OAKWOOD BEACH SEWAGE
TREATMENT PLANT
MAIN PUMP HOUSE
4028,651-653+654T+ 655-687+688T+ 689-691+692T+
693-700+100XD
25XD+1063,626-700
25XD+1063,626-700
2005 9AESUN-1
A4208,1-900+ 1063,1-100+
401-600+25XD+
1063,626-700+
PGL04A,1201-1275+1XD+
PGL04A,1277-1294+1XD+
PGL04A,1296-1297+1XD+
PGL04A,1299+1XD+
TH'A',1-400
A
1063,1-100+
401-600+25XD+
1063,626-700+
PGL04A,1201-1275+1XD+
PGL04A,1277-1294+1XD+
PGL04A,1296-1297+1XD+
PGL04A,1299+1XD+
TH'A',1-200+
A4208,1-2000
B
50XD
4028,651-653+654T+ 655-687+688T+ 689-691+692T+
693-700+100XD
SEE X
X
4028,651-653+654T+ 655-687+688T+ 689-691+692T+ 693-700
C
2005 9AEVNU-1
Fund Source: Gross Project Construction Cost:
Predesign Begin Date:
FY of Const. Funding
Park:
State: Region:
Type of Building
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
SS Prereq 1 Construction Activity Pollution Prevention
Y N/A Project involves interior work only
SS Credit 1 Site Selection Y 1 Land is public parkland (Parkland Exception)
SS Credit 2 Development Density & Community Connectivity
Y 5 Renovation occurs on a previously developed site
SS Credit 3 Brownfield Redevelopment N 1 Site is not contaminated
SS Credit 4.1 Alternative Transportation, Public Transportation Access
Y 1 Renovation is located within 1/4 mile walking distance of a public bus line
SS Credit 4.2 Alternative Transportation, Bicycle Storage & Changing Rooms
Y 1 Bicycle racks, shower and changing facilities are curerently provided
SS Credit 4.3 Alternative Transportation, Low-Emitting & Fuel-Efficient Vehicles
Y 1 preferred parking for low-emitting, fuel efficient vehicles will be provided
Project Type
Description:
Park/PMIS: GATE-201049B
Not Certified/Missing Prereq.
Replace Water Damaged Telecommunication Infrastructure
Please Input CRV in block to the right for the building(s) in this project
0% 0%
Missed Prereq.
Gross Non Building (i.e. Site) Cost:
67% 0%
If Renovation, Exist. Bldg. CRV
Sustainability Features PMIS Submission Predesign Schematic Design Design Development
HDR, Inc. GATE
Missed Prereq.
Not Certified/Missing Prereq.
Gross Building Construction Cost:
Missed Prereq. #VALUE! Missed Prereq.
LEED Certification Level Not Certified/Missing Prereq. Not Certified/Missing Prereq. #VALUE!
Construction
0%% Federal Regulations Achieved
Sustainable Sites (SS) Maximum LEED NC 2009 Credits: 26
Construction Documents
Missed Prereq.
Architect/Engineer Firm:
Date: May 28, 2015
NPS Project Sustainability Checklist Building and Non-Building Projects
(For New Construction or Renovation) LEED 2009 Edition
Project Title: Repair Park Telecommunications Damaged by Hurricane Sandy
Not Certified/Missing Prereq.
Total LEED-NC Credits
Building Size (Square Feet)
0%
Form E 62 (5/26/10) 1
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
SS Credit 4.4 Alternative Transportation, Parking Capacity
Y 1 No new parking is planned for this renovation
SS Credit 5.1 Site Development, Protect or Restore Habitat
Y 1 Construction boundaries will be established ti minimize disturbance of the existing site
SS Credit 5.2 Site Development, Maximize Open Space
Y 1 The renovation is planned to be located within the existing building footprint
SS Credit 6.1 Stormwater Design, Quantity Control (See EISA Section 438)
Y 1 Reuse of stormwater will be investigated for custodial and landscape irrigation
SS Credit 6.2 Stormwater Design, Quality Control (See EISA Section 438)
Y 1 Recycling of rainwater will be investigated
EISA 2007,
Section 438 Protect Hydrology Y N/A Project involves no site work
SS Credit 7.1 Heat Island Effect, Non-Roof Y 1 High albedo coatings and integral colorants will be used for re-roofing
SS Credit 7.2 Heat Island Effect, Roof Y 1 The use of high-albedo roofs will be investigated
SS Credit 8 Light Pollution Reduction Y 1 Interior light fixtures will not produce light spillage through windows
2006 NPS Mgmt Policies (Para.
4.9) Soundscape Preservation Y N/A
Exterior noise producing equipment (air handelers) willl be quieter than ambient noise levels
2006 NPS Mgmt Policies (Para.
4.10) Dark Sky Preservation Y N/A No new exterior lighting is proposed
Missed Prereq.
Missed Prereq. 18 Missed
Prereq.
Missed Prereq.
Missed Prereq.LEED-NC Subtotal
Water Efficiency (WE) Maximum LEED NC 2009 Credits: 10
PMIS Submission Predesign Schematic Design Design Development Construction Documents Construction
Form E 62 (5/26/10) 2 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
WE Prereq 1 Water Use Reduction, 20% Reduction (see Guiding Principle III ‐ Protect and Conserve Water)
N N/A Plumbing fixtures will be utilized for water use reduction
WE Credit 1
Water Efficient Landscaping, Reduce by 50% (see Guiding Principle III ‐ Protect and Conserve Water)
N 0 No exterior landscaping is planned
WE Credit 1 (cont'd)
Water Efficient Landscaping, No Potable Use or No Irrigation
Y 2 Use of recycled rainwater will be investigated
WE Credit 2 Innovative Wastewater Technologies
Y 2 Use of recycled water will be investigated
NPS Policy Water Metering Y N/A Building has an existing water meter
EPACT 2005,
Section 109
Water Used for Energy Conservation
Y N/A The use of water energy conservation systems will be investigated
WE Credit 3 Water Use Reduction (30%, 35%, 40%)
Y 2 Plumbing fixtures will be utilized for water use reduction
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Missed Prereq.
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
EA Prereq 1
Fundamental Commissioning of the Building Energy Systems * (see Guiding Principle I ‐ Employ Integrated Design Principles)
Y N/A Fundemental commissioni ng will be utilized for this renovation
EA Prereq 2 Minimum Energy Performance (see Guiding Principle II Optimize Energy Performance)
Y N/A Energy performance will be improved by 5% for the renovated area
EA Prereq 3
Fundamental Refrigerant Management (see Guiding Principle V ‐ Reduce Environmental Impact of Materials)
Y N/A Equipment that contains Ozone depleting compounds will not be utilized
Design Development Construction Documents
LEED-NC Subtotal
Energy & Atmosphere (EA) Maximum LEED NC 2009 Credits: 35
Sustainability Features PMIS Submission Predesign Schematic Design Construction
Sustainability Features
Form E 62 (5/26/10) 3 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
EA Credit 1
Optimize Energy Performance:** (Federal Regulations require 30% for New Construction and 20% for Existing Building Renovation. Note that this automatically equates to 10 Points for New Construction and 7 Points for Existing Building Renovation.) (see Guiding Principle II ‐ Optimize Energy Performance)
Y 7
Energy performance will be improved by 20% over ASHRAE 90.1 for the renovated area
EISA 2007,
Section 433
Reduce Fossil Fuel Derived Energy
N N/A Renovation is less than $2.5M
EO 13423, Sec.
2.(h)
Energy Efficient Electronic Products (Select EPEAT) (Predominantly relates to purchases of desktop/laptop computers and peripherals)
Y N/A All electronics will be energy efficient
CFR Title 10, Part 436.4
Procure Energy Star or FEMP designated products
Y N/A New fixtures will be Energy Star of FEMP designated products
EPACT 2005,
Section 104
Premium Efficiency Electric Motors
N N/A Project is not a major renovation
EISA 2007,
Section 523
On-Site Renewable Energy*** Solar Thermal for Hot Water (Choose NA if proven not life cycle cost effective)
N N/A Project is not a major renovation
EA Credit 2 On-Site Renewable Energy*** 1%-13% Renewable Energy
Y 2 Renewable alternatives will be investigated
EA Credit 3
Enhanced Commissioning (required for projects with building size > 5,000 sf) (see Guiding Principle I ‐ Employ Integrated Design Principles)
Y 2 Enhanced Commissioning will be investigated
EA Credit 4 Enhanced Refrigerant Management (see Guiding Principle V ‐ Reduce Environmental Impact of Materials)
Y 2 Refrigerants will not be utilized
EA Credit 5 Measurement & Verification (see Guiding Principle II ‐ Optimize Energy Performance)
Y 3 M&V measures will be utilized
EA Credit 6 Green Power Y 2 Green power options will be investigated
Form E 62 (5/26/10) 4 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
Missed Prereq.
Missed Prereq. 18 Missed
Prereq.
Missed Prereq.
Missed Prereq.
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
MR Prereq 1 Storage & Collection of Recyclables
Y N/A Storage and collection of recyclables is currently in use at the facility
MR Credit 1.1 Building Reuse, Maintain Existing Walls, Floors & Roof
Y 3 The exterior envelope will be resued, with improvements, for this project
MR Credit 1.2 Building Reuse, Maintain Interior Nonstructural Elements
N 0 Interior materials will be new
MR Credit 2
Construction Waste Management, Divert 50% from Disposal (see Guiding Principle V ‐ Reduce Environmental Impact of Materials)
Y 1 A waste management plan will be developed
MR Credit 2 (cont'd)
Construction Waste Management, Divert 75% from Disposal
Y 1 A waste management plan will be developed
MR Credit 3 Materials Reuse N 0 Reuse of listed materials will not be utilzed
MR Credit 4
Recycled Content, 10% (post‐ consumer + ½ pre‐consumer). Use EPA's CPG for designated products to use)
Y 1 Materials with 10% recycled content will be utilized
MR Credit 4 Recycled Content, 20% (post-consumer + ½ pre-consumer)
Y 1 Materials with 20% recycled content will be utilized
MR Credit 5 Regional Materials, Extracted, Processed & Manufactured Regionally
Y 2 Regional materials will be utilized
EO 13423, Sec.
2.(d)
Biopreferred Products Y N/A Biopreffered materials will be utilizied
Predesign Schematic Design Design Development Construction Documents
LEED-NC Subtotal
Materials & Resources (MR) Maximum LEED NC 2009 Credits: 14
Sustainability Features PMIS Submission Construction
Form E 62 (5/26/10) 5 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
MR Credit 6 Rapidly Renewable Materials Y 1 Rapidly renewable materials will be utilized
MR Credit 7 Certified Wood (see Guiding Principle V ‐ Reduce Environmental Impact of Materials)
Y 1 Certified lumber will be utilized
Missed Prereq.
Missed Prereq. 11 Missed
Prereq.
Missed Prereq.
Missed Prereq.
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
EQ Prereq 1 Minimum IAQ Performance (See Guiding Principle IV, Enhance Indoor Environmental Quality)
Y N/A The renovation will meet
ASHRAE 62.1-2007
EQ Prereq 2 Environmental Tobacco Smoke (ETS) Control
Y N/A The facility is designated as smoke free
EQ Credit 1 Outdoor Air Delivery Monitoring
Y 1 Outdoor air monitoring will be provided
EQ Credit 2 Increased Ventilation Y 1 Ventilation rates will meet
ASHRAE 62.1-2007
EQ Credit 3.1
Construction IAQ Management Plan, During Construction (See Guiding Principle IV, Enhance Indoor Environmental Quality)
Y 1 An IAQ Management Plan will be utilized during construction
EQ Credit 3.2
Construction IAQ Management Plan, Before Occupancy (See Guiding Principle IV, Enhance Indoor Environmental Quality)
Y 1 All systems will be flushed out prior to occupance
EQ Credit 4.1
Low‐Emitting Materials, Adhesives & Sealants (See Guiding Principle IV, Enhance Indoor Environmental Quality)
Y 1 All sealants will be low VOC
EQ Credit 4.2
Low‐Emitting Materials, Paints & Coatings (See Guiding Principle IV, Enhance Indoor Environmental Quality)
Y 1 All paints and coatings will be low VOC
Schematic Design Design Development Construction Documents Construction Sustainability Features
LEED-NC Subtotal
Indoor Environmental Quality (EQ) Maximum LEED NC 2009 Credits: 15
PMIS Submission Predesign
Form E 62 (5/26/10) 6 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
EQ Credit 4.3
Low‐Emitting Materials, Flooring Materials (See Guiding Principle IV, Enhance Indoor Environmental Quality)
Y 1 All flooring systems will be low
VOC
EQ Credit 4.4 Low-Emitting Materials, Composite Wood & Agrifiber Products
Y 1 All lumber will be low VOC
EQ Credit 5 Indoor Chemical & Pollutant Source Control
Y 1 Indoor chemical and pollutant source controls will be utilized
MOU Guiding Principles & EO
13423 Moisture Control Y N/A
Building enevelope will be enhanced to comply with moisture control requirements
EQ Credit 6.1 Controllability of Systems, Lighting (See Guiding Principle IV, Enhance Indoor Environmental Quality)
Y 1 Interior lighting controls will be utilized
EQ Credit 6.2 Controllability of Systems, Thermal Comfort
Y 1 Thermal comfort controls will be utilized
EQ Credit 7.1 Thermal Comfort, Design (See Guiding Principle IV, Enhance Indoor Environmental Quality)
N 0 Project is not a major renovation
EQ Credit 7.2 Thermal Comfort, Verification Y 1
Buildng occupants will be surveyed 6to 18 months after occupancy regarding thermal comfort
EQ Credit 8.1
Daylight & Views, Daylight 75% of Spaces (See Guiding Principle IV, Enhance Indoor Environmental Quality)
Y 1 Daylight controls will be utilized
EQ Credit 8.2 Daylight & Views, Views for 90% of Spaces
Y 1 Vision glazing will provided for occupied spaces (Exception - Dispatch Room)
Missed Prereq.
Missed Prereq. 14 Missed
Prereq.
Missed Prereq.
Missed Prereq.
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
ID Credit 1.1 Innovation in Design: Provide Specific Title
Innovation & Design Process (ID) Maximum LEED NC 2009 Credits: 6
Sustainability Features Construction
LEED-NC Subtotal
Design Development Construction DocumentsSchematic DesignPMIS Submission Predesign
Form E 62 (5/26/10) 7 credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Y, N, NA Points Concisely explain how credit/requirement is met at this milestone:
Sustainability Features PMIS Submission Predesign Schematic Design Design Development Construction Construction Documents
ID Credit 1.2 Innovation in Design: Provide Specific Title
ID Credit 1.3 Innovation in Design: Provide Specific Title
ID Credit 1.4 Innovation in Design: Provide Specific Title
ID Credit 1.5 Innovation in Design: Provide Specific Title
ID Credit 2 LEED® Accredited Professional
0 0 0 0 0 0
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
RP Credit 1.1 Regional Priority Credit:
Region Defined
RP Credit 1.2 Regional Priority Credit:
Region Defined
RP Credit 1.3 Regional Priority Credit:
Region Defined
RP Credit 1.4 Regional Priority Credit:
Region Defined
0 0 0 0 0 0
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
Y, N, N/A Points Concisely explain how credit/requirement is met at this milestone:
MOU Guiding Principles & EO 13423 (pg. 3)
Complete Integrated Design Narrative During Predesign Only
N N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
LEED Certification Rating System Certified: 40-49 points, Silver: 50-59 points, Gold: 60-79 points, Platinum: 80+ points
For more information on LEED Certification and credits, visit www.usgbc.org
*** The federal requirement (from EISA 2007) that relates to these LEED‐NC credits is "Where life cycle cost effective, design systems to provide not less than 30 percent of the hot water demand through the installation and use of solar hot water heaters." The LEED credits for this item stipulates a percentage of total energy consumption to be provided by on site renewable sources. In some cases meeting the federal requirement will also meet the LEED requirement for these credits.
Sustainability Features PMIS Submission
* For new buildings of 5,000 GSF or more and major renovations to buildings greter than or equal to 5,000 GSF, contract with an independent Commissioning Authority and comply with ASHRAE 0‐2005, "The Commissioning Process". For smaller projects, comply with the requirements of LEED NC 2009, EA Prerequisite 1, "Fundamental Commissioning of the Building Energy Systems" (which allows the commissioning authority to be an employee of the design firm).
** For new building projects of 5,000 GSF or more, perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential) to show performance at least 30% better (20% for major renovations) than a code compliant similar building. If it can be shown that meeting the 30% performance standard for new construction (or 20% for major renovations) is not life cycle cost effective (over 40 years ‐ not 25 years per a recent regulatory change) then the project must incorporate the maximum energy savings that can be shown to be life cycle cost effective. For new building projects with a lower net construction value, an alternative method is to meet or exceed the minimum requirements prescribed by the ASHRAE Advanced Energy Design Guide (a much simpler prescriptive method for achieving the target) appropriate for the project's building. For buildings without an appropriate Advanced Energy Design Guide perform whole building energy simulation(s) in accordance with ASHRAE 90.1, 2007 (or IECC 2006 for residential).
Schematic Design
Regional Priority (RP) Maximum LEED NC 2009 Credits: 4
Design Development
Fulfillment of Guiding Principles for HPSB completes 18 LEED NC credits and 6 prerequisites.
Schematic Design Design Development Construction Documents
Construction Documents Construction
LEED-NC Subtotal
Construction
Non-LEED-NC Federal Requirements Maximum LEED NC 2009 Credits: 26
Predesign
LEED-NC Subtotal
Sustainability Features PMIS Submission Predesign
Form E 62 (5/26/10) 8