This notice provides information about a forthcoming federal contract solicitation for corrective design work at the Colmery O'Neil VA Medical Center in Topeka, Kansas. The scope of work includes modifying existing HVAC systems, adding and modifying ductwork, removing abandoned equipment, connecting sterilizers to the central steam system, installing new doors and hardware, adding an exhaust fan, and testing, adjusting and balancing the HVAC system. The completion period is estimated to be 182 calendar days from notice to proceed. The estimated value is between $1,000,000 and $5,000,000. The solicitation is expected to be posted on or around July 30, 2021 for this work to replace and return sterile processing services to service at the Topeka VAMC.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment

No. Date

Specifications – Volume 1

For: RELOCATE STERILE PROCESSING

SERVICE

At: VA Medical Center, Topeka KS

2200 SW Gage Boulevard Topeka, KS 66622

Solicitation No.

Project No.:

589A5-15-117

Issue: 01/20/2017

Open Bids:

Property of Department of Veterans Affairs

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

00 01 10-1 of 5

DEPARTMENTOFVETERANSAFFAIRS
VHAMASTERSPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

SECTION # SECTION TITLE DATE

DIVISION 00 - SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

010000GeneralRequirements11-15
013216.15ProjectSchedules(SmallProjects–Design/Bid/Build04-13
013323ShopDrawings,ProductData,andSamples07-15
013526SafetyRequirements10-14
014219ReferenceStandards07-15
014529TestingLaboratoryServices06-15
015816TemporaryInteriorSignage07-15
016200ProductOptions(NA)
017329CuttingandPatching(NA)
017419ConstructionWasteManagement09-13
018113SustainableConstructionRequirements09-15
019100GeneralCommissioningRequirements10-15
019105

Fire Door and Hardware Commissioning 01-17

DIVISION 02 – EXISTING CONDITIONS

024100Demolition02-15
028213.19AsbestosFloorTileandMasticAbatement09-15
028333.13Lead-BasedPaintRemovalandDisposal08-11

DIVISION 03 – CONCRETE

03 30 53 (Short-Form) Cast-in-Place Concrete 02-16

DIVISION 04 – MASONRY

040513MasonryMortaring02-16
040516MasonryGrouting02-16
042000UnitMasonry02-16
TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

00 01 10-2 of 5

SECTION # SECTION TITLE DATE

DIVISION 05 – METALS

053100SteelDecking02-16
055000MetalFabrications07-14

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-15

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

071113BituminousDampproofing02-16
075423ThermoplasticPolyolefin(TPO)Roofing10-15
076000FlashingandSheetMetal07-14
078400Firestopping02-16
079200JointSealants10-15

DIVISION 08 - OPENINGS

081113HollowMetalDoorsandFrames01-13
083113AccessDoorsandFrames02-16
085619PassWindows02-16
087100DoorHardware01-16
087113AutomaticDoorOperators02-16
088000Glazing10-15

DIVISION 09 – FINISHES

090516SubsurfacePreparationforFloorFinishes02-15
092216Non-StructuralMetalFraming05/16
092900GypsumBoard11-14
093013Ceramic/PorcelainTiling09-15
095100AcousticalCeilings12-15
096516ResilientSheetFlooring02-16
099100Painting01-16
099659High-BuildGlazedCoatings07-14
TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

00 01 10-3 of 5

SECTION # SECTION TITLE DATE

DIVISION 10 – SPECIALTIES

101400Signage10-15
102113ToiletCompartments12-15
102116ShowerandDressingCompartments11-11
102123CubicleCurtainTracks05-15
102600WallandDoorProtection10-15
102800Toilet,Bath,andLaundryAccessories02-16
104413FireExtinguisherCabinets08-14

DIVISION 11 – EQUIPMENT

11 71 01 Medical Washing and Sterilizing Equipment 02-11

DIVISION12–FURNISHINGS
(notused)

DIVISION 13 - SPECIAL CONSTRUCTION

(not used)

DIVISION 14– CONVEYING EQUIPMENT

(not used)

DIVISION 21- FIRE SUPPRESSION

210800CommissioningofFireSuppressionSystem05-15
211313Wet-PipeSprinklerSystems06-15

