EXISTING APRON
SHOULDER
EXISTING APRON - WIDTH VARIES
PHASE 1
P500 APRON - WIDTH VARIES
P500 CENTRAL
OPEN DRAIN
EXISTING APRON DEMOLISHED
BY P500 PROJECT
STORMWATER AND FUEL
MAIN CONSTRUCTED
EXISTING
BUILDINGS /
TOPSOIL
REMOVED
EXISTING SHOULDER AC
REMOVED
P500 FLEXIBLE
SHOULDER
DRAINAGE AND HYDRANT
PITS CONSTRUCTED TO
FINISHED SURFACE LEVELS,
PROVIDE PROTECTION
APPROXIMATELY APRIL 30 2024 TO JUNE 30 2024
INSTALL STORMWATER PIPE
AND PIT TO FINISHED SURFACE
LEVELS, PROVIDE PROTECTION.
HORIZONTAL CONTROL LINE
CULVERTS CONSTRUCTED
TAXIWAY A CONSTRUCTION PROGRESSING IN 2024.
LENGTH OF ALPHA MATCHING USAF PAVEMENT WILL
BE CONSTRUCTED IN 2024. REFER DRAWING CR301
USAF/KC-30 PAVEMENT INTERFACE DETAIL. KC-30
RIGID PAVEMENT CONSTRUCTED FIRST
KC-30 PROJECT TO DEMOLISH PARTIAL EXTENT OF EXISTING
AMT AS PART OF TAXIWAY A WORKS (TO USAF/KC-30
PAVEMENT INTERFACE POINT). AMT APRON MATERIAL MUST
BE SALVAGED FOR REUSE BY THE P500 PROJECT.
KC-30 CONSTRUCTING TAXIWAY A
APRIL 30 - NOVEMBER 30 2024.
KC-30 TO CONSTRUCT FORMATION OF
A TEMPORARY CENTRAL DRAIN FOR
DRAINAGE UNTIL P500 IS COMPLETED
LI
M
IT
O
F
PA
VE
M
EN
T
W
OR
KS
P500 CENTRAL
OPEN DRAIN
P500 FLEXIBLE
SHOULDER
TEMPORARY DRAIN FORMATION
SUBSOIL DRAINAGE, DEEP BASE CANISTERS AND FLEXIBLE
SHOULDER PAVEMENT CONSTRUCTION
TAXIWAY A OPERATING AS
TEMPORARY RUNWAY
P500 APRON - RIGID PAVEMENT
CONSTRUCTED
P500 TO MATCH INTO KC-30
RIGID PAVEMENT INTERFACE
HORIZONTAL
CONTROL LINE
PHASE 3
APPROXIMATELY MARCH 31 2025 ONWARDS
LI
M
IT
O
F
PA
VE
M
EN
T
W
OR
KS
RIGID PAVEMENT CONSTRUCTION MAY START
FROM NORTHERN BOUNDARY AND PROCEED
SOUTH, SUBJECT TO OLS CONSTRAINTS
P500 FLOODLIGHT POLES WILL BREACH TO
OLS. POLES MUST BE INSTALLED ON
CRADLES UNTIL RUNWAY IS DEACTIVATED
P500 APRON - WIDTH VARIES
RUNWAY OBSTACLE
LIMITATION SURFACE
ANY P500 WORKS ARE RESTRICTED WITHIN THE OBSTACLE LIMITATION SURFACE. HEIGHT
LIMITATIONS ON STRUCTURES WITHIN THE SHADED AREAS. LIKELY NIGHT WORKS WOULD BE
REQUIRED WITH NEGOTIATIONS TO CONSTRAIN THE TEMPORARY RUNWAY IN THESE PERIODS. A
TRUNCATED RUNWAY BAY BE NEGOTIATED FOR NIGHT WORKS TO ENABLE LIGHT AIRCRAFT
NON-SCHEDULED EMERGENCY FLIGHTS.
SURFACE DRAINAGE STRUCTURE
ESTABLISH BEFORE LEAN MIX SUBBASE
AND PAVEMENT CONSTRUCTION
P500 APRON - WIDTH VARIES
P500 CENTRAL
OPEN DRAIN
P500 FLEXIBLE
SHOULDER
P500 TO FORM AND CONSTRUCT
FINAL CENTRAL DRAIN WORKS
TAXIWAY A OPERATING AS A CODE E TAXIWAY,
NO OBSTACLE LIMITATION SURFACE
HORIZONTAL CONTROL LINE
PHASE 4
APPROXIMATELY SEPTEMBER 30 2026 ONWARDS TEMPORARY RUNWAY TO BECOME
TAXIWAY A AND EMERGENCY RUNWAY ONLY. OLS CONSTRAINTS REMOVED.
LI
M
IT
O
F
PA
VE
M
EN
T
W
OR
KS
RIGID PAVEMENT CONSTRUCTION MAY START
FROM NORTHERN BOUNDARY AND PROCEED
SOUTH, SUBJECT TO OLS CONSTRAINTS
EXISTING APRON - WIDTH VARIES
PHASE 2
P500 APRON - WIDTH VARIES
P500 CENTRAL
OPEN DRAIN
STORMWATER AND FUEL
MAIN CONSTRUCTED
EXISTING
BUILDINGS /
TOPSOIL
REMOVED
P500 FLEXIBLE
SHOULDER
DRAINAGE AND HYDRANT
PITS CONSTRUCTED TO
FINISHED SURFACE LEVELS,
PROVIDE PROTECTION
INSTALL STORMWATER PIPE
AND PIT TO FINISHED SURFACE
LEVELS, PROVIDE PROTECTION.
HORIZONTAL CONTROL LINE
CULVERTS CONSTRUCTED
APPROXIMATELY JULY 31 2024 TO FEBRUARY 28 2025
KC-30 CONSTRUCTING
TAXIWAY A APRIL 30 -
NOVEMBER 30 2024
JUNE 30 2024 TO FEBRUARY 28 2025
ONWARDS INSTALL STORMWATER
AND FUEL INFRASTRUCTURE
SURFACE LEVEL DURING PHASE 2
SELECT FILL PLACEMENT TO BE COORDINATED
WITH STORMWATER AND FUEL INFRASTRUCTURE
EXISTING APRON
SHOULDER
TAXIWAY A CONSTRUCTION PROGRESSING IN 2024.
LENGTH OF ALPHA MATCHING USAF PAVEMENT WILL
BE CONSTRUCTED IN 2024. REFER DRAWING CR301
USAF/KC-30 PAVEMENT INTERFACE DETAIL. KC-30
RIGID PAVEMENT CONSTRUCTED FIRST
LI
M
IT
O
F
PA
VE
M
EN
T
W
OR
KS
DEMOLITION COMPLETE BY P500
PROJECT BY JUNE 30 2024
FINAL SUBMITTAL
C044138No.RE
GI
S T
ER
ED PRO F E S S I ON A L E NG I NEER
ST A T E O F C A L I F O R N I A
G-301
1. WORK STAGING DRAWING ILLUSTRATES THE CONSTRUCTION
STAGING REQUIREMENTS AND COORDINATION INTERFACES
BETWEEN THE WORKS UNDER THIS PROJECT (P500) AND THE KC-30
PROJECT (BY OTHERS). STAGING IS SUBJECT TO COORDINATION AND
IS BASED ON INDICATIVE CONSTRUCTION PROGRAMS. MAKE
ALLOWANCE WITHIN PROGRAM TO ALIGN WITH KEY PROJECT
STAGING REQUIREMENTS SHOWN. FOLLOWING CONTRACT AWARD,
COORDINATION WITH THE KC-30 PROJECT AND BASE STAKEHOLDERS
WILL BE REQUIRED VIA THE CONTRACTING OFFICER / ROICC OFFICE.
2. ALL WORKS MUST BE CONSTRUCTED IN ACCORDANCE WITH THE
APPROVED METHOD OF WORKING PLAN.
3. PROVIDE TEMPORARY AND PERMANENT DRAINAGE OF THE WORKS
TO PROTECT PAVEMENTS.
4. REFER TO DRAWING CP501 FOR PAVEMENT DETAILS.
5. REFER TO DRAWING C-101 FOR HORIZONTAL CONTROL LINE DETAILS.
FINISHED DESIGN SURFACE
EXISTING SURFACE
STRIPPED SURFACE
KC-30 PROJECT SURFACE
SHEET GENERAL NOTES:
SHEET LEGEND:
A1TYPICAL APRON SECTIONS - TEMPORARY WORKS
-SCALE: N.T.S
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
AU
G
DATE: 08/16/2023
Evan Mizue
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
D
D
D
S
S
S
S S
S S
S S
S
S
S
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
C
C C C C CC
E C
C
E
E
C
C
C
E E
E
RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM
W W W W W W W W W W W W W W W W W W W W W W W
W WAV
AV
RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM RM
W W W W W W W W W W W W W W W W W W W W W W W
W WAV
AV
C C C C C C C C C C C C C C C C C C C C C C C
C C C C C C C C C C C C C C C C C C C C C C C
C
RMRMRMRM
RRRR
C
SSCSC
LIMIT OF DISTURBANCE
EXISTING CHAIN LINK FENCE PROVIDED
BY WESTERN ACCESS ROAD PROJECT
LIMIT OF DISTURBANCE
WESTERN ACCESS ROAD
TARAKAN ROAD (DECOMMISSIONED)
DEMOLISH AND REMOVE EXISTING CHAIN LINK
FENCE TO THE NEAREST EXISTING POST. POINT
OF REMOVAL SHALL BE APPROVED BY THE
CONTRACTING OFFICER PRIOR TO DEMOLITION.
CLEAR AND GRUB VEGETATION
TO PROVIDE CLEAR HYDRANT
LINE CONSTRUCTION ZONE
EXISTING TEMPORARY AIRSIDE FENCE
PROVIDED BY THE KC-30 PROJECT.
TEMPORARY FENCE TO BE REMOVED BY P700
PROJECT. ESTIMATED FENCE WILL BE
REMOVED BY MARCH 31, 2025. HOWEVER
CONTRACTOR SHOULD VALIDATE AND
COORDINATE THIS WITH THE P700 PROJECT
VIA THE CONTRACTING OFFICE / ROICC OFFICE.
EXTENT OF EXISTING
TEMPORARY AIRSIDE FENCE
PROVIDED BY P700 PROJECT
USAF FUEL FARM
(P200)
USAF SQUADRON
OPERATION BLDG
(P700)
±20.000
SHEET NOTES:
1. ALL DIMENSIONS SHOWN IN CALLOUTS AND NOTES ARE IN METRES
UNLESS OTHERWISE NOTED.
2. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION OF
EXISTING UTILITIES AND SITE FEATURES SHOWN ON PLANS IS APPROXIMATE
AND IS NOT TO BE ASSUMED AS BEING EXACT OR COMPLETE. ALL EXISTING
UTILITIES AND SITE FEATURES WITHIN THE LIMIT OF DISTURBANCE SHALL BE
FIELD VERIFIED PRIOR TO DEMOLITION.
3. THE CONTRACTOR MUST OBTAIN CLEARANCE FROM THE APPROPRIATE
AUTHORITIES PRIOR TO INITIATING WORK.
4. THE CONTRACTOR SHALL REFER TO HAZARDOUS MATERIALS REGISTER,
P500 RAAF BASE TINDAL, REPORT VERSION D-00456/JA0870/JL1309/01
DATED 16 SEP 2020 FOR KNOWN HAZARDOUS MATERIALS.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING FEATURES AND SHALL
BE RESPONSIBLE FOR DAMAGE TO ANY EXISTING FEATURES RESULTING
FROM CONSTRUCTION OPERATIONS. ANY DAMAGE SHALL BE REPORTED
IMMEDIATELY TO THE CONTRACTING OFFICER OR APPROPRIATE
GOVERNMENT REPRESENTATIVE. ANY REPAIR PERFORMED BY THE
CONTRACTOR SHALL BE INSPECTED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE PRIOR TO ACCEPTANCE.
6. OPPORTUNITIES FOR RECOVERY, REUSE AND RECYCLING OF MATERIALS
AND WASTE GENERATED DURING THE CONSTRUCTION PHASE MUST BE
MAXIMISED AND THE FOLLOWING MATERIALS MUST NOT BE DISPOSED TO
LANDFILL: CONCRETE, BRICKS, GLASS, ROAD BASE, SCRAP METALS, CLEAN
FILL (SOIL, SAND, EXCAVATION ROCK AND STONE), ASPHALT MILLINGS,
VEGETATION WASTE, PAPER AND CARDBOARD, EXPANDED POLYSTYRENE /
STYROFOAM PACKAGING, PVC, BATTERIES (ALL TYPES), AND ELECTRIC
WASTE.
FINAL SUBMITTAL
No.10021-C
H A W A I I , U . S . A
ENGINEER
PROFESSIONAL
LICENSEDLU
RE N K. KOMODA
E
CD101
50m
1:500
TN
PLAN
NORTH
A1DEMOLITION PLAN - SHEET 1
SCALE: 1:500m
SHEET LEGEND:
LIMIT OF DISTURBANCE
REMOVE EXISTING FENCE, POSTS, AND FOOTINGS.
NOMINAL LENGTH REMOVED: ±580m PER PLAN
±20m PER THIS SHEET
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
AU
G
LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV
AGL
AGL
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AGL
AGL
C C
C
C
C C
C C
C C
C C
C C C C C C C C C C C C C C C C C C C
VERTICAL RISER TYPE 2
VERTICAL RISER TYPE 2VERTICAL RISER TYPE 2
PVC DRAIN PIPE
VR7
VR8
VR9
CR301
C1
CR301
B1
LIMIT OF PAVEMENT WORKS
CR503
A1
CR503
A2
CR127
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
50m
1:500
TN
PLAN
NORTH
A1SUBSOIL DRAINAGE PLAN
SCALE: 1:500m
150mm PERFORATED SN8 PVC SUBSOIL PIPE
150mm NON-PERFORATED SN8 PVC DRAIN PIPE
INSPECTION FLUSHING POINT
1. FOR PAVEMENT DETAILS REFER DRAWING NO. CP501.
2. ALL SUBSOIL DRAINAGE OUTLETS TO STORMWATER CULVERTS
AND PITS TO BE PROVIDED WITH ONE-WAY FLAP VALVES.
SHEET GENERAL NOTES:
SHEET LEGEND:
VR00 VERTICAL RISER IDENTIFICATION TAG
SETOUT POINTS
ID NUMBER EASTING NORTHING LEVEL
VR7 216678.54 8394072.99 128.581
VR8 216627.22 8394123.57 128.192
VR9 216596.35 8394127.99 128.345
VR10 216573.28 8394154.22 128.522
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
AU
G
AG
L
AGL AGL
AGL AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AG
C
C
C C
C C
C C
C
C C
VERTICAL RISER TYPE 2VERTICAL RISER TYPE 2 VERTICAL RISER TYPE 2
VERTICAL RISER TYPE 2
VERTICAL
RISER TYPE 2
DN 225
SN8 PVC
DN 225
SN8 PVC
PVC DRAIN PIPE PVC DRAIN PIPE
PVC DRAIN PIPE
DN 225
SN8 PVC
VR2
VR3VR4VR5VR6
LIMIT OF PAVEMENT WORKS
CR128
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
1. FOR PAVEMENT DETAILS REFER DRAWING NO. CP501.
2. ALL SUBSOIL DRAINAGE OUTLETS TO STORMWATER CULVERTS
AND PITS TO BE PROVIDED WITH ONE-WAY FLAP VALVES.
TN
PLAN
NORTH
A1SUBSOIL DRAINAGE PLAN
SCALE: 1:500m
50m
1:500
150mm PERFORATED SN8 PVC SUBSOIL PIPE
150mm NON-PERFORATED SN8 PVC DRAIN PIPE
INSPECTION FLUSHING POINT
SHEET GENERAL NOTES:
SHEET LEGEND:
VR00 VERTICAL RISER IDENTIFICATION TAG
SETOUT POINTS
ID NUMBER EASTING NORTHING LEVEL
VR1 216864.26 8393828.32 128.640
VR2 216840.69 8393854.17 128.435
VR3 216842.95 8393879.93 128.594
VR4 216821.97 8393910.74 128.612
VR5 216774.70 8393965.27 128.614
VR6 216725.89 8394019.95 128.608
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
JU
L 2
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
AU
G
M
IN
IM
UM
CLASS 'G'
SOLID LID
5 MPa LEAN MIX
CONCRETE
DN150 RISER
MINIMUM 250
(NO FINES CONCRETE)
DN150 SLOTTED
SUBSOIL DRAIN
5MPa LEAN MIX
CONCRETE
DN150 OR 90° TEE
AS REQUIRED
225Ø
800 x 800 x 180 DEEP
COVER REBATE
50 50 uPVC
PIPE
CAP
15 mm
CHAMFER
(TYP.)
Ø225 uPVC
PIPE SLEEVE
N12 BAR
EXTRA N12 BARS
EXTRA N12 BARS
FINE CRUSHED ROCK
LAYER
CEMENT STABILISED
SUBBASE
SELECT FILL / SUBGRADE
M
IN
MIN
MIN
DN150 SLOTTED PVC PIPE
WITH FILTER SOCK
AGGREGATE SUBBASE
JOINTED PLAIN
CONCRETE
LEAN MIX CONCRETE
BASE
NONWOVEN GEOTEXTILE
FILTER
5MPa LEAN MIX CONCRETE
DESIGN SURFACE
M
IN
NO FINES CONCRETE
PAVEMENT DRAIN
PAVEMENT TYPE 1 PAVEMENT TYPE 3
SELECT FILL
M
IN
ASPHALT WEARING COURSE
BASECOURSE
SUBBASE (VARIABLE)
SELECT FILL (MIN 300mm)
USAF JOINT (AS SPECIFIED)
USAF JPC SLAB
TRANSITION SELECT FILL (AS REQUIRED)
ASPHALT AND CONCRETE JOINT INTERFACE
REFER DETAIL D1 ON CR506
TRANSITION
2.4m
CONSTRUCTED BY KC-30 PROJECT CONSTRUCTED BY USAF PROJECT
CONSTRUCTED BY KC-30 PROJECT CONSTRUCTED FIRST BY USAF PROJECT
REFER NOTES 9
LEAN MIX CONCRETE
AGGREGATE SUBBASE
M
IN
2 m 1 m 0.5 m 0.5 m
SLAB LENGTH
5.25m NORTH, 5.13m SOUTH
(JOINTING TO MATCH USAF)
TRANSITION
0.6m
SELECT FILL
225 PERMEABLE CTB 225 LEAN MIX
USAF JPC SLAB
DOWEL BY KC-30 PROJECT
CR301
FINAL SUBMITTAL
C044138No.RE
GI
S T
ER
ED PRO F E S S I ON A L E NG I NEER
ST A T E O F C A L I F O R N I A
1. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
2. EXCAVATE MATERIAL FOR PLACEMENT OF THE LEAN MIX CONCRETE
FOUNDATION.
