P09 Breakout Pricing Request 589A5-15-117B SPS (1 PG).pdf

PDF 69 KB Posted

Attached to
Y1DZ-- 589A5-15-117B, CORRECT SPS DESIGN ISSUES New (VA-21-00070541)
Solicitation number
36C25521R0102
Issued by

About this file

This document contains a federal contract opportunity notice and related project memo. The federal contract opportunity is for a renovation project at the Colmery O'Neil VA Medical Center in Topeka, KS to correct design issues in the Sterile Processing Services area. The scope of work includes modifying an existing air handling unit and supply ductwork, adding a return air grille, modifying supply and exhaust ductwork to the cart wash area, removing abandoned DX coils and components, connecting sterilizers to central steam, installing a new hazardous materials doorway, adding an N+1 exhaust fan, and providing testing, adjusting, and balancing of the HVAC system. The estimated cost is between $1,000,000 to $5,000,000 and the completion time from notice to proceed is estimated at 182 calendar days. The project location is the Topeka VAMC. The related project memo provides additional details on pricing requests from the general contractor for specific renovation items at the SPS Lab, including breakdowns for labor and materials.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1730 Walnut Street | Kansas City MO 64108 Phone 816.221.1411 | Fax 816.221.1429 | lankfordfendler.com

From: Alan W. Lankford, P.E.

Date: April 6, 2021

Project: SPS Lab – VA Topeka

Re: Bid Breakdown

Cc: Rob Junk – Junk Architects Project No: 5078.00

In review of the bid for Addendum 1 we would request the General Contractor provide a comprehensive Bid Breakdown for General self-performed labor (Davis Bacon hourly rates) and material (LF take-offs or SF take offs) along with any Supplier and/or Sub-contractor quotes with material (LF take-offs or SF take offs) and labor (Davis Bacon hourly rates) breakout pricing for the following items, as outlined below.

AHU Cooling Coil Replacement Only (do not include chilled water piping or installation costs beyond the control valves of the AHU)

1. DX coil removal from AHU

2. Chilled Water coil material

3. Chilled Water coil installation

4. Chilled Water control valve material

5. Chilled Water control valve installation

6. AHU control modifications for coil change to Chilled Water

CAV-3 Ductwork Modifications:

1. Removal and put-back of lay-in tile ceiling

2. Removal and capping of duct for existing supply duct feed

3. Provide and install new fire damper

4. Provide and install new supply duct feed

5. Wall patching for fire damper installation

Add Return Grille in Vestibule B011:

1. Provide and install new return grille into bottom of existing return ductwork

2. Ceiling patching and painting around new return grille

Total Air Balance & Testing:

1. Performance of Total Air Balance of entire suite HVAC system.

2. Provide all necessary labor for NEBB certified HVAC TAB services for this project. All work to be performed during normal working hours. Price shall not include any replacement of motors, belts or sheaves. Duct leak testing, pretesting, indoor-air quality testing, domestic water or sound and vibration testing is excluded.

If you have any questions concerning this, please do not hesitate to call.

PROJECT MEMO