P09 Architectural Details.pdf

PDF 665 KB Posted

Attached to
C219--Project 629-24-103 AE Install Bariatric Capable Patient Lifts throughout SLVHCS
Solicitation number
36C25623R0037
Issued by

View the file

Other files

File Type Posted
01152-1AI143-B2.pdf PDF
01667-2AI142-G2.pdf PDF
01150-1AI142-C2.pdf PDF
01661-2AI142-D2.pdf PDF
01663-2AI142-E2.pdf PDF
Prism Medical Bill of Materials2.pdf PDF
01665-2AI142-F2.pdf PDF
03275-6AI141-M1A.pdf PDF
36C25623R0037 0001.pdf PDF
01144-1AI141-B2.pdf PDF
01149-1AI142-C1.pdf PDF
01662-2AI142-E1.pdf PDF
03276-6AI141-M2.pdf PDF
Ceiling Lift Technical Summary2.pdf PDF
01147-1AI142-B1.pdf PDF
01145-1AI141-C1.pdf PDF
01156-1AI144-B2.pdf PDF
01154-1AI143-C2.pdf PDF
01146-1AI141-C2.pdf PDF
03277-6AI141-M3.pdf PDF
01664-2AI142-F1.pdf PDF
01151-1AI143-B1.pdf PDF
01155-1AI144-B1.pdf PDF
01666-2AI142-G1.pdf PDF
01148-1AI142-B2.pdf PDF
01143-1AI141-B1.pdf PDF
01660-2AI142-D1.pdf PDF
01153-1AI143-C1.pdf PDF
P09 Ceiling Lift Technical Summary.pdf PDF
P09 C450 Owner Manual.pdf PDF
P09 Building 2 Second Floor Plan - Area E1 and E2.pdf PDF
P09 Bariatric Room Request List.pdf PDF
P09 01 45 00 Quality Control.pdf PDF
P09 01 35 26 Safety Requirements.pdf PDF
P09 01 33 23 Shop Drawings Product Data Samples.pdf PDF
P09 Building 6 Second Floor Plan Area M1.pdf PDF
P09 Building 2 Second Floor Plans - Area E1 and E2.pdf PDF
36C25623R0037.docx DOCX document
P09 Building 1 Third Floor Plan.pdf PDF
P09 00 01 00 VA Master Specs Table of Contents.pdf PDF
P09 Building 6 Third Floor Plan Area M2.pdf PDF
P09 01 00 00 General Requirements.pdf PDF
P09 Building 6 Second Floor Plan M2.pdf PDF
P09 Building 6 First Floor Plan M1.pdf PDF
P09 Building 2 Fourth Floor Plan - Area F1 and F2.pdf PDF
P09 Building 1 Second Floor PLan.pdf PDF
P09 Building 2 Second Floor Plan - Area D1 and D2.pdf PDF
P09 Building 2 Second Floor Plan - Area F1 and F2.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PATIENT uFT TRACK

& HANGER

— P3001 UNISTRUT

CEILING LINE

Installation and Structural Details

Detail 1: Inpatient (1), Outpatient (3), and Transitional Living (6) Buildings Detail

Nf \- • .t • : ••• y

'-st \

P550oT UNIsTRUT x LONG lir 13 E)43 BOLTS —

W/ 3 112'

EMBEDMENT (TYP.

0F4)

PROVIDE P1000

UNISTRUT

LONGITUDINAL

BRACING AS RE=

PI 000 UNISTRUT

UNISTRUT FRAMES

4.-0" 0.0. 0)

(Th DETAIL v7---v/-, 5 3/4" = 1-0"

Detail 2: D&T (2) Building Details

SEE DETAIL 5/0SF506

FOR SUPPORT

FRAMING IN BLDGS

01,03,06

45 DEC

ANGLE

BRACKET

CLG TRIM @

SUPPORT PENDANT

SEE RCP

FOR CLG

44 HEIGHT

PLATE / STRUCT DECK

CONNECTION SYSTEM

PER MFR'S

RECOMMENDATIONS

DIAGONAL BRACING

PER MFR'S

RECOMMENDATIONS

HANGER WIRE AS REQ'D

CLG AS SCHEDULED

RECESSED

CLG LIFT TRACK

46 DEC

ANGLE 1

BRACKET --__

CLG TRIM

SUPPORT PENDANT

SEE RCP

FOR CLG

4.0 HEIGHT

SCALE: 1 1/2" = C303:4-LIFT TRH ACT TO ACT-02

c33s-un TRK ACT TO ACT-01 SCALE: 1 1/2'' =1.-0"

PATIENT LIFT TRACK - RECESSED

PATIENT LIFT TRACK - SUSPENDED

SEE DETAIL 510SF506

FOR SUPPORT

FRAMING IN BLOCS

01,03,06

PLATE I STRUCT I

DECK CONNECTION

SYSTEM PER MFR'S

RECOMMENDATIONS

DIAGONAL BRACING

PER MFR'S

RECOMMENDATIONS

HANGER WIRE AS REQ'D

CLG AS SCHEDULED

Page 1
Page 2

File details come from the government source that posted it. Updated .