View the file

Other files

File Type Posted
01152-1AI143-B2.pdf PDF
01667-2AI142-G2.pdf PDF
01150-1AI142-C2.pdf PDF
01661-2AI142-D2.pdf PDF
01663-2AI142-E2.pdf PDF
Prism Medical Bill of Materials2.pdf PDF
01665-2AI142-F2.pdf PDF
03275-6AI141-M1A.pdf PDF
36C25623R0037 0001.pdf PDF
01144-1AI141-B2.pdf PDF
01149-1AI142-C1.pdf PDF
01662-2AI142-E1.pdf PDF
03276-6AI141-M2.pdf PDF
Ceiling Lift Technical Summary2.pdf PDF
01147-1AI142-B1.pdf PDF
01145-1AI141-C1.pdf PDF
01156-1AI144-B2.pdf PDF
01154-1AI143-C2.pdf PDF
01146-1AI141-C2.pdf PDF
03277-6AI141-M3.pdf PDF
01664-2AI142-F1.pdf PDF
01155-1AI144-B1.pdf PDF
01666-2AI142-G1.pdf PDF
01148-1AI142-B2.pdf PDF
01143-1AI141-B1.pdf PDF
01660-2AI142-D1.pdf PDF
01153-1AI143-C1.pdf PDF
P09 Ceiling Lift Technical Summary.pdf PDF
P09 C450 Owner Manual.pdf PDF
P09 Building 2 Second Floor Plan - Area E1 and E2.pdf PDF
P09 Bariatric Room Request List.pdf PDF
P09 01 45 00 Quality Control.pdf PDF
P09 01 35 26 Safety Requirements.pdf PDF
P09 01 33 23 Shop Drawings Product Data Samples.pdf PDF
P09 Building 6 Second Floor Plan Area M1.pdf PDF
P09 Building 2 Second Floor Plans - Area E1 and E2.pdf PDF
36C25623R0037.docx DOCX document
P09 Building 1 Third Floor Plan.pdf PDF
P09 00 01 00 VA Master Specs Table of Contents.pdf PDF
P09 Building 6 Third Floor Plan Area M2.pdf PDF
P09 01 00 00 General Requirements.pdf PDF
P09 Architectural Details.pdf PDF
P09 Building 6 Second Floor Plan M2.pdf PDF
P09 Building 6 First Floor Plan M1.pdf PDF
P09 Building 2 Fourth Floor Plan - Area F1 and F2.pdf PDF
P09 Building 1 Second Floor PLan.pdf PDF
P09 Building 2 Second Floor Plan - Area D1 and D2.pdf PDF
P09 Building 2 Second Floor Plan - Area F1 and F2.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

NNNNNN

NNNNNN

S

S

S

B

XE

A

XC

4.2

G

3B105

3B118

REF:2B118

3B104

3B114

3B116

3B122

TELECOM

3B123D

3B103

SERVICE

BAY

3B123

3B101

NORM

ELEC

3B123B

EMER

ELEC

3B123A

3B115

3B141

REF:2B143

3B143

REF:2B143

3B145

REF:2B145

3B147

REF:2B145

3B149

REF:2B145

3B151

REF:2B145

3B140

REF:2B140

3B142

REF:2B140

3B144

REF:2B140

3B146

REF:2B140

3B148

REF:2B140

3B150

REF:2B140

3B151A

REF:2B143A

3B149A

REF:2B143A

3B147A

REF:2B143A

3B145A

REF:2B143A

3B141A

REF:2B143A

3B143A

REF:2B143A

3B148A

REF:2C142A

3B146A

REF:2C142A

3B144A

REF:2C142A

3B142A

REF:2C142A

3B140A

REF:2C142A

3B130A

REF:2B132D

3B130C

REF:2B132D

3B130E

REF:2B132D

3B107

3B100

3B112

3B102

3B124

3B126A

3B-C01A

3B-C01

3B-C01B

3B-C02

REF:2B-C02

3B-C05

3B130H

REF:2B130F

SECURITY

3B123C

FTG3gFTG3g

FTG3gFTG3g

FTG3g

FTG13

FCD2a

FTG3g FTG3g FTG3g

FCD2aFCD2aFCD2a

9' - 0"

9' - 0"

9' - 0"

9' - 0" 9' - 0"

9' - 0"

9' - 0"

2A I1

-D

1A

I1

-B

XB.1

XA

2.5

A.4

6.3

5.1

Y10

3B130B

REF:2B132C

3B130D

REF:2B132C

ELEV

BP-5

ELEV

BP-6

ELEV

BP-7

ELEV

BS-1

ELEV

BS-4

STAIR

STB-1

3B-C04B

3B-C02A

3B129A

CLST

3B129B

3B126

3B131

3B129

3B130

FTG2cFTG2cFTG2cFTG2cFTG2cFTG2cFTG2cFTG2cFTG2cFTG2c

9' - 0"

9' - 0" FTG3gFTG3gFTG3g FTG13

FCD2b

9' - 6"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

FCD2a

FTG2c

FTG2c

FTG2c

FTG13

9' - 6"

FCD2a

FCD2a

FCD2a

FCD2a

9' - 6"

9' - 6"

FTP1r

9' - 0"

9' - 6"

FTP2o

9' - 0"

FTP2g FTP2g FTP2g

FTP2o

FTP1r

FTP1r

9' - 6"

9' - 0"

FTG3gFTG3g FTP1h

9' - 6"

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FCD2a

FCD2a

FCD2a

9' - 0"

FTP1h FTP1h

9' - 0"

FTG3g

FTP2j

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4b

FTW4b

FTG3g FTG3g

FTG3gFTG3g

1AI143-B1

1AI143-C1

F

D

C

9' - 6"

9' - 6"

9' - 0"

9' - 0"

9' - 0"

1AI430

F4

C

C

C

C

C

C

C

C

C

C

C

C

3B128

3B127A

3B128A

3B127

3B125

3B120

FCD2a

FCD2b

1.4

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

FTW4a

8' - 4"

8' - 6"

FTG2c

9' - 0"9' - 0"

9' - 0"

9' - 0"

ECW-A

ECC-A

9' - 0" FTG3g

9' - 0"

9' - 0"

E.6

A6

0AI520

PATIENT

3B148

CCTV

XD

B3

0AI520

B4

0AI520

B4

0AI520

B3

0AI520

B4

0AI520

D3

0AI520

3B-C04A

FCD2a FCD2a

FCD2aFCD2a

FTG13

FCD2b

FCD2b

FTG13

FTG2c

FTG2c

FTG2c

FTG2c

FCD2a

FCD2aFCD2a

FCD2a

SHAFT

SHB01

SHAFT

SHB03

FCD2a

6"

1' - 5"

1' - 0"

1'

- 6

FCD2a

FCD2a

9' - 0"

9' - 0"

10' - 6" 10' - 6"

10' - 6" 10' - 6"

11' - 0" 11' - 0"

11' - 0" 11' - 6"

FTG2c

FTG2c

3C126

D1

0AI521

C1

0AI521

1'

- 0

1'

- 6 " 303

B

B

A

A

9' - 6"

D1

0AI521

C1

0AI521

C1

0AI521

1AI143-B2

1AI143-C2

AI

3-

A1 1A

I1

-B

0A I1

-B

1A

I1

-B

9' - 0"

FCD2a

FCD2a 3B127B

3B128B

9' - 0"

9' - 0"

9' - 0"

9' - 0" 331 331

2'

- 0

9' - 6" FTG2cFTP2l FTP2l

1' - 6" 2' - 6"

1' - 6" 2' - 6"

2'

- 4

2'

- 4

2'

- 1

0"

