CHESAPEAKE AND OHIO CANAL

Georgetown, Washington, D.C.

REHABILITATE LIFT LOCK #4

CHOH

PMIS NO. 150699

VOLUME 3 OF 3

PROJECT SPECIFICATIONS

Construction Documents

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

June 20, 2016

REHABILITATE LIFT LOCK #3 AND 4

CHOH-150696/150699 TOC-1

TABLE OF CONTENTS

VOLUME 1 OF 3 – REHABILITATE LIFT LOCK #3 AND #4

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work ................................................................ 01 11 00-1 to 01 11 00-4 01 26 01 Contract Modification Procedures ........................................ 01 26 01-1 to 01 26 01-6 01 27 00 Definition of Contract Line Items ........................................ 01 27 00-1 to 01 27 00-6 01 31 00 Project Management & Coordination................................. 01 31 00-1 to 01 31 00-10 01 32 16 Construction Schedule .......................................................... 01 32 16-1 to 01 32 16-9 01 32 33 Photo Documentation for Historic Preservation Projects .... 01 32 33-1 to 01 32 33-2 01 33 23 Submittal Procedures ............................................................ 01 33 23-1 to 01 33 23-8 01 35 13.22 Archeological Protection ............................................01 35 13.22-1 to 01 35 13.22-3 01 35 23 Safety Requirements ............................................................. 01 35 23-1 to 01 35 23-3 01 35 91 Historic Preservation Treatment Procedures ........................ 01 35 91-1 to 01 35 91-7 01 40 00 Quality Requirements ........................................................... 01 40 00-1 to 01 40 00-8 01 42 00 References ........................................................................... 01 42 00-1 to 01 42 00-19 01 50 00 Temporary Facilities and Controls ....................................... 01 50 00-1 to 01 50 00-6 01 57 19.12 Noise & Acoustic Management..................................01 57 19.12-1 to 01 57 19.12-2 01 57 23 Temporary Storm Water Pollution Prevention .................... 01 57 23-1 to 01 57 23-7 01 67 00 Product Requirements ........................................................... 01 67 00-1 to 01 67 00-9 01 73 29 Cutting and Patching ............................................................. 01 73 29-1 to 01 73 29-3 01 73 40 Execution ............................................................................... 01 73 40-1 to 01 73 40-6 01 74 19 Construction Waste Management and Disposal .................. 01 74 19-1 to 01 74 19-7 01 77 00 Closeout Procedures.............................................................. 01 77 00-1 to 01 77 00-4

Geotechnical Engineering Report - C&O Canal Lock #3 Renovations Soils Management Plan Work Plan Sediment and Canal Surface Water Sampling Results Letter

VOLUME 2 OF 3 – CHOH 150696 - REHABILITATE LIFT LOCK #3

DIVISION 02 - EXISTING CONDITIONS

02 41 19 Selective Structure Demolition ............................................. 02 41 19-1 to 02 41 19-6 02 61 50 Management and Disposal of Excavated Non-Hazardous Contaminated Soil and Wastewater ..................................... 02 61 50-1 to 02 61 50-9

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete ....................................................... 03 30 00-1 to 03 30 00-14

CHOH – 150696/150699 TOC-2

DIVISION 04 – MASONRY

04 03 05 Repointing of Existing Stone Masonry ................................ 04 03 05-1 to 04 03 05-3 04 03 07 Stone Masonry ...................................................................... 04 03 07-1 to 04 03 07-8 04 10 00 Mortar .................................................................................... 04 10 00-1 to 04 10 00-3

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES

06 10 63 Exterior Rough Carpentry ..................................................... 06 10 63-1 to 06 10 63-3 06 19 00 Timber Miter Gates ............................................................... 06 19 00-1 to 06 19 00-4

DIVISION 9 – FINISHES

09 96 00 Painting .................................................................................. 09 96 00-1 to 09 96 00-7

DIVISION 31 - EARTHWORK

31 00 00 Earthwork and Grading ....................................................... 31 00 00-1 to 31 00 00-15 31 10 00 Site Clearing .......................................................................... 31 10 00-1 to 31 10 00-4 31 23 19 Dewatering ............................................................................ 31 23 19-1 to 31 23 19-3 31 23 23 Excavatable Flowable Fill .................................................... 31 23 23-1 to 31 23 23-5 31 50 00 Excavation Bracing ............................................................... 31 50 00-1 to 31 50 00-5

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 14 00 Unit Paving ............................................................................ 32 14 00-1 to 31 14 00-3

32 91 13 Soil Preparation .................................................................... 32 91 13-1 to 32 91 13-3 32 92 00 Turf and Grasses ................................................................... 32 92 00-1 to 32 92 00-8 32 93 00 Planting ................................................................................ 32 93 00-1 to 32 93 00-10

DIVISION 33 - UTILITIES

33 11 00 Water Distribution Systems .................................................. 33 11 00-1 to 33 11 00-6 33 45 00 Subsurface Drainage System ................................................ 33 45 00-1 to 33 45 00-4

VOLUME 3 OF 3 - CHOH 150699 - REHABILITATE LIFT LOCK #4

DIVISION 02 - EXISTING CONDITIONS

02 41 19 Selective Structure Demolition ............................................. 02 41 19-1 to 02 41 19-6

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete ....................................................... 03 30 00-1 to 03 30 00-14

DIVISION 04 – MASONRY

04 03 05 Repointing of Existing Stone Masonry ................................ 04 03 05-1 to 04 03 05-3 04 03 07 Stone Masonry ...................................................................... 04 03 07-1 to 04 03 07-8 04 10 00 Mortar .................................................................................... 04 10 00-1 to 04 10 00-3

CHOH – 150696/150699 TOC-3

DIVISION 6 – WOOD, PLASTICS AND COMPOSITES

06 19 00 Timber Miter Gates ............................................................... 06 19 00-1 to 06 19 00-4

DIVISION 9 – FINISHES

09 96 00 Painting .................................................................................. 09 96 00-1 to 09 96 00-7

DIVISION 31 - EARTHWORK

31 20 10 Erosion and Sediment Control ............................................. 31 20 10-1 to 31 20 10-5 31 23 23 Excavatable Flowable Fill .................................................... 31 23 23-1 to 31 23 23-5

CHOH - 150699 024119 - 1

SELECTIVE STRUCTURE DEMOLITION

SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes the following:

1. Demolition and removal of selected site elements.

2. Salvage of existing items to be reused or recycled.

3. See Section 040307 for removal and salvage of stone masonry.

4. See Section 061900 for removal and salvage of timber miter gates and sills.

B. Related Sections include the following:

1. Division 01 Section "Summary" for use of premises, and phasing, and Owner-occupancy requirements.

2. Division 01 Section "Temporary Facilities and Controls" for temporary construction and environmental-protection measures for selective demolition operations.

3. Division 40 Section 040307 “Stone Masonry” for Disassembly of Lock Stone Walls

4. Division 61 Section 061900 “Timber Miter Gates” for Removal of Existing Timber Miter

Gates

1.3 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site, unless indicated to be removed and salvaged or removed and reinstalled.

B. Remove and Salvage: Detach items from existing construction and deliver them to Owner ready for reuse.

C. Remove and Reinstall: Detach items from existing construction, prepare them for reuse, and reinstall them where indicated.

D. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or removed and reinstalled.

1.4 MATERIALS OWNERSHIP

A. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, parking signs, parking lights, antiques, and other items of interest or value to Owner that may be encountered during selective demolition remain

CHOH - 150699 024119 - 2

Owner's property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to Owner.

1. Coordinate with Owner's representative, who will establish special procedures for removal and salvage.

2. Refer to SECTION 061900 TIMBER MITER GATES.

1.5 SUBMITTALS

A. Qualification Data: For professional engineer.

B. Schedule of Selective Demolition Activities: Indicate the following:

1. Detailed sequence of selective demolition and removal work, with starting and ending dates for each activity. Ensure Owner's adjacent construction and on-site operations are uninterrupted.

2. Interruption of utility services. Indicate how long utility services will be interrupted.

3. Coordination for shutoff, capping, and continuation of utility services.

4. Locations of proposed dust- and noise-control temporary partitions and means of egress, including access affected by selective demolition operations.

5. Coordination of Owner's continuing occupancy of portions of existing building and of

Owner's partial occupancy of completed Work.

6. Means of protection for items to remain and items in path of waste removal from site.

C. Inventory: After selective demolition is complete, submit a list of items that have been removed and salvaged.

D. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.

1.6 QUALITY ASSURANCE

A. Demolition Firm Qualifications: An experienced firm that has specialized in demolition work similar in material and extent to that indicated for this Project.

B. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

C. Standards: Comply with ANSI A10.6 and NFPA 241.

D. Predemolition Conference: Conduct conference at Project site to comply with requirements in Division 01 Section "Project Management and Coordination." Review methods and procedures related to selective demolition including, but not limited to, the following:

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review and finalize selective demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

CHOH - 150699 024119 - 3

3. Review requirements of work performed by other trades that rely on substrates exposed by selective demolition operations.

4. Review areas where existing construction is to remain and requires protection.

1.7 PROJECT CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

1. Comply with requirements specified in Division 01 Section "Summary."

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify Engineer of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. If materials suspected of containing hazardous materials are encountered, do not disturb;

immediately notify Engineer and Owner. Owner will remove hazardous materials under a separate contract.

E. Storage or sale of removed items or materials on-site is not permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1.8 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials so as not to void existing warranties.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped.

B. Survey existing conditions and correlate with requirements indicated to determine extent of selective demolition required.

C. Inventory and record the condition of items to be removed and reinstalled and items to be removed and salvaged.

CHOH - 150699 024119 - 4

D. When unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure the nature and extent of conflict.

Promptly submit a written report to Engineer.

