7_-_Contract_Price_Schedule_-_Blank.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
GATE - Repair Park Telecommunications Federal contract opportunity
Solicitation number
p15ps00589
Issued by
Department of the Interior National Park Service National Office

About this file

Price Schedule

View the file

Other files for this federal contract opportunity

Other files attached to GATE - Repair Park Telecommunications, newest first.
File Type Posted
SF-30_Amend_3.pdf PDF
QandA_Amend_3.pdf PDF
Amend_0002_SF-30_P15PS00589.pdf PDF
Amendment_0002_Pre-proposal_mtg_notes.pdf PDF
Amendment_0002_Description_of_Changes.pdf PDF
1_-_Amendment_000001_P15PS00589 _SF-30.pdf PDF
2_-_Amendment_000001_P15PS00589 _Attachment_1 _revised_1040.docx DOCX document
3_-_Amendment_000001_P15PS00589 _Preproposal_Site_Visit_Attendees.pdf PDF
5_-_Wage_Determination _NY3.txt TXT text file
2_-_SF-1442.pdf PDF
GATE_201049B_Drawings_Sheets_1-25.pdf PDF
3_-_Clauses_ _Provisions.docx DOCX document
4_-_Proposal_Submission_Package.docx DOCX document
GATE_201049B_Reference_Drawings.pdf PDF
1_-_RFP_Cover_Letter.doc DOC document
GATE_201049B_Drawings_Sheets_26-28.pdf PDF
GATE_201049B_Drawings_Sheets_35-39.pdf PDF
GATE_201049B_Drawings_Sheets_32-34.pdf PDF
GATE_201049B_Project_Scope.pdf PDF
5_-_Wage_Determination _NJ58.txt TXT text file
6_-_Map _Preproposal_Site_Visit_Location.pdf PDF
GATE_201049B_Drawings_Sheets_29-31.pdf PDF
Presolicitation_Notice _Revised_6-29-15.doc DOC document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: P15PS00589
PARK - PMIS: National Park Service
DEVELOPED AREA: Sandy Hook, Jacob Riis Park, and Great Kills Park
PROJECT TITLE: Repair Park Telecommunications Damaged by Hurricane Sandy
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options. Offerors are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for all line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 60 calendar days from the date of award. Prices will be evaluated by comparing offerors’ total prices including base line items and any options exercised at the time of award. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1DESIGN1LS
2FURNISH AND INSTALL TELECOMMUNICATIONS
INFRASTRUCTURE AT JACOB RIIS PARK1LS
3FURNISH AND INSTALL TELECOMMUNICATIONS
INFRASTRUCTURE AT GREAT KILLS PARK1LS
4FURNISH AND INSTALL DUCTBANK AT SANDY HOOK UNIT1LS
5FURNISH AND INSTALL FIBER OPTIC CABLE BETWEEN BUILDING 26 AND VARIOUS BUILDINGS AT SANDY HOOK UNIT1LS
6FURNISH AND INSTALL FIBER OPTIC CABLE BETWEEN BUILDING 341 AND BUILDINGS 436, 438, AND LIFEGUARD STATION AT SANDY HOOK UNIT1LS
7FURNISH AND INSTALL FIBER OPTIC CABLE BETWEEN BUILDING 341 AND BUILDINGS 338 AND 340 AT SANDY HOOK UNIT1LS
8FURNISH AND INSTALL FIBER OPTIC CABLE BETWEEN BUILDING 26 AND BUILDING 438 AT SANDY HOOK UNIT1LS
9FURNISH AND INSTALL FIBER OPTIC CABLE
BETWEEN BUILDING 438 AND THE FEE COLLECTION BUILDING AT SANDY HOOK UNIT1LS
10UNEXPLODED ORDNANCE SURVEY AND MONITORING AT SANDY HOOK UNIT1LS
TOTAL BASE PRICE (Contract Line Item Number 1 through 10) ------------------------------------$0
11OPTION A: FURNISH AND INSTALL DUCTBANK AND FIBER OPTIC CABLE TO GUNNISON BEACH CENTER PAVILION AT SANDY HOOK UNIT1LS
12OPTION B: FURNISH AND INSTALL DUCTBANK AND FIBER OPTIC CABLE
TO BEACH CENTER E COMFORT STATION AT SANDY HOOK UNIT1LS
13OPTION C: FURNISH AND INSTALL DUCTBANK AND FIBER OPTIC CABLE
TO BEACH CENTER D PAVILION AT SANDY HOOK UNIT1LS
14OPTION D: FURNISH AND INSTALL CONDUIT AND FIBER OPTIC CABLE
TO BEACH CENTER C PAVILION AT SANDY HOOK UNIT1LS
15OPTION E: FURNISH AND INSTALL DUCTBANK AND FIBER OPTIC CABLE TO BEACH CENTER B PAVILION AT SANDY HOOK UNIT1LS
16OPTION F: CUT DOWN EXISTING PIT WALLSAND INSTALL NEW TOP WITH LIFTING MANHOLE LID AT SANDY HOOK UNIT1LS
17OPTION G: FURNISH AND INSTALL DUCTBANK SOUTH OF BUILDING 438 AT SANDY HOOK UNIT1LS
18OPTION H: FURNISH AND INSTALL REDUNDANT FIBER OPTIC CABLE FROM BUILDING 102 AT SANDY HOOK UNIT1LS
19OPTION J: FURNISH AND INSTALL REDUNDANT FIBER OPTIC CABLE FOR BUILDINGS 34, 32, 35, 67, 1, AND WATER BOOST STATION AT SANDY HOOK UNIT1LS
20OPTION K: FURNISH AND INSTALL REDUNDANT FIBER OPTIC CABLE FOR BUILDINGS 47, 75, 73, 72, 71, 41, 66, 84, 64, 29, 30, AND 28 AT SANDY HOOK UNIT1LS
21OPTION L: FURNISH AND INSTALL REDUNDANT FIBER OPTIC CABLE FOR BUILDINGS 53, 58, 20, 338, AND 340 AT SANDY HOOK UNIT1LS
22OPTION M: FURNISH AND INSTALL REDUNDANT FIBER OPTIC CABLE FOR BEACH CENTERS AT SANDY HOOK UNIT1LS
23OPTION N: FURNISH AND INSTALL FIBER OPTIC CABLE FOR SOUTH FEED TO BUILDINGS 436 AND LIFEGUARD STATION AT SANDY HOOK UNIT1LS
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 11 through 23) ------------------------------------$0
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 23) -----------$0
All measurement and payment information is included in the project specifications, Section 012700.

