This document provides the results of an asbestos and lead-based paint survey conducted for a federal construction project to replace air handling units in Buildings 52 and 53 at the Jefferson Barracks VA Medical Center in St. Louis, Missouri. The project, solicitation number 36C25523R0026, will replace obsolete air handling units over 35 years old that support the buildings. Asbestos sampling identified gray window caulk, white thermal system insulation, and mudded joint fittings that exceed quantities requiring abatement prior to renovation. The survey also identified lead-based paint in a black metal rail that will require lead-safe work practices during renovation. The selected contractor must comply with applicable regulations for asbestos and lead abatement and worker certification requirements.

View the file

Other files

File Type Posted
36C25523R0026 0005.docx DOCX document
36C25523R0026_1 Page 5 3 bid items.pdf PDF
36C25523R0026 0004.docx DOCX document
36C25523R0026 0003.docx DOCX document
657-21-106JB - RFI Prebid Jan-2023 Questions.docx DOCX document
657-21-106JB Sign In Sheet.pdf PDF
36C25523R0026_1 Page 5.pdf PDF
36C25523R0026 0002.docx DOCX document
36C25523R0026 0001.docx DOCX document
P01 JB Combined drawings 22 09 09 Part2.pdf PDF
APPENDIX D - ACM LBP MOLD REPORTS PART 2.pdf PDF
P01 APPENDIX B - 100 SPECIFICATIONS 22 09 30 Update.pdf PDF
P01 JB Combined drawings 22 09 09b Part3.pdf PDF
P01 JB Combined drawings 22 09 09 Part1.pdf PDF
36C25523R0026_1.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCI ENGINEERING, INC.

EARTH • SCIENCE • SOLUTIONS

GEOTECHNICAL

ENVIRONMENTAL

NATURAL RESOURCES

CULTURAL RESOURCES

CONSTRUCTION SERVICES

130 Point West Boulevard, St. Charles, Missouri 63301 ■ 636-949-8200 www.sciengineering.com

February 10, 2022

Scott Thraen Romanyk Consulting Corp.

3308 Preston Road, Suite 350-164 Plano, Texas 75093

RE: Asbestos Survey Activities, Building 52 VISN 15 – Project 657-21-106JB FCA – Replace Air Handling Units Buildings 52 & 53 St. Louis, Missouri SCI No. 2017-0502.20 Task 007

Dear Scott Thraen:

INTRODUCTION

SCI Engineering, Inc. (SCI) is pleased to submit this report of the analytical test results for samples of suspect asbestos-containing materials (ACMs) collected during the survey performed on December 2, 2021.

The survey was conducted by Travis S. Clayton, Missouri-Licensed Asbestos Inspector. A copy of Travis Clayton’s asbestos inspector license is enclosed.

The purpose of this survey was to identify ACMs in accessible areas of the structure at the Jefferson Barracks VA Medical Center in St. Louis, Missouri which may be impacted by proposed replacement of selected air handler units in Building 52. This survey is intended to satisfy the requirements for the asbestos National Emission Standard for Hazardous Air Pollutant for demolition and renovation and Occupational Safety and Health Administration (OSHA) compliance.

LIMITATIONS

SCI's asbestos survey entailed visually assessing accessible areas only. If any other suspect asbestos materials are discovered during demolition or renovation, please contact SCI, and we will make arrangements for assessment of these materials. Areas behind walls, under subfloors and above fixed ceilings are considered non-accessible.

During the course of performing the survey of the structure, SCI was able to access all materials which are anticipated to be impacted by the renovation activities.

ASBESTOS SURVEY

Thirty-nine samples were collected from the on-site structure. From these 39 samples, 46 layers were analyzed by Polarized Light Microscopy (PLM). Of the 46 layers analyzed, 3 were found to contain asbestos. Analytical test results and chain-of-custody documentation are enclosed. Additionally, four materials were labeled as ACM in the field or were previously sampled and analyzed by others and were assumed to contain asbestos. The results of the analysis of all samples as well as the assumed ACM materials are summarized in Table 1.

Scott Thraen 2 February 10, 2022 Romanyk Consulting Corp. SCI No. 2017-0502.20 Task 007

Table 1 - Summary of Analytical Test Results

Sample Number Material Location Material Description Approx.

Quantity Result Category

52-001A Rooms GS08 and

GS08A Fiber Ceiling 400 sf

None Detected

-- 52-001B None Detected

52-001C None Detected

52-002A Rooms GS08 and

GS08A Gray Window Caulk 40 lf

3% Chrysotile

NCII 52-002B Not Analyzed Due to Positive Stop

52-002C Not Analyzed Due to Positive Stop

52-003A

Rooms GS08, GS08A, and GN39

White Lagging on Fiberglass Insulation --

None Detected

52-003B None Detected

52-003C None Detected

52-003D None Detected

52-004 Room GS08 White Insulation on Pipe Stub 1 lf 10% Amosite

2% Chrysotile Friable

52-005 Room GS08 Cardboard Pipe Wrap on Domestic Cold Water Pipe Stub

1 lf None Detected --

52-006A

Rooms GS08, GS08A, GN39, and

2S14 Red Fire Stop Caulk --

None Detected

52-006B None Detected

52-006C None Detected

52-006D None Detected

52-006E None Detected

52-007A

Rooms GN39 and 2S14 Plaster System 600 sf

None Detected in Skim Coat or Plaster

52-007B None Detected in Skim Coat or

Plaster

52-007C None Detected in Skim Coat or Plaster

52-007D None Detected in Skim Coat or Plaster

52-008A

Room GN39 Window Caulk 22 lf

None Detected

-- 52-008B None Detected

52-008C None Detected

52-009A

Room GN39 Green Terrazzo Cove Base 60 lf

None Detected

-- 52-009B None Detected

52-009C None Detected sf - square feet lf - linear feet NCII - Non-Friable Category II Material

Scott Thraen 3 February 10, 2022

Table 1 - Summary of Analytical Test Results (continued)

Number Material Location Material Description Approx.

Quantity Result Category

52-010A

Room GN39 Black Vibration Joint Cloth 26 lf

None Detected

-- 52-010B None Detected

52-010C None Detected

52-011A Rooms GN39 and

2S14 Gasket on Duct Hatch 16 lf

None Detected

-- 52-011B None Detected

52-011C None Detected

52-012A

Room 2S14 Brown 12” x 12” Floor Tile 222 sf

2% Chrysotile in Floor Tile;

None Detected in Brown Mastic

NCI 52-012B

Floor Tile Not Analyzed Due to Positive Stop; None Detected in

Brown Mastic

52-012C Floor Tile Not Analyzed Due to Positive Stop; None Detected in

Brown Mastic

52-013A

Room 2S14 Tan Lagging on Fiberglass Duct

Insulation

None Detected

-- 52-013B None Detected

52-013C None Detected

52-014 Room GS08A White Block Thermal

System Insulation

(TSI)

35 lf Assumed ACM Friable

52-015 Room GS08A Mudded Joint Fittings 4 fittings Assumed ACM Friable

52-016 Room 2S14 White Block TSI 90 lf Assumed ACM Friable

52-017 Room 2S14 Mudded Joint Fittings 35 fittings Assumed ACM Friable sf - square feet lf - linear feet NCI - Non-Friable Category I Material

DEMOLITION/RENOVATION

According to the St. Louis County Department of Health (SLCDOH), any friable or potentially friable ACM in excess of 16 linear feet or 10 square feet is classified as a regulated ACM (RACM) and must be removed prior to demolition or renovation which would significantly damage the material.

