P17PS00668-000002_Attachment-05, Specification Section 02 82 00 Asbestos Abatement (22 pages)

View the file

Other files

File Type Posted
P17PS00668-000008_Revised_CWDs-Corrected_Set-Aside_Classification_170804.pdf PDF
P17PS00668-000008_Att-01_CWD-NJ37_170804.pdf PDF
P17PS00668-000008_Att-02_CWD-NJ58_170804.pdf PDF
B09_P17PS00668-000007_Q&A_Responses_170727.pdf PDF
P17PS00668-000007_Att-2_GATE200607A-BidderQuestions-Grading_170630.pdf PDF
P17PS00668-000007_Att-1_P17PS00668_Questions_and_Responses-Pt2_170802.pdf PDF
P17PS00668-000006_Att-1_Q&As_01-22_170727.pdf PDF
P17PS00668-000006_Att-2_GATE_200607A_STSI_170630.pdf PDF
B09_P17PS00668-000006_Q&A_Responses_170727.pdf PDF
P17PS00668-000005_Att-01_SubKPlan_Cklst_170710.doc DOC document
P17PS00668-000005_Ext_POP-Add_SubKtrPlanChklst_170725.pdf PDF
P17PS00668-000004_Pre-Bid_Meeting_Attendees_170721.pdf PDF
P17PS00668-000004_Att-01_Pre-BidMtgSign-InSheet.pdf PDF
P17PS00668-000004_Att-02_Pre-BidMtgAddendeeBusCards.pdf PDF
P17PS00668-000003_Ext_Sol-Q&A_Deadlines_170718.pdf PDF
Att-02_A-2_Bldg._65,_1st_Fl._Abatement_Plan.pdf PDF
Att-07_OHM_Spec_028700_Bldg_49_and_65.pdf PDF
P17PS00668-000002_Contract_Documents_170713.pdf PDF
Att-01_A-1_Bldg._49,_Abatement_Plan.pdf PDF
Att-08_GATE200607A_SAHO_-_STSI_20170201.pdf PDF
Att-03_A-3_Bldg._65,_Attic_Abatement_Plan.pdf PDF
Att-06_Lead_Spec_028313_Bldg_49_and_65.pdf PDF
Att-04_HAZMAT-BldgMatRpt-Bldg_65_w_Attachments.pdf PDF
Sandy-Hook_Fort-Hancock_Map.pdf PDF
B09_P17PS00668-000001_Pre-Bid_Meeting.pdf PDF
205_P17PS00668_Subcontracting_Plan_Form.docx DOCX document
103b_P17PS00668_Subcontractor_Reference.docx DOCX document
Att-03b_CWD-NJ58_170609.pdf PDF
208_P17PS00668_ProposedEquals.docx DOCX document
SF-1442w-Clauses&Provisions_170628.pdf PDF
105_P17PS00668_Past_Performance_Questionnaire.docx DOCX document
Att-04_ProposalSubmissionPackage-complete_170628.pdf PDF
206_P17PS00668_GeneralReferences.docx DOCX document
203_P17PS00668_Contract_Price_Sked.xlsx XLSX spreadsheet
101_P17PS00668_Experience_Form.docx DOCX document
201_SF_24_Bid_Bond.pdf PDF
207_P17PS00668_HazmatForm.docx DOCX document
202_P17PS00668_SF-1442_Solicitation.pdf PDF
103a_P17PS00668_Key_Personnel_Form.docx DOCX document
200_P17PS00668_Sol_Cover_Sheet-Bus_Proposal.pdf PDF
100_P17PS00668_Sol_Cover_Sheet-Tech_Proposal.pdf PDF
Att-02_ConstructionDrawings_170616.pdf PDF
Att-01_Specifications_170616.pdf PDF
203_P17PS00668_Contract_Price_Sked.pdf PDF
204_P17PS00668_Reps_&_Certs.pdf PDF
Att-03a_CWD-NJ37_170609.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDINGS 49 & 65 02 82 00 - 1

ASBESTOS ABATEMENT

SECTION 02 82 00 - ASBESTOS ABATEMENT

PART 1 – GENERAL

1.01 SUMMARY

A. The work in this Specification outlines the requirements for the repair, removal and cleanup of

Asbestos Containing Materials (ACM) from two structures at Fort Hancock part of the National

Gateway Park on Sandy Hook, New Jersey and administered by the National Park Services. The contractor shall be required to perform the abatement in accordance with all applicable federal, state and local laws, rules and regulations.

B. Related Documents

1. Hazardous Materials Building Survey Report, Maintenance Building No. 49, Mabbett &

Associates, Inc., July 19, 2016.

2. Supplemental Hazardous Materials Building Survey Report, Store House Building No.

65, Mabbett & Associates, Inc., June 30, 2017.

C. Scope of Work: The intent of this project is to repair, cleanup, remove and legally dispose of the identified asbestos containing materials as listed below and detailed on Drawings A-1, A-2 and

A-3.

SCOPE OF WORK

1. Building 49 (Maintenance Building)

a. Remove approximately 300 sq. ft. of floor tile in first floor Bathroom and Hallway.

b. Remove approximately 150 sq. ft. of floor tile in first floor Office.

d. Remove approximately 15 sq. ft. black roof flashing at chimney.

e. Exterior abatement of buried asbestos-cement pipe (ACP). Removal as required to facilitate project work.

2. Building 65 (Store House)

a. Remove approximately 600 sq. ft. of floor tile and mastic from First Floor.

b. Remove approximately 1 cubic yard ACM insulating sleeve stock pile in the Attic.

c. Remove approximately 100 sq. ft. boiler insulation and interior ACM rib packing in the

Boiler Room.

d. Remove approximately 100 ln. ft. of ACM pipe and fitting insulation on heating system.

c. Remove approximately 2 sq. ft. of ACM Flue Breeching Cement in Boiler Room.

d. Remove approximately 100 sq. ft. of ACM Debris in Boiler Room.

e. Remove ACM roof flashing and assumed roofing underlayment. Roof area is approximately 3,000 sq. ft.

NOTES:

1. For materials containing less than 1% asbestos content (trace asbestos), as identified in survey documents listed in Section 1.01 above, the waste is not regulated under USEPA's

National Emissions Standards for Hazardous Air Pollutants (NESHAP) for asbestos. This waste material in New Jersey must be managed and disposed of as ID 13C, Construction and

Demolition Waste as defined at N.J.A.C. 7:26-2.13(g)iv.

BUILDINGS 49 & 65 02 82 00 - 2

2. Abatement activities will require air monitoring and observation. Contractor shall retain the services of an independent third party IH consultant to provide abatement project monitoring services.

3. The presence of racoons in Building 65 is evident. Pest control and proper removal of racoon waste may be required prior to abatement activities.

D. The Asbestos Removal Portion of this Project shall be in accordance with the Occupational

Safety and Health Act (OSHA) Section 29 CFR 1926.1101 Asbestos.

E. Air Monitoring for Class I and Class II shall follow OSHA requirements for perimeter verification during work and clearance monitoring in addition to the OSHA personal monitoring of asbestos abatement workers.

F. The removal of asbestos containing material shall be performed utilizing full containment or limited containment procedures, where applicable, to ensure the health and safety of the public.

The procedures utilized shall be presented on the Contractor’s Work Procedures and Abatement

Plan.

F. Contractor shall be aware that most painted surfaces likely will have lead in the paint. The

Contractor shall have a Lead Hazard Mitigation Plan for the protection of his workers.

Appropriate dust control methods may be required to protect workers and surrounding receptors.

1.2 SECTION INCLUDES

A. Requirements for the removal of asbestos-containing materials. All asbestos material shall be disposed of as asbestos-containing material waste.

B. The definitions of specific terms used in these Specifications are verbatim with those of the

OSHA Section 29 CFR 1926.1101 Asbestos

1.3 OWNER'S RIGHT TO CARRY OUT THE ASBESTOS ABATEMENT WORK

A. If the Contractor defaults or neglects to carry out the activities applicable to the Asbestos Abatement

Work in accordance with the Contract Documents and fails within a 24-hour period after receipt of a written notice from the Owner to commence and continue correction of such default or neglect with diligence and promptness (collectively the "deficiencies"), the Owner may, without prejudice to other remedies the Owner may have, act to correct such deficiencies.

B. If the Contractor conducts the Work in a manner which would cause endangerment to public health or safety, the Owner may, without written notice, or prejudice to other remedies the Owner may have, require the Contractor to remedy the situation, or the Owner may act to correct same at the

Contractor's expense.

C. In the above cases, an appropriate Change Order or Construction Change Directive shall be issued deducting from payments then or thereafter due the Contractor the cost of correcting such deficiencies, including compensation for the Owner’s Consultants additional services and expenses made necessary by such deficiencies. Such action by the Owner and amounts charged to the

Contractor are both subject to prior direction and approval of the Owner’s Consultants. If payments then or thereafter due the Contractor are not sufficient to cover such amounts, the Contractor shall pay the difference to the Owner.

BUILDINGS 49 & 65 02 82 00 - 3

1.4 LIABILITY FOR DELAYS ASSOCIATED WITH INSUFFICIENT WORK SCOPE

A. It is the Contractor’s sole responsibility to arrange for the Asbestos Abatement Work scope to be completed in an expeditious and cost-effective manner. A critical consideration is the definition of the Work to be sufficient to allow for all Asbestos Abatement Work to be completed as part of one mobilization prior to the start of other Work on this contract. The Owner shall not be held responsible for delays and duplicative costs associated with the possible eventuality that the

Contractor needs to arrange for some Asbestos Abatement Work to be completed at a time following the initial Asbestos Abatement Work due to the Contractor’s failure to properly define and execute the Asbestos Abatement Work as part of that first mobilization. The Contractor shall be responsible for all consultant fees incurred by the owner due to insufficient work scope or failure to comply with the “Asbestos Abatement Deadline” defined elsewhere in these contract documents.

1.5 QUALIFICATIONS OF CONTRACTOR

A. The Contractor must be licensed (“A” license) by the New Jersey Department of Labor and

Workforce Development (LWD) as an Asbestos Removal Contractor and meet all requirements of the New Jersey Department of Health (DOH) and LWD as cited in N.J.A.C. 8:60 and N.J.A.C.

12:120, respectively or licensed and/or accredited by the EPA or another state per the EPA Model

Accreditation Plan.

1.6 INSURANCE

A. In addition to the insurance requirements in the General Provisions, the Contractor shall purchase from and maintain in a company or companies lawfully authorized to do business in the jurisdiction in which the Project site is located such insurance as will protect the Contractor from claims set forth below which may arise out of or result from the Contractor's operations under the Contractor and for which the Contractor may be legally liable, whether such operations be by the Contractor or by anyone directly employed by any of them, or by anyone for whose acts any of them may be liable:

1. Contractor's asbestos abatement liability insurance in the occurrence form, $3,000,000.00 per occurrence, $5,000,000.00 aggregate.

B. The existence of the above insurance shall in no way relieve any Contractor or any Subcontractor of any responsibility for which they are liable in excess of the amount recoverable under the insurance provided above.

C. Any increase of limits of liability of any type of insurance not described above that any Contractor may require for its protection or on account of statute, shall be its own responsibility and at its own expense. Any policy covering any Contractor's own equipment against loss by physical damage shall include an endorsement providing that the underwriters waive their right of subrogation against the Owner, Architects, Construction Managers, Consultants, other Contractors or Subcontractors.

D. All insurance required by this Section or any other insurance required by the Contract Documents shall be provided by insurers acceptable to the Owner.

E. All insurance required by this Section or any other insurance required by the Contract Documents shall identify the Owner, the Owner’s Architect, the Owner’s Construction Manager, and

Owner’s Consultants, each as an "additional insured".

BUILDINGS 49 & 65 02 82 00 - 4

1.7 CLEANING UP

A. The Contractor is notified that the work area shall be maintained in an orderly condition as possible during the entire Contract period. Unsalvageable materials and debris (non-asbestos or non-asbestos contaminated) resulting from the project operations shall be promptly disposed of, off property, in approved areas.

B. No pay estimates will be processed while the Contractor is in nonconformance with the above requirements. Furthermore, before final inspection and acceptance of the Contract and all areas occupied by the Contractor in connection with the work shall be cleaned of all rubbish, excess materials, temporary structures and equipment, and all parts of the work shall be left in an acceptable condition.

C. No separate payment will be made for the work of cleaning up, but all cost thereof shall be included under the lump sum bid for this project.

1.8 CONTROL OF WORK

A. The Contractor shall provide a contact phone number that will be reachable 24 hours a day - 7 days a week in case of an emergency.

B. Complete all of the Work specified in the time frame submitted and approved by the Owner. The

Work shall begin on a date determined at the Owner’s sole discretion. Unless otherwise specified, weekend and overtime work is not expected on this Project and will require special notification.

Should the Contractor wish to work outside normal weekdays, Monday through Friday, it shall notify the Owner at least 24 hours in advance, except in cases of emergency. Such weekend, holiday, off-hour, and extended work hours shall be subject to the Owner’s prior approval.

C. Due to the critical time frame allowed for this project, the contractor shall provide a sufficient number of abatement workers during prep, removal and cleanup. The contractor shall assign an asbestos supervisor to each work area. The supervisors shall be onsite at all times during work activities.

1.9 RESTRICTIONS AND QUALITY CONTROL

A. ACM shall be properly handled, packaged, and transported for disposal in an asbestos-only landfill.

B. The Contractor shall be responsible for monitoring his own construction safety work practices for compliance with OSHA regulations.

C. Obtain appropriate permit and variances from regulatory agencies as required to complete the safe removal of asbestos containing material.

D. Noise Controls: Provide mufflers on all equipment. Observe local laws.

E. Wastewater: All water used during asbestos abatement activities shall be collected and placed in the asbestos waste bags.

F. Health and safety:

1. Toxic Effects: Assume all responsibility for any toxic effects to workers from the air

BUILDINGS 49 & 65 02 82 00 - 5

supplied to respirators, or from toxic or damaging vapors or residues resulting from the use of encapsulant and/or wetting agents or other substances used during construction.

2. Chemical/Biological hazards: The known chemical and or biological hazards on site are asbestos-containing material and lead in paint. Provide materials, equipment and training to ensure worker protection from these and any other chemical/biological hazards that may be identified during the course of this work.

G. Work Supervision and Coordination:

1. From the start of work through completion, provide an on-site responsible and competent supervisor possessing valid LWD Supervisor permit or EPA accreditation for a job supervisor.

2. Quality of Work: Supervisor shall supervise, inspect and direct the Work.

H. Minimum Experience: Experience with abatement work, as evidenced through participation in at least two asbestos abatement projects of size and complexity comparable to this project.

I. Experience and Training: Supervisors, foremen, and workers shall be adequately trained and knowledgeable in the field of asbestos abatement. All personnel engaged in asbestos abatement or related activities shall have a state permit and/or EPA accreditation.

J. Skilled craftsman experienced in each respective trade shall execute all phases of the work. Proof of such experience shall be submitted upon request. Improperly trained, untrained, or inexperienced personnel shall not be allowed in the work areas.

K. On-Site job supervisor shall have experience with abatement work, as evidenced through participation in at least two asbestos abatement projects of size and complexity comparable to this project.

L. Job supervisors and foremen shall be thoroughly familiar with and experienced in asbestos removal and related work and shall meet the requirements of a competent person set forth in OSHA Standard 29 CFR 1926.1101.

M. All asbestos abatement workers shall be knowledgeable, qualified, and trained in the removal, handling, and disposal of asbestos material and in subsequent cleaning of the affected environment. All asbestos abatement workers shall be certified as having attended and satisfactorily completed asbestos worker training in accordance with OSHA standard 29 CFR 1926.1101(k)(3).

N. Asbestos abatement workers shall have a state permit and/or EPA accreditation.

O. Prior to commencement of the work, all personnel who are to enter the work area shall be instructed in and shall be knowledgeable of the appropriate procedures for personnel protection and asbestos abatement. On-site training in the use of equipment and facilities unique to this job site shall be performed. Emergency evacuation procedure from the work area shall also be included in worker training.

P. Worker Medical Examinations: Provide medical examinations for all employees engaged in asbestos removal and disposal operations in accordance with OSHA Standard 29 CFR 1910.134(b), 1926.1101, and applicable State regulations. Ensure that all employee examination results are on file, available for review and maintained in accordance with OSHA Standard 29 CFR 1926.1101 (n)(3).

BUILDINGS 49 & 65 02 82 00 - 6

1.11 SUBMITTALS

The Contractor shall prepare the following submittals due before the actual start of the fieldwork:

A. Copy of the Contractor’s Asbestos License or accreditation.

B. Schedule of Work Phases with estimated times of completion.

C. A copy of the Contactor’s “Work Procedures and Asbestos Abatement Plan”.

D. A copy of the Contractor’s “Health and Safety Plan”.

E. A copy of the Contractor’s “Lead Mitigation Plan”.

F. Hazard Communication: Procedure on how physical and health hazards associated with the ACM abatement and removal are identified and communicated to employees, and name of the person responsible for implementation of a Hazard Communication Program.

G. Proof of written notifications required for permits, state licenses and notifications and proof that all required permits and variances have been obtained.

H. Proof of written notification to the Owner that asbestos abatement work is being conducted. As a minimum, the notification letter shall include the address of the project, dates work is to be performed, and drawings indicating the areas to undergo abatement.

I. Proof that the job supervisor, foremen, and asbestos abatement workers meet state license requirements or EPA accreditation.

J. Proof of a current medical surveillance program for all personnel.

K. Completed and notarized Certificate of Worker’s Release for each asbestos abatement worker, workers of other trades, or supervisory personnel who enter the work area or otherwise contact

ACM.

L. Proof of a respiratory protection program: Submit level of respiratory protection intended for each operation required by the project.

M. Proof of historic airborne fiber data: Submit airborne asbestos fiber monitoring data from an independent air-monitoring firm to substantiate selection of respiratory protection proposed. Data shall include the following for each procedure required by the work:

1. Date of measurement.

2. Type of work task monitored.

3. Methods used for sample collection and analysis.

4. Number, duration, and results of samples taken.

N. Waste Transportation: Submit information on the asbestos waste hauler, including; names, address, telephone number, and EPA identification number.

O. Waste Disposal: Submit information on the approved waste disposal site that will be used including; name, address, telephone number, and EPA identification number, contact name and facility name. Also submit any required generator certification forms for review.

P. Manufacturer’s literature for all proposed equipment and products. Include Safety Data Sheets (SDS) for encapsulant, fire retardant plastics, and other chemicals.

BUILDINGS 49 & 65 02 82 00 - 7

Q. Specimen of the daily log proposed for use including the dates and times when all personnel enter and leave the work areas.

R. Results of all air monitoring, posted within 24 hours for all workers to see. A copy of the results shall also be given to the Owner or his representative.

S. Certified, signed, and completed copy of each “Waste Shipment Record” form and receipts from the landfill operator that acknowledge the delivery of material, within 30 days following removal of ACM.

T. Copies of a daily log showing the dates and times of entrance to and exit from the work areas for all persons.

U. Compilation in chronological order of all air monitoring records.

V. Compilation of all completed and signed Waste Shipment Record forms, bills of lading, or disposal receipts.

W. Copies of notifications and checks to applicable agencies that the asbestos abatement project has been completed.

X. Notifications: Copies of notifications (and all correspondence with government regulatory agencies) to the necessary governmental agencies in accordance with regulatory requirements, including 10 or 20 day pre-notification requirements. All notifications shall include the following information:

i. Name, Address, designated contact person and telephone number of facility Owner.

ii. Name, Address, designated contact person, telephone number, EPA numbers and license numbers of the Asbestos Abatement Contractor.

iii. The address and description of the facility where the Work will take place.

iv. Construction Contract Number.

v. Description of the type and quantity of asbestos-containing material that will be abated and the procedures that will be used.

vi. Schedules for the Project including start and finished dates for abatement work.

vii. Name, Address, telephone number, EPA, DOT and DEP numbers and license numbers of the

Asbestos Waste Hauler.

viii. Name, Address, telephone number, EPA numbers and license numbers of the Asbestos Waste

Disposal Site.

1.12 LAWS TO BE OBSERVED

1. Occupational Safety and Health Act of 1970 (OSHA).

2. Licenses - Attention is directed to N.J.S.A. 45: 1-8 and 9, which requires that tree experts, home repair contractors, electrical contractors, master plumbers, well drillers and all other contractors licensed by the State of New Jersey shall indicate their license or certificate number on all contracts, subcontracts and bids.

1.13 DOCUMENTS

The current issue of each document incorporated by reference herein shall govern. Where conflict among requirements or with the specification exists, the more stringent requirements shall apply.

A. OSHA Regulations: Provide special attention the following:

BUILDINGS 49 & 65 02 82 00 - 8

1. CFR 1910 (general industry).

2. CFR 1910.134 (respiratory protection)

3. CFR 1910.141 (sanitation)

4. CFR 1910.300-399 (electrical)

5. CFR 1910.1001 (asbestos)

6. CFR 1910.1200 (hard communication)

7. CFR 1926 (construction safety)

8. CFR 1926.52 (noise)

9. CFR 1926.62 (lead)

10. CFR 1926.1101 (asbestos)

11. CFR 1926.59 (hazard communication)

12. CFR 1926.40-449 (electrical)

13. CFR 1926.450-452 (ladders and scaffolding)

B. U.S. Environmental Protection Agency (EPA) including but not limited to:

1. NESHAP Asbestos National Emission Standards for Hazardous Air Pollutants. 40 CFR 61, Subparts A (General Provisions, Sections 01-10) and M (Asbestos, Sections 140-157).

C. DOT Regulations: Provide special attention to the Hazardous Materials Regulations, 49 CFR

171-180, in particular:

1. 49 CFR 171.14(b)(4) (placarding)

2. 49 CFR 172.300-308, 324 (marking)

3. 49 CFR 174.400, 466 (labeling)

4. 49 CFR 172.500, 504, 560 (placarding)

D. Other Standards

1. American National Standards Institute

a. ANSI Standard Z9.2: Fundamentals Governing the Design and Operation of Local

Exhaust Systems.

b. ANSI Standard A40.8: National Plumbing Code.

2. National Fire Protection Association

3. NFPA 70: National Electrical Code

4. NFPA 70E: Standard for Electrical Safety Requirements for Employee Workplaces.

E. New Jersey Regulations

1. N.J.A.C. 8:60 and N.J.A.C. 12:120 et.seq. (Licensing and Permits)

2. N.J.A.C. 7:26-1 et.seq. (Waste Transport).

1.14 HEALTH AND SAFETY PROVISIONS

A. Personal Monitoring:

1. The Contractor shall perform Personal Air Monitoring in accordance with OSHA Standards, 29 CFR 1926.1101 (and 29 CFR 1926.62 Lead). Such records shall be made available to any authorized personnel and copies will be submitted to the Owner’s Consultants.

BUILDINGS 49 & 65 02 82 00 - 9

B. Progress Monitoring:

1. The Asbestos Contractor or a firm retained by the Contractor shall perform Progress Air

Monitoring as required by OSHA for Class I and Class II work.

2. Progress air samples will be analyzed by Phase Contrast Microscopy (PCM) at an accredited laboratory or onsite.

C. Clearance Monitoring:

1. The Asbestos Contractor or a firm retained by the Contractor shall perform Clearance Air

Monitoring in accordance with OSHA for Class I and Class II work.

2. Clearance air samples for full containment shall be analyzed by Transmission Electron

Microscopy (TEM) by an accredited laboratory. Limited containment activities may be cleared by PCM.

D. Emergency Procedures:

1. The Contractor shall establish written emergency procedures to be posted within each work area. These procedures shall include plans for medical emergencies, fire evacuations, temporary loss of electrical power or water, and procedures for repair and clean-up following temporary breach of containment barriers.

E. Training:

1. In accordance with 29 CFR 1926.1101 and other pertinent regulations, all employees shall receive training in the proper methods to handle asbestos-containing materials including proper work procedures and equipment and methods.

2. Each employee shall participate in a medical monitoring program and shall understand the importance of monitoring airborne asbestos fibers as related to the proper of respiratory equipment. The training program shall comply with Federal and State regulatory requirements.

F. Protective Clothing:

1. Work clothes shall consist of fire retardant disposable full-body coveralls, head covers, boots, rubber gloves, non-skid boots or equivalent.

2. In addition, eye protection and hard hats shall be available to all Workers according to applicable Federal and State regulations.

3. The Contractor shall provide all Authorized Visitors with required protective clothing, including coveralls, respirator, hardhat, eye protection and footwear.

1.15 BARRICADES AND WARNING SIGNS

A. Caution Signs and Warning Labels:

1. The Contractor shall provide and display Caution signs so that said signs may be read from a distance so as to prevent accidental entry into the work area(s). The signs shall comply with

OSHA and EPA regulations. In addition, warning labels shall be affixed to all raw materials, mixtures, scrap, waste, debris, and other materials containing asbestos fibers, or to containers.

BUILDINGS 49 & 65 02 82 00 - 10

The signs at entrances to the facility and work areas shall be removed upon project completion.

PART 2 - PRODUCTS

2.1 MATERIALS

The Contractor shall furnish, supply, provide and utilize the following materials or their quality equivalent in the performance of this Contract. No materials, equipment or tools belonging to the Owner shall be used by the Contractor.

A. Utilize only material (e.g., polyethylene sheeting, lumber, etc.) shall be rated to be fire retardant, as tested by ASTM Standard E-84. Additionally, utilize only polyethylene sheeting conforming to the requirements set forth by the National Fire Protection Association Standard 701, Small

Scale Fire Test for Flame-Resistant Textiles and Firms.

B. Materials shall be standard products of manufacturers regularly engaged in the production of the items and shall conform to OSHA Standard 29 CFR 1926.1101; EPA Standard 40 CFR 61, Subpart M; Department of Transportation Standards 49 CFR 171, 172, and 173; and applicable state regulations.

C. Plastic: Fire retardant, 6-mil thickness provided in rolls of sizes that minimize joints, for plasticizing the enclosed work area, preparation of the decontamination enclosure system, and waste packaging.

D. Reinforced Fire Retardant Plastic: Reinforced polyethylene sheet for the floor area of the decontamination enclosure system; 19 mil, 3-ply, high density flame resistant.

E. Duct Tape: Capable of sealing joints of adjacent sheets of plastic and attaching plastic sheeting to finished surfaces without damage to existing finish; capable of adhering under both dry and wet conditions, including use of amended water. When used on windows the tape shall be ultra violet light stable, shall not leave residue when removed and shall be Nashua 357 Black Duct Tape or approved equal.

F. Surfactant: Resin materials in a water base that have been tested to ensure materials are non-toxic and non-hazardous.

G. Lockdown Sealants: Use after asbestos removal to lockdown fugitive fibers; Class “A” fire resistance rating with an ASTM E-162 flame spread index of 15 or less.

H. Caulking Sealant: Single component, non-sag elastomer with 1,600% elongation capacity. Meet the requirements of Federal Specification TT-S-00230C, Class A type II. Sealant shall be used to form an airtight seal around plywood separation barriers or temporary partitions, seal along the seams of the decontamination enclosure system’s plywood sheathing, and seal around piping or other small penetrations of the work area.

I. Foam Sealant: Expanding urethane Class 1 with a UL 723 flame spread index of 25 or less, smoke developed index of 0, and a minimum operating temperature range between -30 0 F and

250 0 F.

J. Plywood: Use for separation barriers, temporary partitions, decontamination enclosure systems, BUILDINGS 49 & 65 02 82 00 - 11 and tunnels; exterior grade and a minimum 1/2-inch thick.

K. Spray Adhesive: Aerosol, specially formulated to stick to sheet polyethylene (3M 76, 3M 77, or approved equal).

L. Disposal Bags: The waste disposal bags shall be, at a minimum, six (6) mil polyethylene bags, labeled according to Federal and State regulations. Fiber Drums will be utilized to contain ACM material and any materials which may puncture waste disposal bags. The fiber drums shall be labeled in accordance with State and Federal Regulations.

M. Shipping Containers: Impermeable, suitable to receive and retain any asbestos-containing or asbestos-contaminated materials until they are disposed of at an approved landfill. Containers shall be labeled in accordance with this Section and shall be both airtight and watertight and conform to DOT Standard 49 CFR 178.224. Each container shall be constructed of fiber, hard plastic, or metal, with locking, airtight lids.

N. Markings and Labels: Disposal bags and shipping containers shall bear danger labels, transportation packaging labels, and generator identification information. Labels shall be permanently affixed to all bags and shipping containers containing ACM, in accordance with

OSHA Standard 29 CFR 1926.1101(k)(2), DOT Standard 49 CFR Part 171 and 172, and EPA

Standard 40 CFR Part 61.150(a)(1)(v).

2.2 EQUIPMENT

A. Spraying Equipment: To apply amended water or removal encapsulant shall be of a low-pressure type to prevent disturbance of the asbestos prior to physical controlled removal. Airless spray equipment shall be provided for the application of asbestos encapsulant.

B. Digital Manometer with Continuous Printout - The Contractor must utilize a sufficient number of

Digital Manometers to monitor the pressure differential between the work area and the area outside the work area and within pressurized seals. Digital Manometers shall have audio and visual alarms that indicate a drop in pressure below the project set limit. One additional back-up digital manometer shall be on-site should any one fail during the project. Additional digital manometers will be required if the Contractor needs to utilize make-up air from any window, door, etc., within the work area.

C. Vehicles: Trucks or vans used for the transportation of asbestos waste shall be enclosed and suitable for loading, temporary storage, transit, and unloading of asbestos-contaminated waste without exposure to persons or property.

D. Fall Protection equipment: certified and approved to be used by trained personnel when working elevated to protect against falling from an elevated work area.

E. Fire Extinguisher: Type ABC dry chemical extinguisher or a combination of NFPA recommended types for the fire hazard exposures in each location. Minimum size of extinguisher shall be 4-A, and 40-B:C. Supply a minimum of one extinguisher for every 1,000 SF of floor area, with a maximum travel distance to an extinguisher of 75 feet. Supply at least one extinguisher in each decontamination enclosure equipment room and clean room.

F. First Aid: First Aid Supplies shall comply with governing regulations and recognized recommendations within the construction industry.

BUILDINGS 49 & 65 02 82 00 - 12

G. Ladders: The Contractor shall provide all ladders and staging equipment, as necessary, to complete the Work of this Contract. All ladders and staging materials shall comply with all applicable OSHA regulations.

H. Warning Labels and Signs: All warning signs and labels will comply with 29 CFR 1910.1001, 29CFR 1926.1101 and/or other Federal and State Regulations.

I. Waste Container: A secure and lockable container for the storage of the double bagged asbestos waste shall be provided prior to removal operations begin, and shall be utilized on a daily basis of waste generated during the work shift. An open topped dumpster with a tie down tarp is not acceptable.

J. Power Tools: When used directly for asbestos removal, equip with a dust collection system.

Attach a shroud connected to a HEPA vacuum system for capture of dust.

K. Electrical Service

1. General - The Contractor shall comply with applicable NEMA, NECA and UL standards and governing regulations for materials and layout of temporary electric service.

2. Temporary Power - Provide service to Work Area subpanel with minimum 60 amp, 2 pole circuit breaker. Subpanel and disconnect shall be sized and equipped to accommodate all electrical equipment required for completion of the Work. The contractor shall arrange service connections with the Owner and/or the local power utility. Portable generators may only be used for short term (8 hours or less) O&M work.

3. Voltage Differences - Provide identification warning signs at power outlets that are other than 110-120 volt power. Provide polarized outlets for plug-in type outlets, to prevent insertion of 110-120 volt plugs into higher voltage outlets. Dry type transformers shall be provided where required to provide voltages necessary for Work operations.

4. Ground Fault Protection - Provide receptacle outlets equipped with ground-fault circuit interrupters, reset button and pilot light, for plug-in connection of power tools and equipment.

5. Electrical Power Cords - Use only grounded extension cords; use "hard-service" cords where exposed to abrasion and traffic. Use single lengths or use waterproof connectors to connect separate lengths of electric cords, if single lengths will not reach Work Areas.

6. Lamps and Light Fixtures - Provide general service incandescent lamps of wattage indicated or required for adequate illumination. Protect lamps with guard cages or tempered glass enclosures, where fixtures are exposed to breakage by construction operations.

L. Water Service/Sanitary

1. Temporary Water Service Connection - All connections to the Owner's water system shall include backflow protection. Valves shall be temperature and pressure rated for operation of the temperatures and pressures encountered. After completion of use, connections and fittings shall be removed without damage or alteration to existing water piping and equipment. Leaking or dripping valves shall be piped to the nearest drain or located over an existing sink or grade where water will not damage existing finishes or equipment.

BUILDINGS 49 & 65 02 82 00 - 13

2. Water Hoses - Employ heavy-duty abrasion-resistant hoses with a pressure rating greater than the maximum pressure of the water distribution system to provide water into each Work

Area and to each Decontamination Unit. Provide fittings, as required, to allow for connection to existing wall hydrants or spouts, as well as temporary water heating equipment, branch piping, showers, shut-off nozzles, and other equipment.

3. Hot Water - The Contractor shall provide a hot water system.

2.3 PROTECTIVE CLOTHING AND EQUIPMENT

2.3.01 RESPIRATORS

A. General

1. The Contractor shall instruct and train each worker in the proper use of respirators. The

Contractor shall require that each worker always wear a respirator in the Work Area, properly fitted on the face, from the start of any operation that may cause the release of airborne asbestos fibers. In addition, the Contractor shall provide a copy of the Respiratory

Protection Program to the Owner’s Consultants prior to the beginning of Work as well as maintain a copy of the program on the job site throughout the performance of the Work.

B. Standards

1. Respiratory protective equipment is required in accordance with the 29 CFR 1910.1001, 29

CFR 1910.134, and 29 CFR 1926.1101 regulations and any State regulations, unless specified elsewhere.

C. Contractor Responsibility

1. The Contractor shall assure that workers always wear a respirator, properly fitted on the face, in the Work Area, from the initiation of the Asbestos Abatement Work until all areas have been cleared by means of TEM clearance air samples. All clearance samples must be below the regulatory limit of 0.01 f/cc.

2. The Contractor shall provide Authorized Visitors with suitable respirators and respirator training whenever they are required to enter the Work Area. Provide at least two (2) extra air hoses when supplied-air respirators are required.

2.3.02 PROTECTIVE CLOTHING

A. Coveralls - The Contractor shall provide, at a minimum, fire retardant disposable full-body coveralls and head covers, and require that they be worn by all workers in the Work Area.

Provide a sufficient number for the number of employees and their required changes.

B. Foot Coverings - The Contractor shall provide foot coverings with non-skid soles, and where required by OSHA, foot protection for all workers. Do not allow shoes to be removed from the

Work Area for any reason after being contaminated with asbestos fibers. The shoes will either be disposed of as asbestos-containing waste or placed in double poly bags and removed from the site.

BUILDINGS 49 & 65 02 82 00 - 14

C. Hard Hats - The Contractor shall provide head protection (hard hats) as required by OSHA for all workers, and provide additional units for use by authorized personnel.

D. Goggles - The Contractor shall provide eye protection as required by OSHA for all workers involved with grinding, spraying, or any other type of process or activity that may potentially cause eye injury.

2.4 AIR FILTRATION SYSTEM

A. The Contractor shall supply the required number of air filtration systems equipped with a HEPA filter capable of creating a pressure differential of 0.02 inches of water column or greater to the work areas and seals of separation barriers in accordance with the following specifications. Each unit shall include the following:

1. A cabinet able to withstand damage from rough handling and transportation.

2. The final filter assembly shall be HEPA type.

3. The unit shall have a minimum of a two-stage pre-filter to protect the HEPA filter from damage resulting from impact with large particles.

4. The unit shall have at a minimum, the instrumentation described below:

a. Magnehelic gauge (pressure differential meter) or manometer to measure pressure drop between filters.

b. A table indicating usable air-handling capacity for various static pressure readings.

c. A meter that keeps track of the time that the unit has been in operation.

d. A mechanical or electrical lockout to prevent the unit from operating without a

HEPA filter in place.

e. An alarm system consisting of lights and an audio alarm to warn of a major rupture in the HEPA filter, blocked air discharge, or abnormal pressure drop.

5. The unit shall be approved by the National Electrical Manufacturers Association (NEMA) and the Underwriters Laboratory (UL).

PART 3 - EXECUTION

3.1 PREPARATION

A. Transmit submittals required by this Section.

B. Furnish products as indicated.

C. Ensure that the substrates are in suitable condition to receive the work.

BUILDINGS 49 & 65 02 82 00 - 15

3.2 SPECIAL CONDITIONS

A. The Contractor shall not begin Asbestos Abatement Work until all tools and equipment and materials are on hand, all notices and permits have been obtained, and locking waste storage containers are on-site.

B. The contractor shall provide onsite, locking waste storage container(s) for the asbestos waste, with the required warning signs, until transportation for offsite disposal is arranged.

C. The Contractor shall protect all wiring during removal activities.

3.3 DECONTAMINATION AND ENCLOSURE SYSTEMS

A. Personnel Decontamination Unit shall be contiguous to the Full Containment Work Area, consisting of three (3) totally enclosed chambers as described in the following. A minimum of two layers of polyethylene sheeting shall be required for floors, walls, and the ceiling. The on-site constructed decontamination unit shall be constructed of 2 x 4 frames. Disposable/pop-up decontamination units may not be used.

B. Waste/Equipment Decontamination Unit System: Locate adjacent to the work area. The waste/equipment decontamination unit shall consist of two totally enclosed spaces. The waste/ equipment decontamination unit shall be sized for the removal of all waste.

C. Optional Attached /Combined Personal / Waste Decontamination Unit: For full containment areas, provide an attached, combined, personal / waste decontamination unit, in compliance with OSHA Standard 29 CFR 1926.1101.

3.3.01 EXECUTION

The Contractor shall follow and adhere to the following procedures for the construction of a

Decontamination Unit for an Asbestos Abatement Project:

A. The Contractor shall construct one chamber to be classified as an Equipment Room with an airlock doorway between it and the work area and another airlock doorway between it and the

Shower Room. This Room shall contain provisions for the storage of contaminated clothing and equipment. Each airlock doorway shall consist of three alternating flaps, each flap shall be sealed at the top and at one side to the wall, in the alternating “Z” pattern. The bottom of each flap shall be weighted.

B. The Contractor shall construct one chamber to be classified as a Shower Room with an airlock doorway (three alternating flaps) between it and the Clean Room. This Room shall possess a shower with provisions for hot and cold running water (heated water to be provided by the

Contractor) that allows for the complete showering of workers during decontamination.

C. The Contractor shall construct one chamber to be classified as a Clean Room with an airlock doorway (three alternating flaps) at its entrance. This Room shall contain provisions for the storage of the worker's street clothing and unused protective clothing and equipment.

BUILDINGS 49 & 65 02 82 00 - 16

3.3.02 EXECUTION OF EQUIPMENT/WASTE-OUT UNIT

The Contractor shall follow and adhere to the following procedures for the construction of an Equipment

Decontamination/Waste-Out Unit for this Asbestos Hazard Abatement Project:

A. The Contractor shall construct one chamber to be classified as a Wash Room with an airlock doorway between it and the Work Area and an airlock doorway between it and the Holding Area.

B. The Contractor shall construct one chamber to be classified as a Holding Area with an airlock doorway at its entrance. This Room will be used to temporarily store the bags and/or drums of asbestos waste prior to transporting to the disposal container.

3.4 PERSONAL PROTECTION AND DECONTAMINATION

A. Take all safety measures and precautions necessary to protect employees in accordance with

OSHA Standard 29 CFR 1926, EPA Standard 40 CFR, Part 61, Subpart M, and applicable state regulations.

B. Provide authorized visitors with suitable properly fitting protective disposable clothing, headgear, hard hats, eye protection, respiratory protection, and footwear (up to four sets per 8-hour shift) whenever they are required to enter the work area.

3.5 SEQUENCE OF WORK - EXECUTION

3.5.01 Operations & Maintenance Activities (Not Anticipated)

A. The following procedures shall be followed while performing the O&M activities:

1. No asbestos O&M work including preparation shall be performed or continued without having proper notification and a certified supervisor at the site.

2. Provide and display danger signs at every entrance to the work areas in clearly visible locations indicating that asbestos removal work is being conducted and unauthorized and not protected persons should not enter.

Signs must use the following legend:

DANGER

ASBESTOS

CANCER AND LUNG DISEASE HAZARD

RESPIRATORS AND PROTECTIVE CLOTHINGS

ARE REQUIRED IN THIS AREA

Signs shall be posted which meet the specifications set forth in 29 CFR 1926.1101 at all approaches to the work area. Signs shall be posted at a sufficient distance from the work area to permit a person to read the sign and take precautionary measures to avoid exposure to asbestos.

3. A contiguous space surrounding the work area shall be roped off and regulated to allow only certified workers and authorized visitors to enter.

BUILDINGS 49 & 65 02 82 00 - 17

4. All asbestos handlers shall wear disposable suits, including gloves, hood and footwear, and appropriate respiratory equipment, prior to entering the containment area.

5. Damaged plaster shall be wetted and loose pieces removed/picked up and placed in a plastic waste bag. Plaster to be removed for installation of ducts, pipes and wires shall;

have a sheet of plastic placed on the ground below the area to be cut; the material shall be wetted; if power tools are used to cut the plaster, appropriate attachments to a HEPA vacuum shall be used; all waste shall be doubled bagged for disposal; and the work area shall be HEPA vacuumed and wet washed.

6. The O&M cleanup of the floors of crawlspaces shall include: sealing all penetrations from the crawlspace to the floor above; a hygiene facility/equipment room shall be constructed above the hatchway into the crawlspace, an airlock shall be attached to the hygiene room with three curtains separating the rooms and at the exit/entrance to the air lock; HEPA air filtration shall be installed at the exterior vents to the crawlspaces (special attachments to the HEPA air units will be required); thermal system insulation on the floors of the crawlspaces shall be wetted, picked up and placed in plastic bags; the ground surface shall be raked to ensure no pieces of TSI remain; and all waste shall be doubled bagged for disposal. Workers will HEPA vacuum their coveralls in the hygiene room and remove and dispose of before exiting the air lock.

3.5.02 Limited Containment Enclosure with Glove Bag Removal

A. The following procedures shall be followed while performing limited containment removals:

1. The work area shall consist of a limited containment “tent” or an area sealed off and appropriate caution and/or danger signs posted on the perimeter to prevent unauthorized personnel from entering the work area.

2. All necessary materials and supplies shall be brought into the work area before any removal begins.

3. Remove the asbestos containing materials utilizing two person teams. The insulation shall be removed within a glove bag. The contractor shall provide a suitable number, size and configuration of glove bags for the project.

4. The substrate shall be washed with a damp cloth and sealed with a lockdown sealant.

5. All waste shall be doubled bagged for disposal.

6. The work area shall be HEPA vacuumed and wet washed following the bag out of the waste material.

3.5.03 Full Containment Work Area

The Contractor shall follow and adhere to the following procedures for the Work Area preparation of this

Asbestos Hazard Abatement Project.

BUILDINGS 49 & 65 02 82 00 - 18

A. FIRST - The Contractor shall construct the decontamination chamber and waste decontamination chamber, prior to any other onsite activity.

B. SECOND -The Contractor shall clean the work areas prior to the installation of the polyethylene, using HEPA vacuum equipment and wet-cleaning methods as appropriate. Air filtration units will be utilized during this clean-up phase of work. All carpeting shall be removed and disposed as asbestos contaminated waste. Any item that may disturb ACM during its removal shall be removed/cleaned by the contractor.

C. The Contractor shall isolate the Work Area for the duration of the project with a minimum of two layers of six (6) mil polyethylene as critical barriers secured to cleaned surfaces.

D. All electric shall be shut down in the Work Area.

E. All grossly contaminated objects located within the Work Area will be treated as asbestos-containing material and will be disposed of in the appropriate manner.

F. The Contractor shall seal any sump pits or floor drains to prevent asbestos contaminated water from entering.

G. The Contractor shall construct temporary walls with 2 x 4 and plywood as needed where no walls are present to hang the wall and ceiling polyethylene.

H. The Contractor shall cover floors with a minimum of two (2) layers of six (6) mil polyethylene.

Other horizontal surfaces shall be covered in accordance with federal, state and local requirements. Vertical surfaces shall be covered with a minimum of one (1) layer of six (6) mil polyethylene. Sheeting shall be sized to minimize the number of seams. No seams shall be allowed within 12 inches of corners or where floor and wall join. Seams shall overlap at least 12 inches between seams of adjacent layers. Second layer floor seams shall be offset at least 12 inches from the first layer floor seams. The exception to the above is where Floor Covering will be removed.

I. The Contractor shall seal all wall, plumbing, duct and other openings with an additional layer of polyethylene or other suitable material to prevent materials from entering such cavities.

J. The Contractor shall regularly check all isolation barriers for punctures, loose seals, and contact with heat-generating devices, and general integrity. Any problems shall be remedied immediately.

K. The Contractor shall maintain emergency and fire exits from the Work Areas. The Contractor will provide fire extinguishers.

L. The Contractor shall provide lighting and power to the work areas, ensure safe and proper installation according to codes and have a backup source of power available if needed.

M. The Contractor shall install and maintain air pressure differential equipment during the removal and decontamination phases of the project until the Clearance Tests have been analyzed and fiber levels are within acceptable limits. The Contractor shall have a sufficient number of units to maintain a pressure differential of 0.02 inches of water column. The Contractor shall have at least one backup unit on site should any one unit fail. Additional units will be required where separation barriers seals are required.

BUILDINGS 49 & 65 02 82 00 - 19

N. Prior to removal, the Contractor shall spray asbestos materials with Amended Water. The asbestos materials shall be sufficiently saturated without causing excessive dripping to prevent emission of airborne fibers. Asbestos containing materials shall be sprayed repeatedly during the

Work Process to maintain a wet condition. If the materials are not easily saturated, then the Work

Area shall be constantly misted to keep fiber emission minimal.

O. The Contractor shall remove asbestos in manageable sections and/or volumes by a multi-person team. Any material that falls to the floor shall be wetted and picked up immediately. ACM shall not be allowed to dry out. Prior to the start of the next area, the asbestos waste must be packaged in an approved manner in an approved waste container appropriately marked according to regulations and this Contract.

P. The Contractor shall keep and maintain the Work Area in a clean and orderly manner. All waste materials shall be placed in the proper containers and labeled accordingly.

Q. The Contractor shall clean and store all waste packages in a Holding Area until that time when moved to the waste container for storage until transported to the disposal site. The packages shall be stored in piles no higher than four (4) feet or in a manner that will result in damage to the packages or drums.

R. The Contractor shall clean all surfaces of contaminated equipment thoroughly by wet sponging or wiping and sealed in polyethylene before…