P26-150_Geotechnical_Report_(Revised)-_Choctaw_Beach_Fishing_Pier-3.26.26.Rev.5.4.26.pdf
PDF 1 MB Posted
- Solicitation number
- 27-01
- Issued by
- Bay County, Florida
About this file
This is a Geotechnical Report prepared by Southern Earth Sciences, Inc. for Walton County Engineering regarding the proposed Choctaw Beach Fishing Pier located at 13837 W Hwy 20, Choctaw Beach, Walton County, Florida. The report documents subsurface soil conditions and foundation recommendations for a fishing pier project extending approximately 140 feet into Choctawhatchee Bay. Field investigations were conducted on March 5, 2026, utilizing cone penetrometer test soundings to depths of 55 to 60 feet below ground surface and direct push boring to 20 feet. Laboratory testing included natural moisture content analysis and percent passing 200 mesh sieve evaluation on selected soil samples. The site, located at the former fire department building, will feature a wood-framed pier approximately 6 feet wide with deck elevation at +6 feet, supported on 8-inch timber piles, with an unsupported pile length of approximately 11 feet at the southernmost end where mudline elevation is approximately -5 feet. Groundwater was measured at depths of 13.8 to 14.5 feet below existing ground surface on the testing date.
The geotechnical investigation determined that soil conditions predominantly consist of sands varying in texture from slightly silty to clayey, with loose to medium dense conditions in the top 11 to 13 feet and medium dense to dense conditions extending to approximately 49 feet below ground surface. The report provides allowable compressive and tensile pile capacities for both 6-inch and 8-inch tip timber piles at various embedment depths, with design compressive capacity estimated in the range of 2 to 3 tons. The report emphasizes that recommended allowable stresses shall conform to the Florida Building Code and recommends a pile load test be performed prior to production pile installation to verify design capacity. Additionally, the report strongly recommends that Southern Earth Sciences, Inc. be employed for construction testing services and monitoring of all production piling installation, and suggests vibration monitoring during pile driving activities. The report notes that soil conditions in Choctawhatchee Bay may differ significantly from the land-based soundings performed.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Walton County Choctaw Beach Fishing Pier Geotechnical Report
13837 W Hwy 20, Choctaw Beach, FL
Walton County Engineering
SESI Project No: P26-150
March 26, 2026 Southern Earth Sciences, Inc. 7500 McElvey Rd, Panama City Beach, Florida 32408 - (850) 769-4773
MOBILE · MONTGOMERY · SUMMERDALE · DESTIN · PANAMA CITY · PENSACOLA · TALLAHASSEE · BATON ROUGE · MANDEVILLE · NEW ORLEANS · LONG BEACH
PANAMA CITY OFFICE
7500 McElvey Road, Ste. A
Panama City Beach, FL 32408
Tel: (850) 769-4773 Fax: (850) 872-9967 www.soearth.com
Walton County Engineering March 26, 2026 117 Montgomery Cir File No: P26-150 DeFuniak Springs, FL 32435 (Revised 5/4/26) Attn: Mr. Chance Powell, PE
Subject: Geotechnical Services for the Proposed Fishing Pier at 13837 W Hwy 20 in Choctaw
Beach, Walton County, FL (Walton County Parcel ID: 28-1S-21-41040-000-00C1)
Dear Mr. Powell:
Southern Earth Sciences, Inc., has completed the geotechnical services for the Proposed Choctaw Beach Fishing Pier at 13837 W Hwy 20 in Choctaw Beach, Walton County, Florida. Our services were performed in general accordance with our proposal XP26-1.29.26-2, dated January 29, 2026. This report presents the results of our field and laboratory testing and includes recommendations with regard to the design and construction of the foundations.
FIELD INVESTIGATIVE PROCEDURES:
Our field testing was performed on land at the location of the proposed pier. Prior to our field testing, we contacted Sunshine State One Call of Florida to locate underground utilities on site. On March 5, 2026, personnel with our firm traveled to the project site and completed the field testing for the above referenced project. For our geotechnical investigation, two (2) cone penetrometer test soundings were performed to depths of approximately 55 and 60 feet below existing ground surface. The cone penetrometer is track mounted and rather than sampling and testing at five foot intervals, as normally done with standard penetration borings, the cone penetrometer is an electronic device that provides continuous evaluation of the soils bearing capacity through point and frictional resistances. The cone penetrometer is hydraulically pushed into the soil with point and frictional resistances obtained continuously on a computer printout. This testing equipment provides an accurate definition of the soil strength characteristics and the changes in stratification. Cone soundings were performed in general accordance with ASTM D5778.
A direct push boring was performed at test location C-1 to a depth of approximately 20 feet below existing ground surface. The direct push samples were obtained with our Geoprobe 6622CPT and the DT22 soil sampling system. This is a closed-piston sampler, with an inner piston rod and outer drive casing, and is driven to the top of the sampling interval. The inner piston rod is removed and the sampler is driven to collect a soil sample. The soil samples are collected in a clear 5-foot PVC liner and were delivered back to our laboratory for soil classification.
Walton County Engineering Choctaw Beach Fishing Pier
Walton County, FL
The test locations were performed on land near the rip rap along the waters edge. No testing was performed in Choctawhatchee Bay. Test locations were established in the field by using a handheld GPS and measurements from existing landmarks, therefore, our test locations should be considered approximate. See the attached Figure for our approximate test locations.
LABORATORY TESTING PROCEDURES:
Laboratory investigative work consisted of physical examination of samples obtained during the soil boring operation and laboratory analyses. Soil samples were visually classified in the laboratory in accordance with the Unified Soil Classification System. Evaluation of these samples, in conjunction lab analyses, have been used to estimate soil characteristics.
Natural Moisture: Three (3) samples were selected for determination of their natural moisture content. In the laboratory, the sample was weighed, dried, and its moisture content was calculated in general accordance with ASTM D2216.
Percent Passing 200 Mesh Sieve: Three (3) samples were selected to determine their percent of materials, by dry weight, finer than the U.S. Number 200 Mesh Sieve. This test was performed in general accordance with ASTM D1140.
The laboratory test results are shown on the boring logs at the depth of the tested sample. Abbreviations of laboratory data are shown below:
NM = Natural Moisture Content (%) -200 = Percent Finer than the U.S. No. 200 Mesh Sieve
CONE PENETROMETER SOUNDINGS:
The CPT Logs graphically indicates the cone tip resistance, friction ratio, equivalent N-value and interpreted soil type at each sounding location. Soil classifications and data were interpreted from methods recommended by Robertson and Campanella and/or the Swedish Geotechnical Institute Information Publication No. 15E. Correlations between Cone Resistance values and Standard Penetration Testing “N” values were performed according to the methods developed by Robertson, Campanella and Wightman. The soil types and stratigraphy shown on the CPT Log sheets are based upon material parameters measured and evaluated as the cone is advanced. The CPT Log sheets were developed for general information only.
SITE AND SOIL CONDITIONS:
The site is located on the south side of W Hwy 20 approximately 300 feet east of the intersection of Alley Street. The site is the former fire department building which we understand will be renovated into a community project with park improvements. On the eastern side of the parcel there will be a new fishing pier extending approximately 140 feet into Choctawhatchee Bay. Based upon the provided topographic information, existing elevations are in the range of +15 Feet along the edge of the rip rap along the bluff that slopes toward the Bay. The provided topographic/bathymetric survey data provides mudline elevations extending approximately 75 feet from the shoreline, terminating at -3 Ft. After discussions with you, we understand that mudline elevation at the end of the proposed pier is in the range of -3 to -5 Feet. The logs of our borings are attached. The elevations of our test locations have been interpolated from the provided topographic information; therefore, should be considered approximate.
The soils encountered throughout the depths of our borings were predominantly sands.
The sands varied in color and texture ranging from slightly silty to silty, slightly clayey to clayey, and clean sands. The sands within the top 11 to 13 feet ranged from loose to medium dense slightly silty to clean sands. At this depth, the sands encountered were medium dense to dense extending to approximately 49 feet below existing ground surface. A thin clayey sand to clay layer was then encountered, extending to approximately 51 below the existing ground surface.
For the remainder of our cone soundings, dense sands were encountered. Various amounts of organics were encountered within the top six to twelve inches of our soundings.
On the date of our field testing (March 5, 2026), groundwater level was measured at the depths of approximately 13.8 to 14.5 feet below existing ground surface. Fluctuations in the water table depths will occur due to changes in gradient, seasonal precipitation/ evapotranspiration differences, neighboring drainage influences, as well as tidal influences.
Therefore, it is highly recommended that the groundwater levels be verified prior to any excavations on the site.
STRUCTURAL INFORMATION:
The proposed pier will extend approximately 140 feet into the Choctawhatchee Bay and be supported on 8-inch timber piles. The pier will be wood framed and approximately 6 feet wide with the deck elevation at +6 Ft. There will also be a 10x20’ deck at the southernmost point and a kayak launch near mid length of the pier. At the southernmost end of the pier, we understand the mudline is approximately -5 Feet; therefore, the unsupported length of piling will be in the range of 11 feet. At this time, design pile capacities are unknown. We understand the design compressive capacity will likely be in the range of 2 to 3 tons. If any of this information is incorrect, we should be contacted in order to provide additional recommendations.
DEEP (PILE) FOUNDATION RECOMMENDATIONS:
Our evaluation of foundation conditions has been based on structural information presented in this report and subsurface data obtained during our investigation. In evaluating the cone penetrometer test soundings, we have used correlations that were previously made between penetration resistances and foundation stabilities observed in soil conditions similar to those encountered at your site.
For deep (pile) foundations, we have calculated compressive and tensile capacities for 6-inch tip and 8-inch tip timber piles. The pile embedment depths shown in the Table below are depths below the assumed mudline elevation (-5 Ft), therefore, any cantilever above the mudline elevation must be added to obtain the total length of piling. Allowable compressive capacities include a factor of safety of two (2), in compression, and three (3), in tension. Skin friction has been reduced ten (10) percent for pre-jetting or jetting during installation.
However, we recommend the last five (5) feet of pile be driven without jetting. The allowable pile capacities are based upon a soil/pile interaction and do not consider the structural aspects of the pile.
The tabulated pile capacities should be provided to the Structural Engineer to select the pile length that is consistent with the design loads and based upon economic considerations for each pile length. Allowable stresses in the piles shall conform to the Florida Building Code. If requested, we can also provide lateral pile capacities for the selected foundation type and length. Table 1 below provides the estimated allowable compressive and tensile capacities for 6-inch tip and 8-inch tip timber piles.
TABLE I: 6-inch Tip and 8-inch Tip Timber Piles
Embedment Depth Below Mudline:
(Assumed Mudline Elevation -5 Ft)
6-inch Tip 8-inch Tip
Compressive (tons)
Tensile (tons)
Compressive (tons)
Tensile (tons)
5 ft 2.0 0.5 3.0 1.0
10 ft 4.0 1.5 6.5 2.0
15 ft 5.5 2.5 7.5 3.0
It should be noted, the soil conditions in the Bay could be significantly different than the soundings performed on land. The pile capacities and evaluation have been based upon the conditions encountered in our soundings/borings performed on land.
A lateral analysis can be performed on the piles once the design load, length of piles and deflection criteria have been determined. The lateral load indicated for the piles is relatively low and should be acceptable with the foregoing pile lengths. However, confirmation would require a lateral analysis.
Prior to the installation of production piling, we recommend performing a pile load test to verify the design capacity. A pile load test can also be performed in accordance with ASTM D- 4945 using a Pile Dynamic Analyzer. Depending upon the results of the pile load test and/or CAPWAP analysis, adjustments in the pile lengths or capacities may be required. It is also recommended the installation of all production piling be monitored by Southern Earth Sciences, Inc., employed by the Owner, to verify production piles are installed in accordance with the pile load test program.
At this time, there are no adjacent structures, nor do we anticipate there to be adjacent structures near the proposed pier, however it should be considered that vibrations from the installation of driven piles may adversely affect adjacent structures causing foundation settlements. If driven timber piles are used, we recommend performing vibration monitoring during all pile driving activities. If there are adjacent structures to monitor, we would suggest performing pre and post driving surveys of adjacent structures to investigate existing damages.
CONSTRUCTION TESTING SERVICES:
The effectiveness of the foundation will depend significantly on the proper preparation of the soils, as indicated previously. Therefore, we recommend Southern Earth Sciences, Inc., be employed as the testing laboratory to perform construction testing services. If we are not employed to provide construction testing services, Southern Earth Sciences, Inc., cannot accept any responsibility for any conditions, which deviate from those described in this geotechnical report. Southern Earth Sciences, Inc., should be invited to the pre-construction conference to discuss the project with all interested parties so that the project may be completed expeditiously and to the intent of our geotechnical report. We would be pleased to review the plans and specifications as they relate to the soil preparation and provide a fee proposal for construction testing.
GENERAL COMMENTS:
Professional judgments on design criteria are presented in this letter. These are based partly on our evaluations of technical information provided, partly on our understanding of the characteristics of the project being planned, and partly on our general experience with subsurface conditions in the area. We do not guarantee performance of the project in any respect, only that our judgments meet the standard of care of our profession.
This information is exclusively for the use and benefit of the addressee(s) identified on the first page of this report and is not for the use or benefit of, nor may it be relied upon by any other person or entity. The contents of this letter may not be quoted in whole or in part or distributed to any person or entity other than the addressee(s) hereof without, in each case, the advance written consent of the undersigned.
This report has been prepared in order to aid in the evaluation of this property and to assist the architects and engineers in the foundation design. It is intended for use with regard to the specific project discussed herein, and any substantial changes in the buildings, loads, locations, or assumed (or reported) grades shall be brought to our attention immediately so that we may determine how such changes may effect our conclusions and recommendations.
We would appreciate the opportunity to review the plans and specifications for the foundation and floor construction to verify that our conclusions and recommendations are interpreted correctly. Our report does not address environmental issues which may be associated with the subject property.
While the borings performed for this project are representative of subsurface soil conditions at their respective locations and for their respective vertical reaches, local variations of the subsurface materials are anticipated and may be encountered. The boring logs and related information are based on the driller’s logs and visual examination of selected samples in the laboratory. Delineation between soil types shown on the boring logs is approximate, and soil descriptions represent our interpretation of subsurface conditions at the designated boring location on the particular date driller.
We appreciate the opportunity to assist you. If you have any questions or if we may be of further assistance, please call at your convenience.
Sincerely, SOUTHERN EARTH SCIENCES, INC.
Howell Logan, E.I.
Project Engineer
Logan A. Fowler, P.E.
Eng. Reg. No. 82343 State of Florida
This item has been digitally signed and sealed by Logan A. Fowler, P.E.
(FL Eng. License No.: 82343) using a Digital Signature. Printed copies of this document are not considered signed and sealed and the authentication code must be verified on any electronic copies.
Southern Earth Sciences, Inc.
CPT Date/Time: 3/5/2026 10:29:36 AM
Location: Walton Co Fishing Pier
Job Number: P26-150
Maximum Depth = 59.38 feet Depth Increment = 0.164 feet
*Soil behavior type and SPT based on data from UBC-1983
Tip Resistance
Qt TSF
Depth (ft)
Local Friction
Fs TSF
Pore Pressure
Pw PSI 40-5
Friction Ratio
Fs/Qt (%)
Soil Behavior Type*
Zone: UBC-1983
1 sensitive fine grained 2 organic material 3 clay
4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt
7 silty sand to sandy silt 8 sand to silty sand 9 sand
10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)
SPT N*
60% Hammer
Operator: Pat Conroy Sounding: C-1 Cone Used: DDG1702 Groundwater: 14.5 feet Elevation: +15 Feet (Approx.)
SP-
SC
SP
SP-
SC
SP-
SM
SP-
SM
SP
SP
Orange Slightly Clayey Fine SAND
Tan Fine SAND Light Gray and Orange Slightly Clayey Fine SAND
Light Brown and Tan Slightly Silty Fine SAND with Trace Organics
Light Gray and Dark Gray Slightly Silty Fine SAND
Gray and Dark Gray Fine SAND
Dark Gray Fine SAND
-5
LL
N Value (blows/ft)
20 40 60 80
Page 1 of 1LOG OF BORING C-1 Walton County Fishing Pier Hwy 20, Walton Co, FL P26-150 03/05/25
SPT Shelby Tube
Notes:
- Elevation Should Be Considered Approximate
PROJECT:
LOCATION:
PROJECT NO.:
DATE:
METHOD:
DRILLER:
ENGR / GEOL:
SURFACE ELEVATION:
Direct Push
PC
LF
+15 ft
Per Plan
Water Level
N
AT
U R
AL
M
O
IS
TU
R
E
PA
SS
IN
G
SI
EV
E
)Soil Symbols
Sampler Symbols and Field Test Data
Water Observations: Groundwater Measured at 14.5 Feet Below Existing Ground Surface
Elevation / Depth
PL PI
ATTERBERG
LIMITS (%)
LI
Q
U
ID
L
IM
IT
PL
AS
TI
C
L
IM
IT
PL
AS
TI
C
IT
Y
IN
D
EX
MATERIAL DESCRIPTION
LOCATION
USCS
N - SPT Data (Blows/Ft) P - Pocket Penetrometer (tsf) Sample Key:
PL LLMC
20 40 60 80 Atterberg Limits Natural Moisture
Measured: Perched:Est. Seasonal High GWL:
LO
G
O F
BO
R
IN
G
P
-1
.G
PJ
S
ES
P C
F L.
G D
T
/2 6/
Southern Earth Sciences, Inc.
Operator: Pat Conroy
Sounding: C-2
Cone Used: DDG1702
CPT Date/Time: 3/5/2026 11:14:19 AM
Location: Walton co fishing pier
Job Number: P26-150
Maximum Depth = 54.46 feet Depth Increment = 0.164 feet
*Soil behavior type and SPT based on data from UBC-1983
Tip Resistance
Qt TSF
Depth (ft)
Local Friction
Fs TSF
Pore Pressure
Pw PSI 70-10
Friction Ratio
Fs/Qt (%)
Soil Behavior Type*
Zone: UBC-1983
1 sensitive fine grained 2 organic material 3 clay
4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt
7 silty sand to sandy silt 8 sand to silty sand 9 sand
10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*)
SPT N*
60% Hammer
Groundwater: Dry Cave 13.8 feet Elevation: +15 Feet (Approx.)
Geotechnical Services Are Performed for Specific Purposes, Persons, and Projects Geotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical engineering study conducted for a civil engi-neer may not fulfill the needs of a construction contractor or even another civil engineer. Because each geotechnical engineering study is unique, each geotechnical engineering report is unique, prepared solely for the client. No one except you should rely on your geotechnical engineering report without first conferring with the geotechnical engineer who prepared it. And no one
— not even you — should apply the report for any purpose or project except the one originally contemplated.
Read the Full Report Serious problems have occurred because those relying on a geotechnical engineering report did not read it all. Do not rely on an executive summary.
Do not read selected elements only.
A Geotechnical Engineering Report Is Based on A Unique Set of Project-Specific Factors Geotechnical engineers consider a number of unique, project-specific fac-tors when establishing the scope of a study. Typical factors include: the client's goals, objectives, and risk management preferences; the general nature of the structure involved, its size, and configuration; the location of the structure on the site; and other planned or existing site improvements, such as access roads, parking lots, and underground utilities. Unless the geotechnical engineer who conducted the study specifically indicates oth-erwise, do not rely on a geotechnical engineering report that was:
• not prepared for you,
• not prepared for your project,
• not prepared for the specific site explored, or
• completed before important project changes were made.
Typical changes that can erode the reliability of an existing geotechnical engineering report include those that affect:
• the function of the proposed structure, as when it's changed from a parking garage to an office building, or from a light industrial plant to a refrigerated warehouse,
• elevation, configuration, location, orientation, or weight of the proposed structure,
• composition of the design team, or
• project ownership.
As a general rule, always inform your geotechnical engineer of project changes—even minor ones—and request an assessment of their impact.
Geotechnical engineers cannot accept responsibility or liability for problems that occur because their reports do not consider developments of which they were not informed.
Subsurface Conditions Can Change A geotechnical engineering report is based on conditions that existed at the time the study was performed. Do not rely on a geotechnical engineer-ing report whose adequacy may have been affected by: the passage of time; by man-made events, such as construction on or adjacent to the site;
or by natural events, such as floods, earthquakes, or groundwater fluctua-tions. Always contact the geotechnical engineer before applying the report to determine if it is still reliable. A minor amount of additional testing or analysis could prevent major problems.
Most Geotechnical Findings Are Professional Opinions Site exploration identifies subsurface conditions only at those points where subsurface tests are conducted or samples are taken. Geotechnical engi-neers review field and laboratory data and then apply their professional judgment to render an opinion about subsurface conditions throughout the site. Actual subsurface conditions may differ—sometimes significantly— from those indicated in your report. Retaining the geotechnical engineer who developed your report to provide construction observation is the most effective method of managing the risks associated with unanticipated conditions.
A Report's Recommendations Are Not Final Do not overrely on the construction recommendations included in your report. Those recommendations are not final, because geotechnical engi-neers develop them principally from judgment and opinion. Geotechnical engineers can finalize their recommendations only by observing actual
Important Information About Your
Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes.
Geotechnical Engineering Report The following information is provided to help you manage your risks.
subsurface conditions revealed during construction. The geotechnical engineer who developed your report cannot assume responsibility or liability for the report's recommendations if that engineer does not perform construction observation.
A Geotechnical Engineering Report Is Subject to Misinterpretation Other design team members' misinterpretation of geotechnical engineering reports has resulted in costly problems. Lower that risk by having your geo-technical engineer confer with appropriate members of the design team after submitting the report. Also retain your geotechnical engineer to review perti-nent elements of the design team's plans and specifications. Contractors can also misinterpret a geotechnical engineering report. Reduce that risk by having your geotechnical engineer participate in prebid and preconstruction conferences, and by providing construction observation.
Do Not Redraw the Engineer's Logs Geotechnical engineers prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical engineering report should never be redrawn for inclusion in architectural or other design drawings.
Only photographic or electronic reproduction is acceptable, but recognize that separating logs from the report can elevate risk.
Give Contractors a Complete Report and Guidance Some owners and design professionals mistakenly believe they can make contractors liable for unanticipated subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems, give con-tractors the complete geotechnical engineering report, but preface it with a clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for purposes of bid development and that the report's accuracy is limited; encourage them to confer with the geotechnical engineer who prepared the report (a modest fee may be required) and/or to conduct additional study to obtain the specific types of information they need or prefer. A prebid conference can also be valuable. Be sure contrac-tors have sufficient time to perform additional study. Only then might you be in a position to give contractors the best information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions.
Read Responsibility Provisions Closely Some clients, design professionals, and contractors do not recognize that geotechnical engineering is far less exact than other engineering disci-plines. This lack of understanding has created unrealistic expectations that have led to disappointments, claims, and disputes. To help reduce the risk of such outcomes, geotechnical engineers commonly include a variety of explanatory provisions in their reports. Sometimes labeled "limitations" many of these provisions indicate where geotechnical engineers’ responsi-bilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly.
Geoenvironmental Concerns Are Not Covered The equipment, techniques, and personnel used to perform a geoenviron-mental study differ significantly from those used to perform a geotechnical study. For that reason, a geotechnical engineering report does not usually relate any geoenvironmental findings, conclusions, or recommendations;
e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated environmental problems have led to numerous project failures. If you have not yet obtained your own geoen-vironmental information, ask your geotechnical consultant for risk man-agement guidance. Do not rely on an environmental report prepared for someone else.
Obtain Professional Assistance To Deal with Mold Diverse strategies can be applied during building design, construction, operation, and maintenance to prevent significant amounts of mold from growing on indoor surfaces. To be effective, all such strategies should be devised for the express purpose of mold prevention, integrated into a com-prehensive plan, and executed with diligent oversight by a professional mold prevention consultant. Because just a small amount of water or moisture can lead to the development of severe mold infestations, a num-ber of mold prevention strategies focus on keeping building surfaces dry.
While groundwater, water infiltration, and similar issues may have been addressed as part of the geotechnical engineering study whose findings are conveyed in this report, the geotechnical engineer in charge of this project is not a mold prevention consultant; none of the services per-formed in connection with the geotechnical engineer’s study were designed or conducted for the purpose of mold preven-tion. Proper implementation of the recommendations conveyed in this report will not of itself be sufficient to prevent mold from growing in or on the structure involved.
Rely, on Your ASFE-Member Geotechncial Engineer for Additional Assistance Membership in ASFE/The Best People on Earth exposes geotechnical engineers to a wide array of risk management techniques that can be of genuine benefit for everyone involved with a construction project. Confer with you ASFE-member geotechnical engineer for more information.
8811 Colesville Road/Suite G106, Silver Spring, MD 20910 Telephone: 301/565-2733 Facsimile: 301/589-2017 e-mail: info@asfe.org www.asfe.org
Copyright 2004 by ASFE, Inc. Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with ASFE’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of ASFE, and only for purposes of scholarly research or book review. Only members of ASFE may use this document as a complement to or as an element of a geotechnical engineering report. Any other firm, individual, or other entity that so uses this document without being an ASFE member could be commiting negligent or intentional (fraudulent) misrepresentation.
IIGER06045.0M
| Cover Page UPDATED |
| P26-150 Geotechnical Report - Walton County Fishing Pier |
| Binder - Fishing Pier |
| Cone Logs |
| C-1 |
| Cone Logs |
| C-2 |
ASFE
| 2026-05-04T10:51:39-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |