This solicitation is for construction services required for the FCA Replace Air Handling Units 657-21-106JB project at the Jefferson Barracks Division of the St. Louis VA Medical Center in St. Louis, Missouri. The project scope includes replacing obsolete air handlers that support Buildings 52 and 53, and all necessary architectural, electrical, structural and hazardous material abatement work. The intent is to replace aging equipment that is beyond its useful life, some over 35 years old. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. Construction services will include replacing the air handling units, as well as all required architectural, electrical, structural and hazardous material abatement to safely provide the new equipment and system components.

View the file

Other files

File Type Posted
36C25523R0026 0005.docx DOCX document
36C25523R0026_1 Page 5 3 bid items.pdf PDF
36C25523R0026 0004.docx DOCX document
36C25523R0026 0003.docx DOCX document
657-21-106JB - RFI Prebid Jan-2023 Questions.docx DOCX document
657-21-106JB Sign In Sheet.pdf PDF
36C25523R0026_1 Page 5.pdf PDF
36C25523R0026 0002.docx DOCX document
36C25523R0026 0001.docx DOCX document
P01 JB Combined drawings 22 09 09 Part2.pdf PDF
APPENDIX D - ACM LBP MOLD REPORTS PART 2.pdf PDF
P01 APPENDIX B - 100 SPECIFICATIONS 22 09 30 Update.pdf PDF
APPENDIX D - ACM LBP MOLD REPORTS PART 1.pdf PDF
P01 JB Combined drawings 22 09 09 Part1.pdf PDF
36C25523R0026_1.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JE

FFER

SON D

RIV

E

SO

U

TH

G

ATE

E N

TR

AN

C E D

R

IV

E

IN

T

ER

ST

AT

E

IN

TE

R

STA

TE

TO INTERSTATE 255 →

N O

R T H

G A T E

E N

T R

A N C

E D

R

IV

E

KOCH ROAD

KOCH ROAD

MISSISSIPPI RIVER

I-2

LO

T

1i

0 GRID / COLUMN LINE DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

Ga5xFB1

WALL TYPE

WINDOW TYPE

ROOM NAME

ROOM NAME / NUMBER

REVISION TAG

PLAN NORTH

TRUE NORTH

NORTH

NORTH ARROW WITH TRUE

NORTH INDICATION

EGRESS ROUTE ID AND

SECTION LENGTH

ROOM

ROOM OCCUPANCY

150 SF

EGRESS : EGRESS ID

Egress Length

ROOM OCCUPANCY & AREA

ELEVATION NUMBER

SECTION

INTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name Elevation

FLOOR LEVEL &

NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

SHEET KEYNOTE

A101

SIM

EXTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

DISCIPLINE:

G - GENERAL

A - ARCHITECTURE

P - PLUMBING

M - MECHANICAL

E - ELECTRICAL

SHEET TYPE

DESIGNATOR

VICINITY MAP

PROJECT TEAM

BUILDING SUMMARY

PROJECT INFORMATION

THE INTENT OF THIS PROJECT IS TO REPLACE OBSOLETE AIR HANDLERS THAT SUPPORT BUILDINGS 52 & 53. THIS INCLUDES ALL ARCHITECTURAL, ELECTRICAL, STRUCTURAL AND HAZARDOUS MATERIAL ABATEMENT NECESSARY TO SAFELY PROVIDE THE NEW EQUIPMENT AND SYSTEM COMPONENTS.

ANNOTATION DRAWING SYMBOLSGENERAL NOTES

PROJECT NAME: FCA REPLACE AIR HANDLING UNITS BUILDINGS 52 & 53

PROJECT NUMBER: 657-21-106JB

PROJECT LOCATION: JEFFERSON BARRACKS VA MEDICAL CENTER, 1 JEFFERSON BARRACKS DR., ST. LOUIS, MO 63125

PROJECT PURPOSE/USE: REPLACE OBSOLETE AHUS THAT SUPPORT BUILDINGS 52 & 53 PER FCA RECOMMENDATIONS

BUILDING 52 AREA:

BASEMENT (EXISTING) 34,923 GSF

LEVEL 01 (EXISTING) 34,963 GSF

LEVEL 02 (EXISTING) 30,936 GSF

BUILDING NUMBER

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION.

THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE

SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW ALL DRAWINGS AND

PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.

2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING

PERFORMED BEFORE SUBMITTING COST QUOTATIONS FOR WORK.

3. NOTIFY THE A/E PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES,

DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED

FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE PROVIDED PRIOR TO

CONTINUING WITH WORK.

4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE A/E.

5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL,

STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE

WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS

AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING

JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED

WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF

PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.

6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF

OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL

TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND

EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO

EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL

CONDITION AT THE CONTRACTOR'S EXPENSE.

7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE

ON A DAILY BASIS.

8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE

ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS

PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH RESPECT TO DELIVERY DATE,

QUALITY, OR COST.

9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND

FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE A/E DOES NOT

ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND METHODS OR FOR

TEMPORARY STRUCTURES.

10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. THE CONTRACTOR SHALL EMPLOY ENGINEERING EXPERTISE AS NEEDED TO

ASSIST IN DEMOLITION.

11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE

AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING

CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA

REGULATIONS DURING CONSTRUCTION.

12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF

BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT,

AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS

FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO

PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD,

RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE

GENERAL CONTRACTOR'S EXPENSE.

13. FLAMMABLE AND COMBUSTIBLE MATERIALS IF USED DURING CONSTRUCTION, SHALL BE

HANDLED AND STORED IN ACCORDANCE WITH NFPA 30.

14. ANY DUCTWORK THAT PENETRATES A RATED ASSEMBLY SHALL BE PROTECTED WITH AN

APPROPRIATE DAMPER AND TIED TO THE FIRE ALARM.

15. ALL ENGINEERED SHOP DRAWINGS ARE TO BE REVIEWED BY THE ARCHITECT AND/OR

ENGINEER OF RECORD PRIOR TO BEING SUBMITTED TO THE BUILDING DEPT. FOR REVIEW.

16. THE GENERAL CONTRACTOR TO BE RESPONSIBLE FOR ABATEMENT OF ALL ASBESTOS

FOUND ON ASBESTOS REPORT PROVIDED BY SCI ENGINEERING.

17. THE GENERAL CONTRACTOR IS TO SUBMIT SUBSTITUTE MATERIAL, SPECIFICATIONS,

PROPOSED +/- COST, AND A SAMPLE FOR APPROVAL IN WRITING TO THE ARCHITECT PRIOR

TO COMMENCEMENT OF WORK.

A101

A101

SCOPE OF WORK SUMMARY:

SHEET NUMBER

WITHIN SERIES

INDEX OF DRAWINGS

BUILDING 53 AREA:

BASEMENT (EXISTING) 28,104 GSF

LEVEL 01 (EXISTING) 24,427 GSF

LEVEL 02 (EXISTING) 24,382 GSF

N O

R T

H

DRAWING INDEX

DEDUCT ALTERNATESNONE AT THIS TIME.

52-AE101

DEMOLITION NOTES

1. FOR DEMOLISHED ITEMS, WHAT IS TAKEN OUT MUST BE LISTED AND REPORTED ON

APPROPRIATE FORM (EE NUMBER ITEMS).

2. ALL EE NUMBERED EQUIPMENT REMOVED DURING SHALL BE DOCUMENTED ON THE BSE

TURN IN FORM AND TURNED IN TO THE COR.

3. ALL EQUIPMENT INSTALLED DURING THIS PROJECT SHALL BE DOCUMENTED ON THE BSE

FORM CHECK IN FORM AND TURNED IN TO THE COR. REFER TO SPECIFICATIONS FOR

FORMS.

OWNER:

Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth, KS 66048-5012

CONTRACTING OFFICER REPRESENTATIVES:

Jefferson Barracks VA Medical Center 1 Jefferson Barracks Drive St. Louis, MO 63125

Lydia Oswald lydia.oswald@va.gov

314.652.4100 x66719

ARCHITECT:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Michele M. Kiehl, AIA, LEED AP BD+C Michele.Kiehl@RomanykConsulting.com

855.424.3838 x313

913.908.3280 cell

MECHANICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

402.981.8882 cell

ELECTRICAL ENGINEER:

Romanyk Consulting Corp.

15 Sunnen Drive, Suite 104 Plano, Texas 75093

Yumei Wang P.E, RCDD, CTS, LEED AP Yumei.Wang@RomanykConsulting.com

855.424.3838 x311 402.321.3766

PROJECT MANAGER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

402.981.8882 cell

Devin Gates devin.gates@va.gov

314.652.4100 x67669

BUILDING SCHEDULE

1 OUTPATIENT CLINICS - VSO

1G EMERGENCY GENERATOR FOR BUILDING 1

1CC CONNECTING CORRIDORS

2 HEALTHACRE ENVIRONMENT AND FACILITY PROGRAMS

3 DOMICILIARY

3T DOMICILIARY OFFICES

18 FISCAL HUMAN RESOURCES

23 PROSTHETICS

24 CANTEEN - LIBRARY - AUDITORIUM

25 NATIONAL CANTEEN SERVICE EXECUTIVE SUITE

25T NRM IMPACT

51 INPATIENT MENTAL HEALTH

51T NEURO PSYCHIATRIC

52 SPINAL CORD INJURY (SCI)

52G EMERGENCY GENERATOR FOR BUILDING 52

52SG TRANSFER SWITCH GEAR

53 COMMUNITY LONG-TERM CARE (CLC)

53G EMERGENCY GENERATOR FOR BUILDING 53

53T HOME BASE PRIMARY CARE

54 REHAB ILITATION

55 OUTPATIENT CLINICS

55G EMERGENCY GENERATOR FOR BUILDING 55

56 TENANTS (NCA,EES,OIT, OGC)

56G EMERGENCY GENERATOR FOR BUILDING 56

57 ENGINEERING LOGISTICS, LAUNDRY

58 MENTAL HEALTH CLINIC

59 FISCHER HOUSE

60 MAIN KITCHEN

60G EMERGENCY GENERATOR FOR BUILDING 60

60T FOOD - NUTRITION - DIETETICS

75 ENERGY PLANT

89 SECURITY STATION

93 HAZARDOUS WASTE STORAGE

101T CFM MAJOR PROJECTS

101T

53T

52G

52SG

60T

60G

51T

1CC

25T

3 3T 18

56G

BUILDINGS IN

PROJECT SCOPE

NOTE: SEE GC100 SERIES FOR SITE STAGING INFORMATION.

CONTRACTOR ENTRANCE

CONTRACTOR PARKING AND

STORAGE, GRAVEL LOT.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA ST. LOUIS HEALTH CARE SYSTEM

FULLY SPRINKLERED

52 & 53

JEFFERSON BARRACKS

Office of Construction and Facilities Management

B

IM

/V

IS

N

J e ff e rs o n B a rr a c k s R e p la c e

A H

U s B

V

/J e ff e rs o n

B a rr a c k s R e p la c e

A H

U s B

V

.r v t

/9

/2

:2

:4

P M

PROJECT INFORMATION AND SHEET INDEX

AUGUST 25, 2022

657-21-106JB

PROJECT NUMBER - 657-21-106JB

FCA REPLACE AIR HANDLING UNITS

BUILDINGS 52 & 53

BID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW DAW

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

GI100

BID DOCUMENTS

SHEET # SHEET TITLE

52-AE100 BUILDING 52 - LEVEL 00 - RM.GN39- ARCHITECTURAL PLANS

52-AE101 BUILDING 52 - LEVEL 00 - RM. GS08A - ARCHITECTURAL PLANS

52-AE102 BUILDING 52 - LEVEL 02 - RM.2S14 - ARCHITECTURAL PLANS

53-AD101 BUILDING 53 - ROOF PLAN - NORTH WING - DEMOLITION PLAN

53-AD102 BUILDING 53 - ROOF PLAN - SOUTH WING - DEMOLITION PLAN

53-AE140 BUIDLING 53 - OVERALL ROOF PLAN

53-AE141 BUILDING 53 - ROOF PLAN - NORTH WING - ARCHITECTURAL

53-AE142 BUILDING 53 - ROOF PLAN - SOUTH WING - ARCHITECTURAL

53-AE530 BUILDING 53 - ROOF DETAILS

ASBESTOS ABATEMENT

52-HA100 BUILDING 52 - ENLARGED PLANS - ASBESTOS CONTAINING MATERIALS (ACM) TO BE ABATED

52-HA101 BUILDING 52 - ENLARGED PLANS SUSPECT MOLD GROWTH TO BE ABATED

52-HA102 BUILDING 52 - ENLARGED PLANS - SUSPECT MOLD GROWTH LOCATIONS

53-HA100 BUILDING 53 - OVERALL PLAN - SUSPECT MOLD GROWTH TO BE ABATED

FIRE PROTECTION

F-100 FIRE PROTECTION LEGEND, DETAILS, GENERAL NOTES AND ABBREVIATIONS

52-FD100 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION DEMOLITION

52-FD101 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION DEMOLITION

52-FS100 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION

52-FS101 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION

MECHANICAL

M-100 MECHANICAL LEGEND AND GENERAL NOTES

M-101 MECHANICAL ABBREVIATIONS

52-MO100 BUILDING 52 - OVERALL PLAN - BASEMENT & LEVEL 01 - MECHANICAL

52-MO101 BUILDING 52 - OVERALL PLAN - LEVEL 02 & ROOF - MECHANICAL

52-MD100 BUILDING 52 - ENLARGED PLANS - HVAC DEMOLITION

52-MD101 BUILDING 52 - ENLARGED PLANS - HVAC DEMOLITION

52-MD200 BUILDING 52 - ENLARGED PLANS - PIPING DEMOLITION

52-MD201 BUILDING 52 - ENLARGED PLANS - PIPING DEMOLITION

52-MH100 BUILDING 52 - ENLARGED PLANS - HVAC

52-MH101 BUILDING 52 - ENLARGED PLANS - HVAC

52-MP100 BUILDING 52 - ENLARGED PLANS - PIPING

52-MP101 BUILDING 52 - ENLARGED PLANS - PIPING

53-MO100 BUILDING 53 - OVERALL PLAN - BASEMENT & LEVEL 01 - MECHANICAL

53-MO101 BUILDING 53 - OVERALL PLAN - LEVEL 02 & ROOF - MECHANICAL

53-MD100 BUILDING 53 - ENLARGED PLANS - HVAC DEMOLITION

53-MD101 BUILDING 53 - ENLARGED PLANS - HVAC DEMOLITION

53-MD200 BUILDING 53 - ENLARGED PLANS - PIPING DEMOLITION

53-MD201 BUILDING 53 - ENLARGED PLANS - PIPING DEMOLITION

53-MH100 BUILDING 53 - ENLARGED PLANS - HVAC

53-MH101 BUILDING 53 - ENLARGED PLANS - HVAC

53-MP100 BUILDING 53 - ENLARGED PLANS - PIPING

53-MP101 BUILDING 53 - ENLARGED PLANS - PIPING

M-300 MECHANICAL DETAILS

M-301 MECHANICAL DETAILS

M-400 MECHANICAL SCHEDULES

M-500 MECHANICAL EQUIPMENT CONTROLS DIAGRAM

M-501 MECHANICAL EQUIPMENT CONTROLS DIAGRAM

M-502 MECHANICAL EQUIPMENT CONTROLS DIAGRAM

M-600 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-601 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-602 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-603 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-604 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-605 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-606 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

ELECTRICAL

E-100 ELECTRICAL LEGEND, GENERAL NOTES AND ABBREVIATIONS

ES100 ELECTRICAL SITE PLAN

52-ED100 BUILDING 52 - LEVEL 00 - ELECTRICAL DEMOLITION PLAN

52-ED101 BUILDING 52 - LEVEL 02 - ELECTRICAL DEMOLITION PLAN

52-EP100 BUILDING 52 - LEVEL 00 - ELECTRICAL PLAN

52-EP101 BUILDING 52 - LEVEL 01 - ELECTRICAL PLAN

52-EP102 BUILDING 52 - LEVEL 02 - ELECTRICAL PLAN

53-ED100 BUILDING 53 - ROOF NORTH & PENTHOUSE - ELECTRICAL DEMOLITION PLAN

53-ED101 BUILDING 53 - ROOF SOUTH - ELECTRICAL DEMOLITION PLAN

53-EP100 BUILDING 53 - LEVEL 02 - ELECTRICAL PLAN

53-EP101 BUILDING 53 - ROOF NORTH & PENTHOUSE - ELECTRICAL PLAN

53-EP102 BUILDING 53 - ROOF SOUTH - ELECTRICAL PLAN

E-400 ELECTRICAL SCHEDULES

SHEET # SHEET TITLE

GENERAL INFORMATION

GI100 PROJECT INFORMATION AND SHEET INDEX

GENERAL CONTRACT

GC100 PROJECT STAGING - OVERALL SITE PLAN

GC101 PROJECT STAGING - ENLARGED SITE PLAN

GC102 PROJECT STAGING - CRANE PLAN

GC103 PROJECT STAGING - ROOF TOP EQUIPMENT WEIGHTS

GC104 BUILDING 53 - TEMPORARY HVAC PHASING PLAN

GC105 BUILDING 53 - TEMPORARY HVAC PHASING PLAN

GC106 BUILDING 53 - TEMPORARY HVAC PHASING PLAN

GC107 BUILDING 53 - TEMPORARY HVAC PHASING PLAN

GC108 BUILDING 52 - TEMPORARY HVAC PHASING PLAN

GC109 BUILDING 52 - TEMPORARY HVAC PHASING PLAN

GC110 BUILDING 52 - TEMPORARY HVAC PHASING PLAN

GC111 BUILDING 52 - LEVEL 00 & 01 - INFECTION CONTROL/PHASING PLANS

GC112 BUILDING 52 - LEVEL 02 - INFECTION CONTROL/PHASING PLANS

GC113 BUILDING 53 - LEVEL 02 & ROOF LEVEL - INFECTION CONTROL/PHASING PLANS

GI202 BUILDING 52 - LEVEL 00 & 01 OVERALL - LIFE SAFETY PLAN

GI203 BUILDING 52 & 53 - LEVEL 02 OVERALL - LIFE SAFETY PLAN

ARCHITECTURAL

52 & 53-AC100 BUILDING 52 & 53 - LEVEL 00 & 02 - REFLECTED CEILING PLANS

Revisions: Date:

Revision 1 Date 1

Part 3

KEYNOTES

GENERAL NOTES

UPDN

DNDN

UPDN

DNDN

1. CONNECT NEW LIGHT FIXTURES TO EXISTING LIGHTING CIRCUIT AND SWITCH SERVING THE

SPACE. COORDINATE LIGHTING FIXTURE LOCATION AND MOUNTING HEIGHT WITH MECHANICAL

CONTRACTOR.

2. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER: 3#6,#10G, 1"C. REPLACE EXISTING BREAKER IN

PANEL P1 WITH 50A/3P. UTILIZE EXISTING PATHWAY WHERE POSSIBLE.

3. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER: 3#6,#10G, 1"C. REPLACE EXISTING BREAKER IN

PANEL P3 WITH 50A/3P. UTILIZE EXISTING PATHWAY WHERE POSSIBLE.

4. PROVIDE AND INSTALL WEATHERPROOF WHILE IN-USE COVER FOR EXISTING RECEPTACLE.

5. PROVIDE LIGHTNING PROTECTION AIR TERMINALS AND BONDING CONDUCTORS ON NEW

MECHANICAL EQUIPMENT. CONNECT TO EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF.

SEE SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS.

6. INSTALL NEW DISCONNECT IN PLACE OF EXISTING. COORDINATE EXACT LOCATION IN FIELD. SEE

SHEET E-400 FOR DISCONNECT AND FEEDER INFORMATION.

7. EXISTING PANEL FOR CONNECTING THE UPDATED MECHANICAL EQUIPMENT. CONTRACTOR TO

COORDINATE WITH VA COR FOR EXACT EXISTING EQUIPMENT LOCATION. NEW CIRCUIT BREAKER

SHALL MATCH EXISTING FOR TYPE AND SHORT CIRCUIT RATINGS.

8. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER:3#6, #10G, 1"C. REPLACE EXISTING CIRCUIT BREAKER IN PANEL P4L WITH 50A/3P. PANEL P4L IS ON BASEMENT LEVEL. UTILIZE EXISTING

PATHWAY WHERE POSSIBLE.

9. PROVIDE FIRE ALARM DUCT DETECTORS AND MONITORING DEVICES AS REQUIRED PER CODE.

COORDINATE WITH MECHANICAL CONTRACTOR.

10. EXISTING CEILING LIGHTING FIXTURES AND DEVICES AFFECTED BY CONSTRUCTION TO BE

REMOVED AND REINSTALLED AS NECESSARY. RECONNECT TO EXISTING CIRCUITS IN PLACE.

11. SEE MECHANICAL SHEETS FOR VFD INFORMATION.

1. SEE SHEET E-100 FOR SYMBOL LEGEND, GENERAL NOTES AND NOTES.

2. SEE MECHANICAL SHEETS FOR CONTROL WIRING TO MECHANICAL EQUIPMENT.

3. ONE-LINE DIAGRAMS ARE MEANT TO SHOW ONLY ELECTRICAL RELATIONSHIPS

AND THEREFORE MAY NOT INCLUDE ALL REQUIRED EQUIPMENT, DEVICES

AND ACCESSORIES.

4. CONTRACTOR TO VERIFY EXISTING EQUIPMENT AND DEVICE LOCATIONS PRIOR TO

BID.

5. USE EXISTING CONDUITS WHERE THEY ARE SUITABLE FOR THE NEW FEEDERS.

PROVIDE NEW CONDUITS WHERE REQUIRED. CONTRACTOR TO PROVIDE CREDIT

FOR UTILIZING EXISTING CONDUITS.

6. KEYED NOTES AND THEIR CORRESPONDING NUMBERS ARE TYPICAL FOR ALL

ELECTRICAL SHEETS. NOT ALL KEYED NOTES ARE USED ON EACH

SHEET.

53-AH-2 53-AH-3

53-AH-4

53-AH-5

53-ERC-5

53-ERC-1

53-AH-1(ON ROOF)

(ON ROOF)

(ON ROOF)

(ON ROOF)

(ON ROOF) (ON ROOF)

(ON ROOF)

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

52 & 53

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:0

P M

BUILDING 53 - LEVEL 02 - ELECTRICAL PLAN

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

YW PP

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

53-EP100

1" = 10'-0"1

BUILDING 53 OVERALL PLAN - LEVEL 02 - ELECTRICAL

Revisions: Date:

FAM FAM

1. CONNECT NEW LIGHT FIXTURES TO EXISTING LIGHTING CIRCUIT AND SWITCH SERVING THE

SPACE. COORDINATE LIGHTING FIXTURE LOCATION AND MOUNTING HEIGHT WITH MECHANICAL

CONTRACTOR.

2. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER: 3#6,#10G, 1"C. REPLACE EXISTING BREAKER IN

PANEL P1 WITH 50A/3P. UTILIZE EXISTING PATHWAY WHERE POSSIBLE.

3. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER: 3#6,#10G, 1"C. REPLACE EXISTING BREAKER IN

PANEL P3 WITH 50A/3P. UTILIZE EXISTING PATHWAY WHERE POSSIBLE.

4. PROVIDE AND INSTALL WEATHERPROOF WHILE IN-USE COVER FOR EXISTING RECEPTACLE.

5. PROVIDE LIGHTNING PROTECTION AIR TERMINALS AND BONDING CONDUCTORS ON NEW

MECHANICAL EQUIPMENT. CONNECT TO EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF.

SEE SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS.

6. INSTALL NEW DISCONNECT IN PLACE OF EXISTING. COORDINATE EXACT LOCATION IN FIELD. SEE

SHEET E-400 FOR DISCONNECT AND FEEDER INFORMATION.

7. EXISTING PANEL FOR CONNECTING THE UPDATED MECHANICAL EQUIPMENT. CONTRACTOR TO

COORDINATE WITH VA COR FOR EXACT EXISTING EQUIPMENT LOCATION. NEW CIRCUIT BREAKER

SHALL MATCH EXISTING FOR TYPE AND SHORT CIRCUIT RATINGS.

8. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER:3#6, #10G, 1"C. REPLACE EXISTING CIRCUIT BREAKER IN PANEL P4L WITH 50A/3P. PANEL P4L IS ON BASEMENT LEVEL. UTILIZE EXISTING

PATHWAY WHERE POSSIBLE.

9. PROVIDE FIRE ALARM DUCT DETECTORS AND MONITORING DEVICES AS REQUIRED PER CODE.

COORDINATE WITH MECHANICAL CONTRACTOR.

10. EXISTING CEILING LIGHTING FIXTURES AND DEVICES AFFECTED BY CONSTRUCTION TO BE

REMOVED AND REINSTALLED AS NECESSARY. RECONNECT TO EXISTING CIRCUITS IN PLACE.

11. SEE MECHANICAL SHEETS FOR VFD INFORMATION.

1. SEE SHEET E-100 FOR SYMBOL LEGEND, GENERAL NOTES AND NOTES.

2. SEE MECHANICAL SHEETS FOR CONTROL WIRING TO MECHANICAL EQUIPMENT.

3. ONE-LINE DIAGRAMS ARE MEANT TO SHOW ONLY ELECTRICAL RELATIONSHIPS

AND THEREFORE MAY NOT INCLUDE ALL REQUIRED EQUIPMENT, DEVICES

AND ACCESSORIES.

4. CONTRACTOR TO VERIFY EXISTING EQUIPMENT AND DEVICE LOCATIONS PRIOR TO

BID.

5. USE EXISTING CONDUITS WHERE THEY ARE SUITABLE FOR THE NEW FEEDERS.

PROVIDE NEW CONDUITS WHERE REQUIRED. CONTRACTOR TO PROVIDE CREDIT

FOR UTILIZING EXISTING CONDUITS.

6. KEYED NOTES AND THEIR CORRESPONDING NUMBERS ARE TYPICAL FOR ALL

ELECTRICAL SHEETS. NOT ALL KEYED NOTES ARE USED ON EACH

SHEET.

53-EP101

4 4

53-AH-5

53-EF6 (EX)

53-EF4 (EX) 53-EF5 (EX)

53-AH-2

53-ERC-5

53-P7

9 9S S

53-EF7 (EX)

ELEVATOR PANEL

EMCC (EX)

MCC (EX)

ELEVATOR TRANSFER SWITCH

VFD-53-RF-2

VFD-53-RF-3

VFD-53-SF-2

VFD-53-SF-3

VFD VFD

VFDVFD

VFD-53-SF-1

VFD

VFD-53-SF-4

VFD

VFD-53-P-6

VFD

VFD-53-P-7

VFD

VFD-53-EF-1

VFD

VFD-53-EF-5

VFD

VFD-53-SF-5

VFD

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:0

P M

BUILDING 53 - ROOF NORTH & PENTHOUSE -

ELECTRICAL PLAN

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

YW PP

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

53-EP101

1/8" = 1'-0"1

BUILDING 53 - ROOF NORTH - ELECTRICAL PLAN

1/4" = 1'-0"2

BLDG 53 PENTHOUSE - ELECTRICAL PLAN

FAM

FAM FAM

1. CONNECT NEW LIGHT FIXTURES TO EXISTING LIGHTING CIRCUIT AND SWITCH SERVING THE

SPACE. COORDINATE LIGHTING FIXTURE LOCATION AND MOUNTING HEIGHT WITH MECHANICAL

CONTRACTOR.

2. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER: 3#6,#10G, 1"C. REPLACE EXISTING BREAKER IN

PANEL P1 WITH 50A/3P. UTILIZE EXISTING PATHWAY WHERE POSSIBLE.

3. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER: 3#6,#10G, 1"C. REPLACE EXISTING BREAKER IN

PANEL P3 WITH 50A/3P. UTILIZE EXISTING PATHWAY WHERE POSSIBLE.

4. PROVIDE AND INSTALL WEATHERPROOF WHILE IN-USE COVER FOR EXISTING RECEPTACLE.

5. PROVIDE LIGHTNING PROTECTION AIR TERMINALS AND BONDING CONDUCTORS ON NEW

MECHANICAL EQUIPMENT. CONNECT TO EXISTING LIGHTNING PROTECTION SYSTEM ON ROOF.

SEE SPECIFICATION SECTION FOR ADDITIONAL REQUIREMENTS.

6. INSTALL NEW DISCONNECT IN PLACE OF EXISTING. COORDINATE EXACT LOCATION IN FIELD. SEE

SHEET E-400 FOR DISCONNECT AND FEEDER INFORMATION.

7. EXISTING PANEL FOR CONNECTING THE UPDATED MECHANICAL EQUIPMENT. CONTRACTOR TO

COORDINATE WITH VA COR FOR EXACT EXISTING EQUIPMENT LOCATION. NEW CIRCUIT BREAKER

SHALL MATCH EXISTING FOR TYPE AND SHORT CIRCUIT RATINGS.

8. DISCONNECT SWITCH 60AS/45AF/3P. FEEDER:3#6, #10G, 1"C. REPLACE EXISTING CIRCUIT BREAKER IN PANEL P4L WITH 50A/3P. PANEL P4L IS ON BASEMENT LEVEL. UTILIZE EXISTING

PATHWAY WHERE POSSIBLE.

9. PROVIDE FIRE ALARM DUCT DETECTORS AND MONITORING DEVICES AS REQUIRED PER CODE.

COORDINATE WITH MECHANICAL CONTRACTOR.

10. EXISTING CEILING LIGHTING FIXTURES AND DEVICES AFFECTED BY CONSTRUCTION TO BE

REMOVED AND REINSTALLED AS NECESSARY. RECONNECT TO EXISTING CIRCUITS IN PLACE.

11. SEE MECHANICAL SHEETS FOR VFD INFORMATION.

1. SEE SHEET E-100 FOR SYMBOL LEGEND, GENERAL NOTES AND NOTES.

2. SEE MECHANICAL SHEETS FOR CONTROL WIRING TO MECHANICAL EQUIPMENT.

3. ONE-LINE DIAGRAMS ARE MEANT TO SHOW ONLY ELECTRICAL RELATIONSHIPS

AND THEREFORE MAY NOT INCLUDE ALL REQUIRED EQUIPMENT, DEVICES

AND ACCESSORIES.

4. CONTRACTOR TO VERIFY EXISTING EQUIPMENT AND DEVICE LOCATIONS PRIOR TO

BID.

5. USE EXISTING CONDUITS WHERE THEY ARE SUITABLE FOR THE NEW FEEDERS.

PROVIDE NEW CONDUITS WHERE REQUIRED. CONTRACTOR TO PROVIDE CREDIT

FOR UTILIZING EXISTING CONDUITS.

6. KEYED NOTES AND THEIR CORRESPONDING NUMBERS ARE TYPICAL FOR ALL

ELECTRICAL SHEETS. NOT ALL KEYED NOTES ARE USED ON EACH

SHEET.

53-AH-4

53-AH-3 53-AH-1

5 5

53-EF2 (EX)

53-ERC-1

53-P6

9S S

S

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:0

P M

BUILDING 53 - ROOF SOUTH - ELECTRICAL

PLAN

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

YW PP

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

53-EP102

1/8" = 1'-0"1

BUILDING 53 - ROOF SOUTH - ELECTRICAL PLAN

KEY NOTES

TS1 (EX)

400 A 3P

400 A 3P

150 A 3P

TO GDP (EX)

20 A 3P

20 A 3P

70 A 3P

70 A 3P

53-EF-6 53-EF-2 53-SF-5 53-SF-1

150 A 3P

150 A 3P

20 A 3P

20 A 3P

VFD VFD

53-SF-4 53-EF-3

20 A 3P

20 A 3P

100 A 3P

70 A 3P

53-P-6 53-P-7

VFD VFD

70 A 3P

20 A 3P

100 A 3P

40 A 3P

53-EF-1 53-EF-4 53-EF-5

100 A 3P

53-SF-2 53-SF-3

53-RF-2 53-RF-3

SPARE SPARE

EMCC (EX)

200 A

120/208V, 3 PHASE, 4 WIRE

MCC (EX)

400 A

120/208V, 3 PHASE, 4 WIRE

EMP (EX)

400 A

120/208V, 3 PHASE, 4 WIRE

MSB (EX)

2000 A

120/208V, 3 PHASE, 4 WIRE

TS1 (EX)

400 A 3P

400 A 3P

150 A 3P

TO GDP (EX)

20 A 3P

20 A 3P

90 A 3P

50 A 3P

53-EF-6 53-EF-2

SF-5

10HP

SF1.1 & SF1.2

(2)7.5HP

175 A 3P

175 A 3P

20 A 3P

45 A 3P

VFD VFD

SF-4

7.5HP

53-EF-3

20 A 3P

20 A 3P

90 A 3P

40 A 3P

53-P-6

2HP

53-P-7

3HP

VFD VFD

70 A 3P

20 A 3P

100 A 3P

45 A 3P

53-EF-4

100 A 3P

SF2.1 & SF2.2

(2)15HP

SF3.1 & SF3.2

(2)15HP

53-EF-1

15HP

53-EF-5

7.5HP

SPARE SPARE

EMCC (EX)

200 A

120/208V, 3 PHASE, 4 WIRE

MCC (EX)

400 A

120/208V, 3 PHASE, 4 WIRE

EMP (EX)

400 A

120/208V, 3 PHASE, 4 WIRE

MSB (EX)

2000 A

120/208V, 3 PHASE, 4 WIRE

VFDVFDVFD

RF3.1 & SF3.2

(2)7.5HP

RF2.1 & SF2.2

(2)3HP

VFD VFD

1 4 1 4

2 2 5 6

3 TYP.

45709040451751759050

45709040

2020451751759050

VFDVFD

10 56 7789

9050 175175 45 2020 40 90 70 45

1. PROVIDE NEW BREAKER IN EXISTING SPACE IN PANEL. BREAKER TYPE AND SHORT CIRCUIT

RATING SHALL MATCH EXISTING.

2. FUSED DISCONNECT SWITCH 200AS/150AF/3P, NEMA 3R. SEE PLAN FOR LOCATION. PROVIDE

MOUNTING UNISTRUT.

3. SEE MECHANICAL DRAWINGS FOR VFD SPECIFICATIONS AND LOCATION.

4. PROVIDE NEW FEEDER FOR REPLACEMENT EQUIPMENT. UTILIZE EXISTING CONDUIT WHERE

POSSIBLE.

5. FUSED DISCONNECT SWITCH 60AS/40AF/3P, NEMA 3R, SEE PLAN FOR LOCATION. PROVIDE

MOUNTING UNISTRUT.

6. FUSED DISCONNECT SWITCH 100AS/80AF/3P, NEMA 3R, SEE PLAN FOR LOCATION. PROVIDE

MOUNTING UNISTRUT.

7. FUSED DISCONNECT SWITCH 30AS/20AF/3P, NEMA 3R, SEE PLAN FOR LOCATION. PROVIDE

MOUNTING UNISTRUT.

8. FUSED DISCONNECT SWITCH 30AS/40AF/3P, NEMA 3R, SEE PLAN FOR LOCATION. PROVIDE

MOUNTING UNISTRUT.

9. FUSED DISCONNECT SWITCH 60AS/50AF/3P, NEMA 3R, SEE PLAN FOR LOCATION. PROVIDE

MOUNTING UNISTRUT.

10. FUSED DISCONNECT SWITCH 100AS/70AF/3P, NEMA 3R, SEE PLAN FOR LOCATION. PROVIDE

MOUNTING UNISTRUT.

1. LOADS IN EXISTING PANELS SHOWN FOR REFERENCE ONLY AND NOT REPRESENT THE

ACTUAL LOADS. CONTRACTOR SHALL VERIFY AND TEST PANEL LOADS PRIOR TO NEW

WORK.

2. CONTRACTOR TO VERIFY CIRCUIT NUMBERS AND AVAILABLE CIRCUITS FOR THE NEW

CONNECTION.

3. HATCHED ITEMS INDICATE TO BE DEMOLISHED; HALF TONE ITEMS INDICATE EXISTING TO

REMAIN; DARK LINE ITEMS INDICATE NEW.

TEMP DIESEL GENERATOR

IN WEATHER ENCLOSURE

150KW, 480V, 3 PHASE

G

TEMP AHU

(SEE MECHANICAL SHEETS)

200A/3

WEATHER ENCLOSURE

OUTDOOR RATED POWER FEEDER FOR

TEMPORARY CONNECTION (3) #6, #10G.

ROUTE FEEDERS ON GRADE AND

PROTECTED.

TEMP DIESEL GENERATOR

IN WEATHER ENCLOSURE

100KW, 480V, 3 PHASE

G

TEMP AHU

(SEE MECHANICAL SHEETS)

OUTDOOR RATED POWER FEEDER FOR

TEMPORARY CONNECTION (3) #6, #10G.

ROUTE FEEDERS ON GRADE AND

PROTECTED.

200A/3

WEATHER ENCLOSURE

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

52 & 53

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:2

P M

ELECTRICAL SCHEDULES

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

YW PP

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

E-400

Notes:

Total Est. Demand: 101 A

Total Conn.: 101 A

Total Est. Demand: 36318 VA

Spare 27600 VA 100.00% 27600 VA Total Conn. Load: 36318 VA

Receptacle 8718 VA 100.00% 8718 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 94 A 94 A 114 A

Total Load: 11306 VA 11306 VA 13706 VA

41 EXISTING 20 A 1 1200 VA 1200 VA 1 20 A EXISTING 42

39 EXISTING 20 A 1 1200 VA 1200 VA 1 20 A EXISTING 40

37 -- -- -- 1200 VA 1200 VA 1 20 A EXISTING 38

35 -- -- -- 1200 VA 0 VA -- -- -- 36

33 EXISTING 15 A 3 1200 VA 0 VA 2 30 A SPARE 34

31 SPARE 20 A 1 0 VA 1200 VA 1 20 A EXISTING 32

29 EXISTING 20 A 1 1200 VA 1200 VA 1 20 A EXISTING 30

27 SPARE 20 A 1 0 VA 1200 VA 1 20 A EXISTING 28

25 SPARE 20 A 1 0 VA 1200 VA 1 20 A EXISTING 26

23 EXISTING 20 A 1 1200 VA 0 VA -- -- -- 24

21 -- -- -- 0 VA 0 VA -- -- -- 22

19 SPARE 20 A 2 0 VA 0 VA 3 15 A SPARE 20

17 -- -- -- 2906 VA 1200 VA 1 20 A EXISTING 18

15 -- -- -- 2906 VA 1200 VA -- -- -- 16

13 NEW 52-AHS2 50 A 3 2906 VA 1200 VA 2 30 A EXISTING 14

11 -- -- -- 0 VA 1200 VA 1 20 A EXISTING 12

9 -- -- -- 0 VA 1200 VA 1 20 A EXISTING 10

7 SPARE 15 A 3 0 VA 1200 VA 1 20 A EXISTING 8

5 -- -- -- 0 VA 1200 VA 1 20 A EXISTING 6

3 -- -- -- 0 VA 1200 VA 1 20 A EXISTING 4

1 SPARE 50 A 3 0 VA 1200 VA 1 20 A EXISTING 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Enclosure: Type 1

Mounting: Surface Wires: 4 Mains Rating: 225 A

Supply From: Phases: 3 Mains Type: MCB

Location: MECH. RM. GS08 Volts: 120/208 Wye A.I.C. Rating: 10,000 A

Branch Panel: P1 (EX)

Notes:

Total Est. Demand: 64 A

Total Conn.: 64 A

Total Est. Demand: 23118 VA

Spare 14400 VA 100.00% 14400 VA Total Conn. Load: 23118 VA

Receptacle 8718 VA 100.00% 8718 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 87 A 67 A 44 A

Total Load: 10106 VA 7706 VA 5306 VA

41 SPACE -- -- 0 VA 0 VA -- -- SPACE 42

39 SPACE -- -- 0 VA 0 VA -- -- SPACE 40

37 -- -- -- 0 VA 0 VA -- -- SPACE 38

35 SPARE 100 A 2 0 VA 0 VA -- -- SPACE 36

33 -- -- -- 0 VA 1200 VA -- -- -- 34

31 SPARE 30 A 2 0 VA 1200 VA 2 20 A EXISTING 32

29 -- -- -- 0 VA 0 VA -- -- -- 30

27 -- -- -- 0 VA 0 VA -- -- -- 28

25 SPARE 40 A 3 0 VA 0 VA 3 30 A SPARE 26

23 SPARE 20 A 1 0 VA 0 VA -- -- -- 24

21 EXISTING 20 A 1 1200 VA 0 VA 2 20 A SPARE 22

19 EXISTING 20 A 1 1200 VA 1200 VA 1 20 A EXISTING 20

17 SPARE 20 A 1 0 VA 1200 VA 1 20 A EXISTING 18

15 SPARE 20 A 1 0 VA 1200 VA 1 20 A EXISTING 16

13 EXISTING 20 A 1 1200 VA 1200 VA 1 20 A EXISTING 14

11 -- -- -- 2906 VA 1200 VA 1 20 A EXISTING 12

9 -- -- -- 2906 VA 1200 VA 1 20 A EXISTING 10

7 NEW 52-AH1 50 A 3 2906 VA 1200 VA 1 20 A EXISTING 8

5 -- -- -- 0 VA 0 VA -- -- -- 6

3 -- -- -- 0 VA 0 VA -- -- -- 4

1 SPARE 15 A 3 0 VA 0 VA 3 15 A SPARE 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Enclosure: Type 1

Mounting: Surface Wires: 4 Mains Rating: 100 A

Supply From: Phases: 3 Mains Type: MCB

Location: Volts: 120/208 Wye A.I.C. Rating: 10,000 A

Branch Panel: P3 (EX)

3/4" = 1'-0"

BUILDING 53 - PARTIAL ONE LINE DIAGRAM - DEMOLITION

3/4" = 1'-0"

BUILDING 53 - PARTIAL ONE LINE DIAGRAM - NEW WORK

Notes:

Total Est. Demand: 64 A

Total Conn.: 64 A

Total Est. Demand: 23118 VA

Spare 14400 VA 100.00% 14400 VA Total Conn. Load: 23118 VA

Receptacle 8718 VA 100.00% 8718 VA

Load Classification Connected Load Demand Factor Estimated Demand Panel Totals

Total Amps: 64 A 64 A 64 A

Total Load: 7706 VA 7706 VA 7706 VA

17 -- -- -- 1200 VA 1200 VA -- -- -- 18

15 -- -- -- 1200 VA 1200 VA -- -- -- 16

13 EXISTING 20 A 3 1200 VA 1200 VA 3 20 A EXISTING 14

11 -- -- -- 1200 VA 0 VA -- -- -- 12

9 -- -- -- 1200 VA 0 VA -- -- -- 10

7 EXISTING 20 A 3 1200 VA 0 VA 3 20 A SPARE 8

5 -- -- -- 2906 VA 1200 VA -- -- -- 6

3 -- -- -- 2906 VA 1200 VA -- -- -- 4

1 NEW 52-AH4 50 A 3 2906 VA 1200 VA 3 40 A EXISTING 2

CKT Circuit Description Trip Poles A B C Poles Trip Circuit Description CKT

Enclosure: Type 1

Mounting: Surface Wires: 4 Mains Rating: 600 A

Supply From: Phases: 3 Mains Type: MCB

Location: ENGINEERING GS09A Volts: 120/208 Wye A.I.C. Rating: 10,000 A

Branch Panel: P4L (EX)

200 200 1 3 #3/0 #6 2"

175 175 1 3 #2/0 #6 2"

150 150 1 3 #1/0 #6 1- 1/2"

110 110 1 3 #1 #6 1-1/2"

90 95 1 3 #2 #8 1-1/4"

80 85 1 3 #3 #8 1- 1/4"

70 70 1 3 #4 #8 1-1/4"

50 50 1 3 #6 #10 1"

40 40 1 3 #8 #10 3/4"

30 30 1 3 #10 #10 3/4"

20 20 1 3 #12 #12 3/4"

FEEDER

NUMBER

FEEDER AMPS

(MAX.)

SETS PHASE

GROUN

D

CONDUIT

SIZE

3 WIRE PLUS GROUND

FEEDER SCHEDULE

NTS

TEMPORARY AHU POWER DIAGRAM - BUILDING 53

NTS

TEMPORARY AHU POWER DIAGRAM - BUILDING 52

File details come from the government source that posted it. Updated .