104_P16PS01045_Past Performance Questionnaire_6.8.16.docx

DOCX document 64 KB Posted

Attached to
Construction Services: Construct Law Enforcement Facility, Hains Point, Washington D. C. NPS PMIS # NCRO-201541 Federal contract opportunity
Solicitation number
P16PS01045
Issued by
Department of the Interior National Park Service National Office

About this file

P16PS01045 Volume I - Technical Proposal Past Performance - Past Performance Questionnaire Form (MS Word)

View the file

Other files for this federal contract opportunity

Other files attached to Construction Services: Construct Law Enforcement Facility, Hains Point, Washington D. C. NPS PMIS # NCRO-201541, newest first.
File Type Posted
P16PS01045-000007_Amendment_complete.pdf PDF
DVB_Gen_Decision_No_DC2_Bldg_08-05-2016.pdf PDF
DVB_Gen_Decision_No_DC1_HC_08-05-2016.pdf PDF
P16PS01045-000006_Amendment_signed.pdf PDF
P16PS01045-000006_Q A_w-attach.pdf PDF
P16PS01045-000005_Amendment_complete.pdf PDF
P16PS01045-000004_Amendment_Complete.pdf PDF
B02_P16PS01045-000003_Amendment_complete.pdf PDF
P16PS01045-000002_Amendment.pdf PDF
P16PS01045-000002_Att2a__DVB_Gen_Decision_No_DC1_HC_07-22-2016.pdf PDF
P16PS01045-000002_Att2b_DVB_Gen_Decision_No_DC2_Bldg_07-22-2016.pdf PDF
P16PS01045-000002_Att1a_Preproposal_Slide_Show_NCRO_201541.pdf PDF
P16PS01045-000002_Att1b_NCRO_201541_attendees_sign_in_7.21.16.pdf PDF
B02_P16PS01045-000001_Amendment.pdf PDF
101_P16PS01045_Experience form 6.8.16.docx DOCX document
201_SF 24 Bid Bond.pdf PDF
02_P16PS01045_SF-1442_Constr_Clauses-Provisions.pdf PDF
100_P16PS01045_SoliCover Sheet-Tech Proposal.pdf PDF
202_P16PS01045_SF 1442_Solicitation_07-14-2016.pdf PDF
Att_1b_NCRO_201541_100__Final_Specifications_Volume_2.pdf PDF
200_P16PS01045_Sol Cover Sheet-Bus Proposal.pdf PDF
103_P16PS01045_Key Personnel Form.docx DOCX document
203_P16PS01045_Contract Price Schedule.pdf PDF
Att_1a_NCRO_201541_100__Final_Specifications_Volume_1.pdf PDF
208_P16PS01045_ProposedEquals.docx DOCX document
207_P16PS01045_HazmatForm.docx DOCX document
Att_3b_DVB_Gen_Decision_No_DC2_Bldg_07-08-2016.pdf PDF
204_P16PS01045_Reps Certs.pdf PDF
Att_2b_NCRO_201541_100__Final_Drawings_Sheets_041to100_of_215_no_Sheet_055.pdf PDF
Att_2c_NCRO_201541_100__Final_Drawings_Sheets_101to160_of_215.pdf PDF
205_P16PS01045_Subcontracting Plan_6.8.16.doc DOC document
Att_3a_DVB_Gen_Decision_No_DC1_HC_07-08-2016.pdf PDF
00_P16PS01045__NCRO 201541 Proposal Submission Pkg.pdf PDF
Att_2a_NCRO_201541_100__Final_Drawings_Sheets_001to040_of_215_no_Sheet_027or039.pdf PDF
102_Subcontractor Form.doc DOC document
206_P16PS01045_GeneralReferences.docx DOCX document
Att_2d_NCRO_201541_100__Final_Drawings_Sheets_161to215_of_215.pdf PDF
203_Contract Price Schedule.XLS XLS spreadsheet
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

CONTRACT INFORMATION (Offeror to complete Blocks 1-4)

1. Contractor Information Firm Name: DUNs Number:

Address:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy): Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:
Complexity of WorkHighMedRoutine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name: Title:

Phone Number: Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NPS PMIS No. NCRO-201541 RFP No. P16PS01045 Construct Law Enforcement Facility at Hains Point, Washington, D.C.

Instructions: Offeror to complete Blocks 1-4. Client to complete Blocks 5-8 and questionnaire. NPS REQUESTS THAT THE CLIENT SUBMIT DIRECTLY BACK VIA EMAIL ATTACHMENT THE ENTIRE COMPLETED QUESTIONNAIRE TO BOTH ALAN_STORMONT@NPS.GOV AND ALBERT_OMARA@NPS.GOV. THE OFFEROR WILL SUBMIT BLOCKS 1-4 OF THE QUESTIONNAIRE TO NPS WITH THEIR TECHNICAL PROPOSAL. THE NPS RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract.

There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

NPS PMIS No. NCRO-201541 RFP No. P16PS01045 Construct Law Enforcement Facility at Hains Point, Washington, D.C.

Contractor Information (Firm Name):

Client Information (Name):

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Conformance with contract requirements
EVGSMUN
b) Quality of workmanship (including subcontractors)
EVGSMUN
c) Adequacy of contractor Quality Control Plan including coordination with and control of subcontractors
EVGSMUN

d) Adequacy of materials, submittals, QC testing, and As-Builts and use of specified materials

E VG S M U N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U N

b) Adequacy of initial and revised Progress Schedules and adherence to project delivery schedules

E VG S M U N

c) Submission of materials/other submittals, change proposals, requests for information, and required documentation
EVGSMUN
d) Submission of timely/accurate/complete invoices
EVGSMUN
e) Response to technical direction, change orders, correction of identified problems, resolution of delays
EVGSMUN

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project services provided?
EVGSMUN

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; business-like and communication)?

E VG S M U N

c) To what extent was the contractor cooperative, responsive, business-like, and concerned with the interests of the customer?
EVGSMUN
d) Overall customer satisfaction – would you hire or work with this firm again? (Please explain below)
EVGSMUN

4. EFFECTIVENESS OF MANAGEMENT/ PERSONNEL/LABOR

a) General effectiveness of on-site management – project manager and superintendent?
EVGSMUN
b) Effectiveness of management and coordination and control of subcontractors, suppliers, materials, and/or labor force?
EVGSMUN
c) Ability to hire, apply, and retain a qualified workforce for this project and manage resources including site clean-up
EVGSMUN
d) Knowledge/expertise demonstrated by contractor and subcontractor personnel
EVGSMUN
e) Utilization of Small Business concerns
EVGSMUN
f) Implementation of Subcontracting Plans
EVGSMUN
g) Professional conduct of all personnel on the project
EVGSMUN
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
EVGSMUN

5. COST CONTROL /FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?
EVGSMUN
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
EVGSMUN
c) Adequacy of Contractor’s accounting system for management and tracking of costs? (Please explain in Remarks section.)
EVGSMUN

6. COMPLIANCE WITH REGULATIONS AND SAFETY STANDARDS

a) Adequacy and implementation of Safety Plan and avoidance of accidents/safety violations
EVGSMUN
b) Compliance with labor laws and regulations with specific attention to the Davis-Bacon Act, EEO requirements, and proper completion and submission of payrolls
EVGSMUN
7. OVERALL RATING FOR THE WORK PERFORMED ON THIS PROJECT BY THIS CONTRACTOR
EVGSMUN

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk.

(please attach additional pages if necessary):

File details come from the government source that posted it. Updated .