Page &P of &N Contract Price Schedule Printed &D

QUOTES

Fiber Optic Cable Quotes
Show MeGraybar (Distributor for Corning)TESSCOdeepsurplus.comdiscount-low-voltage.comGraybar
888-519-9505817-213-1595800-472-7373949-643-5004201-596-2625
Brandon MillerRussFrank Panuccio
joe@showmecables.combrandon.miller@graybar.comsalessupport@tessco.com
12 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations$0.89
24 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations1.02$2.40
36 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
48 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations$1.38
60 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
72 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
84 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
96 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
108 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
204 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
120 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
228 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
132 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
144 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
180 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
300 Strand Indoor/Outdoor Tight Buffered OS2 Rated Single Mode Fiber Optic Cable and Terminations
12 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations
24 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations
36 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations
48 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations
72 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations
96 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations
108 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations
120 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations
144 Strand Submersible Rated Single Mode Fiber Optic Cable and Terminations

mailto:joe@showmecables.commailto:brandon.miller@graybar.commailto:salessupport@tessco.com

CABLE MATERIAL UNIT PRICING

CABLE UNIT PRICING
Previous EstimateChange On 5/5/15 Est
Total StrandsCost / LF / StrandTotal Cost / LFCost / LF / StrandTotal Cost / LF
12$ 0.05$ 0.59
24$ 0.03$ 0.71
36$ 0.03$ 0.94
48$ 0.02$ 0.97
60$ 0.02$ 1.21
72$ 0.03$ 2.25$ 0.02$ 1.44
84$ 0.02$ 1.70
96$ 0.02$ 1.94
108$ 0.02$ 2.18
132$ 0.02$ 2.67
216$ 0.02$ 4.37
240$ - 0

File details come from the government source that posted it. Updated .