About this file

P16PS01045 Questions and Answers (1 question) with attached roof plan

View the file

Other files for this federal contract opportunity

Other files attached to Construction Services: Construct Law Enforcement Facility, Hains Point, Washington D. C. NPS PMIS # NCRO-201541, newest first.
File Type Posted
P16PS01045-000007_Amendment_complete.pdf PDF
P16PS01045-000006_Amendment_signed.pdf PDF
DVB_Gen_Decision_No_DC2_Bldg_08-05-2016.pdf PDF
DVB_Gen_Decision_No_DC1_HC_08-05-2016.pdf PDF
P16PS01045-000005_Amendment_complete.pdf PDF
P16PS01045-000004_Amendment_Complete.pdf PDF
B02_P16PS01045-000003_Amendment_complete.pdf PDF
P16PS01045-000002_Amendment.pdf PDF
P16PS01045-000002_Att2a__DVB_Gen_Decision_No_DC1_HC_07-22-2016.pdf PDF
P16PS01045-000002_Att2b_DVB_Gen_Decision_No_DC2_Bldg_07-22-2016.pdf PDF
P16PS01045-000002_Att1a_Preproposal_Slide_Show_NCRO_201541.pdf PDF
P16PS01045-000002_Att1b_NCRO_201541_attendees_sign_in_7.21.16.pdf PDF
B02_P16PS01045-000001_Amendment.pdf PDF
101_P16PS01045_Experience form 6.8.16.docx DOCX document
104_P16PS01045_Past Performance Questionnaire_6.8.16.docx DOCX document
201_SF 24 Bid Bond.pdf PDF
02_P16PS01045_SF-1442_Constr_Clauses-Provisions.pdf PDF
100_P16PS01045_SoliCover Sheet-Tech Proposal.pdf PDF
202_P16PS01045_SF 1442_Solicitation_07-14-2016.pdf PDF
Att_1b_NCRO_201541_100__Final_Specifications_Volume_2.pdf PDF
200_P16PS01045_Sol Cover Sheet-Bus Proposal.pdf PDF
103_P16PS01045_Key Personnel Form.docx DOCX document
203_P16PS01045_Contract Price Schedule.pdf PDF
Att_1a_NCRO_201541_100__Final_Specifications_Volume_1.pdf PDF
208_P16PS01045_ProposedEquals.docx DOCX document
207_P16PS01045_HazmatForm.docx DOCX document
00_P16PS01045__NCRO 201541 Proposal Submission Pkg.pdf PDF
Att_2a_NCRO_201541_100__Final_Drawings_Sheets_001to040_of_215_no_Sheet_027or039.pdf PDF
102_Subcontractor Form.doc DOC document
206_P16PS01045_GeneralReferences.docx DOCX document
Att_2d_NCRO_201541_100__Final_Drawings_Sheets_161to215_of_215.pdf PDF
203_Contract Price Schedule.XLS XLS spreadsheet
Att_3b_DVB_Gen_Decision_No_DC2_Bldg_07-08-2016.pdf PDF
204_P16PS01045_Reps Certs.pdf PDF
Att_2b_NCRO_201541_100__Final_Drawings_Sheets_041to100_of_215_no_Sheet_055.pdf PDF
Att_2c_NCRO_201541_100__Final_Drawings_Sheets_101to160_of_215.pdf PDF
205_P16PS01045_Subcontracting Plan_6.8.16.doc DOC document
Att_3a_DVB_Gen_Decision_No_DC1_HC_07-08-2016.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NCRO-201541 – NPS Solicitation P16PS01045 Amendment No. 6 – 08/05/2016

QUESTIONS AND ANSWERS - #10

Please find the following government responses to Question #10, which was received by the government as of 2:00 pm MST, August 5, 2016 (responses in red):

10. Amendment #5 answered questions on the Roof anchors, but still did not clarify the extent of the

Lifelines (shown as a dashed line) which usually go from post to post. Please clarify which of the posts get the Lifelines.

Please see cyan colored lines indicated on the attached roof plan to clarify the extent of the lifelines between roof anchors.

Additional questions were received by four firms prior to the submission deadline of 2:00 pm (MST), August 5, 2016, but a response could not be provided at this time. These questions will be answered in an amendment to be issued next week.

A1.1

A2.1

A1.1

A2.1

A1.1

A2.1

3.6

A B C D E F G H

A3.1A1.1

A3.1A1.1

A3.1A1.1

A1.1

A4.10

A3.2A1.1

A1.1

A4.9

A3.2A1.1

A3.2A1.1

A3.2A1.1

A6.3A1.3

38'-0" 24'-0" 24'-0" 24'-0" 24'-0" 24'-0" 32'-0"

ROOF DRAIN, TYP.

OVERFLOW

ROOF DRAIN, TYP

1/4" / 12"

3/16" / 12"

1/4" / 12"

5/16" / 12"5/16" / 12"

1/4" / 12" 1/4" / 12" AIR HANDLER

SEE MECHANICAL

ROOF HATCH WITH

LADDER EXTENSION

5'-0"

CONTROL JOINT,

CONCRETE, TYP.

FALL PROTECTION

@ CL OF COLUMN

LINE U.N.O

SUPPLY DUCT: REFER TO

MECHANICAL

FALL

PROTECTION,

TYP.

15'-2 1/4" 8'-0" 8'-0" 8'-0" 8'-0"

2'-7 1/4"

FALL PROTECTION

@ CL OF COLUMN

LINE U.N.O

EQ EQ

E Q

E Q

FALL PROTECTION

@ CL OF COLUMN

LINE U.N.O

RIDGE

25' - 7 13/16"

SKYLIGHT, TYP.

1/4" / 12"1/4" / 12"1/4" / 12"

3/16" / 12" 1/4" / 12" 3/16" / 12"3/16" / 12"3/16" / 12"3/16" / 12"3/16" / 12"1/4" / 12"

VALLEY

RIDGE

32' - 11 13/16"

VALLEY

32' - 8 13/16"

RIDGE

25' - 7 13/16" 25' - 2 15/16"

VALLEY

RIDGE

26' - 3 1/16"

1/4" / 12"

1/4" / 12"

ARCHITECTURAL

CONCRETE PARAPET

ARCHITECTURAL

CONCRETE COPING

TY

P

TY

P

EQ EQ EQ EQ

EQ 27'-11 5/8" 27'-11 5/8" 27'-11 5/8" EQ

EQ EQ

ALIGN RIDGE

ALIGN

EXTERIOR LADDER TO

HIGH ROOF

4'-10 1/4"

AIR HANDLER

SEE MECHANICAL

32' - 11 13/16"

32' - 11 13/16"

FALL

PROTECTION,

TYP.

A2.1

A1.1 A4.9

A1.1 A2.1

A1.1

26' - 9 7/16"

30'-0" 30'-0"

30'-0" 29'-4"

27' - 1 3/16"

26' - 9 7/16"

1/8" / 12"

27' - 2 3/16"

RIDGE

FALL

PROTECTION @

CL OF

COLUMN LINE

U.N.O

1/8" / 12"1/8" / 12"1/8" / 12"

1/8" / 12"1/ 8" 2"

1/ 8" 2"

OF

DESIGNED:

TECH. REVIEW:

DATE:

SUB SHEET NO. TITLE OF SHEET DRAWING NO.

PMIS/PKG NO.

SHEET

125202

NCRO/201541

ROOF PLANJH

JH

04/18/16

JH

A1.3

MITIGATE FLOODING RISK AT HAINS POINT

FACILITIES: USPP D1 STATION

8 0 8 16

SCALE OF FEET

SCALE A

:2 p m

J:

.0

N P S

H a in s P o in t D .0

D ra w in g s N C R O D ra w in g s A rc h A .d w g

SCALE AA1.3

1 ROOF PLAN

JenHopper Line

JenHopper Line

JenHopper Line

JenHopper Line

JenHopper Text Box Extent of lifelines at roof anchors

File details come from the government source that posted it. Updated .