E. Perform surveys as the Work progresses to detect hazards resulting from selective demolition activities.

3.2 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems: Maintain services/systems indicated to remain and protect them against damage during selective demolition operations.

1. Comply with requirements for existing services/systems interruptions specified in Division 01 Section "Summary."

B. Service/System Requirements: Locate, identify, disconnect, and seal or cap off indicated utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Arrange to shut off indicated utilities with utility companies.

2. If services/systems are required to be removed, relocated, or abandoned, before proceeding with selective demolition provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

3.3 PREPARATION

A. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Comply with requirements for access and protection specified in Division 01 Section "Temporary Facilities and Controls."

3.4 SELECTIVE DEMOLITION, GENERAL

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Proceed with selective demolition systematically, by phasing plans.

2. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping, to minimize disturbance of adjacent surfaces. Temporarily cover openings to remain.

3. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials and promptly dispose of off-site.

4. Dispose of demolished items and materials promptly.

CHOH - 150699 024119 - 5

B. Removed and Salvaged Items:

1. Clean salvaged items.

2. Pack or crate items after cleaning. Identify contents of containers.

3. Store items in a secure area until delivery to Owner.

4. Transport items to Owner's storage area on-site designated by Owner.

5. Protect items from damage during transport and storage.

C. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse. Paint equipment to match new equipment.

2. Pack or crate items after cleaning and repairing. Identify contents of containers.

3. Protect items from damage during transport and storage.

4. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by Engineer items may be removed to a suitable, protected storage location during selective demolition and cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.5 SELECTIVE DEMOLITION PROCEDURES FOR SPECIFIC MATERIALS

A. Asphalt: Demolish in sections. Cut asphalt full depth at junctures with construction to remain and at regular intervals, using power-driven saw, then remove asphalt between saw cuts.

B. Concrete Slabs-on-Grade: Saw-cut perimeter of area to be demolished, then break up and remove and reinstall.

3.6 DISPOSAL OF DEMOLISHED MATERIALS

A. General: All demolition debris shall be removed from University property and disposed of by lawful means. Recycle non-hazardous materials when possible.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn demolished materials.

C. Disposal: Transport demolished materials and dispose of at designated spoil areas on Owner's property.

CHOH - 150699 024119 - 6

3.7 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

3.8 SELECTIVE DEMOLITION SCHEDULE

A. Existing Items to Be Removed: Asphalt paving, stairs (Additive Bid Item #1), handrails, culvert, gravel areas, light pole bases (Additive Bid Item #3) and debris as denoted on demolition plan.

B. Existing Items to Be Removed and Salvaged: None.

C. Existing Items to Be Removed and Reinstalled: None.

D. Existing Items to Remain: Existing utilities shown on demolition plan, including sanitary sewer.

E. END OF SECTION 024119

CHOH - 150699 03 30 00 - 1

CAST-IN PLACE CONCRETE

SECTION 033000 - CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete materials, mixture design, placement procedures, and finishes, for the following:

1. Historic Concrete Lock Wall Repairs

2. Concrete Slab on Grade at base of upper gate

1.3 DEFINITIONS

A. Cementitious Materials: Portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blast-furnace slag, and silica fume; subject to compliance with requirements.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product indicated.

B. Design Mixtures: For each concrete mixture. Submit alternate design mixtures when characteristics of materials, Project conditions, weather, test results, or other circumstances warrant adjustments.

1. Indicate amounts of mixing water to be withheld for later addition at Project site.

C. Steel Reinforcement Shop Drawings: Placing drawings that detail fabrication, bending, and placement. Include bar sizes, lengths, material, grade, bar schedules, stirrup spacing, bent bar diagrams, bar arrangement, splices and laps, mechanical connections, tie spacing, hoop spacing, and supports for concrete reinforcement.

D. Patching mortar samples: Three 8”x8”x2” samples of patching mortar, each with slightly difference color. Patching mortar shall nearly match the existing concrete patch color.

1.5 INFORMATIONAL SUBMITTALS

A. Qualification Data: For testing agency.

B. Material Certificates: For each of the following, signed by manufacturers:

CHOH - 150699 03 30 00 - 2

1. Cementitious materials.

2. Admixtures.

3. Steel reinforcement and accessories.

4. Bonding agents and Epoxy Resin.

5. Adhesives.

6. Vapor retarders.

7. Repair materials.

C. Material Test Reports: For the following, from a qualified testing agency, indicating compliance with requirements:

1. Aggregates. Include service record data indicating absence of deleterious expansion of concrete due to alkali aggregate reactivity.

D. Field quality-control reports.

E. Minutes of preinstallation conference.

1.6 QUALITY ASSURANCE

A. Patching mortar demonstration panel:

B. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed concrete products and that complies with ASTM C 94/C 94M requirements for production facilities and equipment.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

C. Testing Agency Qualifications: An independent agency, qualified according to ASTM C 1077 and ASTM E 329 for testing indicated.

1. Personnel conducting field tests shall be qualified as ACI Concrete Field Testing Technician, Grade 1, according to ACI CP-1 or an equivalent certification program.

2. Personnel performing laboratory tests shall be ACI-certified Concrete Strength Testing Technician and Concrete Laboratory Testing Technician - Grade I. Testing Agency laboratory supervisor shall be an ACI-certified Concrete Laboratory Testing Technician - Grade II.

D. Source Limitations: Obtain each type or class of cementitious material of the same brand from the same manufacturer's plant, obtain aggregate from single source, and obtain admixtures from single source from single manufacturer.

E. ACI Publications: Comply with the following unless modified by requirements in the Contract Documents:

1. ACI 301, "Specifications for Structural Concrete,"

2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."

CHOH - 150699 03 30 00 - 3

F. Concrete Testing Service: Engage a qualified independent testing agency to perform material evaluation tests and to design concrete mixtures.

G. Preinstallation Conference: Conduct conference at Project site.

1. Before submitting design mixtures, review concrete design mixture and examine procedures for ensuring quality of concrete materials. Require representatives of each entity directly concerned with cast-in-place concrete to attend, including the following:

a. Contractor's superintendent.

b. Independent testing agency responsible for concrete design mixtures.

c. Ready-mix concrete manufacturer.

d. Concrete subcontractor.

2. Review special inspection and testing and inspecting agency procedures for field quality control, concrete finishes and finishing, cold- and hot-weather concreting procedures, curing procedures, construction contraction joints, and joint-filler strips, forms and form removal limitations, steel reinforcement installation, concrete repair procedures, and concrete protection.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Steel Reinforcement: Deliver, store, and handle steel reinforcement to prevent bending and damage. Avoid damaging coatings on steel reinforcement.

PART 2 - PRODUCTS

2.1 FORM-FACING MATERIALS

A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous, true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize number of joints.

1. Plywood, metal, or other approved panel materials.

2. Exterior-grade plywood panels, suitable for concrete forms, complying with DOC PS 1, and as follows:

a. High-density overlay, Class 1 or better.

b. Medium-density overlay, Class 1 or better; mill-release agent treated and edge sealed.

c. Structural 1, B-B or better; mill oiled and edge sealed.

d. B-B (Concrete Form), Class 1 or better; mill oiled and edge sealed.

B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved material.

Provide lumber dressed on at least two edges and one side for tight fit.

C. Chamfer Strips: Wood, metal, PVC, or rubber strips, 3/4 by 3/4 inch, minimum.

CHOH - 150699 03 30 00 - 4

D. Form-Release Agent: Commercially formulated form-release agent that will not bond with, stain, or adversely affect concrete surfaces and will not impair subsequent treatments of concrete surfaces.

1. Formulate form-release agent with rust inhibitor for steel form-facing materials.

E. Form Ties: Factory-fabricated, removable or snap-off metal or glass-fiber-reinforced plastic form ties designed to resist lateral pressure of fresh concrete on forms and to prevent spalling of concrete on removal.

1. Furnish units that will leave no corrodible metal closer than 1 inch to the plane of exposed concrete surface.

2. Furnish ties that, when removed, will leave holes no larger than 1 inch in diameter in concrete surface.

3. Furnish ties with integral water-barrier plates to walls indicated to receive dampproofing or waterproofing.

2.2 STEEL REINFORCEMENT

A. Reinforcing Bars: ASTM A 615, Grade 60, deformed.

B. Plain-Steel Wire: ASTM A 82/A 82M.

C. Deformed-Steel Wire: ASTM A 496/A 496M.

2.3 REINFORCEMENT ACCESSORIES

A. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting, and fastening reinforcing bars and welded wire reinforcement in place. Manufacture bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual of Standard Practice," of greater compressive strength than concrete and as follows:

1. For concrete surfaces exposed to view where legs of wire bar supports contact forms, use CRSI Class 1 plastic-protected steel wire or CRSI Class 2 bar supports.

2.4 CONCRETE MATERIALS

A. Cementitious Material: Use the following cementitious materials, of the same type, brand, and source, throughout Project:

1. Portland Cement: ASTM C 150, Type I/II. Supplement with the following:

a. Fly Ash: ASTM C 618, Class F.

b. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.

2. Blended Hydraulic Cement: ASTM C 595, Type IS, portland blast-furnace slag cement.

B. Normal-Weight Aggregates: ASTM C 33, Class 3S coarse aggregate or better, graded. Provide aggregates from a single source.

CHOH - 150699 03 30 00 - 5

1. Maximum Coarse-Aggregate Size: 1-1/2 inches nominal.

2. Fine Aggregate: Free of materials with deleterious reactivity to alkali in cement.

C. Water: ASTM C 94/C 94M and potable.

2.5 PATCHING MORTAR

A. Patching Mortar, General:

1. Only use patching mortars that are recommended by manufacturer for each applicable horizontal or vertical orientation.

2. Color and Aggregate Texture: Provide patching mortar and aggregates of colors and sizes necessary to produce patching mortar that matches existing, adjacent, exposed concrete.

Blend several aggregates if necessary to achieve suitable matches.

3. Coarse Aggregate for Patching Mortar: ASTM C 33, washed aggregate, Size No. 8, Class 5S. Add to patching-mortar mix only as permitted by patching-mortar manufacturer.

B. Cementitious Patching Mortar: Packaged, dry mix for repair of concrete.

1. Manufacturers: Subject to compliance with requirements, provide comparable product by one of the following:

a. BASF Construction Chemicals - Building Systems.

b. CGM, Incorporated.

c. Dayton Superior Corporation.

d. Euclid Chemical Company (The); an RPM company.

e. Fox Industries, Inc.

f. Kaufman Products, Inc.

g. Sika Corporation; Construction Product Division.

h. Sto Corp.; Concrete Restoration Division.

i. Unitex.

j. US SPEC; Division of US MIX Products Company.

k. W. R. Meadows, Inc.

2. Compressive Strength: Not less than 4000 psi at 28 days when tested according to

ASTM C 109/C 109M.

3. General: Mix products, in clean containers, according to manufacturer's written instructions. Do not add water, thinners, or additives unless recommended by manufacturer. When practical, use manufacturer's premeasured packages to ensure that materials are mixed in proper proportions. When premeasured packages are not used, measure ingredients using graduated measuring containers; do not estimate quantities or use shovel or trowel as unit of measure. Do not mix more materials than can be used within time limits recommended by manufacturer. Discard materials that have begun to set.

2.6 ADMIXTURES

A. Air-Entraining Admixture: ASTM C 260.

http://www.specagent.com/LookUp/?uid=123456801488&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801489&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801490&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816467&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801491&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801492&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816468&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816469&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801493&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456816470&mf=04&&mf=04&src=wd http://www.specagent.com/LookUp/?uid=123456801494&mf=04&&mf=04&src=wd

CHOH - 150699 03 30 00 - 6

B. Corrosion inhibiting admixture ASTM C1582.

C. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible with other admixtures and that will not contribute water-soluble chloride ions exceeding those permitted in hardened concrete. Do not use calcium chloride or admixtures containing calcium chloride.

1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.

2. Retarding Admixture: ASTM C 494/C 494M, Type B.

3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.

4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.

5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type G.

6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II.

D. Set-Accelerating Corrosion-Inhibiting Admixture: Commercially formulated, anodic inhibitor or mixed cathodic and anodic inhibitor; capable of forming a protective barrier and minimizing chloride reactions with steel reinforcement in concrete and complying with ASTM C 494/C 494M, Type C.

2.7 VAPOR RETARDERS

A. Sheet Vapor Retarder: Polyethylene sheet, ASTM D 4397, not less than 10 mils thick.

B. Fine-Graded Granular Material: Clean mixture of crushed stone, crushed gravel, and manufactured or natural sand; ASTM D 448, Size 10, with 100 percent passing a 3/8-inch sieve, 10 to 30 percent passing a No. 100 sieve, and at least 5 percent passing No. 200 sieve;

complying with deleterious substance limits of ASTM C 33 for fine aggregates.

2.8 CURING MATERIALS

A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for application to fresh concrete.

B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf, weighing approximately 9 oz./sq. yd. when dry.

C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlap-polyethylene sheet.

D. Water: Potable.

E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1, Class B, dissipating.

2.9 RELATED MATERIALS

A. Bonding Agent: ASTM C 1059/C 1059M, Type II, non-redispersible, acrylic emulsion or styrene butadiene.

CHOH - 150699 03 30 00 - 7

B. Epoxy Bonding Adhesive: ASTM C 881, two-component epoxy resin, capable of humid curing and bonding to damp surfaces, of class suitable for application temperature and of grade to suit requirements, and as follows:

1. Types I and II, non-load bearing, for bonding hardened or freshly mixed concrete to hardened concrete.

C. Epoxy for Dowels into hardened concrete: Two-component epoxy adhesive that are combined when dispensed through a static mixing nozzle with temperature range from 41 degrees to 104 degrees Fahrenheight, suitable for anchoring reinforcing bars to rock or hardened concrete.

Adhesive shall be furnished in side by side packs which keep component A and B separate.

Min. Con strength 2 day cure is 1800 psi. Manufacturer’s accessories for installing the adhesive must be used. Acceptable materials include HILTI RE-500 or approved equivalent.

2.10 CONCRETE MIXTURES, GENERAL

A. Prepare design mixtures for each type and strength of concrete, proportioned on the basis of laboratory trial mixture or field test data, or both, according to ACI 301.

1. Use a qualified independent testing agency for preparing and reporting proposed mixture designs based on laboratory trial mixtures.

2. Trial mixtures shall contain corrosion inhibitor at manufacturer’s recommended rate.

B. Cementitious Materials: Use fly ash, pozzolan, and ground granulated blast-furnace slag as needed to reduce the total amount of portland cement. Limit percentage, by weight, of cementitious materials other than portland cement in concrete as follows:

1. Fly Ash: 25 percent.

2. Combined Fly Ash and Pozzolan: 25 percent.

3. Ground Granulated Blast-Furnace Slag: 50 percent.

4. Combined Fly Ash or Pozzolan and Ground Granulated Blast-Furnace Slag: 50 percent portland cement minimum, with fly ash or pozzolan not exceeding 25 percent.

C. Limit water-soluble, chloride-ion content in hardened concrete to 0.06 percent by weight of cement.

D. Admixtures: Use admixtures according to manufacturer's written instructions.

1. Use corrosion inhibiting admixture at minimum 4 gallons per cubic yard.

2. Use water-reducing or high-range water-reducing admixture in concrete, as required, for placement and workability.

3. Use water-reducing and retarding admixture when required by high temperatures, low humidity, or other adverse placement conditions.

2.11 CONCRETE MIXTURES

A. Proportion normal-weight concrete mixture as indicated.

CHOH - 150699 03 30 00 - 8

2.12 FABRICATING REINFORCEMENT

A. Fabricate steel reinforcement according to CRSI's "Manual of Standard Practice."

2.13 CONCRETE MIXING

A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to ASTM C 94/C 94M and furnish batch ticket information.

1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F, reduce mixing and delivery time to 60 minutes.

B. Project-Site Mixing: Measure, batch, and mix concrete materials and concrete according to ASTM C 94/C 94M. Mix concrete materials in appropriate drum-type batch machine mixer.

1. For mixer capacity of 1 cu. yd. or smaller, continue mixing at least 1-1/2 minutes, but not more than 5 minutes after ingredients are in mixer, before any part of batch is released.

2. For mixer capacity larger than 1 cu. yd., increase mixing time by 15 seconds for each additional 1 cu. yd.

3. Provide batch ticket for each batch discharged and used in the Work, indicating Project identification name and number, date, mixture type, mixture time, quantity, and amount of water added. Record approximate location of final deposit in structure.

PART 3 - EXECUTION

3.1 FORMWORK

A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support vertical, lateral, static, and dynamic loads, and construction loads that might be applied, until structure can support such loads. The design of formwork including any additional supports for stonework used as formwork is solely the responsibility of the contractor’s professional engineer.

B. Design bracing of the wall stone masonry as needed where it is used as formwork.

C. Construct formwork so concrete members and structures are of size, shape, alignment, elevation, and position indicated, within tolerance limits of ACI 117.

D. Limit concrete surface irregularities, designated by ACI 347 as abrupt or gradual, as follows:

1. Class A, 1/8 inch for smooth-formed finished surfaces.

2. Class B, 1/4 inch, Class C, 1/2 inch, Class D, 1 inch for rough-formed finished surfaces.

E. Construct forms tight enough to prevent loss of concrete mortar.

F. Fabricate forms for easy removal without hammering or prying against concrete surfaces.

Provide crush or wrecking plates where stripping may damage cast concrete surfaces. Provide top forms for inclined surfaces steeper than 1.5 horizontal to 1 vertical.

CHOH - 150699 03 30 00 - 9

1. Install keyways, recesses, and the like, for easy removal.

2. Do not use rust-stained steel form-facing material.

G. Set edge forms, bulkheads, and intermediate screed strips for slabs to achieve required elevations and slopes in finished concrete surfaces. Provide and secure units to support screed strips; use strike-off templates or compacting-type screeds.

H. Provide temporary openings for cleanouts and inspection ports where interior area of formwork is inaccessible. Close openings with panels tightly fitted to forms and securely braced to prevent loss of concrete mortar. Locate temporary openings in forms at inconspicuous locations.

I. Chamfer exterior corners and edges of permanently exposed concrete.

J. Form openings, chases, offsets, sinkages, keyways, reglets, blocking, screeds, and bulkheads required in the Work. Determine sizes and locations from trades providing such items.

K. Clean forms and adjacent surfaces to receive concrete. Remove chips, wood, sawdust, dirt, and other debris just before placing concrete.

L. Retighten forms and bracing before placing concrete, as required, to prevent mortar leaks and maintain proper alignment.

M. Coat contact surfaces of forms with form-release agent, according to manufacturer's written instructions, before placing reinforcement.

3.2 EMBEDDED ITEMS

A. Place and secure anchorage devices and other embedded items required for adjoining work that is attached to or supported by cast-in-place concrete. Use setting drawings, templates, diagrams, instructions, and directions furnished with items to be embedded.

3.3 REMOVING AND REUSING FORMS

A. General: Formwork for sides of walls, and similar parts of the Work that does not support weight of concrete may be removed after cumulatively curing at not less than 50 deg F for 24 hours after placing concrete. Concrete has to be hard enough to not be damaged by form-removal operations and curing and protection operations need to be maintained.

1. Leave formwork for slabs, and other structural elements that supports weight of concrete in place until concrete has achieved at least 70 percent of its 28-day design compressive strength.

2. Remove forms only if shores have been arranged to permit removal of forms without loosening or disturbing shores.

B. Clean and repair surfaces of forms to be reused in the Work. Split, frayed, delaminated, or otherwise damaged form-facing material will not be acceptable for exposed surfaces. Apply new form-release agent.

CHOH - 150699 03 30 00 - 10

C. When forms are reused, clean surfaces, remove fins and laitance, and tighten to close joints.

Align and secure joints to avoid offsets. Do not use patched forms for exposed concrete surfaces unless approved by CO.

3.4 STEEL REINFORCEMENT

A. General: Comply with CRSI's "Manual of Standard Practice" for placing reinforcement.

B. Clean reinforcement of loose rust and mill scale, earth, ice, and other foreign materials that would reduce bond to concrete.

C. Accurately position, support, and secure reinforcement against displacement. Locate and support reinforcement with bar supports to maintain minimum concrete cover. Do not tack weld crossing reinforcing bars.

1. Weld reinforcing bars according to AWS D1.4/D 1.4M, where indicated.

D. Set wire ties with ends directed into concrete, not toward exposed concrete surfaces.

E. Dowels installed with Epoxy: Install per Manufacturer’s instructions.

3.5 CONCRETE PLACEMENT

A. Before placing concrete, verify that installation of formwork, reinforcement, and embedded items is complete and that required inspections have been performed.

B. Do not add water to concrete during delivery, at Project site, or during placement unless approved by CO.

C. Before test sampling and placing concrete, water may be added at Project site, subject to limitations of ACI 301.

1. Do not add water to concrete after adding high-range water-reducing admixtures to mixture.

D. Deposit concrete continuously in one layer or in horizontal layers of such thickness that no new concrete will be placed on concrete that has hardened enough to cause seams or planes of weakness. If a section cannot be placed continuously, provide construction joints as indicated.

Deposit concrete to avoid segregation.

1. Deposit concrete in horizontal layers of depth to not exceed formwork design pressures and in a manner to avoid inclined construction joints.

2. Consolidate placed concrete with mechanical vibrating equipment according to ACI 301.

3. Do not use vibrators to transport concrete inside forms. Insert and withdraw vibrators vertically at uniformly spaced locations to rapidly penetrate placed layer and at least 6 inches into preceding layer. Do not insert vibrators into lower layers of concrete that have begun to lose plasticity. At each insertion, limit duration of vibration to time necessary to consolidate concrete and complete embedment of reinforcement and other embedded items without causing mixture constituents to segregate.

CHOH - 150699 03 30 00 - 11

E. Cold-Weather Placement: Comply with ACI 306.1 and as follows. Protect concrete work from physical damage or reduced strength that could be caused by frost, freezing actions, or low temperatures.

1. When average high and low temperature is expected to fall below 40 deg F for three successive days, maintain delivered concrete mixture temperature within the temperature range required by ACI 301.

2. Do not use frozen materials or materials containing ice or snow. Do not place concrete on frozen subgrade or on subgrade containing frozen materials.

3. Do not use calcium chloride, salt, or other materials containing antifreeze agents or chemical accelerators unless otherwise specified and approved in mixture designs.

F. Hot-Weather Placement: Comply with ACI 301 and as follows:

1. Maintain concrete temperature below 90 deg F at time of placement. Chilled mixing water or chopped ice may be used to control temperature, provided water equivalent of ice is calculated to total amount of mixing water. Using liquid nitrogen to cool concrete is Contractor's option.

2. Fog-spray forms, steel reinforcement, and subgrade just before placing concrete. Keep subgrade uniformly moist without standing water, soft spots, or dry areas.

3.6 FINISHING FORMED SURFACES

A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with tie holes and defects repaired and patched. Remove fins and other projections that exceed specified limits on formed-surface irregularities.

B. Stamped Finish: Apply stamped finish to the exposed foundation concrete mat between the lock wall. Stamped finish shall match the approved mockup.

3.7 MISCELLANEOUS CONCRETE ITEMS

A. Filling In: Fill in holes and openings left in concrete structures after work of other trades is in place unless otherwise indicated. Mix, place, and cure concrete, as specified, to blend with in-place construction. Provide other miscellaneous concrete filling indicated or required to complete the Work.

3.8 CONCRETE PROTECTING AND CURING

A. General: Protect freshly placed concrete from premature drying and excessive cold or hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for hot-weather protection during curing.

B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before and during finishing operations. Apply according to manufacturer's written instructions after placing, screeding, and bull floating or darbying concrete, but before float finishing.

CHOH - 150699 03 30 00 - 12

C. Formed Surfaces: Cure formed concrete surfaces, including underside of beams, supported slabs, and other similar surfaces. If forms remain during curing period, moist cure after loosening forms. If removing forms before end of curing period, continue curing for the remainder of the curing period.

D. Unformed Surfaces: Begin curing immediately after finishing concrete. Cure unformed surfaces, including floors and slabs, concrete floor toppings, and other surfaces.

E. Cure concrete according to ACI 308.1, by one or a combination of the following methods:

1. Moisture Curing: Keep surfaces continuously moist for not less than seven days with the following materials:

a. Water.

b. Continuous water-fog spray.

c. Absorptive cover, water saturated, and kept continuously wet. Cover concrete surfaces and edges with 12-inch lap over adjacent absorptive covers.

2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moisture-retaining cover for curing concrete, placed in widest practicable width, with sides and ends lapped at least 12 inches, and sealed by waterproof tape or adhesive. Cure for not less than seven days. Immediately repair any holes or tears during curing period using cover material and waterproof tape.

3. Curing Compound: Apply uniformly in continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Maintain continuity of coating and repair damage during curing period.

a. Removal: After curing period has elapsed, remove curing compound without damaging concrete surfaces by method recommended by curing compound manufacturer.

4. Curing and Sealing Compound: Apply uniformly to floors and slabs indicated in a continuous operation by power spray or roller according to manufacturer's written instructions. Recoat areas subjected to heavy rainfall within three hours after initial application. Repeat process 24 hours later and apply a second coat. Maintain continuity of coating and repair damage during curing period.

3.9 CONCRETE PATCH REPAIRS

A. For existing concrete patches on the masonry lock walls, locate areas of deteriorated or delaminated concrete using hammer sounding and mark boundaries. Mark areas for removal by simplifying and squaring off boundaries. The CO shall review all marked boundaries prior to any removal.

B. Defective Concrete: Repair and patch defective areas after approved by the CO. Saw-cut perimeter of areas indicated for removal to a depth of at least 1/2 inch. Make cuts perpendicular to concrete surfaces. Test areas where concrete has been removed by tapping with hammer, CHOH - 150699 03 30 00 - 13 mark the boundaries, and after approval by the CO, remove additional concrete until unsound and disbonded concrete is completely removed.

C. Patching Mortar: Mix dry-pack patching mortar according to the manufacturer’s instructions.

Wet substrate and forms thoroughly and then remove standing water.

D. General Placement: Place patching mortar by troweling toward edges of patch to force intimate contact with edge surfaces. For large patches, fill edges first and then work toward center, always troweling toward edges of patch.

E. Vertical Patching: Place material in lifts of not more than 1 inch nor less than 1/4 inch. Do not feather edge. After each lift is placed, consolidate material and screed surface. Where multiple lifts are used, score surface of lifts to provide a rough surface for placing subsequent lifts. Allow each lift to reach final set before placing subsequent lifts.

F. Provide forms where necessary to confine patch to required shape.

G. Wet-cure patch for not less than seven days by water-fog spray or water-saturated absorptive cover.

H. Repair materials and installation not specified above may be used, subject to CO's approval.

3.10 FIELD QUALITY CONTROL

A. Testing and Inspecting: Contractor will engage a qualified testing and inspecting agency to perform field tests and inspections and prepare test reports.

B. Inspections:

1. Verify Steel reinforcement placement according to approved shop drawings.

2. Steel reinforcement welding.

3. Verification of use of required design mixture.

4. Concrete placement, including conveying and depositing.

5. Curing procedures and maintenance of curing temperature.

6. Verification of concrete strength before removal of shores and forms from slabs.

C. Concrete Tests: Testing of composite samples of fresh concrete obtained according to ASTM C 172 shall be performed according to the following requirements:

1. Testing Frequency: Obtain at least one composite sample for each 50 cu. yd. or fraction thereof of each concrete mixture placed each day.

a. When frequency of testing will provide fewer than five compressive-strength tests for each concrete mixture, testing shall be conducted from at least five randomly selected batches or from each batch if fewer than five are used.

2. Slump: ASTM C 143/C 143M; one test at point of placement for each composite sample, but not less than one test for each day's pour of each concrete mixture. Perform additional tests when concrete consistency appears to change.

3. Air Content: ASTM C 231, pressure method, for normal-weight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

CHOH - 150699 03 30 00 - 14

4. Concrete Temperature: ASTM C 1064/C 1064M; one test hourly when air temperature is 40 deg F and below and when 80 deg F and above, and one test for each composite sample.

5. Unit Weight: ASTM C 567, fresh unit weight of structural lightweight concrete; one test for each composite sample, but not less than one test for each day's pour of each concrete mixture.

6. Compression Test Specimens: ASTM C 31/C 31M.

a. Cast and laboratory cure three sets of two standard cylinder specimens for each composite sample.

b. Cast and field cure two sets of two standard cylinder specimens for each composite sample.

7. Compressive-Strength Tests: ASTM C 39/C 39M; test one set of two laboratory-cured specimens at 7 days and one set of two specimens at 28 days and one set in reserve.

a. Test one set of two field-cured specimens at 7 days and one set of two specimens at 28 days.

b. A compressive-strength test shall be the average compressive strength from a set of two specimens obtained from same composite sample and tested at age indicated.

8. When strength of field-cured cylinders is less than 85 percent of companion laboratory-cured cylinders, Contractor shall evaluate operations and provide corrective procedures for protecting and curing in-place concrete.

9. Strength of each concrete mixture will be satisfactory if every average of any three consecutive…