DIVISION 22 – PLUMBING

220511CommonWorkResultsforPlumbing09-15
220512GeneralMotorRequirementsforPlumbingEquipment.09-15
220519MetersandGagesforPlumbingPiping09-15
220523General-DutyValvesforPlumbingPiping09-15
220533HeatTracingforPlumbingPiping09-15
220711PlumbingInsulation09-15
220800CommissioningofPlumbingSystems06-13
221100FacilityWaterDistribution09-15
221123DomesticWaterPumps09-15
TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

00 01 10-4 of 5

221300FacilitySanitaryandVentPiping09-15
221400FacilityStormDrainage09-15
221500GeneralServiceCompressed-AirSystems09-15
223111WaterSofteners09-15
223300ElectricDomesticWaterHeaters09-15
224000PlumbingFixtures09-15
226719.16Reverse-OsmosisWaterEquipment09-15

SECTION # SECTION TITLE DATE

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

230511CommonWorkResultsforHVAC02-15
230512GeneralMotorRequirementsforHVACandSteamGeneration

Equipment 11-10

230541NoiseandVibrationControlforHVACPipingandEquipment02-15
230593Testing,Adjusting,andBalancingforHVAC02-15
230711HVACandBoilerPlantInsulation02-15
230800CommissioningofHVACSystems06-13
230923Direct-DigitalControlSystemforHVAC09-11
232113HydronicPiping09-12
232213SteamandCondensateHeatingPiping02-15
232300RefrigerantPiping02-15
233100HVACDuctsandCasings03-13
233400HVACFans02-15
233600AirTerminalUnits02-15
233700AirOutletsandInlets02-15
234000HVACAirCleaningDevices02-12
237300IndoorCentral-StationAir-HandlingUnits04-11
238123Computer-RoomAir-Conditioners04-11
238216AirCoils04-11

DIVISION 25 – INTEGRATED AUTOMATION

(not used)

DIVISION 26 – ELECTRICAL

260511RequirementsforElectricalInstallations01-16
260513MediumVoltageCables01-17
260519Low-VoltageElectricalPowerConductorsandCables07-13
260526GroundingandBondingforElectricalSystems12-12
260533RacewayandBoxesforElectricalSystems05-14
TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

00 01 10-5 of 5

260800CommissioningofElectricalSystems06-13
260923LightingControls05-14
261219PadMounted,Liquid-Filled,MediumVoltageTransformers12-15
261316Medium-VoltageFusibleInterrupterSwitches.01-17
262416Panelboards05-14
262726WiringDevices01-16
265100InteriorLighting08-14

SECTION # SECTION TITLE DATE

DIVISION 27 – COMMUNICATIONS

270511RequirementsforCommunicationsInstallations06-15
270526GroundingandBondingforCommunicationsSystems06-15
270533RacewaysandBoxesforCommunicationsSystems06-15
270800CommissioningofCommunicationsSystems06-15
271000Control,CommunicationandSignalWires06-15
271100TelecommunicationsRoomFittings06-15
271500CommunicationsHorizomtalCabling01-16
271501SiteSpecificStructuredCabling
273131VoiceCommunicationsSwitchingandRoutingEquipment-Extension06-15
275116PublicAddressandMassNotificationSystems10-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

280500CommonWorkResultsforElectronicSafetyandSecurity09-11
280513ConductorsandCablesforElectronicSafetyandSecurity09-11
280526GroundingandBondingforElectronicSafetyandSecurity09-11
280528.33ConduitsandBackboxesforElectronicSafetyandSecurity09-11
280800CommissioningofElectronicSafetyandSecuritySystems06-13
282300VideoSurveillance09-11
282600ElectronicPersonalProtectionSystem09-11
283100FireDetectionandAlarm10-11

DIVISION 31 – EARTHWORK

312000Earthwork10-12
312323.33FlowableFill10-12
TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

00 01 15 - 1 of 2

SECTION000115
LISTOFDRAWINGS
THEDRAWINGSLISTEDBELOWaccompanytheseSpecificationsandformapartoftheContract
DocumentsforthisProject.

SEQUENCE DWG # DRAWING TITLE

GENERALDRAWINGS:
1. GI000COVERSHEET
2. GI001PROJECTINFORMATION
CIVILDRAWINGS:
3.CS100CIVILSITEPLAN

ARCHITECTURAL DRAWINGS:

4. AD100DEMOLITIONPLAN
5. AI100NEWBASEMENTPLAN
6. AI102REFLECTEDCEILINGPLAN
7. AI400WALLSECTIONS
8. AI401PARTITIONTYPES
9. AI600INTERIORROOMELEVATIONS
10. AI601INTERIORROOMELEVATIONS
11. AI602INTERIORROOMELEVATIONSANDDETAILS
12. AI603SIGNAGE
13. AF610DOORANDFINISHSCHEDULE
14. HA600ATC-ABATEMENT
15. HA601ATC-ABATEMENT

FIRE PROTECTION DRAWINGS:

16. FX1-100BASEMENTPLAN-FIREPROTECTION
17. FX1-101BASEMENTPLAN-FIREPROTECTION

MECHANICAL DRAWINGS:

18. MD1-100BASEMENTPLAN-MECHANICALDEMOLITION
19. MG1-100MECHANICALDETAILS
20. MG1-101MECHANICALDETAILS
21. MG1-102MECHANICALDETAILS
22. MG1-103MECHANICALDETAILS
23. MG1-200MECHANICALSCHEDULES
24. MG1-300MECHANICALSYMBOLS
25. MH1-100BASEMENTPLAN-MECHANICAL
26. MH1-101BASEMENTPLAN-MECHANICAL
27. MP1-100BASEMENTPLAN-MECHANICALPIPING
TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

00 01 15 - 2 of 2

PLUMBINGDRAWINGS:
28. PD1-100BASEMENTPLAN-PLUMBINGDEMOLITION
29. PG1-100PLUMBINGDETAILSANDRISERS
30. PG1-300PLUMBINGSYMBOLSANDSCHEDULES
31. PP1-100BASEMENTPLAN-PLUMBING
32. PP1-101BASEMENTPLAN-PLUMBING

SEQUENCE DWG # DRAWING TITLE

ELECTRICALDRAWINGS:
33. ED1-100BASEMENTPLAN-ELECTRICALDEMOLITION
34. EG1-500ELECTRICALDETAILS
35. EG1-501ELECTRICALDETAILS
36. EG1-600ELECTRICALSCHEDULES
37. EL1-102BASEMENTPLAN-ELECTRICALLIGHTING
38. EP1-101BASEMENTPLAN-ELECTRICALPOWER
39. ES1-101SITEPLAN-ELECTRICAL
40. ET1-100BASEMENTFLOORPLAN-ELECTRICALTELECOMMUNICATIONS
41. ET1-101BASEMENTFLOORPLAN-ELECTRICALTELECOMMUNICATIONS
42. ET1-200TELECOMMUNICATIONSDETAILS
43. EY1-100BASEMENTPLAN-ELECTRICALSYSTEMS
44. EY1-101BASEMENTPLAN-ELECTRICALSYSTEMS

- - - E N D - - -

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 1 of 27 1

SECTION010000
GENERALREQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.10 RESTORATION

1.11 PHYSICAL DATA

1.13 AS-BUILT DRAWINGS

1.14 USE OF ROADWAYS

1.15 TEMPORARY USE OF EXISTING ELEVATORS

1.16 TEMPORARY TOILETS

1.17 AVAILABILITY AND USE OF UTILITY SERVICES

1.18 NEW TELEPHONE EQUIPMENT

1.19 TESTS

1.20 INSTRUCTIONS

1.21 GOVERNMENT-FURNISHED PROPERTY

1.22 RELOCATED EQUIPMENT ITEMS

1.23 SAFETY SIGN

1.25 FINAL ELEVATION DIGITAL PHOTOGRAPHIC IMAGES

1.26 CONSTRUCTION PROJECT MANAGEMENT SYSTEM (CPMS):

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 2 of 27 2

SECTION010000
GENERALREQUIREMENTS

1.1 SAFETY REQUIREMENTS

A Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building construction operations, including demolition and removal of existing sitework or structures, and furnish labor and materials and perform work for the remodeling work as indicated in the Drawings.

B. Visits to the site by Bidders may be made only by appointment with the Contracting

Officer’s Representative (herein afterwards referred to as the COR).

C. Authorized representatives of Junk Architects, and their designated professional consultants, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by the COR.

D. The Contracting Officer’s Representative is the duly authorized representative of the government’s Contracting Officer (CO). References throughout the Drawings or within the Specifications to the CO, the Contracting Officer’s Technical Representative (COTR), or to the “Resident Engineer” will have the same meaning and intent as reference to the

COR.

E. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the COR.

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 3 of 27 3

All employees of the General Contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 4 of 27 4

1.3 STATEMENT OF BID ITEM(S)

BID ITEM 1; (BASE BID) This project shall include the demolition and abatement of certain area of the basement of Building 1 and construction of all work shown in the documents for a new Sterile Processing System Laboratory, as well as a small area north and east of the main work area. This small area is for a computer room/IT/server room designated as B42A in the documents. The time frame allowed for this work is 160 calendar days.

BID ITEM 2; ALTERNATE NO. 1 (DEDUCT): This item includes all the work in BID ITEM 1, except remove all work associated with the computer/IT/server room designated as

B42A in the documents. Included within BID ITEM 2 is the raised floor, painting, ceiling, lighting, plumbing and air conditioning, and all aspects of work associated with these items. The time frame for this work is zero (0) calendar days as it is not on the critical path.

BID ITEM 3; ALTERNATE NO. 2 (DEDUCT): This item includes all work in BID ITEM 2, except all finishes in room B013B, Men’s Toilet/Lockers. For purposes of this alternate, finishes are described as floor covering, base, ceramic wall tile, gypsum board on the inside face of the room and the ceiling. The portion of the concrete floor topping that was to be removed in and in front of the shower is included in this alternate bid. This alternate bid also includes, plumbing, lighting and switching in this room. Mechanical and plumbing shall be as follows: Plumbing is to be roughed in only. This alternate bid includes supplying and installing fixtures, carriers, blocking, etc. Mechanical ducts and grills are not included in this alternate bid. Ductwork and grills are to remain in the base bid so as to allow for air balancing. The time frame for this work is negative fourteen (14) days, bringing the total contract time period to 146 calendar days.

BID ITEM 4; ALTERNATE NO. 3 (DEDUCT): This item includes all work in BID ITEM 3, except the wall protection and corner guards throughout the project. For purposes of this alternate bid includes all labor and materials for the wall protection and corner guards shown in the plans and on the finish schedule. The time frame for this work is negative two (2) calendar days.

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 5 of 27 5

BID ITEM 5: Alternate NO. 4 (DEDUCT): This item includes all work in BID ITEM 4, except the way-finding signage as defined in Specification Section 10 14 00. The time frame for this work is zero (0) calendar days.

1.4SPECIFICATIONSANDDRAWINGSFORCONTRACTOR
A.Drawingsandcontractdocumentsmaybeobtainedfromthewebsitewherethe

solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the COR so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the COR.

4. VA reserves the right to close down or shut down the project site and order General

Contractor’s employees off the premises in the event of a national emergency. The

General Contractor may return to the site only with the written approval of the COR.

C. Guards:

1. Guards are not required to be provided by the Contractor for this Project.

D. Key Control:

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 6 of 27 6

1. The General Contractor shall provide duplicate keys and lock combinations to the

COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked

“Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the COR upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of COR.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify the COR and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 7 of 27 7

F.MotorVehicleRestrictions
1.Vehicleauthorizationrequestshallberequiredforanyvehicleenteringthesiteand

such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of permits may be issued for General Contractor and its employees for parking in designated areas only.

3. Parking for construction workers must be provided for by the Contractor off-premises of the facility. The COR may make available one or more parking stalls for use by the Contractor’s vehicles, at an area within the parking lot as designated by the facility.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on

Government premises to areas authorized or approved by the COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the COR and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the COR, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the COR, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the COR. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 8 of 27 8 them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be as determined by the

COR.

E. Workmen are subject to rules of the Medical Center, as applicable to their conduct.

Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of construction materials, debris, standing construction equipment and vehicles at all times.

F. Execute the Work so as to interfere as little as possible with normal functioning of the

Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the existing building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by the COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical

Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by the COR. All such actions shall be coordinated with the COR or the Utility Company involved:

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 9 of 27 9

1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the

Government and not the Contractor.

H.Phasing:
1.TheMedicalCentermustmaintainitsoperation24hoursaday7daysaweek.

Therefore, any interruption in service must be scheduled and coordinated with the

COR to ensure that no lapses in operation occur. It is the Contractor's responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks.

2. To insure such executions, Contractor shall furnish the COR with a schedule of approximate dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such dates to insure accomplishment of this work agreeable to COR and Contractor, as follows:

1. PHASING OF THE WORK: The Work is to be executed within a single phase, once on-site work begins it is to continue until all work has been completed.

I. Protection of Existing Facilities

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 10 of 27 10 access. Coordinate alteration work in areas occupied by Department of Veterans

Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding Subparagraph 1 will be temporarily vacated while alterations are performed.

J. When a building area is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

K. Utilities Services: Maintain existing utility services for Medical Center at all times.

Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by the COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of the COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan approved in writing by the COR. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 11 of 27 11

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of the proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of

Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the

Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

M. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 12 of 27 12 equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

N. Coordinate the work for this contract with other construction operations as directed by the COR. This includes the scheduling of traffic and the use of roadways, as specified in

Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the COR. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required to remain as is, to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by the Contractor and the COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of the COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE

CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88).

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 13 of 27 13

C. Re-Survey: Seven days before expected partial or final inspection date, the Contractor and the COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by the

COR.

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 14 of 27 14

2. Items not reserved shall become property of the Contractor and be removed by

Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government.

When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9PROTECTIONOFEXISTINGVEGETATION,STRUCTURES,EQUIPMENT,&UTILITIES
A.TheContractorshallpreserveandprotectallstructures,equipment,andvegetation

(such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the COR.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the COR may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles,

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 15 of 27 15

"Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged. Existing work

(walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems

(including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4 and VAAR 852.236-88) and

"DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 PHYSICAL DATA

A. Data and information furnished or referred to below is for the Contractor's information.

The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations.

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 16 of 27 16

B. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated. Bidders are expected to examine site of work; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make destructive investigation of concealed conditions of their own at site.

1.12LAYOUTOFWORK
A.TheContractorshalllayouttheworkfromestablishedbaselinesandbenchmarks,as

indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the COR. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the

COR until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the COR may direct them to be replaced and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, or parking lots, are in accordance with lines and elevations shown on contract drawings.

1.13 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 17 of 27 17

B. All variations shall be shown in the same general detail as used in the contract drawings.

To insure compliance, as-built drawings shall be made available for the COR's review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.14 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical Center property.

1.15 TEMPORARY USE OF EXISTING ELEVATORS

A. During construction, use of existing elevators for handling building materials and

Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a. Entrance jambs, heads soffits and threshold plates.

b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c. Finish flooring.

1.16 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

B. Contractor may have for use of Contractor's workmen, such toilet accommodations as may be assigned to Contractor by the COR. Contractor shall keep such places clean and

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 18 of 27 18 be responsible for any damage done thereto by Contractor's workmen. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.

1.17 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the

Contractor from existing outlets and supplies. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the COR, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted.

Maintain minimum temperatures as specified for various materials:

D. Obtain electricity by connecting to the Medical Center electrical distribution system, at no cost to the Contractor.

E. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system.

Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at

COR’s discretion) of use of water from Medical Center's system.

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 19 of 27 19

1.18 NEW TELEPHONE EQUIPMENT

A. The contractor shall coordinate with the work of installation of telephone equipment by others. This work shall be completed before the building is turned over to VA.

1.19 TESTS

A. As per specification section 23 05 93 the contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of the COR or designated representative. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 20 of 27 20 which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.

1.20 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.

C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed training to assigned Department of Veterans Affairs personnel in the operation and complete maintenance for each piece of equipment. All such training will be at the job site. These requirements are more specifically detailed in the various technical sections. Instructions for different items of equipment that are

TopekaVAMedicalCenterIssueDate:01/20/17
RELOCATESTERILEPROCESSINGSERVICEProject#589A5-15-117

01 00 00 - 21 of 27 21 component parts of a complete system, shall be given in an integrated, progressive manner. All instructors for every piece of component equipment in a system shall be available until instructions for all items included in the system have been completed.

This is to assure proper instruction in the operation of inter-related systems.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .