P01 JB Combined drawings 22 09 09 Part2.pdf

PDF 9 MB Posted

Attached to
Z1DA--FCA Replace Air Handling Units 657-21-106JB, Buildings 52 & 53 (VA-23-00004947)
Solicitation number
36C25523R0026
Issued by

About this file

This solicitation is for construction services required to replace obsolete air handling units that support Buildings 52 and 53 at the Jefferson Barracks Division of the St. Louis VA Medical Center in St. Louis, Missouri. The project involves replacing the existing AHUs, which date back 35 years and are beyond their useful life, with new equipment and associated mechanical, electrical, and architectural work. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15. Responses are due by the date specified in the solicitation, and award of the firm fixed price contract will occur shortly thereafter.

View the file

Other files

File Type Posted
36C25523R0026 0005.docx DOCX document
36C25523R0026_1 Page 5 3 bid items.pdf PDF
36C25523R0026 0004.docx DOCX document
36C25523R0026 0003.docx DOCX document
657-21-106JB - RFI Prebid Jan-2023 Questions.docx DOCX document
657-21-106JB Sign In Sheet.pdf PDF
36C25523R0026_1 Page 5.pdf PDF
36C25523R0026 0002.docx DOCX document
36C25523R0026 0001.docx DOCX document
APPENDIX D - ACM LBP MOLD REPORTS PART 2.pdf PDF
P01 APPENDIX B - 100 SPECIFICATIONS 22 09 30 Update.pdf PDF
APPENDIX D - ACM LBP MOLD REPORTS PART 1.pdf PDF
P01 JB Combined drawings 22 09 09b Part3.pdf PDF
P01 JB Combined drawings 22 09 09 Part1.pdf PDF
36C25523R0026_1.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JE

FFER

SON D

RIV

E

SO

U

TH

G

ATE

E N

TR

AN

C E D

R

IV

E

IN

T

ER

ST

AT

E

IN

TE

R

STA

TE

TO INTERSTATE 255 →

N O

R T H

G A T E

E N

T R

A N C

E D

R

IV

E

KOCH ROAD

KOCH ROAD

MISSISSIPPI RIVER

I-2

LO

T

1i

0 GRID / COLUMN LINE DESIGNATOR

EQUIPMENT NUMBER

DOOR NUMBER

Ga5xFB1

WALL TYPE

WINDOW TYPE

ROOM NAME

ROOM NAME / NUMBER

REVISION TAG

PLAN NORTH

TRUE NORTH

NORTH

NORTH ARROW WITH TRUE

NORTH INDICATION

EGRESS ROUTE ID AND

SECTION LENGTH

ROOM

ROOM OCCUPANCY

150 SF

EGRESS : EGRESS ID

Egress Length

ROOM OCCUPANCY & AREA

ELEVATION NUMBER

SECTION

INTERIOR ELEVATION

ENLARGEMENT,

DETAIL

SPOT ELEVATION

Name Elevation

FLOOR LEVEL &

NAME

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

SHEET KEYNOTE

A101

SIM

EXTERIOR ELEVATION

A-101

PLATE NUMBER WHERE

SECTION/DETAIL IS DRAWN

DISCIPLINE:

G - GENERAL

A - ARCHITECTURE

P - PLUMBING

M - MECHANICAL

E - ELECTRICAL

SHEET TYPE

DESIGNATOR

VICINITY MAP

PROJECT TEAM

BUILDING SUMMARY

PROJECT INFORMATION

THE INTENT OF THIS PROJECT IS TO REPLACE OBSOLETE AIR HANDLERS THAT SUPPORT BUILDINGS 52 & 53. THIS INCLUDES ALL ARCHITECTURAL, ELECTRICAL, STRUCTURAL AND HAZARDOUS MATERIAL ABATEMENT NECESSARY TO SAFELY PROVIDE THE NEW EQUIPMENT AND SYSTEM COMPONENTS.

ANNOTATION DRAWING SYMBOLSGENERAL NOTES

PROJECT NAME: FCA REPLACE AIR HANDLING UNITS BUILDINGS 52 & 53

PROJECT NUMBER: 657-21-106JB

PROJECT LOCATION: JEFFERSON BARRACKS VA MEDICAL CENTER, 1 JEFFERSON BARRACKS DR., ST. LOUIS, MO 63125

PROJECT PURPOSE/USE: REPLACE OBSOLETE AHUS THAT SUPPORT BUILDINGS 52 & 53 PER FCA RECOMMENDATIONS

BUILDING 52 AREA:

BASEMENT (EXISTING) 34,923 GSF

LEVEL 01 (EXISTING) 34,963 GSF

LEVEL 02 (EXISTING) 30,936 GSF

BUILDING NUMBER

1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION.

THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE

SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW ALL DRAWINGS AND

PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.

2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING

PERFORMED BEFORE SUBMITTING COST QUOTATIONS FOR WORK.

3. NOTIFY THE A/E PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES,

DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED

FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE PROVIDED PRIOR TO

CONTINUING WITH WORK.

4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE A/E.

5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL,

STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE

WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS

AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING

JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED

WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF

PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.

6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF

OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL

TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND

EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO

EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL

CONDITION AT THE CONTRACTOR'S EXPENSE.

7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE

ON A DAILY BASIS.

8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE

ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS

PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH RESPECT TO DELIVERY DATE,

QUALITY, OR COST.

9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND

FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE A/E DOES NOT

ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND METHODS OR FOR

TEMPORARY STRUCTURES.

10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. THE CONTRACTOR SHALL EMPLOY ENGINEERING EXPERTISE AS NEEDED TO

ASSIST IN DEMOLITION.

11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL

CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE

AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING

CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA

REGULATIONS DURING CONSTRUCTION.

12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF

BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT,

AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS

FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO

PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD,

RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE

GENERAL CONTRACTOR'S EXPENSE.

13. FLAMMABLE AND COMBUSTIBLE MATERIALS IF USED DURING CONSTRUCTION, SHALL BE

HANDLED AND STORED IN ACCORDANCE WITH NFPA 30.

14. ANY DUCTWORK THAT PENETRATES A RATED ASSEMBLY SHALL BE PROTECTED WITH AN

APPROPRIATE DAMPER AND TIED TO THE FIRE ALARM.

15. ALL ENGINEERED SHOP DRAWINGS ARE TO BE REVIEWED BY THE ARCHITECT AND/OR

ENGINEER OF RECORD PRIOR TO BEING SUBMITTED TO THE BUILDING DEPT. FOR REVIEW.

16. THE GENERAL CONTRACTOR TO BE RESPONSIBLE FOR ABATEMENT OF ALL ASBESTOS

FOUND ON ASBESTOS REPORT PROVIDED BY SCI ENGINEERING.

17. THE GENERAL CONTRACTOR IS TO SUBMIT SUBSTITUTE MATERIAL, SPECIFICATIONS,

PROPOSED +/- COST, AND A SAMPLE FOR APPROVAL IN WRITING TO THE ARCHITECT PRIOR

TO COMMENCEMENT OF WORK.

A101

A101

SCOPE OF WORK SUMMARY:

SHEET NUMBER

WITHIN SERIES

INDEX OF DRAWINGS

BUILDING 53 AREA:

BASEMENT (EXISTING) 28,104 GSF

LEVEL 01 (EXISTING) 24,427 GSF

LEVEL 02 (EXISTING) 24,382 GSF

N O

R T

H

DRAWING INDEX

DEDUCT ALTERNATESNONE AT THIS TIME.

52-AE101

DEMOLITION NOTES

1. FOR DEMOLISHED ITEMS, WHAT IS TAKEN OUT MUST BE LISTED AND REPORTED ON

APPROPRIATE FORM (EE NUMBER ITEMS).

2. ALL EE NUMBERED EQUIPMENT REMOVED DURING SHALL BE DOCUMENTED ON THE BSE

TURN IN FORM AND TURNED IN TO THE COR.

3. ALL EQUIPMENT INSTALLED DURING THIS PROJECT SHALL BE DOCUMENTED ON THE BSE

FORM CHECK IN FORM AND TURNED IN TO THE COR. REFER TO SPECIFICATIONS FOR

FORMS.

OWNER:

Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth, KS 66048-5012

CONTRACTING OFFICER REPRESENTATIVES:

Jefferson Barracks VA Medical Center 1 Jefferson Barracks Drive St. Louis, MO 63125

Lydia Oswald lydia.oswald@va.gov

314.652.4100 x66719

ARCHITECT:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Michele M. Kiehl, AIA, LEED AP BD+C Michele.Kiehl@RomanykConsulting.com

855.424.3838 x313

913.908.3280 cell

MECHANICAL ENGINEER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

402.981.8882 cell

ELECTRICAL ENGINEER:

Romanyk Consulting Corp.

15 Sunnen Drive, Suite 104 Plano, Texas 75093

Yumei Wang P.E, RCDD, CTS, LEED AP Yumei.Wang@RomanykConsulting.com

855.424.3838 x311 402.321.3766

PROJECT MANAGER:

Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com

855.424.3838 x324

402.981.8882 cell

Devin Gates devin.gates@va.gov

314.652.4100 x67669

BUILDING SCHEDULE

1 OUTPATIENT CLINICS - VSO

1G EMERGENCY GENERATOR FOR BUILDING 1

1CC CONNECTING CORRIDORS

2 HEALTHACRE ENVIRONMENT AND FACILITY PROGRAMS

3 DOMICILIARY

3T DOMICILIARY OFFICES

18 FISCAL HUMAN RESOURCES

23 PROSTHETICS

24 CANTEEN - LIBRARY - AUDITORIUM

25 NATIONAL CANTEEN SERVICE EXECUTIVE SUITE

25T NRM IMPACT

51 INPATIENT MENTAL HEALTH

51T NEURO PSYCHIATRIC

52 SPINAL CORD INJURY (SCI)

52G EMERGENCY GENERATOR FOR BUILDING 52

52SG TRANSFER SWITCH GEAR

53 COMMUNITY LONG-TERM CARE (CLC)

53G EMERGENCY GENERATOR FOR BUILDING 53

53T HOME BASE PRIMARY CARE

54 REHAB ILITATION

55 OUTPATIENT CLINICS

55G EMERGENCY GENERATOR FOR BUILDING 55

56 TENANTS (NCA,EES,OIT, OGC)

56G EMERGENCY GENERATOR FOR BUILDING 56

57 ENGINEERING LOGISTICS, LAUNDRY

58 MENTAL HEALTH CLINIC

59 FISCHER HOUSE

60 MAIN KITCHEN

60G EMERGENCY GENERATOR FOR BUILDING 60

60T FOOD - NUTRITION - DIETETICS

75 ENERGY PLANT

89 SECURITY STATION

93 HAZARDOUS WASTE STORAGE

101T CFM MAJOR PROJECTS

101T

53T

52G

52SG

60T

60G

51T

1CC

25T

3 3T 18

56G

BUILDINGS IN

PROJECT SCOPE

NOTE: SEE GC100 SERIES FOR SITE STAGING INFORMATION.

CONTRACTOR ENTRANCE

CONTRACTOR PARKING AND

STORAGE, GRAVEL LOT.

G ra p h ic S ca le

/2

0"

G ra p h ic S ca le

/3 2"

0"

' G ra p h ic S ca le

/1 6"

0"

' G ra p h ic

S ca le

/8

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

/8

0"

' G ra p h ic

S ca le

/2

0"

G ra p h ic S ca le

/4

0"

G ra p h ic S ca le

0"

Romanyk Consulting Focusing on what matters

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F

U.S. Department of Veterans Affairs

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

8910 7 6 5 4 3 2 1

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

NOT FOR

PERMITTING OR

CONSTRUCTION

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA ST. LOUIS HEALTH CARE SYSTEM

FULLY SPRINKLERED

52 & 53

JEFFERSON BARRACKS

Office of Construction and Facilities Management

B

IM

/V

IS

N

J e ff e rs o n B a rr a c k s R e p la c e

A H

U s B

V

/J e ff e rs o n

B a rr a c k s R e p la c e

A H

U s B

V

.r v t

/9

/2

:2

:4

P M

PROJECT INFORMATION AND SHEET INDEX

AUGUST 25, 2022

657-21-106JB

PROJECT NUMBER - 657-21-106JB

FCA REPLACE AIR HANDLING UNITS

BUILDINGS 52 & 53

BID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW DAW

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

GI100

BID DOCUMENTS

SHEET # SHEET TITLE

52-AE100 BUILDING 52 - LEVEL 00 - RM.GN39- ARCHITECTURAL PLANS

52-AE101 BUILDING 52 - LEVEL 00 - RM. GS08A - ARCHITECTURAL PLANS

52-AE102 BUILDING 52 - LEVEL 02 - RM.2S14 - ARCHITECTURAL PLANS

53-AD101 BUILDING 53 - ROOF PLAN - NORTH WING - DEMOLITION PLAN

53-AD102 BUILDING 53 - ROOF PLAN - SOUTH WING - DEMOLITION PLAN

53-AE140 BUIDLING 53 - OVERALL ROOF PLAN

53-AE141 BUILDING 53 - ROOF PLAN - NORTH WING - ARCHITECTURAL

53-AE142 BUILDING 53 - ROOF PLAN - SOUTH WING - ARCHITECTURAL

53-AE530 BUILDING 53 - ROOF DETAILS

ASBESTOS ABATEMENT

52-HA100 BUILDING 52 - ENLARGED PLANS - ASBESTOS CONTAINING MATERIALS (ACM) TO BE ABATED

52-HA101 BUILDING 52 - ENLARGED PLANS SUSPECT MOLD GROWTH TO BE ABATED

52-HA102 BUILDING 52 - ENLARGED PLANS - SUSPECT MOLD GROWTH LOCATIONS

53-HA100 BUILDING 53 - OVERALL PLAN - SUSPECT MOLD GROWTH TO BE ABATED

FIRE PROTECTION

F-100 FIRE PROTECTION LEGEND, DETAILS, GENERAL NOTES AND ABBREVIATIONS

52-FD100 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION DEMOLITION

52-FD101 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION DEMOLITION

52-FS100 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION

52-FS101 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION

MECHANICAL

M-100 MECHANICAL LEGEND AND GENERAL NOTES

M-101 MECHANICAL ABBREVIATIONS

52-MO100 BUILDING 52 - OVERALL PLAN - BASEMENT & LEVEL 01 - MECHANICAL

52-MO101 BUILDING 52 - OVERALL PLAN - LEVEL 02 & ROOF - MECHANICAL

52-MD100 BUILDING 52 - ENLARGED PLANS - HVAC DEMOLITION

52-MD101 BUILDING 52 - ENLARGED PLANS - HVAC DEMOLITION

52-MD200 BUILDING 52 - ENLARGED PLANS - PIPING DEMOLITION

52-MD201 BUILDING 52 - ENLARGED PLANS - PIPING DEMOLITION

52-MH100 BUILDING 52 - ENLARGED PLANS - HVAC

52-MH101 BUILDING 52 - ENLARGED PLANS - HVAC

52-MP100 BUILDING 52 - ENLARGED PLANS - PIPING

52-MP101 BUILDING 52 - ENLARGED PLANS - PIPING

53-MO100 BUILDING 53 - OVERALL PLAN - BASEMENT & LEVEL 01 - MECHANICAL

53-MO101 BUILDING 53 - OVERALL PLAN - LEVEL 02 & ROOF - MECHANICAL

53-MD100 BUILDING 53 - ENLARGED PLANS - HVAC DEMOLITION

53-MD101 BUILDING 53 - ENLARGED PLANS - HVAC DEMOLITION

53-MD200 BUILDING 53 - ENLARGED PLANS - PIPING DEMOLITION

53-MD201 BUILDING 53 - ENLARGED PLANS - PIPING DEMOLITION

53-MH100 BUILDING 53 - ENLARGED PLANS - HVAC

53-MH101 BUILDING 53 - ENLARGED PLANS - HVAC

53-MP100 BUILDING 53 - ENLARGED PLANS - PIPING

53-MP101 BUILDING 53 - ENLARGED PLANS - PIPING

M-300 MECHANICAL DETAILS

M-301 MECHANICAL DETAILS

M-400 MECHANICAL SCHEDULES

M-500 MECHANICAL EQUIPMENT CONTROLS DIAGRAM

M-501 MECHANICAL EQUIPMENT CONTROLS DIAGRAM

M-502 MECHANICAL EQUIPMENT CONTROLS DIAGRAM

M-600 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-601 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-602 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-603 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-604 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-605 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

M-606 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM

ELECTRICAL

E-100 ELECTRICAL LEGEND, GENERAL NOTES AND ABBREVIATIONS

ES100 ELECTRICAL SITE PLAN

52-ED100 BUILDING 52 - LEVEL 00 - ELECTRICAL DEMOLITION PLAN

52-ED101 BUILDING 52 - LEVEL 02 - ELECTRICAL DEMOLITION PLAN

52-EP100 BUILDING 52 - LEVEL 00 - ELECTRICAL PLAN

52-EP101 BUILDING 52 - LEVEL 01 - ELECTRICAL PLAN

52-EP102 BUILDING 52 - LEVEL 02 - ELECTRICAL PLAN

53-ED100 BUILDING 53 - ROOF NORTH & PENTHOUSE - ELECTRICAL DEMOLITION PLAN

53-ED101 BUILDING 53 - ROOF SOUTH - ELECTRICAL DEMOLITION PLAN

53-EP100 BUILDING 53 - LEVEL 02 - ELECTRICAL PLAN

53-EP101 BUILDING 53 - ROOF NORTH & PENTHOUSE - ELECTRICAL PLAN

53-EP102 BUILDING 53 - ROOF SOUTH - ELECTRICAL PLAN

E-400 ELECTRICAL SCHEDULES

SHEET # SHEET TITLE

GENERAL INFORMATION

GI100 PROJECT INFORMATION AND SHEET INDEX

GENERAL CONTRACT

GC100 PROJECT STAGING - OVERALL SITE PLAN

GC101 PROJECT STAGING - ENLARGED SITE PLAN

GC102 PROJECT STAGING - CRANE PLAN

GC103 PROJECT STAGING - ROOF TOP EQUIPMENT WEIGHTS

GC104 BUILDING 53 - TEMPORARY HVAC PHASING PLAN

GC105 BUILDING 53 - TEMPORARY HVAC PHASING PLAN

GC106 BUILDING 53 - TEMPORARY HVAC PHASING PLAN

GC107 BUILDING 53 - TEMPORARY HVAC PHASING PLAN

GC108 BUILDING 52 - TEMPORARY HVAC PHASING PLAN

GC109 BUILDING 52 - TEMPORARY HVAC PHASING PLAN

GC110 BUILDING 52 - TEMPORARY HVAC PHASING PLAN

GC111 BUILDING 52 - LEVEL 00 & 01 - INFECTION CONTROL/PHASING PLANS

GC112 BUILDING 52 - LEVEL 02 - INFECTION CONTROL/PHASING PLANS

GC113 BUILDING 53 - LEVEL 02 & ROOF LEVEL - INFECTION CONTROL/PHASING PLANS

GI202 BUILDING 52 - LEVEL 00 & 01 OVERALL - LIFE SAFETY PLAN

GI203 BUILDING 52 & 53 - LEVEL 02 OVERALL - LIFE SAFETY PLAN

ARCHITECTURAL

52 & 53-AC100 BUILDING 52 & 53 - LEVEL 00 & 02 - REFLECTED CEILING PLANS

Revisions: Date:

Revision 1 Date 1

Part 2

SPRINKLER NOTESSPRINKLER DEMO NOTES

DRAWING SYMBOLS

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE DEPARTMENT

OF VETERANS AFFAIRS (VA) STANDARDS.

2. DESIGN BASIS INFORMATION: PROVIDE DESIGN, MATERIALS, EQUIPMENT,

INSTALLATION, INSPECTION, AND TESTING OF THE AUTOMATIC SPRINKLER SYSTEM

IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13.

3. ALL WORK SHALL BE IN CONFORMANCE WITH THE NFPA 13 CODE - LATEST EDITION

2019. THE VA SERVES AS AUTHORITY HAVING JURISDICTION.

4. THESE DOCUMENTS ARE INTENDED TO COMPLY WITH APPLICABLE CODES. WHERE

DISCREPANCIES OCCUR, NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR

INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE

CODES AND STANDARDS AT NO ADDITIONAL COST TO THE OWNER.

5. CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING ALL LABOR,

MATERIALS, PERMITS, TAXES, FEES, INSPECTIONS, HARDWARE, AND COST FOR

INSTALLATION FOR A COMPLETE AND OPERATIONAL SYSTEM.

6. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW, COMPLETE WITH

MANUFACTURER’S GUARANTEE OR WARRANTY AND SHALL BE LISTED BY A

NATIONALLY RECOGNIZED TESTING LABORATORY.

7. PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE SEALED WITH APPROPRIATE

FIRE PROOFING MATERIALS TO RESTORE FIRE RATING. REFER TO ARCHITECTURAL

DRAWINGS FOR FIRE RATED WALLS.

8. CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL DEBRIS ON A DAILY

BASIS. ALL NEW MATERIALS AWAITING INSTALLATION SHALL BE KEPT IN AREAS

DESIGNATED BY THE OWNER.

9. DRAWINGS SHALL NOT BE SCALED FOR DIMENSIONS. REFER TO DIMENSIONED

ARCHITECTURAL FLOOR PLANS. IF THE DIMENSIONS CANNOT BE DETERMINED BY

THE INFORMATION GIVEN, CONTRACTOR SHALL CONTACT THE ENGINEER FOR

ADDITIONAL INFORMATION.

10. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR THE PURPOSE OF

DETERMINING IF THE WORK OF THE CONTRACTOR IS PROCEEDING IN ACCORDANCE

WITH THE CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT

BE CONSTRUED AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR

QUANTITY OF THE WORK, BUT RATHER PERIODIC IN AN EFFORT TO GUARD THE

OWNER AGAINST DEFECTS OR DEFICIENCIES IN THE WORK OF THE CONTRACTOR.

11. INFORMATION CONTAINED ON THE DRAWINGS IS IN ITSELF INCOMPLETE AND VOID

UNLESS USED IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, THE

SPECIFICATIONS, TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC.,

AND SHALL BE CONSIDERED THE CONTRACT DOCUMENTS AND WITH ALL THEREIN BY

REFERENCE, WHICH THE CONTRACTOR CERTIFIES KNOWLEDGE OF BY SIGNING THE

CONTRACT.

12. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED BY REVIEW OF

SHOP DRAWINGS OR PERIODIC OBSERVATION OF CONSTRUCTION, FOR

COMPLIANCE WITH THE CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE

CONFIRMED AND CORRELATED ON THE JOB SITE AND BETWEEN INDIVIDUAL

DRAWINGS OR SETS OF DRAWINGS FOR FABRICATION PROCESSES AND

CONSTRUCTION TECHNIQUES (INCLUDING EXCAVATION, SHORING, SCAFFOLDING,

BRACING, ERECTION, FORM WORK, ETC.), FOR COORDINATION OF THE VARIOUS

TRADES, AND FOR SAFE CONDITIONS ON THE JOB SITE. VARIATIONS IN FIELD

CONDITIONS RELATIVE TO THE CONTRACT DOCUMENTS SHALL BE REPORTED TO

THE ENGINEER AS SOON AS THEY ARE FOUND. WORK SHALL NOT PROGRESS UNTIL

WRITTEN PERMISSION FROM THE ENGINEER IS OBTAINED.

13. ALL EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED SO AS TO BE EASILY

ACCESSIBLE. ALL CLEARANCES FOR EQUIPMENT PER MANUFACTURERS GUIDELINES

AND CODE COMPLIANCE SHALL BE REQUIRED.

14. ALL COMPONENTS OF SYSTEMS SHALL BE PROVIDED FOR A COMPLETELY

OPERATIONAL, UNDERSTANDABLE, SAFE, AND CLEAN SYSTEM; INCLUDING BUT NOT

LIMITED TO EXTRANEOUS FIXTURE TRIM AS SPECIFIED, LABELS, SERVICE AND

COMMISSIONING INTO OPERATION, TESTING AND CLEANING, FIRE AND LIFE SAFETY

REQUIREMENTS, AND CONSIDERING THE REQUESTS OF OWNERS PERSONNEL.

15. ELECTRICAL PANELS SHOWN FOR REFERENCE. DO NOT ROUTE ANY COMPONENTS

ABOVE OR IN FRONT OF ELECTRICAL EQUIPMENT. MAINTAIN CODE REQUIRED

CLEARANCES.

16. FIRE PROTECTION CONTRACTOR SHALL REVIEW ALL PROJECT PLANS AND

SPECIFICATIONS, THEN CONTACT OWNER FOR COORDINATION OF DOCUMENTATION

AND SYSTEM REQUIREMENTS PRIOR TO STARTING WORK.

17. ALL REQUIREMENTS FOR WORKING ON FIRE PROTECTION SYSTEM, INCLUDING BUT

NOT LIMITED TO FIRE WATCH, HYDRANT FLOW TESTING, SYSTEM SHUTDOWNS AND

TESTING, ARE THE RESPONSIBILITY OF THE FIRE PROTECTION CONTRACTOR.

18. PLANS ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE OF WORK AND

GENERAL LOCATIONS OF EQUIPMENT, MATERIALS, ETC. NOT ALL RISERS, DROPS,

OFFSETS, VALVES, ETC. ARE SHOWN. PROVIDE RISERS, DROPS, OFFSETS, VALVES,

ETC. AS REQUIRED TO MEET SPACE REQUIREMENTS AND TO AVOID INTERFERENCES

WITH OTHER TRADES. MAKE FINAL CONNECTIONS TO FIXTURES, EQUIPMENT, ETC.

AS REQUIRED AND/OR PER MANUFACTURER'S RECOMMENDATIONS.

19. CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND LAYOUT OWN WORK

ACCORDINGLY AND IS RESPONSIBLE FOR DETERMINING EXACT LOCATIONS FOR

EQUIPMENT, MATERIALS, ETC.

20. THE EXISTING SPRINKLER SYSTEM SHALL BE MODIFIED PER SPECIFIED PLANS AND

SPECIFICATIONS. FIELD VERIFY EXISTING SPRINKLER SYSTEM REQUIREMENTS PRIOR

TO BIDDING.

21. COORDINATE SCOPE OF WORK WITH THE WORK OF OTHER TRADES PRIOR TO

INSTALLATION. ISSUES DUE TO LACK OF COORDINATION EFFORT WILL BE

CORRECTED AT NO ADDITIONAL COST TO THE OWNER.

22. COORDINATE LOCATION OF SYSTEM COMPONENTS WITHIN LIMITS OF STRUCTURE

AND OTHER ENGINEERED SYSTEMS. ROUTE ALL PIPING IN CONCEALED SPACES AND

INSTALL PIPING AS HIGH AS POSSIBLE. CENTER SPRINKLER HEADS WITHIN CEILING

TILES. OFFSET SYSTEMS ROUTING AS REQUIRED, PROVIDING REQUIRED MATERIALS

AND DRAIN POINTS. PIPE SHALL NOT BE ROUTED IN EXTERIOR WALLS UNLESS

NOTED. COORDINATE ROUTING OF PIPING TO MAINTAIN REQUIRED SERVICE

CLEARANCES AROUND ANY EQUIPMENT AND ELECTRICAL ITEMS.

23. ALL ELEMENTS OF CONSTRUCTION SHALL BE INSTALLED BY SKILLED TRADESMEN OF

THERE PARTICULAR TRADE, AND INSTALLED IN A NEAT WORKMANLIKE MANNER

KEEPING WITH THE HIGHEST STANDARDS OF THE TRADE.

24. COORDINATE SCOPE OF WORK WITH PROJECT SCHEDULES AGREED UPON BY

OWNER AND ALL CONTRACTORS.

25. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS ABOUT DESIGN

STANDARDS, PRODUCTS, DRAWINGS, SUBMITTALS, DOCUMENTATION,

COORDINATION, AND INSTALLATION.

1. ALL PIPING AND DUCTWORK IS SHOWN SCHEMATICALLY BASED ON EXISTING PLANS.

CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF VERIFYING ROUTES

OF ALL EXISTING CONDITIONS AND EXISTING UTILITIES PRIOR TO BIDDING AND

STARTING OF WORK. IF CONDITIONS DIFFER GREATLY CONTACT ENGINEER.

2. COORDINATE SCHEDULE OF WORK WITH OWNER AND PROVIDE SUFFICIENT NOTICE

BEFORE ANY SHUTDOWNS, TO MINIMIZE DISRUPTIONS TO ANY CONCURRENT

OPERATIONS.

3. COMPLY WITH SITE SAFETY PROCEDURES OF OWNER, GENERAL CONTRACTOR, AND

OSHA.

4. DEMOLISH MATERIALS, EQUIPMENT, AND ASSOCIATED SYSTEMS AS SHOWN WITHIN

SCOPE OF WORK AREA AS DESIGNATED/NOTED. DEMOLISH ALL BRANCH DUCT AND

PIPE, SUPPORTS, ACCESSORIES, EQUIPMENT, TERMINAL DEVICES, CONTROLS,

WIRING, CONDUITS, AND ASSOCIATED ITEMS BACK TO RESPECTIVE MAINS. THEN

CAP, SEAL, REPAIR, REINSULATE MAIN CONNECTIONS AS REQUIRED. NOTHING SHALL

BE ABANDONED IN PLACE UNLESS NOTED OTHERWISE. REMOVE ALL DEMOLISHED

ITEMS FROM SITE AND DISPOSE PROPERLY PER LOCAL LAWS.

5. HATCHED OR GRAYED OUT AREAS ARE NOT WITHIN CONTRACT BOUNDARY.

COORDINATE WITH OWNER IF SUCH AREAS REQUIRE ACCESS TO COMPLETE SCOPE

OF WORK, SUCH AS REMOVING A BRANCH MAIN BACK TO LARGER MAIN TO

ELIMINATE DEAD LEGS.

6. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING

PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW

SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS

SCOPE. 8.SAVE NOTED ITEMS FOR REUSE OR OWNERS SALVAGE. STORE NOTED

ITEMS AND OTHER ITEMS IDENTIFIED BY OWNER IN OWNER’S DESIGNATED STORAGE

AREA.

7. PROTECT EXISTING TO REMAIN EQUIPMENT, MATERIALS, AND SURROUND SITE FROM

DAMAGE DURING DEMOLITION. REPAIRS AND REPLACEMENT OF EXISTING TO

REMAIN CONDITIONS SHALL BE THE CONTRACTOR’S RESPONSIBILITY.

8. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS.

H4

H7

A

26-SF 3

26-TU-I-I

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

SECTION LETTER

TYPICAL UNIT NO.

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

(i.e. SUPPLY FAN #3 - "SUPPLY FAN" - BUILDING 26)

EQUIPMENT ABBREVIATION (SUPPLY FAN)

ITEM NUMBER (TERMINAL UNIT NO. 1)

ITEM (TERMINAL UNIT SHOWN)

SERVED BY AIR HANDLER UNIT NO. 1

DRAWING NUMBER WHERE DRAWN

BUILDING NO. WHERE EQUIPMENT IS LOCATED

NOTES:

1. ADJUST SPRINKLERS AS NECESSARY TO CLEAR OBSTRUCTIONS. PROVIDE A

PIPE HANGER IF THE HORIZONTAL OFFSET LENGTH EXCEEDS 24 IN. [610mm].

2. PROVIDE LENGTH TO SUIT.

PROVIDE NEW UPRIGHT

PENDENT SPRINKER HEAD

1" x 1/2" PIPE

REDUCING COUPLING

SPRINKLER

BRANCH LINE

1/2" SCH 80 CLOSE NIPPLE

1" BLACK STEEL SCH 40

PIPING (TYP.)N

O T

E

NOTE 2

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

52 & 53

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:2

P M

FIRE PROTECTION LEGEND, DETAILS,

GENERAL NOTES AND ABBREVIATIONS

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW DAW

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

F-100

NTS

TYPICAL UPRIGHT SPRINKLER HEAD DETAIL

SPR SPRINKLER LINE

SFPE SAFETY AND FIRE PROTECTION ENGINEER

QRS QUICK RESPONSE SPRINKLERS

PRV PRESSURE REDUCING VALVE

PD PRESSURE DROP OR DIFFERENCE

NPW NON POTABLE WATER

NOM. NOMINAL

NO NORMALLY OPEN

NIC NOT IN CONTRACT

NC NORMALLY CLOSED

FS FLOW SWITCH

FP FIRE PROTECTION

FMERC FACTORY MUTUAL ENGINEERING AND RESEARCH CORPORATION

FM FACTORY MUTUAL

FM FLOW METER

FDC FIRE DEPARTMENT (HOSE) CONNECTION

FD FLOOR DRAIN

FACSUL FIRE ALARM CERTIFICATE SERVICE

DN DOWN

DCW DOMESTIC COLD WATER

C CELSIUS

BFP REDUCED PRESSURE BACKFLOW PREVENTER

AS AUTOMATIC SPRINKLER

AG AIR GAP

SPRINKLER ABBREVIATIONS

Revisions: Date:

SCOPE OF WORK

PIT

FP

F P

F P

FD

M E C H . R M .

G S 0 8

M E C H . R M .

G N 3 9

P H Y S I C A L T H E R A P Y

G N 3 1 H A C

G S 6 0

H A C

G S 5 7

H A C

G S 5 8

H A C

G S 5 9

UT I L I T Y R M . ,

S O I L E D

G S 0 6 B

M E C H . R M .

G S 0 9

W O R K R M .

G S 1 4

T O I L E T , M A L E

G S 1 8 A

T O I L E T , F E M A L E

G S 1 8 B

M E C H . R M .

G S 2 0 A

E N G I N E E R I N G

G S 2 0 B

C O R R I D O R

H 0 0 4

T O I L E T

G S 2 2 F

O F F I C E

G S 2 2 A O F F I C E

G S 2 2 B

O F F I C E

G S 2 2 C

O F F I C E

G S 2 2 D

O F F I C E

G S 2 2 E O F F I C E

G S 2 2 E L E V A T O R

L O B B Y

G S 2 4

EL E V . N O . 3

E 2

T O I L E T

G N 2 7

C L O S E T

G N 2 7 A

H A C

G N 2 8

V E N D I N G R M .

G N 2 9

S T O R A G E

G N 3 0

O F F I C E

G N 3 2

W O R K R M .

G N 3 3

W O R K R M .

G N 3 4

T O I L E T

G N 3 5

S T O R A G E

G N 3 6 O F F I C E

G N 3 7 T O I L E T

G N 3 8

P . T . S T O R A G E

G N 4 3

W H E E L C H A I R S

G N 4 3 A

O F F I C E

G N 4 4

F O Y E R

G N 5 7

D R I V E R ' S T R A I N I N G

G N 4 8

M E C H . R M .

G N 5 0 L I N E N C H U T E

G N 5 2 S T O R A G E

G N 5 3

F . E . C L O S E T

G N 5 1

S T A I R 3

S 0 0 3

S T O R A G E

G N 5 4

F . E . C L O S E T

G N 5 5

P I P E C H A S E

Z 0 0 4

P I P E C H A S E

Z 0 0 5

P I P E C H A S E

Z 0 0 1

P I P E C H A S E

Z 0 0 2

P I P E C H A S E

Z 0 0 3

EL E V . N O . 1

E 1

S T A I R 2

S 0 0 2

O I & T

G S 0 1 A

W H E E L C H A I R

S T O R A G E

G S 0 1

H A C

G S 0 2

F . E . C L O S E T

G S 2 3

EL E V . N O . 2

E 3

C O R R I D O R

H 0 0 4 A

C O R R I D O R

H 0 0 2

C O R R I D O R

H 0 0 3 C O R R I D O R

H 0 0 5

C O R R I D O R

H 0 0 6

S H O P

G S 5 8 A

C H A S E

C H - S - 2

C H A S E

C H - N - 1

CHASE

CH-N-2

C H A S E

C H - S - 3

C H A S E

C H - N - 4 C H A S E

C H - N - 3

O F F I C E

G S 1 4 A

W O R K R M .

G S 1 4 B

C H A S E

C H - S - 5

C H A S E

C H - S - 4

C L O S E T

G N 3 6 A

PI T

KEYNOTES

NO SCOPE OF WORK ASSOCIATED WITH THIS AREA

GN39

MECH. RM.

52-AH-1 (EX)

GS08

MECH. RM.

GS08A

MECH. RM.

52-AH-S2 (EX)

52-FD100

52-FD100

52-MD100

NORTH

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:3

P M

BUILDING 52 ENLARGED PLANS - FIRE

PROTECTION DEMOLITION

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW DAW

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

52-FD100

1/2" = 1'-0"1

MECH RM. GN39 - FIRE PROTECTION DEMOLITION

1/2" = 1'-0"2

MECH RM. GS08 - FIRE PROTECTION DEMOLITION

1/2" = 1'-0"3

MECH RM. GS08A - FIRE PROTECTION DEMOLITION

NTS

KEYPLAN - BASEMENT

NO. DESCRIPTION

1 EXISTING CEILING MOUNTED AIR HANDLING UNIT TO BE REMOVED. REFER TO

MECHANICAL PLANS FOR HVAC AND PIPING DEMOLITION SCOPE. SHOWN FOR

REFERENCE ONLY.

2 REMOVE EXISTING FIRE PROTECTION PIPING, HANGERS, SUPPORTS, SPRINKLER

HEADS TO ALLOW FOR AHU EQUIPMENT REMOVAL.

3 THERE IS NO FIRE PROTECTION WORK ASSOCIATED WITH THIS ROOM. SEE 2/52-MD200

FOR MECHANICAL PIPING DEMOLITION SCOPE.

4 EXISTING SAN PIPING TO REMAIN. SHOWN FOR REFERENCE ONLY.

FP FP

2 S 1 6

S T O R A G E

2 S 1 4

2 S 1 5 2 S 1 6

S T O R A G E

2 S 1 4

2 S 1 5

KEYNOTES

NO SCOPE OF WORK ASSOCIATED WITH THIS AREA

2S14

STORAGE

CH-S-5

CHASE

CHASE

2S15

STORAGE

52-AH4 (EX)

FP

52-MD101

NORTH

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:4

P M

BUILDING 52 ENLARGED PLANS - FIRE

PROTECTION DEMOLITION

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW DAW

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

52-FD101

3/4" = 1'-0"1

BUILDING 52 ENLARGED PLAN - LEVEL 02 - STORAGE 2S14 FIRE PROTECTION DEMOLITION

NTS

KEYPLAN - BLDG 52 - LEVEL 02

NO. DESCRIPTION

1 EXISTING CEILING MOUNTED AIR HANDLING UNIT TO BE REMOVED. REFER TO

MECHANICAL PLANS FOR HVAC AND PIPING DEMOLITION SCOPE. SHOWN FOR

REFERENCE ONLY.

2 REMOVE EXISTING FIRE PROTECTION PIPING, HANGERS, SUPPORTS, SPRINKLER

HEADS TO ALLOW FOR AHU EQUIPMENT REMOVAL.

M E C H . R M .

G S 0 8

M E C H . R M .

G N 3 9

P H Y S I C A L T H E R A P Y

G N 3 1 H A C

G S 6 0

H A C

G S 5 7

H A C

G S 5 8

H A C

G S 5 9

UT I L I T Y R M . ,

S O I L E D

G S 0 6 B

M E C H . R M .

G S 0 9

W O R K R M .

G S 1 4

T O I L E T , M A L E

G S 1 8 A

T O I L E T , F E M A L E

G S 1 8 B

M E C H . R M .

G S 2 0 A

E N G I N E E R I N G

G S 2 0 B

C O R R I D O R

H 0 0 4

T O I L E T

G S 2 2 F

O F F I C E

G S 2 2 A O F F I C E

G S 2 2 B

O F F I C E

G S 2 2 C

O F F I C E

G S 2 2 D

O F F I C E

G S 2 2 E O F F I C E

G S 2 2 E L E V A T O R

L O B B Y

G S 2 4

EL E V . N O . 3

E 2

T O I L E T

G N 2 7

C L O S E T

G N 2 7 A

H A C

G N 2 8

V E N D I N G R M .

G N 2 9

S T O R A G E

G N 3 0

O F F I C E

G N 3 2

W O R K R M .

G N 3 3

W O R K R M .

G N 3 4

T O I L E T

G N 3 5

S T O R A G E

G N 3 6 O F F I C E

G N 3 7 T O I L E T

G N 3 8

P . T . S T O R A G E

G N 4 3

W H E E L C H A I R S

G N 4 3 A

O F F I C E

G N 4 4

F O Y E R

G N 5 7

D R I V E R ' S T R A I N I N G

G N 4 8

M E C H . R M .

G N 5 0 L I N E N C H U T E

G N 5 2 S T O R A G E

G N 5 3

F . E . C L O S E T

G N 5 1

S T A I R 3

S 0 0 3

S T O R A G E

G N 5 4

F . E . C L O S E T

G N 5 5

P I P E C H A S E

Z 0 0 4

P I P E C H A S E

Z 0 0 5

P I P E C H A S E

Z 0 0 1

P I P E C H A S E

Z 0 0 2

P I P E C H A S E

Z 0 0 3

EL E V . N O . 1

E 1

S T A I R 2

S 0 0 2

O I & T

G S 0 1 A

W H E E L C H A I R

S T O R A G E

G S 0 1

H A C

G S 0 2

F . E . C L O S E T

G S 2 3

EL E V . N O . 2

E 3

C O R R I D O R

H 0 0 4 A

C O R R I D O R

H 0 0 2

C O R R I D O R

H 0 0 3 C O R R I D O R

H 0 0 5

C O R R I D O R

H 0 0 6

S H O P

G S 5 8 A

C H A S E

C H - S - 2

C H A S E

C H - N - 1

CHASE

CH-N-2

C H A S E

C H - S - 3

C H A S E

C H - N - 4 C H A S E

C H - N - 3

O F F I C E

G S 1 4 A

W O R K R M .

G S 1 4 B

C H A S E

C H - S - 5

C H A S E

C H - S - 4

C L O S E T

G N 3 6 A

PI T

KEYNOTES

NO SCOPE OF WORK ASSOCIATED WITH THIS AREA

GN39

MECH. RM.

52-AH-1

FP

F P

FP

F P

FP

F P

4"Ø SAN

4"Ø SAN

GS08

MECH. RM.

GS08A

MECH. RM.

52-AH-S2

4"Ø SAN

4"Ø SAN

"Ø

S A

N

"Ø

S A

N

4"Ø SAN

2"Ø SAN

F P

FP

F P

FP

F P

FP

F P

F P

52-FS100

52-FS100

52-FS100

NORTH

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:4

P M

BUILDING 52 ENLARGED PLANS - FIRE

PROTECTION

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW DAW

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

52-FS100

1/2" = 1'-0"1

MECH RM. GN39 - FIRE PROTECTION

1/2" = 1'-0"2

MECH RM. GS08 - FIRE PROTECTION

1/2" = 1'-0"3

MECH RM. GS08A - FIRE PROTECTION

NTS

KEYPLAN -BASEMENT

NO. DESCRIPTION

1 RECONFIGURE PIPING AND INSTALL SPRINKLER HEADS IN THIS AREA AFTER NEW AHU

IS INSTALLED. MODIFY EXISTING SYSTEM, TEST, AND PLACE INTO WORKING

CONDITION. SPRINKLERS UNDER DUCT AND HVAC EQUIPMENT SHALL BE FULLY

CAGED TO PROTECT ANY DAMAGE TO THE SPRINKLER. COORDINATE HEAD AND

PIPING LAYOUT WITH OTHER TRADES.

2 THERE IS NO FIRE PROTECTION WORK ASSOCIATED WITH THIS ROOM.

3 FIRE PROTECTION SERVICE ENTRANCE. SHOWN FOR REFERENCE ONLY.

2 S 1 6

S T O R A G E

2 S 1 4

2 S 1 5 2 S 1 6

S T O R A G E

2 S 1 4

2 S 1 5

KEYNOTES

NO SCOPE OF WORK ASSOCIATED WITH THIS AREA

2S14

STORAGE

CH-S-5

CHASE

CHASE

2S15

STORAGE

FP FPFP

52-AH-4

52-MD101

NORTH

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:4

P M

BUILDING 52 ENLARGED PLANS - FIRE

PROTECTION

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW DAW

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

52-FS101

3/4" = 1'-0"1

BUILDING 52 ENLARGED PLAN - LEVEL 02 - STORAGE 2S14 FIRE PROTECTION

NTS

KEYPLAN - BLDG 52 - LEVEL 02

NO. DESCRIPTION

1 RECONFIGURE PIPING AND INSTALL SPRINKLER HEADS IN THIS AREA AFTER NEW AHU

IS INSTALLED. MODIFY EXISTING SYSTEM, TEST, AND PLACE INTO WORKING

CONDITION. SPRINKLERS UNDER DUCT AND HVAC EQUIPMENT SHALL BE FULLY

CAGED TO PROTECT ANY DAMAGE TO THE SPRINKLER. COORDINATE HEAD AND

PIPING LAYOUT WITH OTHER TRADES.

DUCTWORK SYMBOLSMECHANICAL SYMBOLS MECHANICAL GENERAL NOTESGENERAL DEMOLITION NOTESSYMBOLS - PIPING

10"x8"SA(EX)

LIMIT OF DEMOLITION

SUPPLY DIFFUSER/GRILLE (CEILING, SQUARE 4-WAY)

SEE NOTES 1, 2, 3.

CONNECT NEW DUCT TO EXISTING DUCT

D

INCLINED RISE, IN DIRECTION OF AIR FLOW

INCLINED DROP, IN DIRECTION OF AIR FLOW

R

FC

10"x8"SA

FLEXIBLE CONNECTION (FC) - EQUIPMENT,

VIBRATION, OR SEISMIC

VANED ELBOW (PROVIDE ALL SQUARE OR

RECTANGULAR ELBOWS. VANE SYMBOL ARE NOT

SHOWN ON PLANS)

VANED ELBOW (SHORT RADIUS)

STANDARD RADIUS ELBOW (LONG RADIUS)

DUCT LABELING NOTE:

• INSIDE DIMENSIONS: WIDTH x DEPTH

• SA = SUPPLY AIR

• RA = RETURN AIR

• OA = OUTSIDE AIR SUPPLY

• EA = EXHAUST AIR

EXISTING DUCT TO REMAIN

MANUAL VOLUME DAMPER

EXISTING DUCT TO BE REMOVED10"x8"

NEW DUCT

EXHAUST GRILLE

SEE NOTES 1, 2, 3.

SD-14

270 CFM

SUPPLY DUCT UP ("X")

EXHAUST DUCT UP ("Y")

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN CEILING REGISTER OR

GRILLE BELOW DUCT

EXHAUST OR RETURN BOTTOM

REGISTER OR GRILLE (WALL TYPE)

EXHAUST OR RETURN REGISTER OR

TOP GRILLE (WALL TYPE)

RETURN DUCT UP ("/")

SUPPLY DUCT DOWN ("X")

EXHAUST DUCT DOWN ("Y")

RETURN DUCT DOWN ("/")

(ROUND) (RECT.)

EG-21

80 CFM

RETURN GRILLE (CEILING)

SEE NOTES 1, 2, 3.

RG-24

270 CFM

NOTES:

1. AIR TERMINAL LABEL:

AIR TERMINAL TYPE

BALANCED FLOW RATE

2. AIR TERMINAL TYPE:

Sx = SUPPLY, Rx = RETURN, Ex = EXHAUST xD = DIFFUSER xG = GRILLE xR = REGISTER (WITH INTEGRATED VOLUME DAMPER)

(EX. SG-14 = SUPPLY GRILLE)

3. REFER TO AIR DEVICE SCHEDULE FOR DETAILS.

NOTES:

1. DEVICE CONTROL/CONNECTION PANEL.

2. MANUFACTURER'S RECOMMENDED MAINTENANCE/OPERATIONAL CLEARANCE. KEEP

THIS AREA CLEAR AND ACCESSIBLE FOR COIL AND PANEL MAINTENANCE AND

REPAIR.

3. HATCHED AREA INDICATES NEC REQIRED 36" WORKING SPACE - MUST BE KEPT

CLEAR.

4. DISPERSION TUBE WITHIN DUCT.

5. AIR VOLUME CONTROL VALVE.

6. REHEAT COIL WITH DUCT TRANSITION.

TERMINAL UNIT WITHOUT REHEAT COIL

EXISTING TEMINAL UNIT - DEMOLITION

TERMINAL UNIT WITH REHEAT COIL

NOTE 2 (TYP)

AIR VOLUME CONTROL VALVE

(ARROW INDICATED DIRECTION OF FLOW)

NOTE 1 (TYP)

DUCT MOUNTED STEAM HUMIDIFIER

NOTE 4

NOTE 3

AIR VOLUME CONTROL VALVE (SUPPLY)

WITH ASSOCIATED REHEAT COIL

NOTE 6

NOTE 5

1. THE COMPLETE INSTALLATION SHALL BE IN ACCORDANCE WITH THE DEPARTMENT OF

VETERANS AFFAIRS (VA) STANDARDS.

2. ALL WORK SHALL BE IN CONFORMANCE WITH THE INTERNATIONAL MECHANICAL CODE -

LATEST EDITION ADOPTED BY THE VA. THE VA SERVES AS AUTHORITY HAVING JURISDICTION.

3. THESE DOCUMENTS ARE INTENDED TO COMPLY WITH APPLICABLE CODES. WHERE

DISCREPANCIES OCCUR, NOTIFY THE ENGINEER/ARCHITECT IN WRITING FOR

INTERPRETATION. CORRECT ANY INSTALLATION THAT FAILS TO COMPLY WITH THE CODES

AND STANDARDS AT NO ADDITIONAL COST TO THE OWNER.

CONTRACTOR SHALL PROVIDE ALL WORK NECESSARY INCLUDING ALL LABOR, MATERIALS,

PERMITS, TAXES, FEES, INSPECTIONS, HARDWARE, AND COST FOR INSTALLATION FOR A

COMPLETE AND OPERATIONAL SYSTEM.

4. ALL MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE NEW, COMPLETE WITH

MANUFACTURER’S GUARANTEE OR WARRANTY AND SHALL BE LISTED BY A NATIONALLY

RECOGNIZED TESTING LABORATORY.

5. PENETRATIONS THROUGH FIRE RATED WALLS BY DIVISION 23 CONTRACTOR SHALL BE

SEALED WITH APPROPRIATE FIRE PROOFING MATERIAL TO RESTORE FIRE RATING. REFER TO

ARCHITECTURAL DRAWINGS FOR FIRE RATED WALLS.

6. CONTRACTOR SHALL KEEP THE WORK AREA CLEAN OF ALL DEBRIS ON A DAILY BASIS. ALL

NEW MATERIALS AWAITING INSTALLATION SHALL BE KEPT IN AREAS DESIGNATED BY THE

OWNER.

7. DRAWINGS SHALL NOT BE SCALED TO OBTAIN DIMENSIONS. REFER TO DIMENSIONED

ARCHITECTURAL FLOOR PLANS. IF THE DIMENSIONS CANNOT BE DETERMINED BY THE

INFORMATION GIVEN, CONTRACTOR SHALL CONTACT THE ENGINEER FOR ADDITIONAL

INFORMATION.

8. PERIODIC SITE OBSERVATION BY THE ENGINEER IS SOLELY FOR THE PURPOSE OF

DETERMINING IF THE WORK OF THE CONTRACTOR IS PROCEEDING IN ACCORDANCE WITH

THE CONTRACT DOCUMENTS. THIS LIMITED SITE OBSERVATION SHOULD NOT BE CONSTRUED

AS EXHAUSTIVE OR CONTINUOUS TO CHECK THE QUALITY OR QUANTITY OF THE WORK, BUT

RATHER PERIODIC IN AN EFFORT TO GUARD THE OWNER AGAINST DEFECTS OR

DEFICIENCIES IN THE WORK OF THE CONTRACTOR.

9. INFORMATION CONTAINED ON THE MECHANICAL DRAWINGS IS IN ITSELF INCOMPLETE AND

VOID UNLESS USED IN CONJUNCTION WITH ALL OTHER DISCIPLINE DRAWINGS, THE

SPECIFICATIONS, TRADE PRACTICES, OR APPLICABLE STANDARDS, CODES, ETC., AND SHALL

BE CONSIDERED THE CONTRACT DOCUMENTS AND WITH ALL THEREIN BY REFERENCE,

WHICH THE CONTRACTOR CERTIFIES KNOWLEDGE OF BY SIGNING THE CONTRACT.

10. CONTRACTOR IS TO ASSUME FULL RESPONSIBILITY, UNRELIEVED BY REVIEW OF SHOP

DRAWINGS OR PERIODIC OBSERVATION OF CONSTRUCTION, FOR COMPLIANCE WITH THE

CONTRACT DOCUMENTS, FOR DIMENSIONS TO BE CONFIRMED AND CORRELATED ON THE

JOB SITE AND BETWEEN INDIVIDUAL DRAWINGS OR SETS OF DRAWINGS FOR FABRICATION

PROCESSES AND CONSTRUCTION TECHNIQUES (INCLUDING EXCAVATION, SHORING,

SCAFFOLDING, BRACING, ERECTION, FORM WORK, ETC.), FOR COORDINATION OF THE

VARIOUS TRADES, AND FOR SAFE CONDITIONS ON THE JOB SITE. VARIATIONS IN FIELD

CONDITIONS RELATIVE TO THE CONTRACT DOCUMENTS SHALL BE REPORTED TO THE

ENGINEER AS SOON AS THEY ARE FOUND. WORK SHALL NOT PROGRESS UNTIL WRITTEN

PERMISSION FROM THE ENGINEER IS OBTAINED.

11. ALL NEW EQUIPMENT AND ACCESSORIES SHALL BE INSTALLED SO AS TO BE EASILY

ACCESSIBLE. ALL CLEARANCES FOR EQUIPMENT PER MANUFACTURERS GUIDELINES AND

CODE COMPLIANCE SHALL BE REQUIRED.

12. ALL COMPONENTS OF SYSTEMS SHALL BE PROVIDED FOR A COMPLETELY OPERATIONAL,

UNDERSTANDABLE, SAFE, AND CLEAN SYSTEM; INCLUDING BUT NOT LIMITED TO

EXTRANEOUS FIXTURE TRIM AS SPECIFIED, SERVICE AND COMMISSIONING INTO OPERATION,

LABELS, TESTING AND CLEANING, FIRE AND LIFE SAFETY REQUIREMENTS, AND CONSIDERING

THE REQUESTS OF OWNERS PERSONNEL.

13. ELECTRICAL PANELS SHOWN FOR REFERENCE. DO NOT ROUTE ANY COMPONENTS ABOVE

OR IN FRONT OF ELECTRICAL EQUIPMENT. MAINTAIN CODE REQUIRED CLEARANCES.

14. ALL DUCTWORK SIZES SHOWN ON DRAWINGS ARE CLEAR INTERIOR DIMENSIONS.

15. PROVIDE CONCEALING FLANGES AT ALL VISIBLE DUCT PENETRATIONS THROUGH WALLS.

16. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL INTERCONNECTING CONTROL WIRING.

17. PLANS ARE DIAGRAMMATIC AND INTENDED TO CONVEY SCOPE OF WORK AND GENERAL

LOCATIONS OF EQUIPMENT, MATERIALS, ETC. CONTRACTOR SHALL FIELD VERIFY ALL

DIMENSIONS AND LAYOUT OWN WORK ACCORDINGLY AND IS RESPONSIBLE FOR

DETERMINING EXACT LOCATIONS FOR EQUIPMENT, MATERIALS, ETC.

18. THE EXISTING MECHANICAL SYSTEMS SHALL BE MODIFIED PER SPECIFIED PLANS AND

SPECIFICATIONS. FIELD VERIFY EXISTING MECHANICAL SYSTEMS REQUIREMENTS PRIOR TO

BIDDING.

19. COORDINATE SCOPE OF WORK WITH THE WORK OF OTHER TRADES PRIOR TO INSTALLATION.

ISSUES DUE TO LACK OF COORDINATION EFFORT WILL BE CORRECTED AT NO ADDITIONAL

COST TO THE OWNER.

COORDINATE LOCATION OF SYSTEM COMPONENTS WITHIN LIMITS OF STRUCTURE AND

OTHER ENGINEERED SYSTEMS. ROUTE ALL MECHANICAL SYSTEMS IN CONCEALED SPACES

AND INSTALL COMPONENTS AS HIGH AS POSSIBLE. OFFSET SYSTEMS ROUTING AS

REQUIRED, PROVIDING REQUIRED MATERIALS. PIPE SHALL NOT BE ROUTED IN EXTERIOR

WALLS UNLESS NOTED. COORDINATE ROUTING OF MECHANICAL SYSTEMS TO MAINTAIN

REQUIRED SERVICE CLEARANCES AROUND ANY EQUIPMENT AND ELECTRICAL ITEMS.

20. ALL ELEMENTS OF CONSTRUCTION SHALL BE INSTALLED BY SKILLED TRADESMEN OF THERE

PARTICULAR TRADE, AND INSTALLED IN A NEAT WORKMANLIKE MANNER KEEPING WITH THE

HIGHEST STANDARDS OF THE TRADE.

21. COORDINATE SCOPE OF WORK WITH PROJECT SCHEDULES AGREED UPON BY OWNER AND

ALL CONTRACTORS.

22. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS ABOUT DESIGN STANDARDS,

PRODUCTS, DRAWINGS, SUBMITTALS, DOCUMENTATION, COORDINATION, AND INSTALLATION.

23. PROVIDE DIRECT-DIGITAL CONTROL SYSTEM(S) AS INDICATED ON THE PROJECT

DOCUMENTS, POINT LIST, INTEROPERABILITY TABLES, DRAWINGS AND AS DESCRIBED IN

THESE SPECIFICATIONS. INCLUDE A COMPLETE AND WORKING DIRECT-DIGITAL CONTROL

SYSTEM. PROVIDE ALL ENGINEERING, PROGRAMMING, CONFIGURATION/SETUP HARDWARE

AND SOFTWARE, OPEN LICENSES, CONTROLS AND INSTALLATION MATERIALS, INSTALLATION

LABOR, COMMISSIONING AND START-UP, TRAINING, FINAL PROJECT DOCUMENTATION AND

WARRANTY. COORDINATE WITH VA TECHNOLOGY STAFF FOR INTEGRATION OF REQUIRED

SITE NETWORK SECURITY INTEGRATION.

24. CONTROLS SHALL BE AN EXTENSION OF THE EXISTING OWNER PROVIDED TEMPERATURE

CONTROL SYSTEM. PROVIDE A COMPLETE AND FUNCTIONAL EXPANDED CONTROL SYSTEM

TO ADD ON TO THE EXISTING SYSTEM TO CONTROL ALL EQUIPMENT PROVIDED UNDER THIS

CONTRACT. PROVIDE COMPONENTS AND PROGRAMMING THAT MATCH EXISTING SYSTEM

AND ARE COMPATIBLE WITH THE EXISTING SYSTEM, INCLUDING BUT NOT LIMITED TO

CONTROL BOARDS, THERMOSTATS, WIRING, AND ACCESSORIES. FIELD VERIFY EXISTING

PROGRAMMING FOR REUSE AND/OR UPDATING. ALL NEW BUILDING CONTROLLERS SHALL BE

NATIVE BACNET. ALL NEW BACNET CONTROLLERS, DEVICES AND COMPONENTS SHALL BE

LISTED BY BACNET TESTING LABORATORIES.

25. SEQUENCES INCLUDED IN THE SUBMITTAL MUST REFLECT WHAT IS ACTUALLY GOING TO BE

PROGRAMMED, INCLUDING SUGGESTED CHANGES TO THE PLANS. COPIED SEQUENCES

FROM THE PLANS WILL NOT BE ACCEPTED. INCLUDE SYSTEM GRAPHICS INDICATING

MONITORED SYSTEMS, DATA (CONNECTED AND CALCULATED) POINT ADDRESSES,

OPERATOR NOTATIONS, NETWORK CONFIGURATION, ETC.

26. ALL SOFTWARE WORK INVOLVING THIS INTEGRATION PROCESS IS THE RESPONSIBILITY OF

THE TEMPERATURE CONTROL CONTRACTOR AND MUST BE COMPLETED BY A TECHNICIAN

CERTIFIED WITH THE EXISTING SYSTEM. THE TCC MUST SUBMIT A COPY OF THE

CERTIFICATION DOCUMENTATION FOR THE SYSTEM PROGRAMMER PRIOR TO COMPLETING

ANY WORK IN ORDER TO INSURE THE INTEGRITY OF THE SYSTEM.

27. THE TCC IS ALSO RESPONSIBLE FOR PROVIDING AND INSTALLING ALL ROUTERS, SWITCHES, JACE’S, SOFTWARE LICENSES, DRIVERS, ETC, AS NEEDED FOR A COMPLETE INSTALLATION

INCLUDING FULL INTEGRATION. THE TCC IS RESPONSIBLE FOR ALL GRAPHICS GENERATION

AND POINT MAPPING OF POINTS TO BE ADDED IN THE PROJECT. THE TCC SHALL UTILIZE THE

EXISTING DATABASE AS AN EXAMPLE FOR ALL PROGRAMMING, GRAPHICS, ANIMATIONS, AND

POINT MAPPING FOR WORK DONE ON THE PROJECT IN ORDER TO MAINTAIN CONSISTENCY

WITHIN THE BAS.

1. ALL PIPING AND DUCTWORK IS SHOWN SCHEMATICALLY BASED ON EXISTING PLANS.

CONTRACTORS SHALL BE RESPONSIBLE FOR COORDINATION OF VERIFYING ROUTES

OF ALL EXISTING CONDITIONS AND EXISTING UTILITIES PRIOR TO BIDDING AND

STARTING OF WORK. IF CONDITIONS DIFFER GREATLY CONTACT ENGINEER.

2. COORDINATE SCHEDULE OF WORK WITH OWNER AND PROVIDE SUFFICIENT NOTICE

BEFORE ANY SHUTDOWNS, TO MINIMIZE DISRUPTIONS TO ANY CONCURRENT

OPERATIONS.

3. COMPLY WITH SITE SAFETY PROCEDURES OF OWNER, GENERAL CONTRACTOR, AND

OSHA.

4. DEMOLISH MATERIALS, EQUIPMENT, AND ASSOCIATED SYSTEMS AS SHOWN WITHIN

SCOPE OF WORK AREA AS DESIGNATED/NOTED. DEMOLISH ALL BRANCH DUCT AND

PIPE, SUPPORTS, ACCESSORIES, EQUIPMENT, TERMINAL DEVICES, CONTROLS,

WIRING, CONDUITS, AND ASSOCIATED ITEMS BACK TO RESPECTIVE MAINS. THEN

CAP, SEAL, REPAIR, REINSULATE MAIN CONNECTIONS AS REQUIRED. NOTHING

SHALL BE ABANDONED IN PLACE UNLESS NOTED OTHERWISE. REMOVE ALL

DEMOLISHED ITEMS FROM SITE AND DISPOSE PROPERLY PER LOCAL LAWS.

5. HATCHED OR GRAYED OUT AREAS ARE NOT WITHIN CONTRACT BOUNDARY.

COORDINATE WITH OWNER IF SUCH AREAS REQUIRE ACCESS TO COMPLETE SCOPE

OF WORK, SUCH AS REMOVING A BRANCH MAIN BACK TO LARGER MAIN TO

ELIMINATE DEAD LEGS.

6. INFILL AND REPAIR TO MATCH EXISTING CONDITIONS ALL WALL, FLOOR, AND CEILING

PENETRATIONS RESULTING FROM DEMOLISHED ITEMS, AND INSTALLATION OF NEW

SYSTEMS. COORDINATE WITH GENERAL CONTRACTOR FOR COVERAGE OF THIS

SCOPE.

7. SAVE NOTED ITEMS FOR REUSE OR OWNERS SALVAGE. STORE NOTED ITEMS AND

OTHER ITEMS IDENTIFIED BY OWNER IN OWNER’S DESIGNATED STORAGE AREA.

8. PROTECT EXISTING TO REMAIN EQUIPMENT, MATERIALS, AND SURROUND SITE FROM

DAMAGE DURING DEMOLITION. REPAIRS AND REPLACEMENT OF EXISTING TO

REMAIN CONDITIONS SHALL BE THE CONTRACTOR’S RESPONSIBILITY.

9. REFER TO SPECIFICATION MANUAL FOR FURTHER DETAILS.

SYSTEM LABEL SYSTEM DESCRIPTION

?"SYS (EX) GENERAL PIPING - EXISTING TO REMAIN

?" GENERAL PIPING - TO BE DEMOLISHED

?"SYS GENERAL PIPING - NEW WORK

D DRAIN LINE

CHWS CHILLED WATER SUPPLY

CHWR CHILLED WATER RETURN

TYPICAL MECHANICAL SYSTEM - SUPPLY PIPING

TYPICAL MECHANICAL SYSTEM - RETURN PIPING

MPS MEDIUM PRESSURE STEAM

MPC MEDIUM PRESSURE CONDENSATE RETURN

GRS GLYCOL-WATER RUN AROUND SUPPLY

GRR GLYCOL-WATER RUN AROUND RETURN

AIR SEPARATOR

BACKFLOW PREVENTER (BFP)

CHEMICAL POT FEEDER

CONTINUATION BREAK

COUPLING

DIRECTION OF FLOW

DIRECTION OF PITCH

FLEX CONNECTION

PRESSURE GAUGE

REDUCER

STEAM TRAP

STRAINER - WYE (BALL DRAIN)

TEST PLUG

THERMOMETER

UNION

BOTTOM CONNECTION

END DROP / DOWN

END UP / RISER

HEADER FLANGE CAP

PIPE END CAP

RISE / DROP IN-LINE

TEE DOWN

TEE UP

TOP CONNECTION

UP & DN / RISER

VALVE - ANGLE

VALVE - BALANCING - CIRCUIT SETTER

VALVE - BALL, NORMALLY CLOSED

VALVE - BALL, NORMALLY OPEN

VALVE - CHECK

VALVE - CONTROL 2-WAY (MODULATING)

VALVE - CONTROL 3-WAY (MODULATING)

VALVE - PPRESSURE REDUCING VALVE (PRV)

VALVE - SHUT-OFF, NORMALLY CLOSED

VALVE - SHUT-OFF, NORMALLY OPEN

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

52 & 53

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:4

P M

MECHANICAL LEGEND AND GENERAL NOTES

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW MS

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

M-100

OUTDOOR DESIGN

CONDITIONS

95.5 76.8 43.3 6.6 -- -- --

°F °F °F °F °F

TEMP

WET BULB

TEMP % HUMIDITY

TEMP

DEWPOINT

TEMP % HUMIDITY

DESIGN

CONDITIONS

SUMMER WINTER LOWEST

AVERAGE

ANNUAL

DEWPOINT

HVAC DESIGN DATA

' 6

G ra p h ic S c a le

/2

G ra p h ic S c a le

/3

G ra p h ic S c a le

/1

G ra p h ic S c a le

/8

G ra p h ic S c a le

/4

G ra p h ic S c a le

/8

G ra p h ic S c a le

/2

G ra p h ic S c a le

/4

G ra p h ic S c a le

Romanyk Consulting Focusing on what matters

VA FORM 08 - 6231

F

E

D

C

B

A

F

E

D

C

B

A

910 7 6 5 4 3 2 1

ARCHITECT/ENGINEER OF RECORDCONSULTANT

8910 7 6

Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

U.S. Department of Veterans Affairs

Phase

STAMP

5 4 3 2 1

NOT FOR

PERMITTING OR

CONSTRUCTION

Office of Construction and Facilities Management

FULLY SPRINKLERED

52 & 53

B

IM

/V

IS

N

J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

V

/J e ff e rs o n B a rr a ck s R e p la ce

A H

U s

B

M

E P

V

.r vt

/9

/2

:0

:4

P M

MECHANICAL ABBREVIATIONS

AUGUST 25, 2022

657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING

UNITS BUILDINGS 52 & 53

AW MS

JEFFERSON BARRACKS

#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125

M-101

IV INLET VANES

IU INDUCTION UNIT

IS INSECT SCREEN

IRH INTRARED HEATER

IPLV INTERGRATED PART LOAD VALUE

IFB INTEGRAL FACE AND BYPASS

ICF IN-LINE CENTRIFUGAL FAN WPD WATER SIDE PRESSURE DROP

IBT INVERTED BUCKET TRAP Wb WET-BULB (TEMPERATURE)

IAQ INDOOR AIR QUALITY

VSD VARIABLE SPEED DRIVE

HX HEAT EXCHANGER VI VIBRATION ISOLATOR

HWUH HOT WATER UNIT HEATER VFD VARIABLE FREQUENCY DRIVE

HWS HEATING HOT WATER SUPPLY VD VOLUME DAMPER (MANUAL OPPOSED BLADE)

HWR HEATING HOT WATER RETURN V VALVE

HWP HEATING HOT WATER PUMP

HWHC HOT WATER HEATING COIL TWU THRU-WALL UNIT

HWC HOT WATER COIL TU TERMINAL UNIT

H…