARY IN
UNDERTAKING THE WORKS.
SL.9. THE PRINCIPAL AND RELEVANT SERVICE AUTHORITY IS TO BE IMMEDIATELY ADVISED WHEN AN EXISTING UNDERGROUND UTILITY SERVICE NOT PREVIOUSLY IDENTIFIED IS FOUND DURING CONSTRUCTION. A HOLD TIME OF 2 DAYS IS TO BE ALLOWED FOR THE SERVICE AUTHORITY TO
WITNESS AND DOCUMENT.
EXISTING SERVICES NOTES:
ES.1. THE ALIGNMENT AND LEVEL OF EXISTING SERVICES AND DEMOLITION WORKS SHOWN ON THESE DRAWINGS HAS BEEN COMPILED FROM EXISTING
RAAF BASE TINDAL AS-BUILT RECORDS, AND FROM IFC DOCUMENTATION FOR NEW WORKS BEING CONSTRUCTED BY CONCURRENT PROJECTS.
THIS INFORMATION IS INDICATIVE ONLY OF TYPE AND POSITION OF EXISTING SERVICES, AND THE DESIGNER DOES NOT WARRANT OR REPRESENT THAT THE RECORDS ARE ACCURATE AND THE CONTRACTOR MUST NOT RELY ON IT. EXISTING SERVICES MAY EXIST THAT ARE NOT SHOWN AND HAVE NOT BEEN IDENTIFIED BY THE DESIGNER. PRIOR TO COMMENCING CONSTRUCTION OR ORDERING ANY MATERIALS THE CONTRACTOR IS TO LOCATE AND EXPOSE EXISTING UNDERGROUND SERVICES TO CONFIRM THE TYPE, ALIGNMENT AND LEVEL OF ALL SERVICES AFFECTED BY THE PROPOSED WORKS. THE DESIGNER DISCLAIMS RESPONSIBILITY FOR LOSS OR DAMAGE TO THE WORKS AND/OR INJURY TO ANY PERSON CAUSED DIRECTLY OR INDIRECTLY BY USE OF THE EXISTING SERVICES INFORMATION ON THIS DRAWING IN THE EXECUTION OF THE WORKS.
ES.2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONFIRM THE LOCATION OF EXISTING SERVICES.
ES.3. SHOULD INVERT LEVELS OR LOCATION OF ANY SERVICE CONNECTION POINTS DIFFER TO THAT INDICATED ON THE DRAWINGS THEN THE
CONTRACTING OFFICER MUST BE NOTIFIED IMMEDIATELY.
ASPHALT NOTES:
PS.1. REFER UFGS 32 12 13 FOR BITUMINOUS TACK AND PRIME COATS AND 32 12 15.13 FOR ASPHALT PAVING. .
CONCRETE NOTES:
CC.1. REFER UFGS 32 13 14.13 FOR AIRFIELD CONCRETE PAVING.
PAVEMENT NOTES:
CO.1. REFER UFGS 32 11 20 FOR SEPARATION COURSE FOR RIGID PAVEMENTS AND SUBBASES FOR FLEXIBLE PAVING.
CO.2. REFER UFGS 32 11 23.23 FOR BASE COURSE DRAINAGE LAYERS FOR RIGID PAVEMENTS.
CO.3. REFER UFGS 32 11 23 FOR FINE CRUSHED ROCK BASE COURSE FOR FLEXIBLE PAVING.
CO.4. REFER UFGS 32 11 33.13 FOR PORTLAND CEMENT STABILIZED BASE COURSE.
CO.5. REFER UFGS 32 11 36.13 FOR LEAN MIX CONCRETE BASE COURSE OF RIGID PAVEMENTS.
SEWER:
S.1. CONNECTION TO EXISTING SEWER MAIN WILL ONLY BE CARRIED OUT WHEN ALL WORKS AND TESTING (HYDROSTATIC AND CCTV) ARE COMPLETE
IN ACCORDANCE WITH THE DESIGN DRAWINGS AND PROCEDURES, AND HAVE SATISFACTORILY PASSED FINAL INSPECTION.
S.2. SEWER PROPERTY CONNECTIONS MUST BE SET OUT FROM PROPERTY BOUNDARIES AND EASEMENTS IN ACCORDANCE WITH PWC STD. DRG.
W2-1-04.
S.3. THE SEWER CONNECTION INSPECTION OPENING IS TO BE BROUGHT TO THE SURFACE WITHIN THE LOT AND A HEAVY DUTY COVER IS TO BE
INSTALLED IN ACCORDANCE WITH PWC STD. DRG. W2-1-05.
S.4. CONSTRUCTION PHOTOS OF ALL UNDERGROUND WORKS INCLUDED IN DOCUMENTATION AND ESTIMATES ARE TO BE DOCUMENTED IN
ACCORDANCE WITH THE INSPECTION AND TEST PLAN.
S.5. ALL INTERNAL PLUMBING WORKS ARE TO BE CARRIED OUT BY A REGISTERED PLUMBER AND INSTALLED IN ACCORDANCE WITH AS/NZ3500.
S.6. SEWER SERVICES INTERNAL FROM THE LOT CONNECTION POINT ARE INDICATIVE ONLY.
WATER:
W.1. PROVIDE ANCHORAGE OR THRUST BLOCKS FOR ALL VALVES, REDUCERS, VERTICAL BENDS, TEES AND TERMINAL/ENDPOINTS.
W.2. WATER MAINS MUST BE LAID ABOVE STORM WATER, SEWER, NON-POTABLE AND RECYCLED WATER PIPES.
W.3. JOINT DEFLECTION AND BENDING ARE NOT ALLOWED FOR PVC PIPES. USE SO-SO DICL CONNECTORS TO ACHIEVE A MAXIMUM 2 DEGREE JOINT
DEFLECTION OR BENDS FOR LARGER DEFLECTION.
W.4. MARKING TAPE COLOURED GREEN AND MARKED 'WATER MAIN' MUST BE LAID CONTINUOUSLY AND LOCATED 300mm ABOVE THE WATER
PIPEWORK.
W.5. CONNECTIONS TO EXISTING WATER MAINS WILL ONLY BE CARRIED OUT WHEN ALL WORKS AND TESTING (HYDROSTATIC TESTING, DISINFECTION
FLUSHING AND MICROBIOLOGICAL TEST) ARE COMPLETE IN ACCORDANCE WITH THE APPROVED DESIGN DRAWINGS AND PROCEDURES, AND HAVE
SATISFACTORILY PASSED FINAL HANDOVER INSPECTION.
UNEXPLODED ORDNANCE (UXO)
U.1. IN THE EVENT OF INADVERTENT DISCOVERY OF SUSPECTED UXO, DO NOT TOUCH, TAMPER OR TILT THE SUSPECT UXO, ALL WORK WITHIN 25
METRES OF THE SUSPECT ITEM IS TO IMMEDIATELY CEASE, THE AREA CORDONED, PHOTOGRAPH THE ITEM IF POSSIBLE AND REMOVE ALL PERSONAL ITEMS. NO RADIO OR MOBILE PHONE TRANSMISSIONS ARE TO OCCUR WITHIN 25 METRES OF A SUSPECT UXO. INFORM THE LOCAL
MANAGER/AUTHORITY WHO WILL INFORM LOCAL POLICE AND/OR BASE CONTROL.
CONSTRUCTION WATER:
CW.1. EXISTING BOREHOLES AND WATER PIPELINES HAVE BEEN INSTALLED BY THE KC-30 PROJECT AND WATER SUPPLY IS AVAILABLE FOR THE P500
PROJECT.
CW.2. WATER PIPELINE SHALL BE BRANCHED FROM THE EXISTING PIPELINE APPROXIMATELY AT THE INTERSECTION OF AITAPE ROAD AND WESTERN
ACCESS TRACK.
CW.3. MAKE ALLOWANCE FOR COSTS ASSOCIATED WITH CONNECTIONS AND PROVISION OF NEW PIPELINE FROM CONNECTION POINT TO THE P500
WORKS.
CW.4. LIAISE WITH KC-30 MANAGING CONTRACTOR AND BASE STAKEHOLDERS FOR COSTS ASSOCIATED WITH CONNECTION AND CONSUMPTION OF
WATER.
CIVIL GENERAL NOTES
B-52 B-52
15.16m
3.
m
2.
m
C1DETAIL
SCALE: 1:20m
C-003
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
0.
m
C1
A2B-52 LAYOUT PLAN
SCALE: 1:150m
0 15m
1:150
7.51
2m
1:20
B-52 UNDERCARRIAGE SPECIFICATIONS
TYPE OF GEAR
LOAD RATING
(PER STRUT)
NUMBER OF TYRES
PER STRUT
TYRE SIZE
(mm x mm - inches) TYRE PRESSURE
NOSE GEAR (STATIC) 58,560 kg 2 TYRES 56 x 16 - R28 265 psi (1827 KPa)
MAIN GEARS (BRAKING)1 NOT DECLARED
MAIN GEARS 63,440 kg 2 TYRES 32 x 8.8 - R16 305 psi (2103 KPa)
1. NOSE GEAR (BRAKING) - STATIC - 10 ft/sec² DECELERATION
KC-30 (A330-200): 22.15m
.0
8m
9.
m
KC-30 (A330-200)
KC-30 (A330-200)
KC
-3
(A
0-
0)
: 1 2.
m
C1DETAIL
SCALE: 1:20m
C-004
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
C1
A2KC-30 (A330-200) LAYOUT PLAN
SCALE: 1:150m
0 15m
1:150
7.51
2m
1:20
C4DETAIL
SCALE: 1:20m
C4
0.
m
1.
m
1.981m
KC-30A (A330-200) UNDERCARRIAGE SPECIFICATIONS
TYPE OF GEAR
LOAD RATING
(PER STRUT)
NUMBER OF TYRES
PER STRUT
TYRE SIZE
(mm x mm - inches) TYRE PRESSURE
NOSE GEAR (STATIC) 25,580 kg 2 TYRES 1050 x 395 - R16 184 psi (1269 KPa)
MAIN GEARS (BRAKING)1 40,150 kg
MAIN GEARS 110,518 kg 4 TYRES 1400 x 530 - R23 206 psi (1420 KPa)
1. NOSE GEAR (BRAKING) - STATIC - 10 ft/sec² DECELERATION
C-17: 18.95m
7.
m
C-
: 1 0.
m
C-17
C-17
7.
m
C1DETAIL
SCALE: 1:20m
C-005
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
C1
A2C-17 LAYOUT PLAN
SCALE: 1:150m
0 15m
1:150
7.51
2m
1:20
C4DETAIL
SCALE: 1:20m
C4
0.
m
1.
m
0.29m (TYP)
C-17A UNDERCARRIAGE SPECIFICATIONS
TYPE OF GEAR
LOAD RATING
(PER STRUT)
NUMBER OF TYRES
PER STRUT
TYRE SIZE
(inches x inches - inches) TYRE PRESSURE
NOSE GEAR (STATIC) 21,264 kg 2 TYRES 40 x 16 - R16 160 psi (1103 KPa)
MAIN GEARS (BRAKING)1 NOT DECLARED
MAIN GEARS 122,270 kg 6 TYRES 50 x 21 - R23 144 psi (993 KPa)
1. NOSE GEAR (BRAKING) - STATIC - 10 ft/sec² DECELERATION 1.
m
2.46m
20 40 60 80
MT0A
0 20
MD01 719
520 540
MD
0 20
860 880
MS01 884
0 20
220 240
640 660
820 840 860
MA01 86260
20204060
420 440 460
0MA02
0204060
80 100
360 380 400 420
0MS02
MR01
420 440
MC
MT0E
MT0F
MT
0C
02040608010
MD03
MC
MT0B
MT0D
8890 20
620 640 660 680
860 880
MV01
HORIZONTAL ALIGNMENT REPORT - MA01
POINT CHAINAGE EASTING NORTHING ELEVATION ELEMENT LENGTH BEARING
START 0 216510.142 8394183.394 130.172
STRAIGHT 19.412 135°22'55.120"
TC 19.412 216523.777 8394169.576 130.154 135°22'55.120"
CC 216623.430 8394267.908 R = -140.000 25
CTC 44.412 216542.828 8394153.439 130.078 125°09'02.119"
CC 216557.221 8394173.880 R = -25.000 21.996
CTC 66.409 216563.801 8394149.761 129.855 74°44'20.505"
CC 216548.008 8394207.645 R = -60.000 24
CT 90.409 216585.097 8394160.481 129.704 51°49'14.582"
STRAIGHT 23.89 51°49'14.582"
HIP 114.298 216603.876 8394175.248 130.038
STRAIGHT 42.5 48°14'39.778"
HIP 156.798 216635.581 8394203.551 130.633
STRAIGHT 5 48°14'39.778"
HIP 161.798 216639.311 8394206.880 130.678
STRAIGHT 61 48°14'39.778"
HIP 222.798 216684.816 8394247.504 131.288
STRAIGHT 427.5 138°14'39.778"
HIP 650.298 216969.512 8393928.592 131.288
STRAIGHT 61 228°14'39.778"
HIP 711.298 216924.006 8393887.969 130.678
STRAIGHT 5 228°14'39.778"
HIP 716.298 216920.277 8393884.639 130.633
STRAIGHT 42.5 228°14'39.778"
HIP 758.798 216888.572 8393856.336 130.038
STRAIGHT 23.89 224°40'04.975"
TC 782.689 216871.777 8393839.345 129.799 224°40'04.975"
CC 216914.448 8393797.165 R = -60.000 24
CTC 806.689 216858.720 8393819.399 129.987 201°44'59.052"
CC 216881.940 8393810.135 R = -25.000 21.996
CTC 828.685 216860.003 8393798.144 130.207 151°20'17.438"
CC 216982.849 8393865.293 R = -140.000 25
CT 853.685 216873.884 8393777.391 130.308 141°06'24.437"
STRAIGHT 8.073 141°06'24.437"
END 861.758 216878.953 8393771.108 130.33
HORIZONTAL ALIGNMENT REPORT - MA02
POINT CHAINAGE EASTING NORTHING ELEVATION ELEMENT LENGTH BEARING
START 0 216636.673 8394041.655 129.928
STRAIGHT 35.014 319°52'51.456"
TC 35.014 216614.111 8394068.431 129.964 319°52'51.456"
CC 216767.052 8394197.307 R = +200.000 41.99
CTC 77.004 216590.610 8394103.136 129.943 331°54'36.625"
CC 216608.695 8394112.788 R = +20.500 54.624
CTC 131.628 216620.330 8394129.667 129.785 124°34'42.932"
CC 216506.823 8393964.997 R = +200.000 41.99
CT 173.618 216652.156 8394102.395 129.863 136°36'28.101"
STRAIGHT 35.014 136°36'28.101"
HIP 208.632 216676.211 8394076.951 129.877
STRAIGHT 184.5 138°14'39.778"
HIP 393.132 216799.079 8393939.316 129.877
STRAIGHT 35.014 139°52'51.456"
TC 428.146 216821.642 8393912.540 129.863 139°52'51.456"
CC 216668.700 8393783.664 R = +200.000 41.99
CTC 470.136 216845.143 8393877.835 129.785 151°54'36.625"
CC 216827.057 8393868.183 R = +20.500 54.624
CTC 524.76 216815.423 8393851.304 130.063 304°34'42.932"
CC 216928.930 8394015.974 R = +200.000 41.99
CT 566.75 216783.596 8393878.576 130.105 316°36'28.101"
STRAIGHT 35.014 316°36'28.101"
END 601.764 216759.542 8393904.020 130.075
HORIZONTAL ALIGNMENT REPORT - MC00
POINT CHAINAGE EASTING NORTHING ELEVATION ELEMENT LENGTH BEARING
START 0 216554.839 8394116.056 129.868
STRAIGHT 41 48°14'41.272"
TC 41 216585.425 8394143.360 129.868 48°14'41.272"
CC 216608.734 8394117.250 R = +35.000 54.978
CT 95.978 216634.843 8394140.559 130.038 138°14'39.778"
STRAIGHT 334.5 138°14'39.778"
TC 430.478 216857.605 8393891.025 130.038 138°14'39.778"
CC 216831.495 8393867.716 R = +35.000 54.978
CT 485.455 216854.804 8393841.606 129.954 228°14'39.778"
STRAIGHT 41 228°14'39.778"
END 526.455 216824.218 8393814.302 129.954
HORIZONTAL ALIGNMENT REPORT - MD03
POINT CHAINAGE EASTING NORTHING ELEVATION ELEMENT LENGTH BEARING
START 0 217008.442 8394013.135 129.457
STRAIGHT 25.103 323°25'50.812"
HIP 25.103 216993.486 8394033.296 129.510
STRAIGHT 6.63 317°21'15.810"
HIP 31.733 216988.995 8394038.173 129.524
STRAIGHT 19.996 318°04'14.365"
HIP 51.729 216975.633 8394053.049 129.567
STRAIGHT 10.001 317°21'15.810"
HIP 61.73 216968.858 8394060.406 129.588
STRAIGHT 20.004 318°04'13.364"
HIP 81.734 216955.491 8394075.288 129.630
STRAIGHT 20.001 318°41'41.004"
HIP 101.735 216942.289 8394090.312 129.673
STRAIGHT 8.089 317°03'28.515"
TC 109.824 216936.778 8394096.234 129.690 317°03'28.515"
CC 216944.098 8394103.047 R = +10.000 15.707
CT 125.531 216937.285 8394110.366 129.723 47°03'04.769"
STRAIGHT 0.892 47°03'04.769"
END 126.423 216937.938 8394110.974 129.725
C-101
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
62.50 125m
1:1250
TN
PLAN
NORTH
A1CONTROL LINE SETOUT PLAN
SCALE: 1:1250m
1. REFER TO DRAWING NUMBER C-102 FOR ADDITIONAL SETOUT
TABLES.
2. REFER TO DRAWING NUMBER C-401 TO C-408 FOR LEVELS OF
ACCESS TRACKS.
SHEET GENERAL NOTES:
HORIZONTAL ALIGNMENT REPORT - MS01
POINT CHAINAGE EASTING NORTHING ELEVATION ELEMENT LENGTH BEARING
START 0 216520.819 8394193.929 129.948
STRAIGHT 19.412 135°22'55.120"
TC 19.412 216534.454 8394180.111 129.929 135°22'55.120"
CC 216623.430 8394267.908 R = -125.000 22.321
CTC 41.734 216551.464 8394165.703 129.778 125°09'02.119"
CC 216557.221 8394173.880 R = -10.000 8.798
CTC 50.532 216559.853 8394164.232 129.555 74°44'20.505"
CC 216548.008 8394207.645 R = -45.000 18
CT 68.532 216575.824 8394172.272 129.404 51°49'14.582"
STRAIGHT 19.592 51°49'14.582"
HIP 88.125 216591.225 8394184.382 129.678
STRAIGHT 3.363 52°19'40.035"
HIP 91.487 216593.887 8394186.437 129.736
STRAIGHT 128 48°14'39.779"
HIP 219.487 216689.374 8394271.680 130.598
STRAIGHT 457.5 138°14'39.777"
HIP 676.987 216994.048 8393930.388 130.599
STRAIGHT 127.532 228°14'39.780"
HIP 804.519 216898.911 8393845.458 129.895
STRAIGHT 23.422 224°40'04.975"
TC 827.941 216882.445 8393828.800 129.607 224°40'04.975"
CC 216914.448 8393797.165 R = -45.000 18
CTC 845.941 216872.652 8393813.840 129.901 201°44'59.052"
CC 216881.940 8393810.135 R = -10.000 8.798
CTC 854.74 216873.165 8393805.338 129.993 151°20'17.438"
CC 216982.849 8393865.293 R = -125.000 22.321
CT 877.061 216885.559 8393786.809 130.101 141°06'24.437"
STRAIGHT 7.34 141°06'24.437"
END 884.402 216890.168 8393781.096 130.148
HORIZONTAL ALIGNMENT REPORT - MS02
POINT CHAINAGE EASTING NORTHING ELEVATION ELEMENT LENGTH BEARING
START 0 216648.006 8394051.485 129.703
STRAIGHT 34.8 319°52'51.456"
TC 34.8 216625.581 8394078.097 129.739 319°52'51.456"
CC 216767.052 8394197.307 R = +185.000 38.841
CTC 73.641 216603.843 8394110.198 129.688 331°54'36.625"
CC 216608.695 8394112.788 R = +5.500 14.655
CTC 88.296 216611.817 8394117.317 129.607 124°34'42.932"
CC 216506.823 8393964.997 R = +185.000 38.841
CT 127.136 216641.256 8394092.09 129.659 136°36'28.101"
STRAIGHT 34.8 136°36'28.101"
HIP 161.936 216665.164 8394066.802 129.652
STRAIGHT 184.072 138°14'39.778"
HIP 346.008 216787.747 8393929.486 129.652
STRAIGHT 34.8 139°52'51.456"
TC 380.808 216810.171 8393902.874 129.638 139°52'51.456"
CC 216668.7 8393783.664 R = +185.000 38.841
CTC 419.649 216831.909 8393870.772 129.56 151°54'36.625"
CC 216827.057 8393868.183 R = +5.500 14.655
CTC 434.304 216823.936 8393863.654 129.838 304°34'42.932"
CC 216928.93 8394015.974 R = +185.000 38.841
CT 473.144 216794.496 8393888.881 129.88 316°36'28.101"
STRAIGHT 34.8 316°36'28.101"
END 507.944 216770.589 8393914.169 129.849
HORIZONTAL ALIGNMENT REPORT - MV01
POINT CHAINAGE EASTING NORTHING ELEVATION ELEMENT LENGTH BEARING
START 0 216522.955 8394196.036 129.903
STRAIGHT 19.412 135°22'55.120"
TC 19.412 216536.589 8394182.218 129.884 135°22'55.120"
CC 216623.43 8394267.908 R = -122.000 21.786
CTC 41.198 216553.191 8394168.156 129.718 125°09'02.119"
CC 216557.221 8394173.88 R = -7.000 6.159
CTC 47.357 216559.064 8394167.127 129.495 74°44'20.504"
CC 216548.008 8394207.645 R = -42.000 16.800
CT 64.157 216573.97 8394174.63 129.344 51°49'14.582"
STRAIGHT 19.592 51°49'14.582"
HIP 83.749 216589.371 8394186.741 129.618
STRAIGHT 3.176 52°27'47.042"
HIP 86.925 216591.889 8394188.675 129.691
STRAIGHT 131.000 48°14'39.779"
HIP 217.925 216689.614 8394275.916 130.478
STRAIGHT 395.100 138°14'39.778"
HIP 613.025 216952.732 8393981.174 130.835
STRAIGHT 4.243 93°14'39.778"
HIP 617.267 216956.968 8393980.934 130.775
STRAIGHT 15.000 138°14'39.778"
HIP 632.267 216966.958 8393969.744 130.775
STRAIGHT 4.243 183°14'39.778"
HIP 636.51 216966.718 8393965.508 130.835
STRAIGHT 45.400 138°14'39.778"
TC 681.91 216996.952 8393931.64 130.534 138°14'39.779"
CC 216995.46 8393930.308 R = +2.000 3.142
CT 685.052 216996.792 8393928.816 130.557 228°14'39.780"
STRAIGHT 128.438 228°14'39.780"
HIP 813.49 216900.978 8393843.282 129.866
STRAIGHT 23.329 224°40'04.975"
TC 836.818 216884.578 8393826.691 129.589 224°40'04.975"
CC 216914.448 8393797.165 R = -42.000 16.800
CTC 853.618 216875.438 8393812.729 129.885 201°44'59.052"
CC 216881.94 8393810.135 R = -7.000 6.159
CTC 859.777 216875.798 8393806.777 129.950 151°20'17.438"
CC 216982.849 8393865.293 R = -122.000 21.786
CT 881.563 216887.894 8393788.693 130.060 141°06'24.437"
STRAIGHT 7.340 141°06'24.437"
END 888.904 216892.503 8393782.98 130.112
HORIZONTAL ALIGNMENT REPORT - MT0A
POINT CHAINAGE EASTING NORTHING ELEMENT LENGTH BEARING
START 0 216920.782 8394114.637
STRAIGHT 9.879 161°46'52.270"
TC 9.879 216923.871 8394105.253 161°46'52.270"
CC 216930.520 8394107.442 R = -7.000 2.876
CT 12.755 216925.298 8394102.780 138°14'39.778"
STRAIGHT 360.745 138°14'39.778"
END 373.5 217165.538 8393833.667
HORIZONTAL ALIGNMENT REPORT - MT0B
POINT CHAINAGE EASTING NORTHING ELEMENT LENGTH BEARING
START 0 216835.434 8394209.278
STRAIGHT 25.3 318°14'39.779"
HIP 25.3 216818.586 8394228.152
STRAIGHT 74.7 48°14'39.779"
END 100 216874.311 8394277.898
HORIZONTAL ALIGNMENT REPORT - MT0C
POINT CHAINAGE EASTING NORTHING ELEMENT LENGTH BEARING
START 0 216893.603 8394325.780
STRAIGHT 242.341 26°45'11.309"
TC 242.341 217002.692 8394542.180 26°45'11.309"
CC 217020.551 8394533.177 R = +20.000 7.502
CT 249.843 217007.232 8394548.097 48°14'39.778"
STRAIGHT 23.157 48°14'39.778"
END 273 217024.507 8394563.518
HORIZONTAL ALIGNMENT REPORT - MC01
POINT CHAINAGE EASTING NORTHING…