3. COMPACT 150 mm OF IN-SITU MATERIAL BELOW THE EXCAVATION TO
98 % OF MODIFIED MAXIMUM DRY DENSITY.
4. LONGITUDINALLY TRIM, GRADE AND FINISH SURFACE OF COMPACTED
MATERIAL.
5. CONSTRUCT THE LEAN MIX FOUNDATION, TRANSVERSELY TRIM,
GRADE AND FINISH THE SURFACE OF THE LEAN MIX CONCRETE TO
FALL TO THE SLOTTED DRAINAGE PIPE.
6. IN CASE OF A GRATED DRAIN INSTALLATION, COMPLETE THE
CONSTRUCTION OF THE GRATED DRAIN.
7. OUTER FACES OF NO-FINES CONCRETE DRAIN SHOWN VERTICAL
MUST BE CONSTRUCTED VERTICAL USING FORMWORK. CONSTRUCT
THE NO-FINES CONCRETE DRAIN TO THE LEVELS SHOWN IN THE
DETAIL TO MATCH THE SURFACE LEVEL AND SURFACE LEVEL
TOLERANCE SPECIFIED FOR THE ABUTTING PAVEMENT COURSE.
8. WHERE NEW PAVEMENT CONSTRUCTION ABUTS NO FINES CONCRETE
PAVEMENT DRAIN, CONSTRUCT PAVEMENT DRAIN BEFORE NEW
PAVEMENT.
9. THICKENED EDGE CONCRETE PAVEMENT, LEAN MIX CONCRETE,
AGGREGATE SUBBASE, SELECT FILL AND SUBSOIL DRAIN OF THE
TRANSITION PAVEMENT CONSTRUCTION FIRST BY KC-30 PROJECT.
C1SECTION - SUBSOIL AT APRON EDGE
CR127NOT TO SCALE
A3VERTICAL RISER DETAIL (TYPE 2)
-NOT TO SCALE
B1SECTION - USAF / KC-30 PAVEMENT INTERFACE TAXIWAY FULL STRENGTH PAVEMENT
CR127NOT TO SCALE
SHEET GENERAL NOTES:
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
AU
G
1 - 5 1 - 5
B52
A332
C17
B52
A332
C17
B52
A332
C17
STAN
D 4
STAN
D 3
STAN
D 2
STAND 1
STAND 2
2 31
OLA
W
OLAN
OLA
E
OL
A S
1 2 2 3 3
1 - 5 A1 A2
A3
A4
A5
A6
A7
A8A9
A10
A11
A12 A13
R20.50
R2
.0
R200.00
R25.00
R60.00
R140.00
R92.25
R35.
00 R35.00
R35.
00 R35.00
R35.
R35.00
R35.00 R35.00
R3 0.
R30.00 A14
A15
A16
A17
A18
A19
A20
A21
A22
A23A24
A25
A26
A27
A28
A29
A30
A31
A32
A33
A34
A35
A36
A37
A38
A39 A40
A41
A42
A43
A44
A45
A46
A47
A48
R3 0.
R30.00 R3 0.0
D2
CM503
A49
A50
A51
A52
A53
A54
A55 D1
CM503
C1
CM503
B2
CM503
A2
CM503
B1
CM503
A1
CM503
C3
CM504
A114
A115
C3
CM503
PAVEMENT MARKING SETOUT POINTS
POINT EASTING NORTHING
A1 216510.133 8394183.403 A2 216523.774 8394169.579 A3 216542.828 8394153.438 A4 216563.802 8394149.761 A5 216585.096 8394160.480 A6 216603.876 8394175.248 A7 216684.816 8394247.504 A8 216636.674 8394041.655 A9 216614.111 8394068.431 A10 216590.611 8394103.135 A11 216620.330 8394129.666 A12 216652.157 8394102.394 A13 216676.211 8394076.950 A14 216531.531 8394142.166 A15 216580.949 8394139.365 A16 216578.148 8394089.946 A17 216585.425 8394143.360 A18 216634.843 8394140.559 A19 216603.640 8394151.878 A20 216651.629 8394174.310 A21 216634.079 8394158.643 A22 216648.828 8394124.893 A23 216652.741 8394120.510 A24 216646.581 8394127.410 A25 216650.493 8394123.028 A26 216699.911 8394120.227 A27 216682.361 8394104.559 A28 216664.088 8394185.432 A29 216667.147 8394188.163 A30 216680.586 8394200.161 A31 216688.046 8394206.820 A32 216694.953 8394212.986 A33 216712.369 8394131.348 A34 216715.428 8394134.079 A35 216728.868 8394146.077 A36 216736.328 8394152.736 A37 216743.235 8394158.902 A38 216697.110 8394070.808 A39 216694.863 8394073.326 A40 216701.022 8394066.426 A41 216698.775 8394068.944 A42 216730.642 8394050.474 A43 216748.193 8394066.142 A44 216760.651 8394077.264 A45 216763.710 8394079.994 A46 216777.150 8394091.992 A47 216784.610 8394098.652 A48 216791.516 8394104.818 A49 216587.349 8394144.958 A50 216639.610 8394206.545 A51 216622.051 8394139.871 A52 216677.266 8394108.053 A53 216670.337 8394085.783 A54 216725.543 8394053.974 A55 216718.619 8394031.698 A114 216578.165 8394136.583
CM107
FINAL SUBMITTAL
C044138No.RE
GI
S T
ER
ED PRO F E S S I ON A L E NG I NEER
ST A T E O F C A L I F O R N I A
50m
1:500
TN
PLAN
NORTH
A1PAVEMENT MARKING PLAN
SCALE: 1:500m
1. MARK EARTHING POINTS IN ACCORDANCE WITH DETAIL ON CM403. FOR
SETOUT OF EARTHING POINTS REFER TO DRAWING E-516.
SHEET GENERAL NOTES:
2. PAVEMENT MARKING FOR FUEL HYDRANT LOW POINT AND HIGH POINT
DRAINS NOT SHOWN FOR CLARITY. HYDRANT PITS, LOCATED ON
DRAWINGS CX101, CX104, CX107 AND CX108 MUST BE MARKED IN
ACCORDANCE WITH THE DETAIL PROVIDED ON DRAWING CM503.
TAXIWAY A
SQID
PAD
1 1 1
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
JU
L 2
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E W
ITH
A
ME
ND
ME
NT
AU
G
2 - 6 2 - 6
B52
A332
C17
B52
A332
C17
B52
A332
C17
STAN
D 6
STAN
D 5
STAND 3
STAND 4
STAND 5
4 5 6
OLA
W OL
A S
OLA
EOLAN
FOD CONTROL
3 4 4 5 5 6
R35.
R35.00
R35.
00 R35.00
R35.
00 R35.00
R35.00 R35.00
R200.00 R20.50
R60.00
R1
.0
R2
.0
R92.25
R35 .00
R25 .00
R3 0.0
0 R30.00 R3 0.0
0 R30.00 R3 0.0
0 R30.00
A56
A57 A58
A59
A60
A61
A62
A63
A64
A65
A66
A67
A68 A69
A70
A71
A72
A73
A74
A75
A76
A77
A78
A79 A80
A81
A82
A83
A84
A85
A86
A87
A88
A89
A90
A91
A92
A93 A94
A95
A96
A97
A98
A99
A100
A101 A102
A103
A104
A105A106
A107
A108
A109
A110
A111
A112
B2
CM503
A113
C1
CM503
D1
CM503
B1
CM503
A1
CM503
D2
CM503
B3
CM504
A1
CM504
C3
CM503
PAVEMENT MARKING SETOUT POINTS
POINT EASTING NORTHING
A56 216743.144 8394019.242 A57 216745.392 8394016.724 A58 216747.056 8394014.859 A59 216749.304 8394012.342 A60 216778.924 8393996.390 A61 216796.475 8394012.058 A62 216808.933 8394023.179 A63 216811.991 8394025.910 A64 216825.431 8394037.908 A65 216832.891 8394044.567 A66 216839.798 8394050.733 A67 216791.426 8393965.158 A68 216793.673 8393962.640 A69 216795.338 8393960.775 A70 216797.586 8393958.257 A71 216827.205 8393942.306 A72 216844.756 8393957.973 A73 216857.214 8393969.095 A74 216860.273 8393971.826 A75 216873.713 8393983.824 A76 216881.173 8393990.483 A77 216888.080 8393996.649 A78 216839.707 8393911.073 A79 216841.955 8393908.556 A80 216843.620 8393906.691 A81 216845.867 8393904.173 A82 216875.487 8393888.221 A83 216893.038 8393903.889 A84 216905.496 8393915.011 A85 216908.555 8393917.741 A86 216921.995 8393929.739 A87 216929.455 8393936.399 A88 216936.361 8393942.565 A89 216969.512 8393928.592 A90 216888.572 8393856.336 A91 216871.777 8393839.345 A92 216858.720 8393819.399 A93 216860.003 8393798.144 A94 216869.684 8393782.869 A95 216847.526 8393788.193 A96 216850.328 8393837.611 A97 216800.910 8393840.412 A98 216854.804 8393841.606 A99 216856.609 8393843.338 A100 216857.605 8393891.025 A101 216759.542 8393904.020 A102 216783.596 8393878.576 A103 216815.423 8393851.304 A104 216845.143 8393877.835 A105 216821.642 8393912.540 A106 216799.079 8393939.316 A107 216773.829 8393999.885 A108 216766.901 8393977.614 A109 216822.111 8393945.801 A110 216815.182 8393923.530 A111 216870.397 8393891.721 A112 216923.707 8393888.305 A113 216865.325 8393858.742
CM108
FINAL SUBMITTAL
C044138No.RE
GI
S T
ER
ED PRO F E S S I ON A L E NG I NEER
ST A T E O F C A L I F O R N I A
50m
1:500
TN
PLAN
NORTH
A1PAVEMENT MARKING PLAN
SCALE: 1:500m
1. MARK EARTHING POINTS IN ACCORDANCE WITH DETAIL ON CM403. FOR
SETOUT OF EARTHING POINTS REFER TO DRAWING E-516.
SHEET GENERAL NOTES:
2. PAVEMENT MARKING FOR FUEL HYDRANT LOW POINT AND HIGH POINT
DRAINS NOT SHOWN FOR CLARITY. HYDRANT PITS, LOCATED ON
DRAWINGS CX101, CX104, CX107 AND CX108 MUST BE MARKED IN
ACCORDANCE WITH THE DETAIL PROVIDED ON DRAWING CM503.
FOR SETOUT OF ACCESS ROAD
MARKING AND SIGNAGE REFER
TO DRAWING C-410
TAXIWAY A
AC
CE
SS
R
OA
D
1 1 1
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
JU
L 2
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E W
ITH
A
ME
ND
ME
NT
AU
G
OLA1
N
CONTINUOUS YELLOW
AP
RO
N
SH
OU
LD
ER
AP
RO
N
0.
0.
GA
P
0.
0.
SETOUT POINT TYPICAL (TP'S AND ENDS)
YELLOW
AI
RC
RA
FT
PA
RK
IN
G
0.
YE
LL
OW
0.
0.
RE
D 0.
YE
LL
OW
0.
M
IN
0.
M
AX
SETOUT POINT TYPICAL (TP'S AND ENDS)
AP
RO
N
PARKING CLEARANCE
0.
0.
1.00 1.00 1.00
1.
0.
15 0.15 0.15
0.15WHITE
AIRCRAFT PUSH-BACK LINE
1.00 1.00 0.
WHITE
PUSH-BACK LIMIT
MARKING
3.00 30.00
DIRECTION OF TRAVEL
YELLOW
0.
1.001.00 1.0018.00 10.00
NOSEWHEEL
POSITION
DIRECTION OF TRAVEL
TAXIWAY
SETOUT POINT TYPICAL (TP'S AND ENDS)
CONTINUOUS YELLOW0.
1.00
TYP.
1.00
TYP.
TAXI GUIDELINE
MARKING
TAXIWAY
SHOULDER
TAXIWAY TAXIWAY
SHOULDER
TAXIWAY
0.
0.
0.
TAXI GUIDELINE
MARKING
TAXIWAY EDGE
MARKING
TAXIWAY EDGE
MARKING
YELLOW
SETOUT POINT
VARIES
0.50 - 1.50
VARIES
0.50 - 1.50
NOTES:
1. A DASH OF THE BROKEN LINE SHALL BE CENTERED ON THE TAXI GUIDELINE MARKING.
2. THE BROKEN LINE SHALL EXTEND TO THE INSIDE EDGE OF THE TAXIWAY EDGE MARKING IN 1.00 m DASHES AND GAPS. THE LAST DASH OR GAP MAY EXCEED 1.00 m IN LENGTH BUT NOT LONGER THAN
1.50 m; WHERE GREATER THAN 1.50 m BUT LESS THAN 2.00 m THEN A DASH OR GAP WITH A LENGTH OF
0.50 m - 1.00 m SHALL BE PROVIDED TO ABUT THE INSIDE EDGE OF THE TAXIWAY EDGE MARKING.
D2TAXI GUIDELINE MARKING
CM107, CM1081:100
C2ALIGNMENT LINE MARKING
CM107, CM1081:100
D1APRON EDGE MARKING
CM107, CM1081:100
B2INTERMEDIATE HOLDING POSITION MARKING
CM107, CM1081:100
C1PARKING CLEARANCE MARKING LINE
CM107, CM1081:100
B1PUSH-BACK LIMIT MARKING
CM107, CM1081:100
A1PUSH-BACK ALIGNMENT MARKING
CM107, CM1081:100
SETOUT
POINT
MINIMUM BASE MARKING
200 x 200 mm WHITE SQUARE
FACILITY NUMBER
MINIMUM 30 mm HIGH BLACK LETTERING
(MAY HAVE MULTIPLE NUMBERS)
CARDINAL POINT DESCRIPTION OF
CORNER LOCATION eg. S,SW,N
C3AIRFIELD EXPLOSIVE FACILITY CORNER MARKING
CM107, CM1081:4
FACILITY NUMBER(S) AND CARDINAL POINT
DESCRIPTION TO BE CONFIRMED UPON
CONSTRUCTION AND LICENCING
50mm WIDE BLACK PAINTED
BORDER/RING
Ø450mm PAINTED CIRCULAR WHITE
DISC CENTRED ON EARTH POINT
SERIAL NUMBER OF THE POINT
PAINTED IN BLACK. OBTAIN SERIAL
NUMBER, UNIQUE FOR EACH POINT,
FROM RAAF BASE MAINTENANCE
CONTRACTOR.
THE WORDS 'TEST DUE' FOLLOWED BY
THE APPROPRIATE MONTH AND YEAR, IE
'MARCH 2019' PAINTED IN BLACK. TEXT
HEIGHT 30 mm.
DO NOT PAINT BRONZE
EARTH POINT
XXX
TEST DUE
XXX 20XX
B3STANDARD DOME EARTH REFERENCE POINT MARKING
CM107, CM1081:100
LABEL ALL HYDRANTS, LOW POINT DRAINS
AND HIGH POINT VENTS WITH
IDENTIFICATION NUMBERS. IDENTIFICATION
NUMBER AS PER DWG _____ WHITE STENCIL
TEXT ON BLACK BACKGROUND. TEXT HEIGHT
60mm.
XXX-XXX
2.00
2.
A3HYDRANT, LOW POINT DRAIN & HIGH POINT VENT MARKINGS
CM107, CM1081:20
100 mm RED PAINTED BORDER
CM503
PAVEMENT MARKING NOTES:
1. ALL DIMENSIONS IN METRES UNLESS NOTED OTHERWISE.
2. PAVEMENT MARKINGS MUST BE SET OUT, SPOTTED AND PAINTED AS
SPECIFIED USING DATA SHOWN ON THE PAVEMENT MARKING PLANS AND
PAVEMENT MARKING DETAILS AND IN COMPLIANCE WITH THE SPECIFIED
TOLERANCES.
3. WIDTHS OF MARKINGS ON PLANS AND DETAILS ARE DIAGRAMMATIC
ONLY. DO NOT SCALE DIMENSIONS FROM DRAWINGS.
4. ON CURVED PAVEMENT MARKINGS, SPOTTING SETOUT MUST BE
LOCATED ON THE INSIDE OF THE CURVE AND CLOSELY SPACED.
FOLLOWING SPOTTING THE CURVE MUST BE MARKED IN CHALK
CONTINUOUSLY SO THAT THE MARKING, AS PAINTED, IS A SMOOTH
CURVE OF CONSTANT RADIUS.
5. WHERE CURVED PAVEMENT MARKINGS ARE TO BE SET OUT USING A
CENTRE POINT THAT IS OFF THE PAVED SURFACE AND
VEGETATION/GRASS INTERFERES WITH THE SETTING OUT, SLASH/MOW
VEGETATION/GRASS TO REMOVE INTERFERENCE AND PROVIDE FOR
SETTING OUT OF THE MARKING TO THE TOLERANCES SPECIFIED.
6. LONGITUDINAL MARKINGS, WHEN VIEWED IN THE DIRECTION OF THE
LINE, MUST HAVE A SMOOTH AND CONTINUOUS ALIGNMENT. IN
PARTICULAR, STRAIGHT MARKINGS, WHEN VIEWED IN THE DIRECTION OF
THE LINE, MUST APPEAR STRAIGHT.
7. DO NOT USE A MECHANICAL PAINT SPRAYING MACHINE FOR PAVEMENT
MARKING WHERE THE WHEELS OF THE MACHINE WILL NOT TRACK
ENTIRELY ON THE SEALED PAVEMENT OR THE SHAPE OF THE PAVEMENT
CAUSES DEVIATION IN THE TRACKING OF THE MACHINE AND THE
ALIGNMENT OF THE PAVEMENT MARKING.
8. ALL PAVEMENT MARKING SETOUT MUST MATCH WITH AERONAUTICAL
GROUND LIGHTING SET OUTS.
9. PAINT COLOURS USED MUST CONFORM TO AUSTRALIAN STANDARD AS
2700-1996 AS FOLLOWS:
YELLOW : (Y14) - GOLDEN YELLOW
WHITE : (N14) - WHITE
BLACK : (N61) - BLACK
RED : (R13 / R14 / R15) - SIGNAL RED, WARATAH OR CRIMSON. AS CODE
R13, SIGNAL RED IS PREFERRED.
BLUE : (B41) - BLUE BELL
GREEN : (G35 / G26) - LIME / APPLE GREEN
ORANGE : (X15) - ORANGE
11. MARKINGS MUST BE CLEARLY VISIBLE AGAINST THE BACKGROUND UPON
WHICH THEY ARE PLACED. WHERE REQUIRED, ON A SURFACE OF LIGHT
COLOUR, A CONTRASTING SURROUND MUST BE PROVIDED. THE WIDTH
OF A CONTRASTING SURROUND FOR A MARKING MUST BE:
FOR A LINE MARKING WITH A WIDTH OF UP TO AND INCLUDING 0.3 M -
NOT LESS THAN THE LINE WIDTH OF THE MARKING;
FOR A MARKING WITH A WIDTH GREATER THAN 0.3 M - NOT LESS THAN
0.3 M;
FOR ALL OTHER MARKINGS - NOT MORE THAN 0.3 M
12. PROVIDE 12 AIRFIELD EXPLOSIVE FACILITY CORNER MARKINGS REFER
TO DETAIL C3.
FINAL SUBMITTAL
C044138No.RE
GI
S T
ER
ED PRO F E S S I ON A L E NG I NEER
ST A T E O F C A L I F O R N I A
2m
1:20
10m
1:100
0.20 0.4m
1:4
0.1
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
AU
G
LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV
AGL
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AGL
AGL
V-08
C C
C
C C
C C
C C
C C
C C
C C C C C C C C C C C C C C C C C C C
129.7
129.8
130.1
129.9
130.2
130.3
130.6
130.4
130.5
130.7
130.8
130.9
131.1
131.1
131.2
131.2
130.0
130.0
131.0
131.0
129.3 129.3
129.4
129.4
129.5
129.5
129.6
129.6
129.7
129.8
129.9
130.1
130.2
130.3
130.4
130.5
130.6
130.7
130.8
130.9
130.9
131.1
131.1
131.2
131.2
130.0
131.0
131.0
130.0
129.0
128.0
128.0
129.0
130.0
130.0
129.0
128.0
128.0
129.0
131.0
129.0
130.0
129.0
128.0
128.0
129.0
128.0
129.0
129.9
129.8
129.7129.7
129.8 129.9
130.0
129.6
C C C C C C C C C C C C C C
C C
C C
C C
C C
C C
C C
C C
C C
C C C C C C C C C C C C C C
C2
C2
C2 C2 C C C C C C C C C C C CC2
C C C
C
C C
C C
C C
C C
C C
C C
C
E
E E
E
S
AGL
AGL
AG
L
AG
L
AG
L
AGL
AGL
AGL
AG
L
AGL
AGL
AGL
AG
L
AGL
AGL
AG
L
AG
L
AGL
AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL
AGL AGL
AGL
AGL AGL AGL AGL AGL AGL AGL
AGL
AGL
AGL
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AG
L
AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL
AGL
01 02 03
LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LV
LVLVLV
LV LV LV LV LV LV LV LV
LV LV
LV
LV
LV
LV
36.60
LIMIT OF PAVEMENT WORKS
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
POLPOLPOL
POL POL POL POL POL POL POL POL
POLPOLPOLPOLPOL
W
W
W
W
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)E(LV)E(LV)E(LV)E(LV)
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
E(LV
E(
LV
E(
LV
E(
LV
E(
LV
W
W
W
W
W
W
E(
LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(
LV
E(L
E(LV
E(LV
E(LV
E(LV
E(LV)
E(LV)
E(LV)
E(LV)
E(LV) E(LV)
E(LV)E(LV)
E(LV
E(LV
E(LV
E(LV
E(LV
C C
C C
C C
C C
C C
C C
C C
C C
C C
FU
FU
W
W
W
W
W
W W W W W W W W W W W W W W W W
W W
W W
W W
W W
1500 1500 12001500 1500 1500 1500
450 450 450 450 450
2100x900
1200 1500
W W W W W W W W W W W W
9.0
8.0
9.
9.0
8.
8.
9.
8.
9.
130.0
130.0
130.0
130 0
130.0
129.9 129.8 129.7 129.6 129.5 129.4
JB06JB05JB04JB03JB02JB01
D3
TR01
TR02
TR03
TR04
TR05
TR06
D4
PEN 1
HW1
D1
D2
T01
WEIR 1
PEN 2
HW2
WEIR 2
HW3
CS107
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
STORMWATER QUALITY IMPROVEMENT
DEVICE (SQID). REFER TO DRAWING
CS504 FOR DETAILS.
PENSTOCK FOR EMERGENCY CONTAINMENT.
REFER TO DRAWING CS510 FOR DETAILS.
34.20 34.20 36.60 36.00 18.00
APRON PERIMETER OPEN DRAIN TO MATCH
INTO EXISTING OPEN DRAIN
(CONSTRUCTED BY KC-30 PROJECT)
50m
1:500
TN
PLAN
NORTH
A1DRAINAGE PLAN
SCALE: 1:500m
REFER TO CS508 FOR
OUTLET PROTECTION DETAIL
APRON OPEN DRAIN TO MATCH
EXISTING OPEN DRAIN
(CONSTRUCTED BY KC-30 PROJECT)
PAVEMENT TYPE 4 LINING TO OPEN
DRAIN. REFER TO DRAWING CP107 AND
CP108.
1. ALL DIMENSIONS SHOWN IN METRES UNLESS NOTED OTHERWISE.
2. REFER TO DRAWING C-001 AND C-002 FOR LEGEND DETAILS.
3. REFER TO DRAWING C-101 FOR CONTROL LINE DETAILS.
4. REFER TO DRAWING CR127 AND CR128 FOR SUBSOIL DRAINAGE DETAILS.
5. REFER TO DRAWING CS301 TO CS308 FOR DRAINAGE PIPE LONGITUDINAL
SECTIONS.
6. REFER TO DRAWING CS401 FOR PIT SCHEDULE AND DRAWING CS501 FOR
GRATED DRAIN SCHEDULE.
7. REFER TO DRAWINGS CS502 TO CS511 FOR DRAINAGE DETAILS.
8. REFER TO CS104, CS107 AND CS108 FOR WATER SUPPLY TO FLAME
TRAPS.
PENSTOCK FOR EMERGENCY
CONTAINMENT. REFER TO
DRAWING CS511 FOR DETAILS.
TAXIWAY A
STORMWATER CULVERT
W
DRAINAGE PIT
TRENCH GRATE
WATER SUPPLY TO FLAME TRAPS
SUBSOIL DRAINAGE
SHEET GENERAL NOTES:
SHEET LEGEND:
CS506
C1
REFER TO DRAWING C-101 FOR
SWALE CONTROL LINE SETOUT
REFER TO DRAWING C-101 FOR
SWALE CONTROL LINE SETOUT
REFER TO CS508 FOR
OUTLET PROTECTION DETAIL
DN40
DN25 CONNECTION TO
FLAME TRAP (TYPICAL)
DN40
DN40
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
AU
G
AG
L
AGL AGL
AGL AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AG
C
C
C C
C C
C C
C
C C
130.0
130.0
0.0
130.0130.0
130.0
130.0
130.0
129.5
129.5
129.6
129.6 129.7
129.7
129.8
129.8
129.9
130.2
130.1
130.3
130.4
130.5
130.6
130.9
130.7
130.8
131.1
131.1
131.2
131.2
130.0
130.0
131.0
131.0
129.9
130.0
130.1
130.2
130.3
130.4
130.6
130.7
130.5
130.9
130.8
131.1
131.1
131.2
131.2
130.0
131.0
131.0
130.8
130.7
.6
0.
0.
0.3
0.
130.0130.0
130.0
129.0
129.0129.0
129.0
129.0
129.9
129.8
129.9
130.0
129.9
130.0
130.1
0.
36.60
LIMIT OF PAVEMENT WORKS
POL POL POL POL POL POL POL POL POL POL
PO
L
PO
L
PO
L
PO
L
PO
L
PO
L
POLPOLPOLPOLPOLPOLPOLPOLPOL
E(L V)
E(LV)
E(LV)
E(LV) E(LV)
E(LV)
E(LV)
E(LV
E(LV
E(L
V)E(LV)
E(
LV
E(LV
E(
LV
E(
LV
E(LV)
E(LV)E(LV)E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
LV)
E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV) E(LV)
E(LV) E(LV)E(LV) E(LV) E(LV)
E(LV
W
W
C
CE(LV
E(LV)
E(LV
C
E(LV
V
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
E(LV
C
C
C
CJB12JB11JB10JB09JB08JB07
TR07
TR08
TR09
TR10
TR11
TR12
HW4
W W W W W W W W W W W W W W W W
W W
W W
W W
W W
1200 1200 1050 1050 1050 900
450 450 450 450 450 450
(2x)1800 x 900
W
C C
C C
C C
C C C C C C C C C C C C C C C C C C C C C
C
C C C C C CC2
E C
C C
C
C C C C C C C C C C C C C C C C C2C2C1
C C
C C
C C
C C
C
C C C
AGL
E
E
E
E
E
E
S
AGL
AG
L
AGL
AGL
AGL
AG
L
AGL
AGL
AGL
AG
L
AGL
AGL
AGL
AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL
AGL
AGL
AGL AGL AGL
AGL
AGL AGL AGL AGL AGL
AGL
AGL
AGL
AGL
AGL AGL
AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL AGL
AGL AGL
AGL AGL AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
AGL
S
AGL
A
04 05 06
LV LV LV LV LV LV LV LV LV
LV
LV
LV
LV
LV
LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV LV
LV LV
LV LV LV LV
LVLV
CS108
FINAL SUBMITTAL
C044138No.RE G I
S T
ER
ED PR O FE S S I ON A L E NG I NEER
S TA T E O F C A L I F O R N I A
33.7517.1036.6036.6036.0036.00
50m
1:500
TN
PLAN
NORTH
A1DRAINAGE PLAN
SCALE: 1:500m
REFER TO DRAWING CS506 FOR SWALE
DETAIL AND LINING REQUIREMENTS
TAXIWAY A
STORMWATER CULVERT
W
DRAINAGE PIT
TRENCH GRATE
WATER SUPPLY TO FLAME TRAPS
SUBSOIL DRAINAGE
LOCALLY THICKENED TRENCH GRATE
WALL TO MATCH EDGE OF APRON
SHEET GENERAL NOTES:
SHEET LEGEND:
PAVEMENT TYPE 4 LINING TO OPEN
DRAIN. REFER TO DRAWING CP107 AND
CP108.
1. ALL DIMENSIONS SHOWN IN METRES UNLESS NOTED OTHERWISE.
2. REFER TO DRAWING C-001 AND C-002 FOR LEGEND DETAILS.
3. REFER TO DRAWING C-101 FOR CONTROL LINE DETAILS.
4. REFER TO DRAWING CR127 AND CR128 FOR SUBSOIL DRAINAGE DETAILS.
5. REFER TO DRAWING CS301 TO CS308 FOR DRAINAGE PIPE LONGITUDINAL
SECTIONS.
6. REFER TO DRAWING CS401 FOR PIT SCHEDULE AND DRAWING CS501 FOR
GRATED DRAIN SCHEDULE.
7. REFER TO DRAWINGS CS502 TO CS511 FOR DRAINAGE DETAILS.
8. REFER TO CS104, CS107 AND CS108 FOR WATER SUPPLY TO FLAME
TRAPS.
REFER TO DRAWING C-101 FOR
SWALE CONTROL LINE SETOUT
REFER TO CS508 FOR INLET
PROTECTION DETAIL
DN40
DN25 CONNECTION TO
FLAME TRAP (TYPICAL)
DN40
AC
CE
SS
R
OA
D
RE
VI
SE
D
IN
A
CC
OR
DA
NC
E
W
ITH
A
ME
ND
ME
NT
AU
G
| G-301 - TYPICAL APRON SECTIONS - TEMPORARY WORKS |
| CD101 - DEMOLITION PLAN - SHEET 1 |
| CR127 - SUBSOIL DRAINAGE PLANSHEET 7 |
| CR128 - SUBSOIL DRAINAGE PLANSHEET 8 |
| CR301 - TYPICAL SUBSOILCROSS SECTIONS |
| CM107 - PAVEMENT MARKING PLAN - SHEET 7 |
| CM108 - PAVEMENT MARKING PLAN - SHEET 8 |
| CM503 - PAVEMENT MARKING DETAILS - SHEET 1 |
| CS107 - DRAINAGE PLAN - SHEET 7 |
| CS108 - DRAINAGE PLAN - SHEET 8 |