This is a General Decision wage determination document (NY20260018, effective 01/02/2026) issued by the U.S. Department of Labor establishing prevailing wage rates for highway construction projects in Steuben County, New York. The determination supersedes the previous General Decision NY20250018.

The document specifies prevailing wage rates and fringe benefits for multiple trade classifications including electricians, operating engineers, ironworkers, laborers, plumbers, pipefitters, and truck drivers. For example, standard electricians earn $43.40 per hour with $31.72 in fringes (ELEC0139-003, effective 06/01/2025), while electricians performing line construction work earn $31.72-$52.86 depending on classification. Operating engineers in heavy and highway construction range from $36.61-$61.38 per hour depending on equipment group. Laborers in Heavy & Highway Zone III earn $35.26-$35.46 with fringe benefits of $23.85 plus paid holidays. Truck drivers are classified into three groups with rates ranging from $25.96-$26.52 per hour. The document includes detailed classifications for each trade, specifying equipment, tools, or work types corresponding to each wage rate tier. Paid holidays are defined for each classification and include New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, and Christmas Day, with varying conditions regarding work requirements before and after the holiday. The determination also references Executive Order 13706 regarding paid sick leave (1 hour per 30 hours worked, up to 56 hours annually) and Executive Order 13658 establishing a minimum wage floor of $13.30 per hour for 2025. The document includes appeal procedures for wage determination disputes directed to the Branch of Wage Surveys or Branch of Construction Wage Determinations within the Department of Labor.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: NY20260018 01/02/2026

Superseded General Decision Number: NY20250018

State: New York

Construction Type: Highway

County: Steuben County in New York.

HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date

0 01/02/2026

ELEC0139-003 06/01/2025

Rates Fringes

ELECTRICIAN......................$ 43.40 31.72

ELEC1249-003 05/05/2025

ELECTRICIAN (LINE

CONSTRUCTION: LIGHTING AND

TRAFFIC SIGNAL Including any and all Fiber Optic Cable necessary for Traffic Signal

Systems, Traffic Monitoring systems and Road Weather information systems)

Flagman.....................$ 31.72 7%+27.65

Groundman (Truck Driver)....$ 42.29 7%+27.70

Groundman Truck Driver

(tractor trailer unit)......$ 47.57 7%+27.70

Lineman & Technician........$ 52.86 7%+31.90

Mechanic....................$ 42.29 7%+27.70

FOOTNOTE:

a. New Year's Day, Memorial Day, Independence Day, Labor

Day, Thanksgiving Day, Christmas Day, plus President's

Day, Good Friday, Decoration Day, Election Day for the

President of the United States and Election Day for the Governor of the State of New York, provided the employee works the day before or the day after the holiday.

ENGI0158-033 07/01/2025

Operating Engineer:

EXCAVATING AND PAVING

GROUP 1....................$ 41.26 34.85+a

GROUP 2....................$ 40.79 34.85+a

GROUP 3....................$ 40.10 34.85+a

GROUP 4....................$ 36.61 34.85+a

MASTER MECHANIC............$ 43.26 34.85+a

HEAVY AND HIGHWAY

GROUP 1....................$ 55.38 35.75+a

GROUP 2....................$ 54.68 35.75+a

GROUP 3....................$ 51.81 35.75+a

GROUP 4....................$ 61.38 35.75+a

GROUP 5....................$ 59.88 35.75+a

GROUP 6....................$ 58.38 35.75+a

GROUP 7....................$ 56.81 35.75+a

TUNNEL AND SHAFT

GROUP 1....................$ 58.43 35.00+a

GROUP 2....................$ 57.21 35.00+a

GROUP 3....................$ 54.42 35.00+a

GROUP 4....................$ 51.41 35.00+a

MASTER MECHANIC............$ 60.84 35.00+a

For EXCAVATION AND PAVING:

a. PAID HOLIDAYS: New Year's Day; Memorial Day;

Independence

Day; Labor Day; Thanksgiving Day; Christmas Day, regardless of the day of the week on which the holiday may fall, provided the employee works either on the work day immediately preceding the holiday or on the scheduled work day immediately following the holiday.

EXCAVATION AND PAVING CLASSIFICATIONS

GROUP 1: Asphalt paver; automatic fine grader; backhoe

(except tractor mounted, rubber tired); blacktop plant

(automated); cableway; caisson auger; central mix concrete plant (automated); cherry picker- over 5 ton capacity;

crane; cranes and derricks (steel erection); dragline;

dual drum paver; front end loader (4 cu. yd. and over);

hoist,(Tow or 3 drum); pile driver; power grader with elevation loader attachment; quarry master (or equivalent);

shovel; slip form paver; tractor drawn belt-type loader;

truck crane tunnel shovel; excavator, all purpose hydraulically operated

GROUP 2: Backhoe (tractor mounted, rubber tired);

bituminous spreader and mixer; blacktop plant (non automated);

boring machine; cage hoist; central mix plant (non automated) and all concrete batching plants; cherry picker, 5 tons and under; compressor (4 or less) exceeding 2000 CFM combined capacity; concrete paver over 16s; concrete pump;

crusher;

drill rigs (tractor mounted); front end loader (under 4 cu.

yds); hi- pressure boiler (15 lbs and over); hoist (one drum); Kolman plant loader and similar type loaders;

maintenance engineer; maintenance grease man; mechanical slurry machine; mixer for stabilized base self propelled;

monorail machine; plant engineer; power broom; power grader; pump crete; ready mix concrete plant; road widener;

roller (all above sub-grade); side boom; tractor scraper;

tractor with dozer and or pusher; trencher; winch

GROUP 3: Compressors (4 not to exceed 2000 CFM combined capacity; or 3 or less with more than 1200 CFM but not to exceed 2000 CFM); compressors (any size but subject to other provisions for compressors); dust collectors;

generators; welding machines (4 of any type or combination); concrete pavement spreaders and finishers;

conveyor; drill (core); drill (well); electric pump used in conjunction with well point systems; farm tractor with accessories; fine grade machine; fork lift; gunite machine;

hammers-hydraulic-self propelled; locomotive; post hole digger and post driver; pumps (regardless of motive power, not more than 4 in number not to exceed 20"" in total capacity); submersible electric pumps when used in lieu of well points, tractor with towed accessories; vibratory compactor; vibro tamp; well point

GROUP 4: Compressor (any size, but subject to other provisions for compressors); dust collectors; generators;

welding machines (3 or less of any type or combination);

concrete mixer (16s and under), concrete saw-self propelled; fireman; form tamper; mulching machine; power heaterman; pumps regardless of motive power no more than in number not to exceed 12"" in total capacity; revinius widener; steam cleaner; tractor

GROUP 5: Master Mechanic

For HEAVY AND HIGHWAY CONSTRUCTION:

b. PAID HOLIDAYS: New Years Day, Memorial Day, Day, Labor Day, Thanksgiving Day, Christmas Day provided the employee works the working day before and the working day after the holiday

POWER EQUIPMENT OPERATOR CLASSIFICATIONS (HEAVY/HIGHWAY):

GROUP 1: Asphalt Curb Machine, Self Propelled, Slipform, Automated Concrete Spreader (CMI Type), Automatic Fine

Grader, Backhoe (Except Tractor Mounted, Rubber Tired), Backhoe Excavator Full Swing (CAT 212 or similar type), Back Filling Machine, Belt Placer (CMI Type), Blacktop

Plant (Automated), Boom truck , Cableway, Caisson Auger, Central Mix Concrete Plant (Automated), Concrete Curb

Machine, Self Propelled, Slipform, Concrete Pump, Crane, Cherry Picker, Derricks (steel erection), Dragline, Overhead Crane (Gantry or Straddle type), Pile Driver, Truck Crane, Directional Drilling Machine, Dredge, Dual

Drum Paver, Excavator (All Purpose Hydraulically

Operated)

(Gradall or Similar), Front End Loader ( 4 cu. yd. and

Over), Head Tower (Sauerman or Equal), Hoist (Two or

Three

Drum), Holland Loader, Maintenance Engineer, Mine Hoist, Mucking Machine or Mole Pavement Breaker(SP) Wertgen; PB-and similar type, Power Grader, Profiler (over 105 H.P.)

Quad 9, Quarry Master (or equivalent), Scraper, Fireman, Fork Lift, Form Tamper, Grout Pump, Gunite Machine, Hammers

(Hydraulic self-propelled), Hydra-Spiker, ride-on, Hydraulic Pump (jacking system), Hydro-Blaster (Water), Mulching Machine, Oiler, Parapet Concrete or Pavement, Shovel, Side Boom, Slip Form Paver, Tractor Drawn, BeltType

Loader, Truck or Trailer Mounted Log , Chipper (Self

Feeder), Tug Operator (Manned Rented Equipment Excluded), Tunnel Shovel

GROUP 2: Asphalt Paver, Backhoe (Tractor Mounted, Rubber

Tired), Bituminous Recycler Machine, Bituminous Spreader and Mixer, Blacktop Plant (NonAutomated), Blast or Rotary

Drill (Truck or Tractor Mounted), Boring Machine, Cage

Hoist, Central Mix Plant (NonAutomated) and All Concrete

Batching Plants, Cherry Picker (5 tons capacity and under), Concrete Paver (Over 16S), Crawler Drill, Self-contained, Crusher, Diesel Power Unit, Drill Rigs, Tractor Mounted, Front End Loader (Under 4 cu. yd.), Greaseman/Lubrication

Engineer, HiPressure Boiler (15 lbs. and over), Hoist

(One

Drum), Hydro-Axe, Kolman Plant Loader and Similar Type

Loaders, L.C.M. Work Boat Operator, Locomotive Mixer (for stabilized base selfpropelled), Monorail Machine, Plant

Engineer, Profiler (105 H.P. and under), Grinder, Post

Hole

Digger and Post Driver, Power Broom (towed), Power

Heaterman, Power Sweeper, Revinius Widener, Roller (Grade and Fill), Scarifier, ride-on, Shell Winder, Skid steer loader (Bobcat or similar), Span-Saw, ride-on, Steam

Cleaner, Pug Mill, Pump Crete Ready Mix Concrete Plant

Refrigeration Equipment (for soil stabilization)Road

Widener, Roller (all above subgrade), Sea Mule, Self-contained Ride-on Rock Drill, Excluding Air-Track

Type

Drill, Skidder, Tractor with Dozer and/or Pusher, Trencher.

Tugger Hoist, Vermeer saw (ride on, any size or type), Winch, Winch Cat

GROUP 3: A Frame Winch Hoist on Truck , Articulated Heavy

Hauler, Aggregate Plant, Asphalt or Concrete Grooving, Machine (ride on), Ballast Regulator, Ride-on Boiler

(used in conjunction with production), Bituminous Heater, self-propelled, Boat (powered), Cement and Bin Operator, Compressors, Dust Collectors, Generators, Pumps, Welding

Machines, Light Plants, Heaters (hands-off equipment), Concrete Pavement Spreader and Finisher, Concrete Paver or

Mixer (16S and under), Concrete Saw (self-propelled), Conveyor, Deck Hand, Directional Drill Machine Locator, Drill, (Core), Drill, (Well,) Farm Tractor with accessories, Fine Grade Machine, Tamper, ride-on, Tie

Extractor, ride-on, Tie Handler, ride-on, Tie Inserter, ride-on, Tie Spacer, ride-on, Tire Repair, Track Liner, ride-on, Tractor, Tractor (with towed accessories), Vibratory Compactor, Vibro Tamp, Well Point

GROUP 4: Tower Cranes

GROUP 5: Cranes 50 tons and over

GROUP 6: Cranes 49 tons and below

GROUP 7: Master Mechanic

For TUNNEL AND SHAFT:

b. PAID HOLIDAYS: New Year's Day, Memorial Day, Day, Labor Day, Thanksgiving Day, Christmas Day, regardless of the day of the week on which the Holiday may fall, provided the employee works the working day before and the working day after the holiday

TUNNEL AND SHAFT CLASSIFICATIONS

GROUP 1: Automated concrete spreader (CMI or equivalent);

automated fine grade machine (cmi); backhoe; belt placer

(cmi or similar); blacktop spreader (automated);

cableway;

caisson auger; central mix plant (automated); cherry picker

(5 tons); concrete curb machine (self-propelled slipform);

concrete pump; crane; crane shaft; crane underground;

cranes and derricks (steel erection); dragline; dredge;

dual drum paver; excavator (all purpose-hydraulicly operated gradall or similar); fork lift (factory rated

15' and over); front end loader (4cu yd and over); head tower

(sauerman or equal); hoist; shaft; hoist (two or three drum); holland loader; maintenance engineer (shaft and tunnel); mine hoist; mining machine (mole and similar types); mucking machine or mose; overhead crane (gantry or straddle type); pile driver; power grader; Quad 9, quarry master (or equivalent); scraper; shovel; side boom; slip form paver; tripper/maintenance engineer (shaft and tunnel); tractor drawn belt-type loader; truck crane;

truck or trailer mounted log chipper (self feeder); tug operator

(manned rented equipment excluded); tunnel shovel

GROUP 2: Automated central mix concrete plant; backhoe

(topside); backhoe (tractor mounted,rubber tired);

bituminous spreader and mixer; blacktop plant (non automated); blast or rotary drill (truck or tractor mounted); boring machine; cage hoist; central mix plant

(non automated) and all concrete batching plants; cherry picker (5 tons capacity and under); compressors (4 or less exceeding 2000 CFM combined capacity); concrete paver

(over

16s); concrete pump; crane (topside); crusher; diesel power unit; drill rigs, tractor mounted; front end loader

(under

4 cu. yds); grayco epoxy machine; hi-pressure boiler (15 lbs and over); hoist (one drum); hoist (two or three drum)

(topside); kolman plant loader and similar type loaders;

L.C.M. work boat operator; locomotive; maintenance engineer

(topside); maintenance greaseman; mixer (for stabilized base self-propelled); monorial machine; plant engineer;

personnel hoist; pump crete; ready mix concrete plant;

refrigeration equipment (from soil stabilization); road widener; roller (all above sub-grade); sea mule;

shotcrete machine; shovel (topside); tractor with dozer and/or pusher; trencher; tugger hoist; tunnel locomotive;

welder;

winch; winch cat

GROUP 3: ""A"" frame truck; ballast regulator (ride on);

compressors (4 not to exceed 2000 cfm combined capacity;

or

3 or less with more than 1200 cfm but not to exceed 2000 cfm); compressors (any size but subject to other provisions for compressors; dust collectors; generators; pumps;

welding machines; light plants (4 of any type or combination); concrete pavement spreaders and finishers;

conveyor; drill (core); drill (well); electric pump used in conjunction with well point system; farm tractor with accessories; fine grade machine; fork lift (under 15 ft);

ground pump over 5 cu. ft (manufacturers rating); gunite machine; hammers (hydraulic self propelled); hydra-spiker

(ride on); hydra blaster (water); hydra blaster;

motorized form carrier; post hole digger and post driver; power sweeper; roller (grade and fill); scarifer (ride on);

span saw (ride on); submersible electric pump (when used in lieu of well points); tamper (ride on); tie extractor (ride on);

tie handler (ride on); tie inserter (rider on); tie spacer

(ride on); track liner (ride on); tractor with towed accessories; vibratory compactor; vibro tamp; well point aggregate plant; boiler (used in conjunction with production); cement and bin operator; compressors (3 or less not to exceed 1200 cfm combined capacity);

compressors

(any size; but subject to other provisions for compressors); dust collectors; generators; pumps; welding machines; light plants (3 or less of any type or combination); concrete paver or mixer (16s and under);

concrete saw (self propelled); fireman; form tamper;

greaseman; hydraulic pump (jacking system); junior engineer; light plants; mulching machine; oiler; parapet concrete or pavement grinder; power broom (towed); power heaterman (when used for production); revinius widener;

shell winder; steam cleaner; tractor

GROUP 4: Crane, friction or lattice type with boom length feet and over

IRON0006-002 07/01/2024

TOWNSHIPS OF CANISTEO, FREEMONT, GREENWOOD, HARTSVILLE,

HORNELL, HORNELLSVILLE, HOWARD, JASPER, TROUPSBURG, WEST

UNION

Ironworkers:

Fence Erector...............$ 34.06 30.80

Ironworker (Rodmen).........$ 35.49 32.30

IRON0033-009 07/01/2025

TWPS OF ADDISON, AVOCA, BATH, BRADFORD, CAMERON, CAMPBELL,

CATON, COHOCTON, CORNING, DANSVILLE, ERWIN, HORNBY,

LINDLEY,

PRATTSBURG, PULTENEY, RATHBONE, THURSTON, TUSCARORA,

URBANA,

WAYLAND, WAYNE WOODHULL

Ironworkers:

Ornamental, Reinforcing

Stone Derrickman, Rigger, Rodman, Structural

Machinery Movers, Fence

Erectors, Precast Concrete

Erector.....................$ 35.75 30.80

Sheeter.....................$ 36.00 30.80

LABO0785-022 07/01/2023

HEAVY & HIGHWAY

ZONE III

LABORER

GROUP 1.....................$ 35.26 23.85+a

GROUP 2.....................$ 35.46 23.85+a

a. PAID HOLIDAYS: New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Christmas

Day, provided the employee works the working day before and the working day after the holiday.

LABORER CLASSIFICATIONS

GROUP 1: Laborers; Flaggers; Outboard and Hand Boats;

Bull

Float; Chain Saw; Concrete Aggregate Bin; Concrete bootman;

Gin Buggy; Hand or Machine Vibrator; Jackhammer; Mason

Tender; Mortar Mixer; Pavement Breaker; Handlers of all

Steel Mesh; Small Generators for laborers' tool;

Installation of Bridge Drainage Pipe; Pipelayers;

Vibrator type Rollers; Tamper; drill Doctor; Tail or Screw

Operator on Asphalt Paver; Water Pump Operators (1- 1/2"" and single diaphram); Nozzle (asphalt, gunnite, seeding and sandblasting); Laborers on Chain Link Fence Erection;

rock

Splitter and Power Unit; Pusher Type Concrete Saw and all other Gas, Electric, Oil and Air Tool Operators; Wrecking

Laborers

GROUP 2: All Rock or Drill Machine Operators (except quarry master and similar type); Acetylene Torch Operator;

Asphalt

Raker; Powderman; Blasters; Form Setters; Stone or

Granite

Curb Setters

PLUM0267-001 05/01/2019

TOWNS OF ADDISON, BATH, BRADFORD, CAMPBELL, CANTON,

CORNING,

ERWIN, HORNBY, LINDLEY, PULTENEY, RATHBONE, THURSTON,

TUSCARORA, URBANA AND WAYNE COUNTIES

Plumber, Pipefitter, Steamfitter (including HVAC work)............................$ 35.51 24.57

TEAM0317-004 06/01/2025

HEAVY & HIGHWAY

Townships of Avoca, Canisteo, Cohocton, Dansville, Freemont, Greenwood, Hartsville, Hornell, Howard, Jasper, Prattsburg, Pulteney, Troupsburg, West Union, Wheeler.

TRUCK DRIVER

GROUP 1.....................$ 35.48 31.58+a

GROUP 2.....................$ 35.83 31.58+a

a. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas

Day, provided the employee works the working day before the working day after the holiday.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Yardman; Pickups; panel trucks; flatboy materials trucks (straight jobs); single axle dump trucks;

dumpsters;

receivers; greasers; truck tireman, tandems; batch truck;

mechanics; semi- trailors; low-boy trucks; asphalt distributor trucks; agitator; mixer trucks and dumpcrete type vehicles; truck mechanic; fuel truck

GROUP 2: Specialized earth moving equipment - euclid type or similar off-highway equipment, where not self-loaded;

straddle (ross) carrier; self-contained concrete mobile unit; off-highway tandem back dump; twin engine equipment;

double-hitched equipment where not self-loaded

TEAM0529-002 05/01/2025

STEUBEN COUNTY: Towns of Addison, Avoca, Bath, Bradford, Cameron, Campbell, Caton, Corning, Erwin, Hornby, Howard, Lindley, Pulteney, Rathbone, Thurston, Tuscarora, Urbana, Wayne, Wheeler and Woodhull

TRUCK DRIVER

GROUP 1.....................$ 25.96 15.91+a

GROUP 2.....................$ 26.03 15.91+a

GROUP 3.....................$ 26.52 15.91+a

FOOTNOTES:

a. PAID HOLIDAYS: New Year's day, Memorial Day, Day, Labor Day, Thanksgiving Day, Christmas Day, provided the employee works the working day before and the working day after the holiday.

TRUCK DRIVERS CLASSIFICATIONS:

GROUP 1: Flat Bed Truck (Single Axle); Dump Trucks

(Under

10 yds Single Axle); Stake Body Truck (Single Axle);

Dumpster (Single Axle)

GROUP 2: Dump Truck (Over 10 yds); Transit Mix (Under 5 yds); Transit Mix (Over 5 yds); Flat or Stake Body

(Tandem); A-Frame/Winch Trucks; Dry Batch Truck; Truck

Mounted Sweeper and Vac Trucks; Dumpster (Tandem)

GROUP 3: Euclid-Type; Off Highway Equipment-Back or

Double

Bottom Dump Trucks (Over 20 Tons); Straddle Trucks;

Pusher;

Articulate Dumped Trucks; Low Boy Trailers; Semi

Trailers;

Asphalt Distributors; Fuel Truck

SUNY1988-001 06/22/1988

LABORER..........................$ 11.02 2.12

ROOFER...........................$ 11.62 3.21

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick

Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the

EO

is available at https://www.dol.gov/agencies/whd/government-contracts.

Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between

January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive

Order 13658 does not apply to contracts subject only to the

Davis-Bacon Related Acts regardless of when they were awarded.

If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.

Union Rate Identifiers

A four-letter identifier beginning with characters other than

""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be

Plumbers.

0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.

Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.

Union Average Rate Identifiers

The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:

UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of

Ohio.

The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.

A UAVG rate will be updated once a year, usually in

January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.

Survey Rate Identifiers

The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-

6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.

?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has discretion to update such rates under 29 CFR 1.6(c)(1).

State Adopted Rate Identifiers

The ""SA"" identifier indicates that the classifications prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007

01/03/2024. SA reflects that the rates are state adopted.

ME

refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1) Has there been an initial decision in the matter? This can be:

a) a survey underlying a wage determination

b) an existing published wage determination

c) an initial WHD letter setting forth a position on a wage determination matter

d) an initial conformance (additional classification and rate) determination

On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD

Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:

Branch of Wage Surveys

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage

Determinations.

Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with decision can request review and reconsideration from the

Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part

7).

Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of interested party's position and any information (wage payment data, project description, area practice material, etc.)

that the requestor considers relevant to the issue.

3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

Washington, DC 20210.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .