P01 - Drawings - 528A6-22-665 Rebuild B29a Parking Lot.pdf
PDF 20 MB Posted
- Attached to
- Y1DA--528A6-22-665 Rebuild B29A Parking Lot
- Solicitation number
- 36C24226B0047
About this file
This document is a comprehensive set of construction drawings for the "Rebuild Building 29A Parking Lot" project at Bath VA Medical Center in Bath, New York (Project Number 528A6-22-665). The project scope includes full reconstruction and configuration of Parking Lot 16, encompassing approximately 15,500 square feet of full-depth pavement, mill and overlay work, concrete curb and sidewalk installation, ADA parking access improvements, pavement markings, site lighting, drainage improvements, retaining wall reconstruction, and new stairs to access Building 30. The project is being executed by ACELA Architects + Engineers, PC (2633 Moravian Avenue, Allentown, PA 18103) as the Architect/Engineer of Record, with a professional engineer certification from Jeremie M. Schadler (NY PE #075290) dated February 3, 2025.
The 19-sheet drawing set includes general notes, site plans, maintenance and protection of traffic plans, erosion and sedimentation control plans, civil engineering details (layout, grading, utility, and stormwater profiles), construction details (concrete, sidewalk, pavement, utility trenches, and drainage structures), structural details for Building 30, electrical site plans with lighting photometrics, and site schedules. Key construction requirements include maintaining minimum one-lane roadway access and pedestrian circulation throughout the project, coordination with the functioning hospital campus, staging of improvements to minimize disruption, and compliance with erosion control measures per the Construction & Erosion and Sedimentation Pollution Control Plan. Pavement reconstruction involves full-depth construction with specified stone base, asphalt binder and top courses, and mill-and-overlay sections where applicable. The project includes 99 total parking spaces (3 ADA, 1 ADA van accessible, 95 regular), new lighting poles with photometric control, drainage infrastructure with yard inlets and storm piping, and retaining walls with concrete stairs and aluminum railings for Building 30 access.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA U.S. Department of Veterans Affairs
LIST OF DRAWINGS
PROJECT CONTACT DIRECTORY
LOCATION MAP
CIVIL ENGINEERS
APPROVALS
Approved by Medical Center Director Approved by Director of Facility Management Service
Approved by Project COR Approved by Medical Director
Approved by Infection Control Approved by Safety Officer
Approved by Project CO
Approved by
PROJECT INFORMATION
REBUILD BUILDING 29A
PARKING LOT
AT
BATH VA MEDICAL CENTER
PROJECT NUMBER: 528A6-22-665
76 VETERANS AVE, BATH, NY 14810
SCALE: 1" = 2,000'
SOURCE: USGS BATH, NY QUAD MAP
PROJECT
LOCATION
N.T.S.
SOURCE: GOOGLE MAPS
I HEREBY CERTIFY THAT ALL INFORMATION INDICATED ON THIS
DRAWING WAS OBTAINED OR VERIFIED BY ACTUAL
MEASUREMENTS IN THE FIELD, AND THAT EVERY EFFORT HAS
BEEN MADE TO FURNISH COMPLETE AND ACCURATE
INFORMATION.
Jeremie M. Schadler, P.E. NY #075290
PROFESSIONAL ENGINEER'S CERTIFICATION
ACELA ARCHITECTS + ENGINEERS, PC
2633 MORAVIAN AVENUE
ALLENTOWN, PA 18103
02/03/2025 Schadler RCG
Bath VA Medical Center Bath, NY
528A6-22-665 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. ofJeremie M. Schadler PE# 075290
SHEET LIST TABLE
SHEET
NUMBER DRAWING NO. SHEET TITLE
GENERAL
GI100 1 OF 19 TITLE SHEET
GI101 2 OF 19 GENERAL NOTES SHEET
GC100 3 OF 19 MAINTENANCE & PROTECTION OF TRAFFIC PLAN
GC101 4 OF 19 EROSION & SEDIMENTATION POLLUTION CONTROL PLAN
CIVIL
CD100 5 OF 19 EXISTING FEATURES PLAN & DEMOLITION PLAN
CS100 6 OF 19 LAYOUT PLAN
CG100 7 OF 19 GRADING & UTILITY PLAN
CG101 8 OF 19 STORMWATER PROFILES PLAN
CS500 9 OF 19 CONSTRUCTION DETAILS '1'
CS501 10 OF 19 CONSTRUCTION DETAILS '2'
CS502 11 OF 19 CONSTRUCTION DETAILS '3'
CS503 12 OF 19 CONSTRUCTION DETAILS '4'
CS504 13 OF 19 EROSION & SEDIMENTATION POLLUTION CONTROL DETAILS
STRUCTURAL
SS001 14 OF 19 GENERAL NOTES
30-SB101 15 OF 19 BUILDING 30 PLAN
30-SB201 16 OF 19 BUILDING 30 TYPICAL DETAILS
ELECTRICAL
ES100 17 OF 19 ELECTRICAL SITE PLAN & LIGHTING
ES101 18 OF 19 ELECTRICAL LIGHTING PHOTOMETRICS PLAN
ES102 19 OF 19 ELECTRICAL SITE SCHEDULE
PA
EXISTING CONDITIONS NOTES
1. THE EXISTING FEATURES PLAN INFORMATION SHOWN IN THIS PLAN SET ARE BASED ON AN ON THE GROUND
FIELD SURVEY BY ACELA ARCHITECTS + ENGINEERS, PC. DURING JUNE 2023. AREAS SHOWN OUTSIDE THE SCOPE OF WORK ARE BASED ON DRAWINGS PROVIDED BY THE DEPARTMENT OF VETERAN AFFAIRS.
2. IT IS ASSUMED ONLY THOSE ITEMS VISIBLE ON THE GROUND AT THE TIME OF SURVEY WERE LOCATED AND SHOWN ON THIS PLAN. ACELA ARCHITECTS + ENGINEERS, PC. CONTRACTED A SUBSURFACE UTILITY COMPANY TO LOCATE UNDERGROUND UTILITIES. THE UTILITIES SHOWN HEREON ARE A RESULT OF SURFACE AND SUBSURFACE INVESTIGATION. CONTRACTORS AND OTHER USERS OF THIS PLAN ARE RESPONSIBLE FOR VERIFICATION AND LOCATION OF ALL UTILITIES PRIOR TO CONSTRUCTION WORK AT LOCATIONS SHOWN HEREON. ACELA ARCHITECTS + ENGINEERS, P.C. ASSUMES NO LIABILITY TO DAMAGE TO ANY EXISTING UTILITY DURING CONSTRUCTION. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR
ANY DAMAGE THAT MAY OCCUR DURING CONSTRUCTION.
3. THE SURVEY IS BASED ON NEW YORK STATE PLANE COORDINATE SYSTEM.
DEMOLITION NOTES
1. PERFORM DEMOLITION IN SUCH MANNER AS TO ELIMINATE HAZARDS TO PERSONS AND PROPERTY; TO
MINIMIZE NOISE; TO MINIMIZE INTERFERENCE WITH USE OF ADJACENT AREAS, UTILITIES AND STRUCTURES OR INTERRUPTION OF USE OF SUCH UTILITIES; AND TO PROVIDE FREE PASSAGE TO AND FROM SUCH
ADJACENT AREAS OF STRUCTURES.
2. PROVIDE SAFEGUARDS, INCLUDING WARNING SIGNS, BARRICADES, TEMPORARY FENCES, WARNING LIGHTS, AND OTHER SIMILAR ITEMS THAT ARE REQUIRED FOR PROTECTION OF ALL PERSONNEL DURING
DEMOLITION AND REMOVAL OPERATIONS.
3. MAINTAIN FENCES, BARRICADES, LIGHTS AND OTHER SIMILAR ITEMS AROUND EXPOSED EXCAVATIONS
UNTIL SUCH EXCAVATIONS HAVE BEEN COMPLETELY FILLED.
4. PREVENT SPREAD OF FLYING PARTICLES AND DUST. SPRINKLE RUBBISH AND DEBRIS WITH WATER TO KEEP DUST TO A MINIMUM. DO NOT USE WATER IF IT RESULTS IN HAZARDOUS OR OBJECTIONABLE CONDITION
SUCH AS, BUT NOT LIMITED TO; ICE, FLOODING OR POLLUTION.
5. BEFORE BEGINNING ANY DEMOLITION WORK, THE CONTRACTOR SHALL SURVEY THE SITE AND EXAMINE THE DRAWINGS AND SPECIFICATIONS TO DETERMINE THE EXTENT OF THE WORK. THE CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS TO AVOID DAMAGES TO EXISTING ITEMS TO REMAIN IN PLACE, TO BE REUSED, OR TO REMAIN THE PROPERTY OF THE MEDICAL CENTER; ANY DAMAGED ITEMS SHALL BE REPAIRED OR REPLACED AS APPROVED BY THE CONTRACTING OFFICER REPRESENTATIVE (COR). THE
CONTRACTOR SHALL COORDINATE THE WORK WITH ALL OTHER WORK AND SHALL CONSTRUCT AND
MAINTAIN SHORING, BRACING, AND SUPPORTS AS REQUIRED. THE CONTRACTOR SHALL ENSURE THAT
STRUCTURAL ELEMENTS ARE NOT OVERLOADED AND SHALL BE RESPONSIBLE FOR INCREASING
STRUCTURAL SUPPORTS OR ADDING NEW SUPPORTS AS MAY BE REQUIRED AS A RESULT OF ANY CUTTING, REMOVAL, OR DEMOLITION WORK PERFORMED.
6. DEMOLISH AND REMOVE OUTSIDE UTILITY SERVICE LINES SHOWN TO BE REMOVED.
7. REMOVE ABANDONED OUTSIDE UTILITY LINES THAT WOULD INTERFERE WITH INSTALLATION OF NEW
UTILITY LINES AND NEW CONSTRUCTION.
8. ALL WASTE DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE AND LAWFULLY DISPOSED OF. DEBRIS, INCLUDING BRICK, CONCRETE STONE, METALS AND SIMILAR MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF BY THE CONTRACTOR DAILY, OFF THE MEDICAL CENTER PROPERTY TO AVOID ACCUMULATION AT THE DEMOLITION SITE. MATERIALS THAT CANNOT BE REMOVED DAILY SHALL BE STORED IN AREAS SPECIFIED BY THE CONTRACTING OFFICERS REPRESENTATIVE. CONTRACTOR SHALL NOTIFY ENGINEER AND COR IMMEDIATELY IF MATERIALS UNCOVERED DURING ANY PART OF THE WORK APPEAR TO BE CONTAMINATED. ALL LOCAL, STATE AND
FEDERAL LAWS SHALL PREVAIL IN THE EVENT OF CONTAMINATED MATERIALS.
9. BREAK UP CONCRETE SLABS BELOW GRADE THAT DO NOT REQUIRE REMOVAL FROM PRESENT LOCATION INTO PIECES NOT EXCEEDING 24 INCHES (600 MM) SQUARE TO PERMIT DRAINAGE. CONTRACTOR SHALL DISPOSE OF DEBRIS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE AND LOCAL PERMITS, RULES
AND/OR REGULATIONS.
10. AS PART OF THE PROPOSED WORK, ANY DAMAGE TO THE EXISTING CURB SHALL BE CORRECTED BY THE
CONTRACTOR TO THE SATISFACTION OF THE COR.
11. ANY SIDEWALK, ON THESE PLANS, THAT IS SHOWN TO BE REMOVED OR REPLACED SHALL BE REMOVED TO
THE NEAREST EXISTING SIDEWALK JOINT.
12. THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING AND MAINTAINING ALL TREES AND LIGHT POLES
SURROUNDING THE PARKING LOTS AND ROADWAY. ANY SUCH FEATURES DAMAGED DURING
CONSTRUCTION SHALL BE REMOVED AND REPLACED AT THE CONTRACTOR'S EXPENSE.
CONCRETE REPAIR NOTES
1. EXPANSION JOINTS SHALL BE INSTALLED WHENEVER CONCRETE IS PLACED AGAINST ROADWAY PAVEMENT, PARKING LOTS, EXISTING CONCRETE, BUILDINGS, OR STRUCTURES AND PER VA REQUIREMENTS. SPACING
OF ALL SIDEWALK JOINTS SHALL BE PER THE CONCRETE SIDEWALK JOINT SPACING DETAIL.
2. CONCRETE SHALL BE FINISHED BY MEANS OF A FLOAT, STEEL TROWELED AND BROOMED WITH A FINE
BRUSH IN A TRANSVERSE DIRECTION, UNLESS STATED OTHERWISE ON THE PLANS.
3. THE CONTRACTOR SHALL BE RESPONSIBLE TO REPAIR ANY DAMAGED ASPHALT ADJACENT TO THE AREA OF CONSTRUCTION ASSOCIATED WITH REPAIR AND/OR REPLACEMENT OF EXISTING SIDEWALK AND/OR STAIRS
TO THE SATISFACTION OF THE COR.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SPREADING TOPSOIL, SEEDING AND STABILIZING ANY DAMAGED OR UNVEGETATED PERVIOUS AREA ADJACENT TO THE AREA OF CONSTRUCTION ASSOCIATED
WITH REPAIR AND/OR REPLACEMENT OF EXISTING SIDEWALK.
5. POSITIVE DRAINAGE SHALL BE PROVIDED ALONG ALL SIDEWALKS. SIDEWALK CONSTRUCTION AND REPAIR
SHALL BE COMPLETED IN A MANNER TO PREVENT LOW POINTS AND STANDING WATER.
PAVEMENT RECONSTRUCTION NOTES
1. ALL WASTE, DEBRIS, UNSUITABLE, AND EXCESS MATERIAL SHALL BE REMOVED FROM THE SITE AND
LAWFULLY DISPOSED OF.
2. SAWCUT PAVEMENT TO A DEPTH OF 2" WHERE MILLING OPERATIONS ABUT BITUMINOUS PAVEMENT TO REMAIN. SEAL JOINT WITH 12" WIDE ASPHALT SEALANT. REFER TO SAW CUT DETAIL FOR MORE
INFORMATION.
3. A RECLAIMED BASE MAY BE UTILIZED, WHERE A PROFESSIONAL GEOTECHNICAL ENGINEER LICENSED IN NEW YORK RETAINED BY THE CONTRACTOR APPROVES THE SOIL, IN THE AREAS WHERE EXISTING
PAVEMENT IS TO BE RECONSTRUCTED. THE RECLAMATION SHALL MEET THE MINIMUM
REQUIREMENTS AND CROSS SECTION OF THE FULL DEPTH CONSTRUCTION. IF THE EXISTING CROSS SECTION DOES NOT PROVIDE ADEQUATE DEPTH OR MATERIAL FOR RECLAMATION, NEW MATERIAL
SHALL BE IMPORTED. ANY RECLAIMED MATERIAL SHALL BE APPROVED PRIOR TO REUSE.
4. POOR IN-SITU SOIL THAT IS DEEMED UNSUITABLE, BY THE THIRD PARTY PROFESSIONAL
GEOTECHNICAL ENGINEER LICENSED IN NEW YORK RETAINED BY THE CONTRACTOR, FOR USE AS
PAVING SUBGRADE SHALL BE OVER-EXCAVATED AND REPLACED WITH HIGHER QUALITY
LOAD-BEARING FILL AS DIRECTED BY THE PROFESSIONAL GEOTECHNICAL ENGINEER.
5. PAVEMENT RECONSTRUCTION AND ASSOCIATED IMPROVEMENTS SHALL BE STAGED TO MINIMIZE
DISRUPTION TO THE MEDICAL FACILITY. STAGING AREAS AND EQUIPMENT STORAGE SHALL BE
COORDINATED WITH THE CONTRACTING OFFICERS REPRESENTATIVE (COR).
6. REPAIR DAMAGED CURB AS INDICATED, OR AS NECESSARY IF ADDITIONAL DAMAGE OCCURS DURING
CONSTRUCTION.
7. ALL PAVEMENT MARKINGS AND ROAD SIGNS TO BE IN ACCORDANCE WITH THE CURRENT EDITION OF
THE MANUAL FOR UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND THE NEW YORK STATE
SUPPLEMENT TO THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES.
8. AFTER THE INSTALLATION OF THE BINDER COURSE WITHIN EACH PHASE, AND NO SOONER THAN 24 HOURS AFTER THE ASPHALT HAS BEEN INSTALLED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING TEMPORARY PAVEMENT MARKINGS, PRIOR TO THE AREA BEING OPENED FOR GENERAL PARKING. THE CONTRACTOR SHALL UTILIZE A PAINT EQUIVALENT TO THAT OF THE PERMANENT PAINT
MARKINGS ON THE BINDER COURSE., UNLESS OTHERWISE AGREED TO BY THE CONTRACTING
OFFICER.
9. AFTER THE INSTALLATION OF THE WEARING COURSE, AND NO SOONER THAN 24 HOURS AFTER THE
ASPHALT HAS BEEN INSTALLED, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
TEMPORARY PAVEMENT MARKINGS TO CLEARLY IDENTIFY PARKING STALLS AND DRIVE AISLES. THE
TEMPORARY PAVEMENT MARKINGS MAY NEED TO BE SUPPLEMENTED WITH TRAFFIC CONES,
BARRELS, SIGNAGE, ETC. THESE TEMPORARY PAVEMENT MARKINGS ARE NOT INTENDED TO BE THE
PERMANENT PAVEMENT MARKINGS. ADEQUACY OF THE TEMPORARY PAVEMENT MARKINGS AND
APPURTENANCES SHALL BE DETERMINED BY THE COR AND IMPROVED OR MODIFIED AS REQUESTED AT NO COST TO THE GOVERNMENT. PERMANENT PAVEMENT MARKINGS SHALL BE INSTALLED NO LESS THAN 14 DAYS AFTER FINAL WEARING COURSE INSTALLATION, OR GREATER IF RECOMMENDED BY THE MANUFACTURER. PAVEMENT MARKINGS SHALL NOT BE INSTALLED DURING NORMAL BUSINESS HOURS (0700H-1600H, MONDAY THRU FRIDAY, EXCLUSIVE TO HOLIDAYS) UNLESS OTHERWISE APPROVED BY
THE CONTRACTING OFFICER.
UTILITY NOTES
1. KEEP HYDRANTS CLEAR AND ACCESSIBLE AT ALL TIMES. PROHIBIT DEBRIS FROM ACCUMULATING
WITHIN A RADIUS OF 15 FT (4500 MM) OF FIRE HYDRANTS.
2. THE LOCATIONS, SIZES, AND TYPES OF EXISTING UTILITIES ARE SHOWN AS AN APPROXIMATE
REPRESENTATION ONLY. THE OWNER OR ITS REPRESENTATIVE(S), HAVE NOT INDEPENDENTLY
VERIFIED THE INFORMATION AS SHOWN ON THE PLANS. THE UTILITY INFORMATION SHOWN DOES NOT GUARANTEE THE ACTUAL EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES, NOR DOES IT GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT
THAT ARE NOT SHOWN ON THE PLANS. PRIOR TO ORDERING MATERIALS AND BEGINNING
CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS, SIZES AND ELEVATIONS OF THE POINTS OF CONNECTION TO THE EXISTING UTILITIES AND SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH EXISTING UTILITIES AND THE PROPOSED UTILITY ROUTES, INCLUDING ROUTES WITHIN THE PUBLIC RIGHTS OF WAY.
3. THE CONTRACTOR SHALL VERIFY DIMENSIONS OF STORM INLET BOXES PRIOR TO ORDERING GRADE
ADJUSTMENT RINGS OR TOP UNITS.
4. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING
CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS
INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE INFORMATION SHALL BE FURNISHED IN WRITING BY
THE CONTRACTOR TO THE ENGINEER, CONTRACTING OFFICER, AND CONTRACTING OFFICER'S
REPRESENTATIVE FOR THE RESOLUTION OF THE CONFLICT. THE CONTRACTORS FAILURE TO NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR ADDITIONAL
PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO RESOLVE THE CONFLICT.
5. ANY EXISTING UTILITY, SUCH AS BUT NOT LIMITED TO STRUCTURES, PIPES, VALVES, POLES, AND GUY WIRES, IN CONFLICT WITH ANY IMPROVEMENTS SHALL BE ADJUSTED AS REQUIRED, INCLUDING BOTH
HORIZONTAL AND VERTICAL CONFLICTS.
6. RIM ELEVATIONS FOR DRAINAGE AND SEWER MANHOLES, WATER VALVE COVERS, GAS GATES, ELECTRIC AND TELEPHONE PULL BOXES, AND OTHER SUCH ITEMS, ARE APPROXIMATE AND SHALL BE
SET/RESET AS FOLLOWS:
A. PAVEMENTS AND CONCRETE SURFACES: FLUSH
B. ALL SURFACES ALONG ACCESSIBLE ROUTES: FLUSH
C. LANDSCAPE OR LOAM AND SEED AREAS: ONE INCH ABOVE SURROUNDING AREA AND TAPER EARTH
TO THE RIM ELEVATION.
7. ANY EXISTING UTILITY STRUCTURE, BOX OR POLE IN HORIZONTAL CONFLICT WITH ANY PAVEMENT
RECONSTRUCTION AND/OR WIDENING SHALL BE RELOCATED.
8. IMMEDIATELY PRIOR TO THE END OF CONSTRUCTION OR ACCEPTANCE BY THE COR, THE
CONTRACTOR SHALL INSPECT ALL CATCH BASINS AND DRAINAGE MANHOLES WITHIN AND
DOWNSTREAM OF THE LIMITS OF WORK. PIPES AND STRUCTURES SHALL BE CLEANED AND FLUSHED
AS NECESSARY.
9. THE CONTRACTOR SHALL WORK WITH THE COR AND VA STAFF TO VERIFY EXISTING CONDITIONS OF ELECTRICAL SYSTEMS BEING SPLICED TO WITH PROPOSED LIGHTING. WIRE SIZES AND BREAKER
SIZES SHALL BE VERIFIED PRIOR TO ANY WORK TO ENSURE ACCURACY WITH THE PLAN. THE
CONTRACTOR SHALL PROVIDE LARGER WIRE SIZES WHERE NECESSARY TO SPLICE TO EXISTING
CIRCUITS.
10. PROPOSED STORMWATER PIPE LENGTHS ARE SHOWN FROM CENTER OF STRUCTURE TO CENTER OF
STRUCTURE.
11. SEAL BETWEEN CONCRETE STRUCTURES WITH BUTYL RUBBER SEALANT MEETING ASTM C-990-91.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING UTILITIES. EXISTING UTILITIES DETERMINED TO BE PREVIOUSLY ABANDONED SHALL BE DISCUSSED WITH THE COR IF THE UTILITY SHALL REMAIN IN PLACE OR BE REMOVED, UNLESS OTHERWISE SHOWN ON THE PLANS. ANY UTILITY UNABLE TO BE PREVIOUSLY VERIFIED, INCLUDING ANY "LOST SIGNAL" UTILITY, SHALL BE FURTHER INVESTIGATED BY THE CONTRACTOR AND DISCUSSED WITH THE COR PRIOR TO ANY UTILITY
DISRUPTION AND/OR REMOVAL.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING THE EXISTING LIGHT POLES DURING
DEMOLITION, FOR REUSE. ANY DAMAGE TO THE EXISTING POLES SHALL BE REPLACED AT THE
CONTRACTORS EXPENSE.
14. ALL STRUCTURE PENETRATIONS SHALL BE PRECAST OPENINGS. NO FIELD CUTTING FOR OPENINGS IS PERMITTED UNLESS APPROVED BY THE COR. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO
THE COR FOR APPROVAL OF EACH STRUCTURE PRIOR TO ORDERING.
GENERAL NOTES
1. THESE PLANS ARE FOR THE RECONSTRUCTION AND EXPANSION OF PARKING LOT "16", CONSTRUCTION OF NEW RAISED
CONCRETE CURB/ISLANDS FOR SEPARATION, AND SITE LIGHTING. THE CONTRACTOR SHALL COORDINATE
CONSTRUCTION WITH THE VAMC.
2. THE CONTRACTOR SHALL REFER TO THE SPECIFICATIONS PREPARED FOR DESIGN REBUILD BUILDING LOT 29A PARKING
LOT, PREPARED BY ACELA ARCHITECTS + ENGINEERS, P.C.
3. THE CONTRACTOR SHALL NOTIFY "DIG-SAFE" (1-800-962-7962) AT LEAST 72 HOURS PRIOR TO EXCAVATION.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY. CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS, STATE AND LOCAL REQUIREMENTS. THE CONTRACTOR SHALL PROVIDE FENCING OR BARRIERS AROUND THE ENTIRE WORK AREA. THE CONTRACTOR SHALL NOT BEGIN WORK UNTIL THE SITE
SAFETY PLAN HAS BEEN APPROVED BY THE VA'S SAFETY OFFICER.
5. UPON AWARD OF CONTRACT, THE CONTRACTOR SHALL MAKE NECESSARY CONSTRUCTION NOTIFICATIONS, APPLY FOR AND OBTAIN NECESSARY PERMITS, PAY FEES, AND POST BONDS ASSOCIATED WITH THE WORK INDICATED WITHIN THE CONSTRUCTION PLANS, SPECIFICATIONS AND CONTRACT DOCUMENTS. THE CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION NOR CLOSE OR OBSTRUCT ROADWAYS, SIDEWALKS AND/OR FIRE HYDRANTS WITHOUT APPROPRIATE
PERMITS AND/OR PERMISSIONS.
6. TRAFFIC SIGNAGE (TEMPORARY AND PERMANENT) SHALL CONFORM TO THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(MUTCD) FOR ALL LOCAL RIGHTS OF WAY AND BE IN ACCORDANCE WITH TRAFFIC MANAGEMENT PLANS. THE TRAFFIC MANAGEMENT PLANS SHALL BE PART OF THE SITE SAFETY PLANS AND SHALL BE APPROVED BY THE VA'S
SAFETY OFFICER.
7. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK THAT BECOME DISTURBED BY THE CONTRACTORS OPERATIONS SHALL BE RESTORED BY THE CONTRACTOR TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.
8. VEGETATED AREAS DISTURBED DURING CONSTRUCTION SHALL RECEIVE A MINIMUM OF SIX (6) INCHES OF TOPSOIL.
THESE AREAS SHALL BE IMMEDIATELY SEEDED AND STABILIZED.
9. DAMAGE TO SURFACE FEATURES, SUBSURFACE FEATURES AND SUBSURFACE INFRASTRUCTURE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
10. THE CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF-SITE AREAS, AND SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY, AT NO COST TO OWNER.
11. THE CONTRACTOR IS REQUIRED TO BACKFILL TRENCHES OR SECURE WITH METAL PLATES DAILY. NO OPEN TRENCHES
SHALL BE LEFT UNATTENDED OR OUTSIDE OF THE PROTECTED WORK AREA.
12. THE CONTRACTOR SHALL VERIFY THE PROPOSED LAYOUT WITH ITS RELATIONSHIP TO THE EXISTING SITE SURVEY. THE CONTRACTOR SHALL ALSO VERIFY ALL DIMENSIONS, SITE CONDITIONS, AND MATERIAL SPECIFICATIONS AND SHALL NOTIFY THE OWNER AND ENGINEER OF ANY DISCREPANCIES BEFORE COMMENCING OR PROCEEDING WITH WORK.
13. THE ENGINEER SHALL NOT HAVE CONTROL OR CHARGE OF AND SHALL NOT BE RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCE ON PROCEDURE, OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH WORK, ALL OF WHICH SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. METHODS AND MATERIALS USED IN THE CONSTRUCTION OF IMPROVEMENTS FOR THIS PROJECT SHALL CONFORM TO THE CURRENT CONSTRUCTION STANDARDS AND SPECIFICATIONS OF THE NEW YORK DEPARTMENT OF TRANSPORTATION.
14. MATERIALS WHICH COULD BE A POTENTIAL SOURCE OF STORMWATER POLLUTION, SUCH AS GASOLINE, DIESEL FUEL, HYDRAULIC OIL, ETC., SHALL BE STORED AT THE END OF EACH DAY IN A STORAGE TRAILER OR COVERED LOCATION, OR TAKEN OFF-SITE AND PROPERLY DISPOSED. ALL TYPES OF WASTE GENERATED AT THIS SITE SHALL BE DISPOSED OF IN
A MANNER CONSISTENT WITH APPLICABLE REGULATIONS.
15. THE CONTRACTOR SHALL NOTIFY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATION AT LEAST TWO WORKING DAYS, BUT NOT MORE THAN TEN WORKING DAYS, PRIOR TO COMMENCEMENT OF EXCAVATION OR DEMOLITION. ALL WATER, GAS, SEWER, ELECTRIC AND OTHER UTILITIES SHALL BE MAINTAINED AT ALL
TIMES DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPLACING, WITH MATCHING MATERIALS, ANY PAVEMENT, WALKS, CURBS, ETC. THAT MUST BE CUT OR THAT ARE DAMAGED DURING CONSTRUCTION TO THE SATISFACTION OF THE COR.
17. AN APPROVED SET OF PLANS, SPECIFICATIONS AND ALL APPLICABLE PERMITS MUST BE AVAILABLE AT THE
CONSTRUCTION SITE.
18. THE CONTRACTOR AGREES THAT HE/SHE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS;
AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL AND ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM "THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER." THE CONTRACTOR IS RESPONSIBLE FOR INSTALLING A PROTECTIVE BARRIER AROUND THE SITE PRIOR TO AND MAINTAINED DURING
CONSTRUCTION.
19. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE APPROVED PLANS AND SPECIFICATIONS ISSUED BY ACELA ARCHITECTS + ENGINEERS P.C. ANY DEVIATIONS FROM THESE DOCUMENTS SHALL REQUIRE NOTIFICATION TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF/OR CONSTRUCTION OF ANY CHANGE. WITHOUT NOTIFICATION TO THE ENGINEER, THE CONTRACTOR WILL BE WORKING AT HIS/HER OWN RISK. ANY WORK INSTALLED IN CONFLICT WITH THE CONTRACT DRAWINGS, CODE REQUIREMENTS OR MANUFACTURER REQUIREMENTS WITHOUT THE PRIOR APPROVAL OF
THE COR AND THE ENGINEER SHALL BE CORRECTED AT THE CONTRACTORS EXPENSE.
20. ALL CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE COR AT LEAST 72 HOURS PRIOR TO THE START OF
THE CONSTRUCTION ACTIVITY.
21. THE CONTRACTOR SHALL MAINTAIN UPDATED RECORD DOCUMENTS OF CONSTRUCTION CHANGES ("AS-BUILT DRAWINGS") AND SHALL PROVIDE SAID DOCUMENTATION TO THE ENGINEER UPON COMPLETION OF CONSTRUCTION IN BOTH DIGITAL AND HARD COPY FORMATS. AS BUILT DRAWINGS SHALL BE UPDATED AS CONSTRUCTION PROGRESSES.
RECORD DOCUMENTS SHALL ARTICULATE WHERE ACTUAL INSTALLATION OF WORK, PRODUCTS AND/OR SYSTEMS VARY FROM THE DESIGN INTENT EXPRESSED/SPECIFIED IN THE CONTRACTOR DOCUMENTS. **NO EXCEPTION ALLOWED**. THE UPDATED ON-SITE DRAWINGS SHALL BE MADE AVAILABLE TO THE COR AND/OR DESIGN ENGINEER UPON REASONABLE
REQUEST.
22. ANY SINKHOLE ENCOUNTERED HAS TO BE REPAIRED PER PLAN APPROVED BY THE COR FROM THE PROFESSIONAL
GEOTECHNICAL ENGINEER LICENSED IN NEW YORK RETAINED BY THE CONTRACTOR.
EROSION CONTROL NOTES
1. CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE CONSTRUCTION & EROSION AND SEDIMENTATION
POLLUTION CONTROL PLAN (ENS) PREPARED FOR THE PROJECT.
2. PRIOR TO STARTING ANY WORK ON THE SITE, THE CONTRACTOR SHALL NOTIFY THE COR AND SHALL INSTALL EROSION
CONTROL MEASURES AS SHOWN ON THE APPROVED PLANS.
3. THE CONTRACTOR SHALL INSPECT AND MAINTAIN EROSION CONTROL MEASURES DAILY, REMOVE SEDIMENT ON A WEEKLY BASIS AND WITHIN TWELVE HOURS AFTER EACH STORM EVENT, AND DISPOSE OF SEDIMENT. SEDIMENT SHALL
BE REMOVED FROM THE SITE OR PLACED ON THE SITE AS DIRECTED BY THE COR.
4. THE CONTRACTOR SHALL BE FULLY RESPONSIBLE TO CONTROL CONSTRUCTION SUCH THAT SEDIMENTATION SHALL NOT AFFECT REGULATORY PROTECTED AREAS, WHETHER SUCH SEDIMENTATION IS CAUSED BY WATER, WIND, OR
DIRECT DEPOSIT.
5. THE CONTRACTOR SHALL PERFORM CONSTRUCTION SEQUENCING SUCH THAT EARTH MATERIALS ARE EXPOSED FOR A MINIMUM TIME BEFORE THEY ARE COVERED, SEEDED, OR OTHERWISE STABILIZED TO PREVENT EROSION.
6. THE CONTRACTOR SHALL INSTALL PROTECTIVE MEASURES TO PREVENT DEBRIS AND/OR SEDIMENT FROM ENTERING DRAINAGE CATCH BASINS AND PIPES. UPON COMPLETION OF CONSTRUCTION AND ESTABLISHMENT OR PERMANENT GROUND COVER, THE CONTRACTOR SHALL REMOVE AND DISPOSE OF EROSION CONTROL MEASURES AND REMOVE ANY
DEBRIS AND/OR SEDIMENT FROM ALL DRAINAGE INFRASTRUCTURE.
7. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO CONTROL DUST AND TAKE ALL NECESSARY MEASURES TO ENSURE ALL ROADS ARE MAINTAINED IN A DUST FREE CONDITION AT ALL TIMES THROUGHOUT THE DURATION OF THE PROJECT.
REPETITIVE TREATMENTS SHOULD BE APPLIED AS NECESSARY.
8. PERMANENT VEGETATIVE COVER SHALL BE INSTALLED TO ALL DISTURBED AREAS THAT HAVE REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN ANY GIVEN AREA HAS PERMANENTLY CEASED. THE RECOMMENDED PERMANENT SEEDING DATES ARE APRIL 1 TO JUNE 15
AND AUGUST 15 TO OCTOBER 1.
9. TEMPORARY VEGETATIVE COVER SHALL BE APPLIED TO ANY DISTURBED AREAS (INCLUDING SOIL STOCKPILE AREAS) THAT HAVE NOT YET REACHED FINISHED GRADE AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED, UNLESS THE ACTIVITY IS TO RESUME WITHIN TWENTY-ONE (21) DAYS. THE RECOMMENDED TEMPORARY SEEDING DATES ARE MARCH 1 TO JUNE 15 AND
AUGUST 15 TO OCTOBER 1.
10. AREAS WHICH HAVE BEEN TEMPORARILY OR PERMANENTLY SEEDED SHOULD BE MULCHED IMMEDIATELY FOLLOWING SEEDING IN ADDITION TO AREAS WHICH CANNOT BE SEEDED WITHIN THE RECOMMENDED SEEDING DATES AND ANY SOIL STOCKPILE AREAS. TEMPORARY MULCHING SHOULD BE PERFORMED AS SOON AS POSSIBLE, BUT NOT MORE THAN FOURTEEN (14) DAYS AFTER THE CONSTRUCTION ACTIVITY IN THAT AREA HAS TEMPORARILY CEASED UNLESS THE ACTIVITY IS TO RESUME WITHIN TWENTY-ONE (21) DAYS. STRAW OR HAY MULCH, WOOD FIBER MULCH, AND HYDROMULCH ARE RECOMMENDED. THE MATERIALS USED IN MULCHING SHALL CONFORM TO THE REQUIREMENTS LISTED IN THE NEW YORK STATE STANDARDS AND SPECIFICATIONS FOR EROSION AND SEDIMENTATION CONTROL.
11. ALL MULCHES MUST BE INSPECTED PERIODICALLY, IN PARTICULAR AFTER RAIN EVENTS, TO CHECK FOR EROSION.
WHERE EROSION IS OBSERVED, ADDITIONAL MULCH MUST BE APPLIED. IF NETTING IS USED, THE NET SHOULD BE INSPECTED AFTER RAIN EVENTS FOR DISLOCATION OR FAILURE. IF WASHOUTS OR BREAKAGE OCCUR, THE NET MUST BE REINSTALLED AS NECESSARY AFTER REPAIRING DAMAGE TO SLOPE. INSPECTIONS SHOULD TAKE PLACE UNTIL VEGETATIVE COVER IS FIRMLY ESTABLISHED. VEGETATION IS CONSIDERED TO BE FIRMLY ESTABLISHED AT A MINIMUM HEIGHT OF THREE (3) INCHES. ANY EXISTING OR PROPOSED CATCH BASINS THAT MAY BE SUBJECT TO SEDIMENTATION PROCESSES SHALL HAVE INLET PROTECTION INSTALLED TO PREVENT SEDIMENT FROM ENTERING THE PROPOSED STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION OF THE DISTURBED SITE. THE PROPER INLET PROTECTION DEVICES SHALL BE INSTALLED WHERE STORMWATER CATCH BASINS ARE TO BE MADE OPERATIONAL
BEFORE PERMANENT STABILIZATION OF ANY DISTURBED DRAINAGE AREA.
12. THE CONTRACTOR SHALL RESTORE DISTURBED AREAS AS CLOSELY AS POSSIBLE. AREAS DAMAGED DURING CONSTRUCTION SHALL BE RESODDED, RESEEDED, OR OTHERWISE RESTORED TO THEIR ORIGINAL STATE. TREES AND
OTHER EXISTING VEGETATION SHALL BE RETAINED WHEREVER FEASIBLE.
13. THE CONTRACTOR SHALL PREVENT DUST, SEDIMENT AND DEBRIS FROM EXITING THE SITE AND SHALL BE RESPONSIBLE
FOR CLEANUP, REPAIRS AND CORRECTIVE ACTION IF NECESSARY.
14. ALL EXISTING AND PROPOSED CATCH BASINS SHALL RECEIVE INLET PROTECTION. AN APPROPRIATE INLET PROTECTION
OPTION SHALL BE SELECTED BASED ON LOCATION AND TRIBUTARY AREA.
15. PERIMETER CONTROL SHALL BE INSTALLED DOWNSLOPE OF ALL DISTURBANCE. AN APPROPRIATE OPTION FOR PERIMETER CONTROL SHALL BE SELECTED BASED ON LOCATION AND UPSLOPE DISTURBANCE. COMPOST FILTER SOCK
AND SILT FENCE ARE VIABLE OPTIONS FOR PERIMETER CONTROL.
16. ALL DISTURBED SLOPES OF 3:1 OR STEEPER SHALL RECEIVE EROSION CONTROL MATTING AND BE IMMEDIATELY
STABILIZED.
17. ALL EXISTING AND PROPOSED CATCH BASINS SHALL BE CLEANED OUT BY THE CONTRACTOR AT THE END OF
CONSTRUCTION.
18. A CONCRETE TRUCK WASHOUT SHALL BE PROVIDED AT A LOCATION AGREED UPON BY THE COR AND CONTRACTOR.
19. EROSION CONTROL FEATURES HAVE BEEN INCORPORATED IN TO THE PHASING PLANS.
ELECTRICAL NOTES
1. LOCATIONS OF UNDERGROUND ELECTRIC ARE APPROXIMATE ONLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD VERIFYING LOCATIONS PRIOR TO ANY REMOVAL AND/OR RELOCATION. ANY DISRUPTION TO AN EXISTING ELECTRICAL CIRCUIT SHALL BE APPROVED BY THE COR PRIOR TO DISRUPTION. ANY DISCREPANCY ON THE PLAN REGARDING SUBSURFACE UTILITIES SHALL BE REPORTED TO THE COR. IT IS POSSIBLE THAT A SINGLE ELECTRIC LINE , AS SHOWN ON THE PLANS, COULD REPRESENT MULTIPLE LINES, ALSO, THESE LINES MAY BE ACTIVE OR ABANDONED.
THE CONTRACTOR SHALL VERIFY PRIOR TO REMOVAL AND/OR RELOCATION. CONTRACTOR IS RESPONSIBLE FOR
ADJUSTMENTS AS NECESSARY TO MATCH FIELD CONDITIONS.
2. CONTRACTOR SHALL REMOVE ALL ABANDONED LINES. PRIOR TO REMOVAL THE CONTRACTOR SHALL COORDINATE WITH
COR.
3. THE MINIMUM 90-DEGREE BEND RADIUS FOR CONDUIT IS 6 TIMES THE INTERNAL DIAMETER OF THE CONDUIT. CONDUITS ENTERING A VAULT MUST ENTER THE BODY OF THE VAULT. CONDUITS MUST NEVER ENTER THE TRAFFIC RING.CONDUITS MUST MAINTAIN A 12 INCH SEPARATION FROM OTHER CONDUITS (ELEC., GAS, ETC.)
4. INSTALL PULL CORDS IN ALL CONDUIT. WHEN PULLING CABLE IN CONDUIT INSTALL A PULL CORD WITH THE CABLE SO
ADDITIONAL CABLE CAN BE INSTALLED LATER IF NEEDED.
5. ALL SALVAGED POLES SHALL BE STORED FOR VAMC.
6. THE CONTRACTOR SHALL PUT A CAP ON THE UNUSED LEG IN CONDUIT AT THE END OF THE WIRE. THE CAPPED WIRE
NEEDS TO BE ACCESSIBLE AND SHALL BE IN A JUNCTION BOX.
7. THE EXISTING LIGHTING CONTROL PANELS AND CONNECTIONS ON THE SITE-LIGHTING PANEL SHALL REMAIN.
8. THE CONTRACTOR IS RESPONSIBLE FOR RELOCATING AND EXTENDING THE EXISTING CONDUCTORS FOR THE SITE LIGHTING FIXTURES. (EXISTING: 3#6 + 1#10 GRD IN 1” C PVC.) THE CONTRACTOR SHALL REBALANCE THE PHASES WITH
THE RELOCATED AND PROPOSED SITE LIGHTING FIXTURE POWER SUPPLY.
9. ALL PROPOSED CONDUITS SHALL BE 1” C PVC UNLESS OTHERWISE NOTED. ANY CONDUIT THAT IS EXPOSED OR ENCASED IN CONCRETE, AS WELL AS ALL JUMPERS FROM HANDHOLES TO LIGHT POLES, SHALL BE GALVANIZED STEEL.
FUSIBLE LINKS SHALL BE INSTALLED FROM HANDHOLES TO LIGHT POLES. #3 AWG WIRES SHALL BE PROTECTED BY #4
AWG FUSIBLE LINKS.
TRAFFIC MANAGEMENT NOTES
1. THE CONTRACTOR SHALL MAINTAIN A MINIMUM OF ONE MOVING LANE ALONG ROADWAYS
AT ALL TIMES, EXCEPT WHERE STATED ON THE MPT PLANS, OR IF GIVEN PERMISSION BY
THE VAMC AND CONTRACTING OFFICERS REPRESENTATIVE.
2. THE CONTRACTOR SHALL PROVIDE ALL SIGNAGE, BARRICADES, CAUTION TAPE, CONES
AND BARRELS REQUIRED TO FACILITATE A SAFE LANE OR SIDEWALK CLOSURE.
3. PEDESTRIAN ACCESS SHALL BE MAINTAINED AND MANAGED DURING SIDEWALK AND
CROSSWALK CLOSURES.
4. ACCESS TO ALL ROADWAYS, DRIVEWAYS AND LOADING RAMPS SHALL BE MAINTAINED
DAILY AFTER CONSTRUCTION ACTIVITIES HAVE CONCLUDED.
5. THE CONTRACTOR SHALL COORDINATE ANY ROADWAY, PARKING LOT, DRIVEWAY AND/OR
SIDEWALK CLOSURES WITH THE VAMC PRIOR TO PERFORMING WORK.
6. ANY SIGNAGE TO BE REMOVED DUE TO CONSTRUCTION SHALL BE PLACED IN A
TEMPORARY CONDITION AT THE SAME LOCATION IF WARRANTED OR AT A RELOCATED
LOCATION. DO NOT REMOVE TEMPORARY SIGNAGE UNTIL A REPLACEMENT IS AVAILABLE
AND INSTALLED.
LAYOUT AND MATERIALS NOTES
1. PRIOR TO START OF CONSTRUCTION, THE CONTRACTOR SHALL VERIFY EXISTING
PAVEMENT, WALKWAY AND BUILDING ELEVATIONS AT INTERFACE WITH PROPOSED
PAVEMENTS AND WALKWAYS, AS WELL AS EXISTING GROUND ELEVATIONS ADJACENT TO
MANHOLES AND DRAINAGE STRUCTURES TO ASSURE PROPER TRANSITIONS BETWEEN
EXISTING AND PROPOSED FACILITIES.
2. SYMBOLS AND LEGENDS OF PROJECT FEATURES ARE GRAPHIC REPRESENTATIONS AND
ARE NOT NECESSARILY SCALED TO THEIR ACTUAL DIMENSIONS OR LOCATIONS ON THE
DRAWINGS. THE CONTRACTOR SHALL REFER TO THE DETAIL SHEET DIMENSIONS,
MANUFACTURER'S LITERATURE, SHOP DRAWINGS AND FIELD MEASUREMENTS OF
SUPPLIED PRODUCTS FOR LAYOUT OF THE PROJECT FEATURES.
3. THE CONTRACTOR SHALL NOT RELY SOLELY ON ELECTRONIC VERSIONS OF PLANS,
SPECIFICATIONS, AND DATA FILES THAT ARE OBTAINED FROM THE DESIGNERS, BUT SHALL
FIELD VERIFY LOCATION OF PROJECT FEATURES.
4. THE CONTRACTOR SHALL PROVIDE AND ALLOWANCE FOR TRUING AND LEVELING COURSE
FOR 15,500 SF.
5. PROPRIETARY PRODUCTS OR ASSEMBLIES UTILIZED AS "BASIS OF DESIGN":
- ON OCCASION, THE DRAWINGS MAY REFER TO A SINGLE PROPRIETARY PRODUCT
OR ASSEMBLY. WHEN THIS OCCURS, THE PRODUCT OR ASSEMBLY ILLUSTRATED BY
THE DRAWINGS IS THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY.
- THE DIMENSIONS, MOUNTING HEIGHTS, CLEARANCES, AND ACCESS REQUIREMENTS
OF SPECIFIED PRODUCTS AND ASSEMBLIES OTHER THAN THE "BASIS OF DESIGN"
MAY VARY FROM THAT SHOWN BY THE DRAWINGS.
- THE CONTRACTOR MAY UTILIZE ANY OTHER SPECIFIED PRODUCT OR ASSEMBLY IN
LIEU OF THE "BASIS OF DESIGN" PRODUCT OR ASSEMBLY, AS APPROVED BY THE
COR. HOWEVER, THE CONTRACTOR IS RESPONSIBLE (AT NO ADDITIONAL EXPENSE
TO THE OWNER) FOR ALL COORDINATION AND REVISIONS TO DIMENSIONS AND/OR
DETAILS NECESSARY TO ACHIEVE THE SAME FUNCTIONAL AND AESTHETIC DESIGN
INTENT AS ILLUSTRATED BY THE "BASIS OF DESIGN" SHOWN BY THE CONTRACT
DOCUMENTS.
GENERAL PHASING NOTES
1. THE CONTRACTOR SHALL BE AWARE THAT THE CAMPUS IS A FUNCTIONING HOSPITAL AND
SHALL WORK WITH THE VA AND COR THROUGHOUT CONSTRUCTION TO ENSURE THAT THE
CAMPUS IS ABLE TO FUNCTION AS INTENDED. THE CONTRACTOR MUST NOTIFY THE COR
BEFORE CLOSURE OF ANY PARKING LOTS, ROADS, DRIVEWAYS AND SIDEWALKS. FULL
CLOSURES OF ROADWAYS AND PARKING LOTS WILL NOT BE PERMITTED, UNLESS
OTHERWISE APPROVED BY THE COR.
2. CONTRACTOR STAGING WITHIN THE PROJECT LIMITS, OR AS DIRECTED BY THE COR. THE
LOCATION IS SHOWN ON EROSION AND SEDIMENTATION CONTROL PLANS, HOWEVER THE
EXACT LOCATION AND EXTENT SHALL BE COORDINATED WITH THE COR PRIOR TO
CONSTRUCTION.
3. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL TRAFFIC CONTROL STRUCTURES
AND PERSONNEL REQUIRED FOR LANE OR SIDEWALK CLOSURES. LOCATION OF SUCH
TRAFFIC CONTROL DEVICES SHALL BE COORDINATED WITH THE COR BEFORE CLOSURE.
OVERNIGHT CLOSURES REQUIRE SIGNS WITH FLASHING LIGHTS.
4. SUB PHASES WITHIN EACH PHASE SHALL BE APPROVED BY THE COR PRIOR TO
CONSTRUCTION.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TYING THE ENDS OF EACH PHASE BACK
TO EXISTING CONDITIONS TO ENSURE A SAFE TRANSITION BETWEEN PHASES. BEFORE
COMPLETION OF EACH PHASE THE CONTRACTOR SHALL OBTAIN APPROVAL FROM THE
COR AND COMPLETE ANY REQUIRED TRANSITION WORK.
6. THE CONTRACTOR SHALL PROVIDE THE COR WITH A SITE SAFETY PLAN PRIOR TO
CONSTRUCTION.
7. CONSTRUCTION FENCING SHALL BE INSTALLED BEFORE THE START OF THE PROJECT
02/03/2025 Schadler RCG
Bath VA Medical Center Bath, NY
528A6-22-665 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. ofJeremie M. Schadler PE# 075290
S
E
EM
H
E
EM
H
S
S
E E
E
EX
. S
LO
W
S
IG
N
EX
. S
TO
P
SI
GN
EX
. S
TO
P
SI
GN
SA
W
CU
T
SAWCUT
SAWCUT
SAWCUT
BU
ILD
IN
G
A
BU
ILD
IN
G
CO
H
EA
D W
AL
L
IN
V:
7.
EX
. B
O
LL
AR
D
(T
YP
EXISTING
ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
BUILDING 31
BUILDING 31
BUILDING 34
BUILDING 106
BUILDING 35
BUILDING 32
BUILDING 75
BUILDING 35
WV
WVWVWV
FH
WV
S
E
E
S S
E
E
E
24" DECID.
24" DECID.
18" DECID.
16" DECID.
16" DECID.
CO
TO BE REMOVE AND
REPLACE (SEE
STRUCTURAL
DRAWINGS)
TO BE REMOVE AND
REPLACE (SEE
STRUCTURAL
DRAWINGS)
HEADWALL
INV: 1137.54
btstep
41011132.87
BUILDING 30
02/03/2025 Schadler RCG
Bath VA Medical Center Bath, NY
528A6-22-665 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. ofJeremie M. Schadler PE# 075290
SITE SYMBOLS - GENERAL
BENCHMARK #1: SANITARY MANHOLE AT THE WESTERN
WALL OF BUILDING 30 , CLOSEST TO WATER VALES
ELEV. 1140.55
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
STORM SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, WATER MANHOLE (WMH)W
UTILITY, ELECTRICAL MANHOLE (EMH)E
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
TREES - DECIDUOUS (DECID.)
DRAINAGE CATCH BASIN (CB)
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
ELECTRIC LINE
APPROX APPROXIMATELY
BLDG BUILDING
CIP CAST IRON PIPE
CO CLEANOUT
CONC CONCRETE
CPP CORRUGATED HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
DS DOWN SPOUT
EB ELECTRIC BOX
ELEC ELECTRIC
EOP EDGE OF PAVEMENT
GOVT GOVERNMENT
GV GAS VALVE
HDPE HIGH DENSITY POLY ETHYLENE
INV STORMWATER PIPE END
JB JUNCTION BOX
LF LINEAR FEET
MH MANHOLE
PLCC PLAIN CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
RCP REINFORCED-CONCRETE PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
RCEP REINFORCED CONCRETE ELLIPTICAL PIPE
RET RETAINING
SAN CO SANITARY CLEANOUT
SF SQUARE FEET
SLCPP SMOOTH-LINED CORRUGATED POLYETHYLENE PIPE
TC TERRA COTTA STORM PIPE
TELE TELEPHONE
TEMP TEMPORARY
TRANS. TRANSFORMER
TYP TYPICAL
U.D. UNDERDRAIN
VCP VITRIFIED CLAY PIPE
W/4" 4" WIDE WHITE PAINT LINE
Y/4" 4" WIDE YELLOW PAINT LINE
DRAINAGE MANHOLE (DMH)D
GAS VALVE (GV)
HYDRANT, FIRE (FH)
UTILITY, SANITARY MANHOLE - (SSWR-MH)S
WATER VALVE (WV)
COMMUNICATION LINE
GAS LINE
SANITARY SEWER LINE
STEAM LINE
TELEPHONE LINE
UNKNOWN LINE
CENTERLINE
CHAINLINK FENCE
NRCS SOIL LINE
VEGETATION
BOLLARD LIGHTS
LIGHT POST (LP)
BOLLARD
TREE - CONIFEROUS (CONF.)
CONCRETE
APPROXIMATE PROPERTY LINE
UTILITY, COMMUNICATION MANHOLE (CMH)C
UTILITY, TELEPHONE MANHOLE (TMH)T
UTILITY, STEAM MANHOLE (STM-MH)ST
CHILLED WATER LINE RETURN
CHILLED WATER LINE SUPPLY
FLAG POLE
FA FIRE ALARM LINE
U/T
WTR
SAN
GAS
U/E
SCALE: 1"=30'
60'30'0'
KEY MAP
1"=1000'
W20-1 36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
G20-2 18"x36"
(MOUNTED
ON TYPE III
BARRICADE)
R9-9 24"x12"
(MOUNTED ON TYPE III
BARRICADE)
SITE SYMBOLS - TRAFFIC
TRAFFIC SIGNAGE
LIMIT OF CONSTRUCTION PHASE
CONSTRUCTION FENCING
EMPLOYEE AND PATIENT CIRCULATION
PARKING LOT 2
PARKING LOT 2
PARKING LOT 16
W20-1 36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
W20-7a 36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
ONE
LANE
ROAD
W20-4 36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
THE CONTRACTOR
SHALL MAINTAIN
ACCESS THROUGHOUT
THE CONSTRUCTION PHASE
COORDINATE ACCESS WITH COR
ONE
LANE
ROAD
THE CONTRACTOR SHALL
MAINTAIN ACCESS TO THE
LOADING DOCK AND ADA
ACCESS THROUGHOUT THE
CONSTRUCTION PHASE.
COORDINATE ACCESS WITH COR
CONSTRUCTION NOTES:
1. THE SCOPE OF WORK INCLUDES THE RECONSTRUCTION AND CONFIGURATION OF
PARKING LOT 16 . THIS PHASE INCLUDES FULL-DEPTH PAVEMENT, MILL AND OVERLAY,
CONCRETE CURB, CONCRETE SIDEWALKS, ADA PARKING ACESS, PAVING MARKINGS,
SITE LIGHTING, DRAINAGE IMPROVEMENTS, RETENTION WALLS RECONSTRUCTION, AND
NEW STAIRS TO ACCESS BUILDING 30.
2. THE CONTRACTOR SHALL COORDINATE WITH THE COR FOR TRAFFIC PATTERNS WHEN
WORKING ON THE RECONSTRUCTION AND EXPANSION OF THE PARKING LOT.
SINGLE-LANE OPERATION WITH TRAFFIC CONTROL, FLAGGERS, AND TRAFFIC SIGNALS
ALERTING DRIVERS SHALL BE PROVIDED AS PER NYDOT REQUIREMENTS.
3. THE CONTRACTOR SHALL PROVIDE TRAFFIC SIGNALS ALERTING DRIVERS SHALL BE
PROVIDED AS PER NYSDOT REQUIREMENTS.
4. THE CONTRACTOR SHALL MAINTAIN ACCESS TO THE ROAD AND LOADING DOCK
THROUGHOUT THE CONSTRUCTION PHASE.
5. MAINTENANCE AND PROTECTION OF TRAFFIC SHALL BE IN ACCORDANCE WITH THE
MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) - PART VI: "STANDARDS AND
GUIDES FOR TEMPORARY TRAFFIC CONTROL.".
6. TRAFFIC SAFETY SIGNS SHALL BE PLACED PRIOR TO THE START OF CONSTRUCTION.
7. SIDEWALKS SHOULD NOT BE CLOSED FOR PROLONGED TIMES. ALL WORK SHALL BE
COMPLETED BY PROVIDING TEMPORARY ALTERNATES OR IN OFF HOURS AND
WEEKENDS. THE CLOSURE OF SIDEWALKS SHALL BE COORDINATED AND APPROVED BY
THE COR 14 DAYS PRIOR TO PLANNED CLOSURE.
8. THE CONTRACTOR MUST PROVIDE SUB-PHASE COORDINATION DRAWINGS INDICATING
HOW TO MINIMIZE THE IMPACT AND DURATION OF CLOSURES. PLANS SHALL BE
COORDINATED AND APPROVED BY THE COR 14 DAYS PRIOR TO THE PLANNED CLOSURE.
SIGNS TO BE USED ONLY
WHEN ROADWAY WORK IS
BEING PERFORMED
W20-7a 36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
W20-4 36"x36"
(MOUNTED
ON TYPE III
BARRICADE)
SITE SYMBOL - EROSION
INLET PROTECTION
TS
SA
IP
CFS 18" COMPOST FILTER SOCK
STAGING AREA
TOPSOIL STOCKPILE
RCE ROCK CONSTRUCTION
ENTRANCE
OP OULET PROTECTION
EXISTING FEATURES TO BE DEMOLISHED, SHOWN IN RED
NATIONAL CEMETERY
WV
WV
WVWV
FH
WV
S
E
E
FIRE
DEPARTMENT
CONNECTION
S S
E
E
EX. METAL VAULT
E
EX. SLOW SIGN
EX. STOP SIGN
EX. STOP SIGN
BUILDING 29A
24" DECID.
24" DECID.
18" DECID.
16" DECID.
16" DECID.
BUILDING 30
CO
CO
6" P
VC
P
IP
E
6" P
VC
P
IP
E
6" P
VC
P
IP
E
HEADWALL
INV: 1137.54
EX. FIRE
DEPARTMENT
CONNECTION
EX. FIRE
DEPARTMENT
CONNECTION
39114
113711
431144
11391139
38113911
381139
114511 451143 11
U /E
U /E
U/EU/EU/E
U /E
U /E
U/EU/EU/EU/E
U /E
U /E
U/EU/EU/EU/E
U/E
U/E
U/E
U/E
U/E U/E
U /E
U /E
U /E
U /E
U /E
U /E
U /E
U /E
STEPS
PR
O
P. C O
N C
. SID
EW
ALK
PROP. CONC. SIDEWALK
EXISTING
ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
" H
DP
E
" H
DP
E
" H
DP
E
8" P
VC
8"
P
VC
8" P
VC
12" HDPE
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
CONNECT EXISTING ROOF LEADER
381139
33 11
39 11
35 11
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
8" PVC
12" HDPE
58 11
1148 1147 1146
1145 1144
1143 1142
" H
DP
E
" P
VC
8"
P
VC
TS
C
FS
SA
IP
RCE
IP
IP
IP
IP
CFS
OP
IP
IP
IP
CF
S
IP
CFS
02/03/2025 Schadler RCG
Bath VA Medical Center Bath, NY
528A6-22-665 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. ofJeremie M. Schadler PE# 075290
SITE SYMBOLS - GENERAL
BENCHMARK #1: SANITARY MANHOLE AT THE WESTERN
WALL OF BUILDING 30 , CLOSEST TO WATER VALES
ELEV. 1140.55
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
STORM SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, WATER MANHOLE (WMH)W
UTILITY, ELECTRICAL MANHOLE (EMH)E
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
TREES - DECIDUOUS (DECID.)
DRAINAGE CATCH BASIN (CB)
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
ELECTRIC LINE
APPROX APPROXIMATELY
BLDG BUILDING
CIP CAST IRON PIPE
CO CLEANOUT
CONC CONCRETE
CPP CORRUGATED HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
DS DOWN SPOUT
EB ELECTRIC BOX
ELEC ELECTRIC
EOP EDGE OF PAVEMENT
GOVT GOVERNMENT
GV GAS VALVE
HDPE HIGH DENSITY POLY ETHYLENE
INV STORMWATER PIPE END
JB JUNCTION BOX
LF LINEAR FEET
MH MANHOLE
PLCC PLAIN CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
RCP REINFORCED-CONCRETE PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
RCEP REINFORCED CONCRETE ELLIPTICAL PIPE
RET RETAINING
SAN CO SANITARY CLEANOUT
SF SQUARE FEET
SLCPP SMOOTH-LINED CORRUGATED POLYETHYLENE PIPE
TC TERRA COTTA STORM PIPE
TELE TELEPHONE
TEMP TEMPORARY
TRANS. TRANSFORMER
TYP TYPICAL
U.D. UNDERDRAIN
VCP VITRIFIED CLAY PIPE
W/4" 4" WIDE WHITE PAINT LINE
Y/4" 4" WIDE YELLOW PAINT LINE
DRAINAGE MANHOLE (DMH)D
GAS VALVE (GV)
HYDRANT, FIRE (FH)
UTILITY, SANITARY MANHOLE - (SSWR-MH)S
WATER VALVE (WV)
COMMUNICATION LINE
GAS LINE
SANITARY SEWER LINE
STEAM LINE
TELEPHONE LINE
UNKNOWN LINE
CENTERLINE
CHAINLINK FENCE
NRCS SOIL LINE
VEGETATION
BOLLARD LIGHTS
LIGHT POST (LP)
BOLLARD
TREE - CONIFEROUS (CONF.)
CONCRETE
APPROXIMATE PROPERTY LINE
UTILITY, COMMUNICATION MANHOLE (CMH)C
UTILITY, TELEPHONE MANHOLE (TMH)T
UTILITY, STEAM MANHOLE (STM-MH)ST
CHILLED WATER LINE RETURN
CHILLED WATER LINE SUPPLY
FLAG POLE
FA FIRE ALARM LINE
U/T
WTR
SAN
GAS
U/E
SCALE: 1"=30'
60'30'0'
KEY MAP
1"=1000'
STRCT #5 STRCT #4
YARD INLET 4
YARD INLET 3
STRCT #3
STRCT #2
STRCT #1
CLEANOUT
YARD INLET 1
YARD INLET 2
FLARED END SECTION
EX. CB
EX. HEADWALL
EXISTING STORM STRUCTURE
TO BE REMOVED
STORMWATER PIPE TO BE REMOVED
SITE SYMBOL - DEMOLITION
TO BE REMOVED(T.B.R.)
EXISTING PAVEMENT
TO BE 2" MILL/OVERLAY
PAVEMENT SAWCUT
EXISTING CONCRETE TO BE REMOVED
EXISTING STORM STRUCTURE TO BE REMOVED
DECIDUOUS TREE TO BE REMOVED
SIGN TO BE REMOVED
EXISTING TREE TO BE REMOVED
EXISTING LAWN/ WOODED AREA
TO BE REMOVED
FOR NEW CONSTRUCTION
REMOVE SIDEWALK TO NEAREST JOINT
3 REMOVE SIGN, POST, AND BASE
TO BE RELOCATED(REL.)
SHRUB TO BE REMOVED
EXISTING PAVEMENT
TO BE REMOVED
5 EXISTING SIGN TO BE RELOCATED
EXISTING GRAVEL
TO BE REMOVED
ELECTRICAL LINE TO BE REMOVED
LIGHT POLE TO BE REMOVED AND SALVAGED
E/U
FIREPLACE
EMPTY TRANSFORMER
BLOCK BUILDING
GUY WIRE
ELECTRIC SUPPLY
OVERHEAD SERVICE
GUY WIRE
INCOMING 12.5 KV
HEAVY BRUSH
OVERHEAD SERVICE
OV
ER
HE
AD
S
ER
VI
CE
OV
ER
HE
AD
S
ER
VI
CE
20'
52'
8'
END CAP
24'
65'
71'-8"
5' TRANSITION PIPE
8'
29'
11'-6"
23'-7"45'-4"
5' TRANSITION PIPE
8'
31'
6'-4" 21'-11"
36'-6"
5' TRANSITION PIPE
END CAP
8'
2'-5"
22'
16'-9"
31'-1"
5' TRANSITION PIPE
21'-3"
8'
8'
20'-9"
37'-10"
5' TRANSITION PIPE 2'-6"
22'-9"
8'-3"
34'-5"
19'-7"
5' TRANSITION PIPE
41'-6"
5'
7'
40'-8"
38'
"T" 38" DEEP
51'-9"
23'-4"
5'-6"
8'-6"
3' 2'-6"
9'
6" STEEL, 30" DEEP
9'
20'-4"
6" X 4" REDUCER, 3'-2" FROM VALVE
H
OVERHEAD SERVICE
381139
33 11
39 11
35 11
58 11
1148 1147 1146
1145 1144
WV
WV
WVWV
FH
WV
S
E EMH
E EMH
FIRE
DEPARTMENT
CONNECTION
S S
E
E
EX. METAL VAULT
EX. SLOW SIGN
EX. STOP SIGN
EX. STOP SIGN
30" DECID.
(T.B.R.)
EX. ADA PARKING
SIGN
(TBR)
CB
TG: 1141.97
INV: 1141.61
(T.B.R.)
SAWCUT
PARKING LOT 16
SA
WCU
T
SA
W
CU
T
SAW
CUT
LP #1
EX. LP #2
EX. LP #3
(TBR & SALVAGE) EX. LP #4
EX. PARKING LOT 16 SIGN
(REL)
EX. ADA PARKING
SIGN
(T.B.R.)
EX. PARKING
UV SIGN
(REL)
BUILDING 29A
24" DECID.
24" DECID.
18" DECID.
16" DECID.
16" DECID.
BUILDING 30
SHRUB
(T.B.R.)
CO
HEADWALL
TG: 1135.85
INV: 1135.42
(T.B.R.)
TO BE REMOVE AND
REPLACE (SEE
STRUCTURAL
DRAWINGS)
TO BE REMOVE AND
REPLACE (SEE
STRUCTURAL
DRAWINGS)
(T.B.R.)
(T.B.R.)
(T.B.R.)
HEADWALL
INV: 1137.54
(TBR & SALVAGE)
(TBR & SALVAGE)
(TBR & SALVAGE)
EX. FIRE
DEPARTMENT
CONNECTION
EX. FIRE
DEPARTMENT
CONNECTION
EX. BOLLARD (TYP)
(TBR )
SAWCUT
SA
W
CU
T
SA
W
CU
T
SA
W
CU
T
SA
W
CU
T
SAWCUT
CORE 1
(TOTAL DEPTH=10.25")
N.T.S.
1.55" WEARING
2.75" BASE
5.95" STONE
CORE 2
(TOTAL DEPTH=12.50")
N.T.S.
3.50" WEARING
5.00" BASE
4.00" STONE
CORE 3
(TOTAL DEPTH=12.75")
N.T.S.
1.37" WEARING
4.00" BASE
7.38" STONE
CORE 4
(TOTAL DEPTH=7.37")
N.T.S.
1.70" WEARING
2.12" BASE
3.54" STONE
02/03/2025 Schadler RCG
Bath VA Medical Center Bath, NY
528A6-22-665 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. ofJeremie M. Schadler PE# 075290
SITE SYMBOLS - GENERAL
BENCHMARK #1: SANITARY MANHOLE AT THE WESTERN
WALL OF BUILDING 30 , CLOSEST TO WATER VALES
ELEV. 1140.55
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
STORM SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, WATER MANHOLE (WMH)W
UTILITY, ELECTRICAL MANHOLE (EMH)E
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
TREES - DECIDUOUS (DECID.)
DRAINAGE CATCH BASIN (CB)
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
ELECTRIC LINE
APPROX APPROXIMATELY
BLDG BUILDING
CIP CAST IRON PIPE
CO CLEANOUT
CONC CONCRETE
CPP CORRUGATED HIGH DENSITY POLYETHYLENE PIPE
DIP DUCTILE IRON PIPE
DS DOWN SPOUT
EB ELECTRIC BOX
ELEC ELECTRIC
EOP EDGE OF PAVEMENT
GOVT GOVERNMENT
GV GAS VALVE
HDPE HIGH DENSITY POLY ETHYLENE
INV STORMWATER PIPE END
JB JUNCTION BOX
LF LINEAR FEET
MH MANHOLE
PLCC PLAIN CEMENT CONCRETE
PVC POLYVINYL CHLORIDE
RCP REINFORCED-CONCRETE PIPE
RCCP REINFORCED CONCRETE CYLINDER PIPE
RCEP REINFORCED CONCRETE ELLIPTICAL PIPE
RET RETAINING
SAN CO SANITARY CLEANOUT
SF SQUARE FEET
SLCPP SMOOTH-LINED CORRUGATED POLYETHYLENE PIPE
TC TERRA COTTA STORM PIPE
TELE TELEPHONE
TEMP TEMPORARY
TRANS. TRANSFORMER
TYP TYPICAL
U.D. UNDERDRAIN
VCP VITRIFIED CLAY PIPE
W/4" 4" WIDE WHITE PAINT LINE
Y/4" 4" WIDE YELLOW PAINT LINE
DRAINAGE MANHOLE (DMH)D
GAS VALVE (GV)
HYDRANT, FIRE (FH)
UTILITY, SANITARY MANHOLE - (SSWR-MH)S
WATER VALVE (WV)
COMMUNICATION LINE
GAS LINE
SANITARY SEWER LINE
STEAM LINE
TELEPHONE LINE
UNKNOWN LINE
CENTERLINE
CHAINLINK FENCE
NRCS SOIL LINE
VEGETATION
BOLLARD LIGHTS
LIGHT POST (LP)
BOLLARD
TREE - CONIFEROUS (CONF.)
CONCRETE
APPROXIMATE PROPERTY LINE
UTILITY, COMMUNICATION MANHOLE (CMH)C
UTILITY, TELEPHONE MANHOLE (TMH)T
UTILITY, STEAM MANHOLE (STM-MH)ST
CHILLED WATER LINE RETURN
CHILLED WATER LINE SUPPLY
FLAG POLE
FA FIRE ALARM LINE
U/T
WTR
SAN
GAS
U/E
SCALE: 1"=30'
60'30'0'
CORE BORING SAMPLE
LOCATION
SITE SYMBOLS - BORING
CORE BORING No.1
CORE BORING No.2
CORE BORING No.3
CORE BORING No.4
SITE SYMBOL - IMPROVEMENTS
PROPOSED CONCRETE CURB
SAWCUT LINE
SITE SYMBOL - STRIPING
FULL DEPTH PAVEMENT
PROPOSED CONCRETE
LAWN AREA TO BE RESTORED
PROPOSED SIGN
PROPOSED LIGHT POLE (SEE LIGHTING
PLANS FOR DETAILS)
SITE SYMBOL - CURBING
RESERVED PARKING (HANDICAP) SIGN
(MUTCD R7-8) POST MOUNTED WITH BOLLARD
TAPER CURB TO SIDEWALK
MATCH SIDEWALK TO EXISTING
SIDEWALK, HORIZONTAL & VERTICAL1
DETECTABLE WARNING SURFACE
SITE SYMBOL - SIGNAGE
4" WHITE PAINT
4" WHITE PAINT (45° @ 3' C-C)
ADA ACCESSIBILITY PARKING SYMBOL
4" BLUE PAINT 45° @ 5' C-C
4" BLUE PAINT
12" WHITE STOP BAR
1A
1B VAN ACCESSIBLE SIGN (MUTCD R7-8A)
POST MOUNTED WITH BOLLARD
2 STOP SIGN (MUTCD R1-1)
MILL AND OVERLAY
DEPRESSED CURB4
PROPOSED BOLLARDS
7 4" RED PAINT
8 4" RED PAINT (45° @ 3' C-C)
RIP-RAP
WV
WV
WVWV
FH
WV
S S
S
EX. SLOW SIGN
EX. STOP SIGN
EX. STOP SIGN
SAWCUT
SA
WCU
T
SA
W
CU
T
SAW
CUT
BUILDING 29A
24" DECID.
24" DECID.
18" DECID.
16" DECID.
16" DECID.
BUILDING 30
CO
6" P
VC
P
IP
E
6" P
VC
P
IP
E
6" P
VC
P
IP
E
HEADWALL
INV: 1137.54
SAWCUT
SA
W
CU
T
SA
W
CU
T
SA
W
CU
T
SA
W
CU
T
SAWCUT
TOTAL PARKING SPACES: 99
ADA PARKING: 3
ADA VAN PARKING: 1
REGULAR PARKING: 95
24'
9'
9'
9'
9'
PROP.
BOLLARDS
(TYP.)
1B
18'
18'
18'
31'
25'
29'
12'
R3'
R3'
R245'
R3'
R10'
R3'
R3' R3'
R3'
R5'
GRASS
1A
EOP
EO
P
EOP
HANDHOLE1
PROPOSED
LIGHT POLE #1
PROPOSED
LIGHT POLE #2
PROPOSED
LIGHT POLE #4
PROPOSED
LIGHT POLE #3
PROPOSED
LIGHT POLE #9
PROPOSED
LIGHT POLE #7
PROPOSED
LIGHT POLE #8
PROPOSED
LIGHT POLE #6
PROPOSED
LIGHT POLE #5
PROPOSED
LIGHT POLE #10
PROPOSED
LIGHT POLE #11
8'
18'
9'
18'
5' 5' 8' 5' 11'
24'
24'
24'
24'
TM
3'
R10' 3'
1A
19' 5'9' 8' 5' 9'
18'
20'
18'
9'
24'
STEPS
PR
O
P. C O
N C
. SID
EW
ALK
PROP. CONC. SIDEWALK
5'
PROP.
BOLLARDS
(TYP.)
6'
6'
6'
8'8'
6'
6'
6'
PROPOSED
RETAINING WALL
PROPOSED
STAIRS AND LANDING
PROPOSED
RETAINING WALL
PROPOSED
STAIRS AND LANDING
R3'
R3'
R14
5 '
R4'
5'
5' 5'
5' 5'
5'
5'5'
18' 18'
18'
EO
P
R 3 ' R3'
R3'
R3
4'
3'
PROP.
BOLLARD
EX. PIV
PROP.
BOLLARDS
(TYP.)5'
1A
TO BE REMOVE AND
REPLACE (SEE
STRUCTURAL
DRAWINGS)
TO BE REMOVE AND
REPLACE (SEE
STRUCTURAL
DRAWINGS)
02/03/2025 Schadler RCG
Bath VA Medical Center Bath, NY
528A6-22-665 Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Project Director
Revisions: Date: Dwg. ofJeremie M. Schadler PE# 075290
SITE SYMBOLS - GENERAL
BENCHMARK #1: SANITARY MANHOLE AT THE WESTERN
WALL OF BUILDING 30 , CLOSEST TO WATER VALES
ELEV. 1140.55
DRAWING BLOCK TITLE WITH GRAPHIC SCALE
(SHOWN HALF ACTUAL SIZE)
PLAN
DIMENSION
A
SITE SYMBOLS - CONCRETE/MASONRY
SITE SYMBOLS - UTILITIES
NOTE:
VERTICAL TEXT INDICATES PROPOSED FEATURES (PROP.)
SLANTED TEXT INDICATES EXISTING FEATURES (EX.)
STORM SEWER LINE
UTILITY, UTILITY POLE (UP)
UTILITY, WATER MANHOLE (WMH)W
UTILITY, ELECTRICAL MANHOLE (EMH)E
SIGN
WATER LINE
EDGE OF PAVEMENT
CURB LINE
MINOR CONTOUR
MAJOR CONTOUR
SITE SYMBOLS - EXISTING
TREES - DECIDUOUS (DECID.)
DRAINAGE CATCH BASIN (CB)
DETAIL NUMBER
DETAIL SHEET
SITE SYMBOLS - ABBREVIATIONS
ELECTRIC LINE
APPROX APPROXIMATELY
BLDG BUILDING
CIP CAST IRON PIPE
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .