About this file

P17PS00668-000002_Attachment-02, Abatement Plan A-2 Building 65 First Floor (1 sheet)

View the file

Other files

File Type Posted
P17PS00668-000008_Revised_CWDs-Corrected_Set-Aside_Classification_170804.pdf PDF
P17PS00668-000008_Att-01_CWD-NJ37_170804.pdf PDF
P17PS00668-000008_Att-02_CWD-NJ58_170804.pdf PDF
B09_P17PS00668-000007_Q&A_Responses_170727.pdf PDF
P17PS00668-000007_Att-2_GATE200607A-BidderQuestions-Grading_170630.pdf PDF
P17PS00668-000007_Att-1_P17PS00668_Questions_and_Responses-Pt2_170802.pdf PDF
P17PS00668-000006_Att-1_Q&As_01-22_170727.pdf PDF
P17PS00668-000006_Att-2_GATE_200607A_STSI_170630.pdf PDF
B09_P17PS00668-000006_Q&A_Responses_170727.pdf PDF
P17PS00668-000005_Att-01_SubKPlan_Cklst_170710.doc DOC document
P17PS00668-000005_Ext_POP-Add_SubKtrPlanChklst_170725.pdf PDF
P17PS00668-000004_Pre-Bid_Meeting_Attendees_170721.pdf PDF
P17PS00668-000004_Att-01_Pre-BidMtgSign-InSheet.pdf PDF
P17PS00668-000004_Att-02_Pre-BidMtgAddendeeBusCards.pdf PDF
P17PS00668-000003_Ext_Sol-Q&A_Deadlines_170718.pdf PDF
Att-07_OHM_Spec_028700_Bldg_49_and_65.pdf PDF
P17PS00668-000002_Contract_Documents_170713.pdf PDF
Att-01_A-1_Bldg._49,_Abatement_Plan.pdf PDF
Att-05_Asbestos_Spec_028200_Bldg_49_and_65.pdf PDF
Att-08_GATE200607A_SAHO_-_STSI_20170201.pdf PDF
Att-03_A-3_Bldg._65,_Attic_Abatement_Plan.pdf PDF
Att-06_Lead_Spec_028313_Bldg_49_and_65.pdf PDF
Att-04_HAZMAT-BldgMatRpt-Bldg_65_w_Attachments.pdf PDF
Sandy-Hook_Fort-Hancock_Map.pdf PDF
B09_P17PS00668-000001_Pre-Bid_Meeting.pdf PDF
205_P17PS00668_Subcontracting_Plan_Form.docx DOCX document
103b_P17PS00668_Subcontractor_Reference.docx DOCX document
Att-03b_CWD-NJ58_170609.pdf PDF
208_P17PS00668_ProposedEquals.docx DOCX document
SF-1442w-Clauses&Provisions_170628.pdf PDF
105_P17PS00668_Past_Performance_Questionnaire.docx DOCX document
Att-04_ProposalSubmissionPackage-complete_170628.pdf PDF
206_P17PS00668_GeneralReferences.docx DOCX document
203_P17PS00668_Contract_Price_Sked.xlsx XLSX spreadsheet
101_P17PS00668_Experience_Form.docx DOCX document
201_SF_24_Bid_Bond.pdf PDF
207_P17PS00668_HazmatForm.docx DOCX document
202_P17PS00668_SF-1442_Solicitation.pdf PDF
103a_P17PS00668_Key_Personnel_Form.docx DOCX document
200_P17PS00668_Sol_Cover_Sheet-Bus_Proposal.pdf PDF
100_P17PS00668_Sol_Cover_Sheet-Tech_Proposal.pdf PDF
Att-02_ConstructionDrawings_170616.pdf PDF
Att-01_Specifications_170616.pdf PDF
203_P17PS00668_Contract_Price_Sked.pdf PDF
204_P17PS00668_Reps_&_Certs.pdf PDF
Att-03a_CWD-NJ37_170609.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABC

F

G

H I J

L

K

M

DE

up

LEGEND

NOTES:

1. ALL ASBESTOS ABATEMENT WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL

GOVERNMENT REGULATIONS. THE CONTRACTOR SHALL USE MANUAL WET METHODS

TO CONTROL THE RELEASE OF DUST WHEN PERFORMING THE REMOVAL OF ALL

ASBESTOS AND NON-ASBESTOS MATERIALS FROM THE WORK AREA.

2. ALLABATEMENT REQUIRING CONTAINMENT SHALL BE CONDUCTED WITHIN A NEGATIVE

PRESSURE ENCLOSURE. A NEGATIVE AIR PRESSURE OF AT LEAST -0.02 INCHES OF WATER

COLUMN, AS MEASURED AT ANY WORK AREA PERIMETER LOCATION, SHALL BE

PROVIDED AT ALL TIMES DURING ASBESTOS REMOVAL. NEGATIVE AIR PRESSURE SHALL

BE CREATED IN THE WORK AREA USING HEPA FILTERED EXHAUST AND EXHAUSTED TO

THE OUTDOORS. THESE HEPA FILTERED EXHAUST UNITS WILL BE USED TO GENERATE AT

LEAST FOUR AIR CHANGES PER HOUR INSIDE THE WORK AREA. NEGATIVE AIR PRESSURE

IN THE WORK AREA SHALL BE CONTINUOUSLY MONITORED THROUGH THE USE OF

DIGITAL MANOMETERS POSTED OUTSIDE THE WORK AREA.

3. HAZARDOUS MATERIALS DRAWINGS SHOW THE EXTENT OF HAZARDOUS MATERIALS

FOUND WITHIN THE EXISTING STRUCTURE. THE CONTRACTOR SHALL REMOVE

HAZARDOUS MATERIALS THAT EXIST WITHIN WORK AREAS PRIOR TO THE START OF

WORK WITHIN EACH WORK AREA. REFER TO DESIGN DRAWINGS FOR FURTHER

INFORMATION. REFER TO SPECIFICATIONS FOR REMOVAL PROCEDURES.

(3) THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ASBESTOS CONTAINING FLOOR TILE AND MASTIC AS ACM.

(4) THE ABATEMENT CONTRACTOR SHALL REMOVE AND DISPOSE OF

ASBESTOS CONTAINING BOILER PACKING, BOILER INSULATION,

PIPE AND FITTING INSULATION, FLUE BREECHING CEMENT AND

DEBRIS AS ACM.

Scientists I Engineers I Program Managers

Mabbett & Associates, Inc.

5 Alfred Circle Bedford, MA 01730-2318

T. 781-275-6050 - 800-877-6050 www.mabbett.com

ASBESTOS

ABATEMENT PLAN

1st Floor

SANDY HOOK UNIT OF THE GATEWAY

NATIONAL RECREATION AREA SANDY HOOK, NEW JERSEY

HAZARDOUS MATERIALS SURVEY-BLDG. 65

AutoCAD SHX Text 9"x9" FLOOR TILE MASTIC

AutoCAD SHX Text 9"x9" FLOOR TILE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DRAWN

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

SCALE

AutoCAD SHX Text

DWG. NO.

AutoCAD SHX Text

PROJ. NO.

AutoCAD SHX Text 2016002.001.006

AutoCAD SHX Text

PEH

AutoCAD SHX Text

MFD

AutoCAD SHX Text 1"=10'

AutoCAD SHX Text A-2

AutoCAD SHX Text

GRAPHIC SCALE

AutoCAD SHX Text

AutoCAD SHX Text

1 INCH= FEET

AutoCAD SHX Text

AutoCAD SHX Text 5'

AutoCAD SHX Text 10'

AutoCAD SHX Text 20'

AutoCAD SHX Text Copyright, 2016

AutoCAD SHX Text Mabbett & Associates, Inc.

AutoCAD SHX Text C

Sheets and Views
ASBESTOS ABATEMENT PLAN 1st Floor