E1

0AI522

TYP DET @ OPEN'GS

3B130 AND 3B131

A

A

EQ

EQ

6' - 0" 6' - 0" 2' - 4" 6"

4' - 0" 1' - 0"

EQ

EQ

2'

- 2

"2

1"

1' - 6"

EQ

EQ

3' - 3" 1' - 0"

B.6

4.8

8"

1' - 7"

ALIGN

MTT1

MTT1

MTT1

MTT1

MTT1

MTT1

FCD2a

P-51 FCD2a

FCD2a

FCD2a

FCD2a

MTT1 FIX: ALTERNATE 8.32

ADDITIONAL LIGHTING

FTH3bFTH3b

4.9

FTG2c

FCW3 FCW3

FTG2c FTG2c

FCW3 FCW3

FTG2c FTG2c

FCW3 FCW3

FTG2c FTG2c

FCW3 FCW3

FTG2c FTG2c

FCW3 FCW3

FTG2c FTG2c

FCW3 FCW3

FCW3

FCW3FCW3

FTG2cFTG2c

FCW3FCW3

FCW3

FCD2a

FCW3

FCW3FCW3

FTG2cFTG2c

FCW3FCW3

FCW3

FCD2a

FCW3

FCW3FCW3

FTG2cFTG2c

FCW3FCW3

FCD2a

FCW3FCW3FCW3

9' - 6"9' - 6"9' - 6"9' - 6"9' - 6"9' - 6"

9' - 6"9' - 6"9' - 6"9' - 6"9' - 6"9' - 6"

9' - 0"

9' - 0"

9' - 0"

9' - 0"

1AI423

B6

1AI422

C5

3B-C03

FTP4d FTP4d FTP4d

8' - 6"

9' - 0"

8' - 6"

9' - 6"

9' - 6"

9' - 6" FTP1h

FTP1h

310310

FTG3gFTG3g

3B155C

C1

0AI521

C1

0AI521

E1

0AI522

D1

0AI527

D1

0AI527

A1

0AI527

A1

0AI527

C1

0AI521

1'

- 0

Q D2 D1

E2 E1

F2 F1

G2 G1

A2

A4

A5

A1

A6

B1

C1 C2

B2

H

J1 J2

L

K

M1 M2 M3

P

N1 N2

A7

D3

E3

F3

R1

R4

R2 R3

A3

PLAN

NORTH

DATE

LOCATION

CHECKED DRAWN

PROJECT TITLE PROJECT NUMBER

DOCUMENT SET PACKAGE

DRAWING NUMBERAPPROVED: PROJECT DIRECTOR

DRAWING TITLEARCHITECT/ENGINEERS:CONSULTANTS:

REVISIONS: DATE

B

A

D

C

E

VA FORM 08-6231

O N

E

EI

G H

T

IN

C H

O

N E

FO

O

T O

N E

Q U

AR

TE

R

IN

C H

O

N E

FO

O

T O

N E

H A L

F

IN

C H

O

N E

FO

O

T

TH

R

EE

Q U

AR

TE

R S

IN

C

H

O N

E

FO

O T

TH

R

EE

IN

C H

ES

O N

E

FO

O T

O N

E

IN

C H

F

O R

TY

F

E E T

(1

0'

6"

6"

0'

0'

123456

F

B

A

D

C

E

F

O N

E

SI

X T

EE

N

TH

IN

C

H

O N

E

FO

O T

O N

E

AN

D O

N E

H

AL

F

IN

C H

ES

O N

E

FO

O T

6"

BUILDING NUMBER

1AI143-B1

BLDG 1 THIRD FLOOR REFLECTED CEILING

PLAN-AREA B1

JG KOFebruary 29, 2012

01629-HS2-401SLVHCS REPLACEMENT MEDICAL

CENTER PROJECT

NEW ORLEANS, LOUISIANA

SCHRENK & PETERSON CONSULTING ENGINEERS / CIVIL

KORDA/NEMETH ENGINEERING / STRUCTURAL

BR+A CONSULTING ENGINEERS / MECH, ELECT, PLUMBING, LOW VOLTAGE

ARCHITECTURAL ENGINEERING / PLUMBING

SCALES ASSOCIATES / FIRE PROTECTION

DESMAN ASSOCIATES / PARKING

CODE CONSULTANTS, INC. / CODE CONSULTANT

THE SEXTANT GROUP / AV & ACOUSTICAL

HAMMER DESIGN ASSOCIATES / FOOD SERVICE

PYBURN & ODOM / ABATEMENT

TATA & HOWARD / TANK CONSULTANT

Department of

Veterans Affairs

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

WP_08

CONSTRUCTION DOCUMENTS 1

FULLY SPRINKLERED

I.S.C. GROUP, INC. / IRRIGATION

DAN EUSER WATER ARCHITECTURE, INC. / WATER FEATURE

SCALE: 1/8" = 1'-0"

BLDG 1 THIRD FLOOR REFLECTED CEILING PLAN - AREA B1BLDG 1 THIRD FLOOR REFLECTED CEILING PLAN - AREA B1BLDG 1 THIRD FLOOR REFLECTED CEILING PLAN - AREA B1BLDG 1 THIRD FLOOR REFLECTED CEILING PLAN - AREA B11111

REFER TO LEVEL 2 FOR DIMENSIONS,

CODED NOTES, DETAIL TAGS UNLESS

OTHERWISE NOTED THIS SHEET.

REFER TO NEXT SHEETREFER TO NEXT SHEETREFER TO NEXT SHEETREFER TO NEXT SHEET

FOR GENERAL RCP NOTESFOR GENERAL RCP NOTESFOR GENERAL RCP NOTESFOR GENERAL RCP NOTES

AND RCP SHEET NOTESAND RCP SHEET NOTESAND RCP SHEET NOTESAND RCP SHEET NOTES

GYP BD CEILING EXTENTS REDUCED IN NURSING CORRIDORS. CLG MATL

REVISED TO ACOUSTIC TILE. SIX INCH STEP IN CLG HGT SHOWN IN SKETCHES

FOR ADDENDUM 4.0 IS ELIMINATED. ASSOCIATED 'AXIOM' TRANSITION REVISED

ACCORDINGLY.

NO CHANGE TO LIGHTING FIXTURE TYPES OR LAYOUT EXCEPT MINOR

DIMENSIONAL REVISIONS AS REQD FOR EXPANDED EXTENTS OF LAY-IN CLG.

CLG ACCESS PANELS ELIMINATED AT PATIENT ROOM DOOR ENTRIES.

REFER TO REVISED CEILING PROFILE DIAGRAMS AND REFERENCED DETAILS.

INTERIOR BACK-UP WALL, OPENINGS, SOFFITS, ETC

AROUND PERIMETER OF BUILDING REVISED TO

COORDINATE W/ EWP-06 SKIN COST REDUCTIONS. NEW

AND/OR REVISED PLAN/SECTION/RCP DETAILS AS

INDICATED ON PLANS AND REFLECTED CEILING PLANS.

11 BULL 015A - PRE-AWARD 7/26/2013

12 BULL 015A - VE 7/26/2013

CHANGES CLOUDED IN RED - BULL 039A

- 2/26/2015

P-41

P-41

P-41 AT HORIZONTAL AND

VERTICAL SURFACES OF GWB

CEILING & ACCESS PANELS

TO BE PAINTED TO MATCH

RFI 01719: Shaft size to be revised in bulletin 15a to match opening in structural drawings

RFI 05345: GWB pocket detail acceptable in lieu of A5/0AI520 and

C2/0AI520.

RFI 05215.1: Frame and insulate soffit around movable partition per attached sketch.

BULL 039A 2/26/2015

1A I1

-B

RFI 6487

Control Joint

File details come from the government source that posted it. Updated .