Several ACM TSI materials were identified in the proposed project area, including white insulation on pipe stub (sample 52-004), white block TSI (samples 52-014, 52-016), and mudded joint fittings (samples 52-015, 52-017). These materials are considered friable and exceed the minimum quantity requirements.

Therefore, these materials must be abated if they will be impacted by renovation activities.

The brown floor tile is a Category I non-friable material; furthermore, the gray window caulk is a Category II non-friable material. These materials would not normally require removal from the structure prior to renovation. However, the VA typically requires abatement prior to any renovation which will impact ACM.

Scott Thraen 4 February 10, 2022

The Occupational Safety & Health Administration also has regulations (29 CFR Parts 1910 et al, Occupational Exposure to Asbestos, August 10, 1994) regarding removal of asbestos-containing materials which must be followed.

REPORTING

Attached is SLCDOH Notification of Demolition and Renovation form, which has been filled out to the extent possible by SCI. The remaining information must be completed by you.

This report, as well as the completed EPA Notification of Demolition and Renovation form, must be submitted to the SLCDOH, Ms. Kathrina Donnegan, SLCDOH, 111 South Meramec, Clayton, MO, 63105.

It should be noted that following submittal of the notification form, there is a 10-day waiting period before demolition, renovation, or abatement activities can begin.

If this report is to be used for bidding purposes for asbestos abatement, SCI recommends the contractor visit the site to verify all conditions and quantities.

SCI appreciates the opportunity to be of service to you on this project, and we look forward to working with you in the future. Please contact us if you have any questions or comments regarding the information provided.

Respectfully, Travis S. Clayton Glen A. Grissom Missouri State Certified Asbestos Inspector Senior Scientist Certificate Number 7011011821MOIR18366

Edwin P. Grimmer, P.E.

Vice President

TSC/GAG/EPG/lf/rah

Enclosures Asbestos NESHAP Notification of Demolition and Renovation Analytical Test Results and Chain of Custody Asbestos Inspector Certificate

2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T007-Jefferson Barracks VA-Bldgs. 52 and 53 AHU\!ACM\Bldg. 52\FCA Replace AHUs Bldg 52 - ACM Report.doc tclayton Typewritten Text X tclayton Typewritten Text United States of America tclayton Typewritten Text 1 Jefferson Barracks Road tclayton Typewritten Text Saint Louis tclayton Typewritten Text Saint Louis tclayton Typewritten Text

MO

tclayton Typewritten Text 63125 tclayton Typewritten Text X tclayton Typewritten Text Building 52 tclayton Typewritten Text 1 Jefferson Barracks Road tclayton Typewritten Text Saint Louis tclayton Typewritten Text Saint Louis tclayton Typewritten Text

MO

tclayton Typewritten Text 63125 tclayton Typewritten Text Basement and 2nd Level tclayton Typewritten Text tclayton Typewritten Text ~72,000 sf tclayton Typewritten Text ~80 years tclayton Typewritten Text Hospital tclayton Typewritten Text Hospital tclayton Typewritten Text Asbestos Bulk PLM EPA 600/R-93/116 tclayton Typewritten Text X tclayton Typewritten Text Window Caulk, TSI tclayton Typewritten Text , Floor Tile tclayton Typewritten Text tclayton Typewritten Text tclayton

SanAir ID#: 21075408

Project #: 2017-0502.20 Task007

Project Name: FCA Replace AHUs Bldgs 52 & 53

Report Date: 12/15/2021

Analysis Report prepared for SCI Engineering Inc

Dear (None), We at SanAir would like to thank you for the work you recently submitted. The 39 sample(s) were received on Tuesday, December 07, 2021 via UPS. The final report(s) is enclosed for the following sample(s): 52-001A, 52-001B, 52-001C, 52-002A, 52-002B, 52-002C, 52-003A, 52-003B, 52-003C, 52-003D, 52-004, 52-005, 52-006A, 52-006B, 52 -006C, 52-006D, 52-006E, 52-007A, 52-007B, 52-007C, 52-007D, 52-008A, 52-008B, 52-008C, 52-009A, 52-009B, 52-009C, 52-010A, 52-010B, 52-010C, 52-011A, 52-011B, 52-011C, 52-012A, 52-012B, 52-012C, 52-013A, 52-013B, 52-013C.

These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.

Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory

Final Report Includes:

- Cover Letter

- Analysis Pages

- Disclaimers and Additional Information

Sample conditions:

- 39 samples in Good condition.

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2017-0502.20 Task007Project Number:

P.O. Number:

Project Name: FCA Replace AHUs Bldgs 52 & 53

12/2/2021Collected Date:

12/7/2021 10:00:00 AMReceived Date:

12/15/2021 2:05:21 PM

21075408 SanAir ID Number

FINAL REPORT

SCI Engineering IncName:

Address: 130 Point West Blvd

St Charles, MO 63301

636-757-1034Phone:

Analyst: Campos, Angie

Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

52-001A / 21075408-001 Rms GS08 And GS08A / Fiber Ceiling

Brown Fibrous

Homogeneous

97% Cellulose 3% Other None Detected

52-001B / 21075408-002 Rms GS08 And GS08A / Fiber Ceiling

Brown Fibrous

Homogeneous

97% Cellulose 3% Other None Detected

52-001C / 21075408-003 Rms GS08 And GS08A / Fiber Ceiling

Brown Fibrous

Homogeneous

97% Cellulose 3% Other None Detected

52-002A / 21075408-004 Rms GS08 And GS08A / Window Caulk

Off-White Non-Fibrous

Homogeneous

97% Other 3% Chrysotile

52-002B / 21075408-005 Rms GS08 And GS08A / Window Caulk

Not Analyzed

52-002C / 21075408-006 Rms GS08 And GS08A / Window Caulk

Not Analyzed

52-003A / 21075408-007 Rms GS08, GS08A, and GN39 / Lagging On FG Insulation

White Non-Fibrous

Homogeneous

100% Other None Detected

52-003B / 21075408-008 Rms GS08, GS08A, and GN39 / Lagging On FG Insulation

White Non-Fibrous

Homogeneous

100% Other None Detected

52-003C / 21075408-009 Rms GS08, GS08A, and GN39 / Lagging On FG Insulation

White Non-Fibrous

Homogeneous

100% Other None Detected

52-003D / 21075408-010 Rms GS08, GS08A, and GN39 / Lagging On FG Insulation

White Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 12/15/2021 Date: 12/15/2021

Approved Signatory:

2017-0502.20 Task007Project Number:

P.O. Number:

Project Name: FCA Replace AHUs Bldgs 52 & 53

12/2/2021Collected Date:

12/7/2021 10:00:00 AMReceived Date:

12/15/2021 2:05:21 PM

21075408 SanAir ID Number

FINAL REPORT

SCI Engineering IncName:

Address: 130 Point West Blvd

St Charles, MO 63301

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

52-004 / 21075408-011 Rms GS08 / Insulation On Pipe Stub

White Non-Fibrous

Homogeneous

88% Other 10% Amosite 2% Chrysotile

52-005 / 21075408-012 Rms GS08 / Cardboard Pipe Wrap On Domestic Cold Water Pipe S

White Fibrous

Homogeneous

75% Cellulose 25% Other None Detected

52-006A / 21075408-013 Rms GS08, GS08A, GN39, And 2S14 / Fire Stop Caulk

Red Non-Fibrous

Homogeneous

100% Other None Detected

52-006B / 21075408-014 Rms GS08, GS08A, GN39, And 2S14 / Fire Stop Caulk

Red Non-Fibrous

Homogeneous

100% Other None Detected

52-006C / 21075408-015 Rms GS08, GS08A, GN39, And 2S14 / Fire Stop Caulk

Red Non-Fibrous

Homogeneous

100% Other None Detected

52-006D / 21075408-016 Rms GS08, GS08A, GN39, And 2S14 / Fire Stop Caulk

Red Non-Fibrous

Homogeneous

100% Other None Detected

52-006E / 21075408-017 Rms GS08, GS08A, GN39, And 2S14 / Fire Stop Caulk

Red Non-Fibrous

Homogeneous

100% Other None Detected

52-007A / 21075408-018 Rms GN39 And 2S14 / Plaster System, Plaster

Grey Non-Fibrous

Homogeneous

100% Other None Detected

52-007A / 21075408-018 Rms GN39 And 2S14 / Plaster System, Skim Coat

White Non-Fibrous

Homogeneous

100% Other None Detected

52-007B / 21075408-019 Rms GN39 And 2S14 / Plaster System, Plaster

Grey Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 12/15/2021 Date: 12/15/2021

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2017-0502.20 Task007Project Number:

P.O. Number:

Project Name: FCA Replace AHUs Bldgs 52 & 53

12/2/2021Collected Date:

12/7/2021 10:00:00 AMReceived Date:

12/15/2021 2:05:21 PM

21075408 SanAir ID Number

FINAL REPORT

SCI Engineering IncName:

Address: 130 Point West Blvd

St Charles, MO 63301

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

52-007B / 21075408-019 Rms GN39 And 2S14 / Plaster System, Skim Coat

White Non-Fibrous

Homogeneous

100% Other None Detected

52-007C / 21075408-020 Rms GN39 And 2S14 / Plaster System, Plaster

Grey Non-Fibrous

Homogeneous

100% Other None Detected

52-007C / 21075408-020 Rms GN39 And 2S14 / Plaster System, Skim Coat

White Non-Fibrous

Homogeneous

100% Other None Detected

52-007D / 21075408-021 Rms GN39 And 2S14 / Plaster System, Plaster

Grey Non-Fibrous

Homogeneous

100% Other None Detected

52-007D / 21075408-021 Rms GN39 And 2S14 / Plaster System, Skim Coat

White Non-Fibrous

Homogeneous

100% Other None Detected

52-008A / 21075408-022 Rm GN39 / Window Caulk

Grey Non-Fibrous

Homogeneous

100% Other None Detected

52-008B / 21075408-023 Rm GN39 / Window Caulk

Grey Non-Fibrous

Homogeneous

100% Other None Detected

52-008C / 21075408-024 Rm GN39 / Window Caulk

Grey Non-Fibrous

Homogeneous

100% Other None Detected

52-009A / 21075408-025 Rm GN39 / Terrazzo Covebase

Green Non-Fibrous

Homogeneous

100% Other None Detected

52-009B / 21075408-026 Rm GN39 / Terrazzo Covebase

Green Non-Fibrous

Homogeneous

100% Other None Detected

Analyst:

Analysis Date: 12/15/2021 Date: 12/15/2021

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2017-0502.20 Task007Project Number:

P.O. Number:

Project Name: FCA Replace AHUs Bldgs 52 & 53

12/2/2021Collected Date:

12/7/2021 10:00:00 AMReceived Date:

12/15/2021 2:05:21 PM

21075408 SanAir ID Number

FINAL REPORT

SCI Engineering IncName:

Address: 130 Point West Blvd

St Charles, MO 63301

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

52-009C / 21075408-027 Rm GN39 / Terrazzo Covebase

Green Non-Fibrous

Homogeneous

100% Other None Detected

52-010A / 21075408-028 Rm GN39 / Vibration Joint Cloth

Black Non-Fibrous

Homogeneous

10% Synthetic 90% Other None Detected

52-010B / 21075408-029 Rm GN39 / Vibration Joint Cloth

Black Non-Fibrous

Homogeneous

10% Synthetic 90% Other None Detected

52-010C / 21075408-030 Rm GN39 / Vibration Joint Cloth

Black Non-Fibrous

Heterogeneous

10% Synthetic 90% Other None Detected

52-011A / 21075408-031 Rms GN39 And 2S14 / Gasket On Duct Hatch

Black Non-Fibrous

Homogeneous

100% Other None Detected

52-011B / 21075408-032 Rms GN39 And 2S14 / Gasket On Duct Hatch

Black Non-Fibrous

Homogeneous

100% Other None Detected

52-011C / 21075408-033 Rms GN39 And 2S14 / Gasket On Duct Hatch

Black Non-Fibrous

Homogeneous

100% Other None Detected

52-012A / 21075408-034 Rm 2S14 / 12x12 Floor Tile, Floor Tile

White Non-Fibrous

Homogeneous

98% Other 2% Chrysotile

52-012A / 21075408-034 Rm 2S14 / 12x12 Floor Tile, Mastic

Brown Non-Fibrous

Homogeneous

100% Other None Detected

52-012B / 21075408-035 Rm 2S14 / 12x12 Floor Tile, Floor Tile

Not Analyzed

Analyst:

Analysis Date: 12/15/2021 Date: 12/15/2021

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2017-0502.20 Task007Project Number:

P.O. Number:

Project Name: FCA Replace AHUs Bldgs 52 & 53

12/2/2021Collected Date:

12/7/2021 10:00:00 AMReceived Date:

12/15/2021 2:05:21 PM

21075408 SanAir ID Number

FINAL REPORT

SCI Engineering IncName:

Address: 130 Point West Blvd

St Charles, MO 63301

Stereoscopic Components

SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers

52-012B / 21075408-035 Rm 2S14 / 12x12 Floor Tile, Mastic

Brown Non-Fibrous

Homogeneous

100% Other None Detected

52-012C / 21075408-036 Rm 2S14 / 12x12 Floor Tile, Floor Tile

Not Analyzed

52-012C / 21075408-036 Rm 2S14 / 12x12 Floor Tile, Mastic

Brown Non-Fibrous

Homogeneous

100% Other None Detected

52-013A / 21075408-037 Rm 2S14 / Lagging On FG Duct Insulation

White Fibrous

Homogeneous

75% Cellulose 25% Other None Detected

52-013B / 21075408-038 Rm 2S14 / Lagging On FG Duct Insulation

White Fibrous

Homogeneous

75% Cellulose 25% Other None Detected

52-013C / 21075408-039 Rm 2S14 / Lagging On FG Duct Insulation

White Fibrous

Homogeneous

75% Cellulose 25% Other None Detected

Analyst:

Analysis Date: 12/15/2021 Date: 12/15/2021

Approved Signatory:

10501 Trade Ct., N. Chesterfield, VA 23236 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com

2017-0502.20 Task007Project Number:

P.O. Number:

Project Name: FCA Replace AHUs Bldgs 52 & 53

12/2/2021Collected Date:

12/7/2021 10:00:00 AMReceived Date:

12/15/2021 2:05:21 PM

21075408 SanAir ID Number

FINAL REPORT

SCI Engineering IncName:

Address: 130 Point West Blvd

St Charles, MO 63301

Disclaimer

This report is the sole property of the client named on the SanAir Technologies Laboratory chain-of-custody (COC). Results in the report are confidential information intended only for the use by the customer listed on the COC. Neither results nor reports will be discussed with or released to any third party without our client's written permission. The final report shall not be reproduced except in full without written approval of the laboratory to assure that parts of the report are not taken out of context. The information provided in this report applies only to the samples submitted and is relevant only for the date, time, and location of sampling. The accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample(s) in the condition in which they arrived at the laboratory and information provided by the client on the COC, such as: project number, project name, collection dates, po number, special instructions, samples collected by, sample numbers, sample identifications, sample type, selected analysis type, flow rate, total volume or area, and start stop times that may affect the validity of the results in this report. Samples were received in good condition unless otherwise noted on the report. SanAir assumes no responsibility or liability for the manner in which the results are used or interpreted. This report does not constitute and shall not be used to claim product certification, approval, or endorsement by NVLAP, NIST, or any other U.S. governmental agencies and may not be certified by every local, state, and federal regulatory agencies.

Samples are held for a period of 60 days. Fibers smaller than 5 microns cannot be seen with this method due to scope limitations.

For NY state samples, method EPA 600/M4-82-020 is performed.

NYELAP Disclaimer:

Polarized- light microscopy is not consistently reliable in detecting asbestos in floor covering and similar non-friable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos containing.

Asbestos Certifications NVLAP lab code 200870-0 City of Philadelphia: ALL-460 PA Department of Environmental Protection Number: 68-05397 California License Number: 2915 Colorado License Number: AL-23143 Connecticut License Number: PH-0105 Massachusetts License Number: AA000222 Maine License Number: LB-0075, LA-0084 New York ELAP lab ID: 11983 Rhode Island License Number: PCM00126, PLM00126, TEM00126 Texas Department of State Health Services License Number: 300440 Commonwealth of Virginia 3333000323 Washington State License Number: C989 West Virginia License Number: LT000616 Vermont License: AL166318 Louisiana Department of Environmental Quality: 212253, Cert 05088

Revision Date: 8/14/2020

Page 1 of 1Page 8 of 10

Missouri Department of dnr.mo.gov

NATURAL RESOURCES

February 8, 2021

Travis S Clayton

402 Washington Dr Waterloo, IL 62298

Carol S. Comer, Director

CERTIFICATION NUZER:

7011011821 MOIR18366

THIS CERTIFIES

Travis S Clayton

HAS CODFLETED THE CERTIFICATION

REQUIREMENTS FOR

Inspector

APPROVED: 02108/2021 TRAINING DATE: 01/18/2021

EXPIRES: 0210812022RE: Missouri Asbestos Occupation Certification Card Drector of Aar PoUubon Control Program

Enclosed is your certification card for Asbestos Inspector, as issued by the Asbestos Unit of the Missouri Department of Natural Resources' Air Pollution Control Program.

Missouri Certification Number: 701101182 IMOIRI 8366 Course Training Date: January 18, 2021 Missouri Certification Approval Date: February 08, 2021 Missouri Certification Expiration Date: February 08, 2022

Note:

• All Missouri-certified asbestos personnel must comply with the following statutes and regulations:

0 Sections 643.225 to 643.250, RSMo•, 0 10 CSR 10-6.241 Asbestos Projects-Registration, Abatement, Notification, Inspection, Demolition, and Performance Requirements; and

0 10 CSR 10-6.250 Asbestos Projects-Certification, Accreditation and Business Exemption Requirements.

• To keep your occupation certification up-to-date, you must complete an annual refresher course and submit a renewal application each year.

• In order to be eligible to renew your certification, you must successfully complete a refresher course with a Missouri-accredited training provider within 12 months of the expiration date of your current training certificate. If you exceed this grace period, you will be required to retake a Missouri-accredited initial course in order to be eligible for Missouri certification.

To obtain a copy of the certification renewal application, or review regulations and requirements, please visit our website at http://dnr.mo.gov/env/apcp/asbestos/index.htm.

If you have any questions please call the Air Pollution Control Program at 573-751-4817.

AIR POLLUTION CONTROL PROGRAM

Director of Air Pollution Control Program

Recycled papor

GEOTECHNICAL

ENVIRONMENTAL

NATURAL RESOURCES

Romanyk Consulting 3308 Preston Road, Suite 350-164 Plano, Texas 75093

RE: Selective Lead-Based Paint Survey Report, Building 52 VISN 15 – Project 657-21-106JB FCA – Replace Air Handling Units Buildings 52 & 53 St. Louis, Missouri SCI No. 2017-0502.20 Task 007

Dear Scott Thraen:

INTRODUCTION

SCI Engineering, Inc. (SCI) is pleased to submit this report summarizing lead-based paint (LBP) survey activities performed on December 2, 2021.

The purpose of this survey was to determine the presence of lead-based paint in accessible areas which will be impacted by proposed replacement of selected air handler units in Building 52 of the Jefferson Barracks VA facility in St. Louis County, Missouri.

LEAD BASED PAINT SURVEY

SCI performed a LBP survey to determine whether LBP systems are prevalent within the on-site structure. The survey was conducted by Travis S. Clayton, Missouri Licensed Lead Inspector.

This survey was performed using a handheld X-Ray Fluorescence Detector (XRF) that can quickly and nondestructively determine the quantity of lead present in paint coatings on various interior and exterior components of the structure.

The United States Department of Housing and Urban Development and the Missouri Department of Health and Senior Services indicates that LBP is any paint, varnish, stain, or other applied coating that has one milligram per square centimeter (mg/cm2) or 5,000 micrograms per gram (ug/g) by dry weight (0.5 percent by mass) or more of lead. Based upon a review of the XRF results, one of the paint systems analyzed had a lead content greater than 1.0 mg/cm3. A summary of these LPB results is included in Table 1, below. A complete summary of the lead testing results is enclosed.

Table 1 - LBP XRF Results (Results Reported in mg/cm2)

Sample Number Sample Location Sample Description Results (Pb)

27 GS08 Black Metal Rail 3.03

Romanyk Consulting SCI No. 2017-0502.20

During renovation of these areas, care should be taken not to sand, grind or abrade surfaces coated with LBP. Any disturbance of these painted surfaces must be performed by workers that are renovation, repair and paint program (RRP) trained. If the painted building components are to remain and be refinished, then stripping the paint should be performed by a licensed abatement contractor. If the components are to be removed then they can be removed by personnel with lead-based paint awareness training and appropriate PPE. Lead-based paint which adheres to demolition debris may be disposed of in a properly permitted sanitary landfill or sent to a permitted treatment, storage, or disposal facility approved to accept non-hazardous waste.

CONCLUSION

As can be seen in Table 1, one paint coating was identified as a LBP coating. Based on the sample results above, the black metal rail in Room GS08 was identified as LBP. However, based on SCI’s review of the project plans from the 35 percent Schematic Design Phase, this coating does not appear to be in areas where renovations are anticipated.

We appreciate the opportunity to be of service to you on this project. If you have any questions or comments regarding these results, please feel free to contact us.

Travis S. Clayton Lead Inspector License Number: 160328-300004933

Glen A. Grissom Senior Scientist

TSC/GAG/lf/rah

Enclosures XRF Results

2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T007-Jefferson Barracks VA-Bldgs. 52 and 53 AHU\!LBP\Bldg. 52\FCA Replace AHUs Bldg 52 - LBP Report.docx

FCA - Replace Air Handling Units Buildings 52 53

SCI No. 20217-0502.20 Task 007

Reading No Time Type Duration Units Sequence Results Depth Index Action Level Component Substrate Side Color Pb Pb Error 1 6/1/2007 0:01 Quantify Lead Paint 20.81 mg / cm ^2 Final Inconclusive 1.1 1 pos cal 1.01 0.1 2 6/1/2007 0:01 Quantify Lead Paint 11.39 mg / cm ^2 Final Negative 1 1 neg cal <LOD 0.01 3 6/1/2007 0:02 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1.82 1 DOOR METAL gray 0.19 0.02 4 6/1/2007 0:02 Quantify Lead Paint 11.03 mg / cm ^2 Final Negative 1.38 1 DOOR case METAL gray 0.15 0.01 5 6/1/2007 0:03 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 2.31 1 WALL BLOCK WHITE 0.07 0.01 6 6/1/2007 0:04 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 COLUMN CONCRETE WHITE <LOD 0.01 7 6/1/2007 0:04 Quantify Lead Paint 11.39 mg / cm ^2 Final Negative 1 1 WALL CONCRETE WHITE <LOD 0.01 8 6/1/2007 0:04 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 PIPE METAL WHITE <LOD 0.01 9 6/1/2007 0:05 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 FLOOR CONCRETE GRAY <LOD 0.01

10 6/1/2007 0:06 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 WALL CONCRETE WHITE <LOD 0.01 11 6/1/2007 0:06 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 WALL BLOCK WHITE <LOD 0.01 12 6/1/2007 0:07 Quantify Lead Paint 11.74 mg / cm ^2 Final Negative 1.73 1 AHU METAL RED 0.25 0.02 13 6/1/2007 0:07 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 AHU METAL TAN <LOD 0.01 14 6/1/2007 0:08 Quantify Lead Paint 11.03 mg / cm ^2 Final Negative 1.61 1 PIPE HANGAR METAL TAN 0.1 0.01 15 6/1/2007 0:09 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.63 1 DUCT METAL WHITE 0.04 0.01 16 6/1/2007 0:09 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.11 1 PIPE METAL RED 0.45 0.1 17 6/1/2007 0:11 Quantify Lead Paint 11.38 mg / cm ^2 Final Negative 1.66 1 DUCT METAL TAN 0.04 0.01 18 6/1/2007 0:11 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 COLUMN CONCRETE WHITE <LOD 0.01 19 6/1/2007 0:12 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL GRAY <LOD 0.01 20 6/1/2007 0:13 Quantify Lead Paint 13.48 mg / cm ^2 Final Negative 2.02 1 AHU METAL GRAY 0.05 0.01 21 6/1/2007 0:16 Quantify Lead Paint 0.83 mg / cm ^2 Final Negative 1 1 AHU METAL GRAY <LOD 0.01 22 6/1/2007 0:17 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 DOOR METAL YELLOW <LOD 0.01 23 6/1/2007 0:17 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.92 1 DOOR CASE METAL GS08 WHITE 0.2 0.02 24 6/1/2007 0:18 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 2.23 1 DOOR CASE METAL GS08 TAN 0.12 0.02 25 6/1/2007 0:18 Quantify Lead Paint 11.04 mg / cm ^2 Final Negative 3.97 1 WALL BLOCK GS08 WHITE 0.24 0.03 26 6/1/2007 0:18 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 COLUMN CONCRETE GS08 WHITE <LOD 0.01 27 6/1/2007 0:19 Quantify Lead Paint 10.68 mg / cm ^2 Final Positive 2.37 1 RAIL METAL GS08 BLZCK 3.03 0.1 28 6/1/2007 0:20 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL GS08 GRAY <LOD 0.01 29 6/1/2007 0:21 Quantify Lead Paint 11.03 mg / cm ^2 Final Negative 1 1 ELEC BOX RACK METAL GS08 GRAY <LOD 0.01 30 6/1/2007 0:21 Quantify Lead Paint 11.38 mg / cm ^2 Final Negative 1.53 1 AIR COMP METAL GS08 GRAY 0.56 0.1 31 6/1/2007 0:22 Quantify Lead Paint 12.08 mg / cm ^2 Final Negative 1 1 WALL BLOCK GS08 WHITE <LOD 0.01 32 6/1/2007 0:23 Quantify Lead Paint 11.73 mg / cm ^2 Final Negative 1 1 WALL BLOCK GS08 WHITE <LOD 0.01 33 6/1/2007 0:23 Quantify Lead Paint 1.53 mg / cm ^2 Final Negative 1 1 PIPE METAL GS08 TAN <LOD 0.02 34 6/1/2007 0:24 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 PIPE METAL GS08 TAN <LOD 0.01 35 6/1/2007 0:24 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 PUMP METAL GS08 RED <LOD 0.01 36 6/1/2007 0:25 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 PIPE METAL GS08 WHITE <LOD 0.01 37 6/1/2007 0:25 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 PIPE METAL GS08 RED <LOD 0.01 38 6/1/2007 0:26 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 TANK METAL GS08 GRAY <LOD 0.01 39 6/1/2007 0:27 Quantify Lead Paint 0.48 mg / cm ^2 Final Negative 1 1 TANK METAL GS08 GRAY <LOD 0.01 40 6/1/2007 0:27 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 TANK METAL GS08 WHITE <LOD 0.01 41 6/1/2007 0:28 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1.32 1 HANGAR METAL GS08 WHITE 0.06 0.01 42 6/1/2007 0:29 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.25 1 WALL BLOCK GS08 TAN 0.32 0.1 43 6/1/2007 0:30 Quantify Lead Paint 11.39 mg / cm ^2 Final Negative 1 1 FLOOR CONCRETE GS08 GRAY <LOD 0.01

SCI No. 20217-0502.20 Task 007

Reading No Time Type Duration Units Sequence Results Depth Index Action Level Component Substrate Side Color Pb Pb Error 44 6/1/2007 0:30 Quantify Lead Paint 0.48 mg / cm ^2 Final Negative 1 1 FLOOR CONCRETE GS08 GRAY <LOD 0.01 45 6/1/2007 0:31 Quantify Lead Paint 18.37 mg / cm ^2 Final Negative 1 1 WALL CONCRETE GS08 WHITE <LOD 0.01 46 6/1/2007 0:38 Quantify Lead Paint 15.22 mg / cm ^2 Final Negative 1 1 FAN CAGE METAL GS08 TAN 0.07 0.01 47 6/1/2007 0:47 Quantify Lead Paint 0.15 mg / cm ^2 Final Negative 1 1 FAN CAGE METAL GS08 TAN <LOD 0.01 48 6/1/2007 1:18 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.23 1 DOOR METAL GN39 YELLOW 0.14 0.01 49 6/1/2007 1:18 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1.55 1 DOOR CASE METAL GN39 YELLOW 0.27 0.02 50 6/1/2007 1:19 Quantify Lead Paint 11.38 mg / cm ^2 Final Negative 3.89 1 WALL PLASTER GN39 WHITE 0.25 0.03 51 6/1/2007 1:19 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 2.26 1 WALL PLASTER GN39 WHITE 0.28 0.03 52 6/1/2007 1:19 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 2.78 1 WALL PLASTER GN39 WHITE 0.13 0.02 53 6/1/2007 1:19 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 3.78 1 WALL PLASTER GN39 WHITE 0.16 0.03 54 6/1/2007 1:20 Quantify Lead Paint 11.02 mg / cm ^2 Final Negative 1 1 BRACE METAL GN39 WHITE <LOD 0.01 55 6/1/2007 1:20 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 3.85 1 REGISTER METAL GN39 WHITE 0.17 0.03 56 6/1/2007 1:21 Quantify Lead Paint 11.73 mg / cm ^2 Final Negative 1 1 COVE BASE TERRAZZO GN39 BLACK <LOD 0.01 57 6/1/2007 1:22 Quantify Lead Paint 10.33 mg / cm ^2 Final Negative 1.89 1 WINDOW SASH METAL GN39 TAN 0.08 0.01 58 6/1/2007 1:23 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 WINDOW SILL CONCRETE GN39 TAN <LOD 0.01 59 6/1/2007 1:23 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.53 1 DUCT METAL GN39 TAN 0.04 0.01 60 6/1/2007 1:24 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 2.25 1 DUCT HATCH METAL GN39 TAN 0.34 0.1 61 6/1/2007 1:25 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.05 1 PIPE METAL GN39 RED 0.43 0.1 62 6/1/2007 1:25 Quantify Lead Paint 2.31 mg / cm ^2 Final Negative 1 1 PIPE METAL GN39 RED <LOD 0.01 63 6/1/2007 1:47 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL GN39 GRAY <LOD 0.01 64 6/1/2007 2:31 Quantify Lead Paint 10.7 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL 2S14 GRAY <LOD 0.01 65 6/1/2007 2:32 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 3.77 1 DOOR CASE METAL 2S14 WHITE 0.13 0.02 66 6/1/2007 2:32 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1.57 1 DOOR WOOD 2S14 STAIN 0.05 0.01 67 6/1/2007 2:33 Quantify Lead Paint 11.38 mg / cm ^2 Final Negative 2.9 1 WALL PLASTER 2S14 WHITE 0.09 0.02 68 6/1/2007 2:33 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 WALL PLASTER 2S14 WHITE <LOD 0.01 69 6/1/2007 2:34 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 2.79 1 WALL PLASTER 2S14 WHITE 0.16 0.02 70 6/1/2007 2:34 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 WALL PLASTER 2S14 WHITE <LOD 0.01 71 6/1/2007 2:34 Quantify Lead Paint 10.34 mg / cm ^2 Final Negative 1 1 PIPE METAL 2S14 RED <LOD 0.01 72 6/1/2007 2:35 Quantify Lead Paint 12.78 mg / cm ^2 Final Negative 1 1 HANGER METAL 2S14 WHITE <LOD 0.01 73 6/1/2007 2:35 Quantify Lead Paint 12.77 mg / cm ^2 Final Negative 3.52 1 WINDOW SASH METAL 2S14 WHITE 0.25 0.03 74 6/1/2007 2:36 Quantify Lead Paint 12.78 mg / cm ^2 Final Negative 2.98 1 WINDOW SILL METAL 2S14 WHITE 0.15 0.02 75 6/1/2007 2:36 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 2.5 1 REGISTER METAL 2S14 WHITE 0.15 0.02 76 6/1/2007 2:37 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 2.12 1 DUCT HATCH METAL 2S14 TAN 0.3 0.1 77 6/1/2007 2:37 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 DUCT HATCH METAL 2S14 GRAY <LOD 0.01 78 6/1/2007 2:38 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 DUCT METAL 2S14 TAN <LOD 0.01 79 6/1/2007 2:38 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 DUCT FG 2S14 TAN <LOD 0.01 80 6/1/2007 2:39 Quantify Lead Paint 11.38 mg / cm ^2 Final Negative 1.13 1 CEILING CONCRETE 2S14 WHITE 0.02 0.01 81 6/1/2007 2:40 Quantify Lead Paint 20.8 mg / cm ^2 Final Inconclusive 1.12 1 POS CAL 1.06 0.1 82 6/1/2007 2:40 Quantify Lead Paint 20.81 mg / cm ^2 Final Negative 1 1 NEG CAL <LOD 0.01 83 6/1/2007 2:45 Action Lead Paint 0.15 mg / cm ^2 Final Negative 1 1 PIPE METAL 2S14 TAN <LOD 0.17 84 6/1/2007 2:45 Action Lead Paint 0.15 mg / cm ^2 Final Negative 1 1 PIPE METAL 2S14 TAN <LOD 0.21 85 6/1/2007 2:46 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 2.51 1 PIPE METAL 2S14 TAN 0.15 0.02 86 6/1/2007 2:49 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 COVE BASE CONCRETE 2S14 GRAY <LOD 0.01

SCI No. 20217-0502.20 Task 007

Reading No Time Type Duration Units Sequence Results Depth Index Action Level Component Substrate Side Color Pb Pb Error 87 6/1/2007 3:16 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-5 TAN <LOD 0.01 88 6/1/2007 3:17 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-5 TAN <LOD 0.01 89 6/1/2007 3:17 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-5 WHITE <LOD 0.01 90 6/1/2007 3:17 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-5 WHITE <LOD 0.01 91 6/1/2007 3:18 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-5 WHITE <LOD 0.01 92 6/1/2007 3:18 Quantify Lead Paint 10.33 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-5 WHITE <LOD 0.01 93 6/1/2007 3:19 Quantify Lead Paint 11.03 mg / cm ^2 Final Negative 1 1 EF-5 METAL AHU-5 TAN <LOD 0.01 94 6/1/2007 3:20 Quantify Lead Paint 11.38 mg / cm ^2 Final Negative 2 1 HANGAR METAL AHU-5 TAN 0.11 0.02 95 6/1/2007 3:20 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 BOX METAL AHU-5 SILVER <LOD 0.01 96 6/1/2007 3:21 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 FLASHING METAL AHU-5 WHITE <LOD 0.01 97 6/1/2007 3:23 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 DUCT SUPPORT METAL AHU-5 WHITE <LOD 0.01 98 6/1/2007 3:23 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ROOFING METAL AHU-5 SILVER <LOD 0.01 99 6/1/2007 3:24 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 COPING METAL AHU-2 WHITE <LOD 0.01

100 6/1/2007 3:24 Quantify Lead Paint 10.7 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-2 TAN <LOD 0.01 101 6/1/2007 3:25 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-2 WHITE <LOD 0.01 102 6/1/2007 3:25 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-2 WHITE <LOD 0.01 103 6/1/2007 3:26 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM DUCT METAL AHU-2 WHITE <LOD 0.01 104 6/1/2007 3:27 Quantify Lead Paint 10.34 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-2 GRAY <LOD 0.01 105 6/1/2007 3:28 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 CONDUIT METAL AHU-2 GREEN <LOD 0.01 106 6/1/2007 3:28 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 2.29 1 HANGAR METAL AHU-2 WHITE 0.09 0.02 107 6/1/2007 3:31 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 PEN COVER METAL AHU-2 WHITE <LOD 0.01 108 6/1/2007 3:33 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-4 TAN <LOD 0.01 109 6/1/2007 3:34 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-4 TAN <LOD 0.01 110 6/1/2007 3:34 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-4 GRAY <LOD 0.01 111 6/1/2007 3:35 Quantify Lead Paint 11.04 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-3 TAN <LOD 0.01 112 6/1/2007 3:35 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-3 TAN <LOD 0.01 113 6/1/2007 3:36 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1.94 1 SUPPORT BEAM METAL AHU-3 WHITE <LOD 0.01 114 6/1/2007 3:36 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-3 WHITE <LOD 0.01 115 6/1/2007 3:37 Quantify Lead Paint 12.08 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM DUCT METAL AHU-3 WHITE <LOD 0.01 116 6/1/2007 3:39 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-3 GRAY <LOD 0.01 117 6/1/2007 3:39 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 ELEC BOX METAL AHU-1 WHITE <LOD 0.01 118 6/1/2007 3:39 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-1 WHITE <LOD 0.01 119 6/1/2007 3:40 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM METAL AHU-1 WHITE <LOD 0.01 120 6/1/2007 3:40 Quantify Lead Paint 11.74 mg / cm ^2 Final Negative 1 1 HANGAR METAL AHU-1 WHITE <LOD 0.01 121 6/1/2007 3:41 Quantify Lead Paint 11.04 mg / cm ^2 Final Negative 1 1 AHU METAL AHU-1 TAN <LOD 0.01 122 6/1/2007 3:41 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 EF-1 METAL AHU-1 TAN <LOD 0.01 123 6/1/2007 3:41 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 EF-1 METAL AHU-1 TAN <LOD 0.01 124 6/1/2007 3:42 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM DUCT METAL AHU-1 TAN <LOD 0.01 125 6/1/2007 3:43 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 SUPPORT BEAM PARAPET METAL AHU-1 WHITE <LOD 0.01 126 6/1/2007 3:44 Quantify Lead Paint 11.04 mg / cm ^2 Final Negative 1 1 CONDUIT METAL AHU-3 WHITE <LOD 0.01 127 6/1/2007 3:44 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 PENETRATION CAP METAL AHU-3 WHITE <LOD 0.01 128 6/1/2007 3:46 Quantify Lead Paint 20.81 mg / cm ^2 Final Inconclusive 1.12 1 POS CAL 1.05 0.1 129 6/1/2007 3:46 Quantify Lead Paint 20.82 mg / cm ^2 Final Negative 1 1 POS CAL <LOD 0.01

SCI No. 20217-0502.20 Task 007

Reading No Time Type Duration Units Sequence Results Depth Index Action Level Component Substrate Side Color Pb Pb Error 130 6/1/2007 3:50 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE GRAY <LOD 0.01 131 6/1/2007 3:50 Quantify Lead Paint 9.99 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE GRAY <LOD 0.01 132 6/1/2007 3:50 Quantify Lead Paint 10.69 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE GRAY <LOD 0.01 133 6/1/2007 3:51 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE TAN <LOD 0.01 134 6/1/2007 3:51 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 ELEC BOX PENTHOUSE TAN <LOD 0.01 135 6/1/2007 3:53 Quantify Lead Paint 21.15 mg / cm ^2 Final Inconclusive 1.11 1 POS CAL 1.05 0.1 136 6/1/2007 3:53 Quantify Lead Paint 21.16 mg / cm ^2 Final Negative 1 1 NEG CAL <LOD 0.01 137 6/1/2007 4:17 Quantify Lead Paint 11.39 mg / cm ^2 Final Negative 1 1 CEILING TILE 53-2 WHITE <LOD 0.01 138 6/1/2007 4:17 Quantify Lead Paint 10.68 mg / cm ^2 Final Negative 1 1 CEILING GRID 53-2 WHITE <LOD 0.01 139 6/1/2007 4:25 Quantify Lead Paint 20.8 mg / cm ^2 Final Inconclusive 1.14 1 POS CAL 1.04 0.1 140 6/1/2007 4:26 Quantify Lead Paint 20.8 mg / cm ^2 Final Negative 1 1 NEG CAL <LOD 0.01

GEOTECHNICAL

ENVIRONMENTAL

NATURAL RESOURCES

Romanyk Consulting 3308 Preston Road Suite 350-164 Plano, Texas 75093

RE: Mold Reconnaissance, Building 52 VISN 15 – Project 657-21-106JB FCA – Replace Air Handling Units Buildings 52 & 53 St. Louis, Missouri SCI No. 2017-0502.20 Task 007

Dear Scott Thraen:

INTRODUCTION

SCI Engineering, Inc. (SCI) is pleased to present the results of our mold assessment performed on December 2, 2021. The purpose of this assessment was to identify areas of mold growth or potential mold growth in accessible areas which will be impacted by proposed replacement of selected air handler units (AHUs) in Building 52 of the Jefferson Barracks VA facility in St. Louis County, Missouri.

OBSERVATIONS

SCI’s reconnaissance included proposed renovation areas in rooms GS08, GS08A, GN39, and 2S14.

Each space was assessed independently, and a summary of SCI’s observations is detailed below

Room GS08

Room GS08 was a mechanical space that housed an air compressor, water circulation pumps, and domestic water heaters. The room was connected to a mechanical tunnel located in the northwestern portion of the space.

Room GS08 was hot and noticeably humid compared to adjacent functional spaces. A steam pipe in the tunnel access in the northwestern corner of the room was actively discharging water into a drain below the main level of the floor. Furthermore, condensation was observed on a chilled water supply valve and a possible leak or condensate drip was noted on an unlabeled valve located above the chilled water pump.

Dark suspect mold growth was observed on paper lagging associated with fiberglass pipe insulation servicing the chilled water pumps in this area.

Based on plans available during the 35 percent Schematic Design Phase, only minimal mechanical work involving piping is planned in this room, and it does not appear that demolition or installation of new equipment will impact the chilled water pumps or associated equipment. Therefore, it is unlikely that the project will impact suspect mold growth in this space.

Room GS08A

Room GS08A was a mechanical space adjacent to Room GS08. The space housed a small AHU that had recently undergone abatement to remove asbestos-containing materials. The AHU is slated for replacement. SCI did not observe any evidence elevated humidity or current or historical moisture intrusion in this space. Furthermore, no suspect mold growth was observed. As such SCI does not anticipate that the project will impact suspect mold growth in this space.

Room GN39

Room GN039 was a mechanical space that housed a ceiling-mounted AHU slated for replacement. The AHU was no longer functioning at the time of SCI’s reconnaissance and appeared to have been isolated from the low-pressure steam system; however, SCI observed evidence of historical moisture issues within the space. Brown discoloration and dark suspect mold growth, likely associated with historical condensation, was observed on paper lagging associated with fiberglass pipe insulation servicing the AHU. Since this AHU and associated piping is planned to be removed, the project will likely impact this suspect mold growth.

Room 2S14

Room 2S14 is a multi-purpose space that housed an AHU slated for replacement. The room was also used as a storage space for various durable materials. The AHU was no longer functioning at the time of SCI’s reconnaissance; however, lines in the space appeared to still be connected to the low-pressure steam system. Dark staining indicative of suspect mold growth was observed on the lagging associated with the low-pressure steam and chilled water return and supply lines servicing the AHU. Additional suspect mold growth was observed on the fabric lagging associated with the AHU. Although no evidence of moisture intrusions or elevated humidity was noted at the time of the site reconnaissance, this suspect mold growth is likely associated with historical condensation issues when the AHU equipment was operational. Since this AHU and associated piping is planned to be removed, the project will likely impact this suspect mold growth.

CONCLUSIONS AND RECOMMENDATIONS

SCI recommends removing thermal system insulation that appears to be impacted by suspect mold growth prior to renovations that will impact the materials. These activities should take place in contained conditions under negative air pressure. The negative air machine or air scrubber should be vented to the outside and, if necessary, allowances made for make-up air. Air exchanges should occur a minimum of once every five minutes in the area being air washed, with periodic repositioning of the negative air machine to try to avoid “dead” spots where little or no air flow occurs. Fans or blowers could be used to aid air movement as necessary. Air washing should be maintained for a minimum of 100 air exchanges where good air flow can be achieved.

In Room 2S14, suspect mold growth was observed on asbestos-containing thermal system insulation.

These materials should be removed by a licensed abatement contractor according applicable regulations pertaining to asbestos-containing materials and properly disposed.

Scott Thraen 3 February 10, 2022

LIMITATIONS

Because mold infestations are created by omnipresent microscopic spores and influenced by varying weather conditions, such as temperature and humidity; because a mold infestation may exist in an area that is hidden from view and otherwise not readily accessible; and because mold infestations can grow quickly neither SCI, nor any other consultant, can possibly eliminate the risk of a latent mold infestation going undetected, or of incipient infestation growing quickly and becoming apparent shortly after SCI completes its services. SCI’s detection and characterization services and implementation of our recommendations will not and cannot, of themselves, prevent future infestations of mold.

Our recommendations for the minimization of the potential for a recurrence of detected mold infestations are of necessity based on a variety of assumptions, some of which may prove to be invalid. Likewise, SCI can not evaluate the faithfulness with which our recommendations are implemented if we are not retained to observe the implementation of such recommendation, and, depending on what occurs or what is found during the implementation, to modify or expand on our recommendations as necessary.

This report conveys findings about conditions that existed at the time such conditions were observed.

The absence of mold in areas that we did not observe and/or test is not to be construed as an assurance that mold cannot migrate to or colonize such areas at a later date. Significant mold growth can occur in a matter of days, creating significantly changed conditions. Because of this, one cannot conclusively assume that the conditions documented in this report even still exist. Likewise, SCI makes no representations regarding future mold growth, as SCI has no control over site conditions such as water intrusion events which cause most indoor mold growth.

SCI does not employ medical professionals and does not have the training or expertise to assess or diagnose potential mold related health effects or to determine whether exposure to mold, mold spores, microbial volatile organic compounds (mVOC) or mycotoxins will cause illness on an individual basis.

SCI appreciates being of service to you on this project. Should you have any questions or comments regarding these results please feel free to contact us.

Staff Scientist

TSC/GAG/lf/rah

Enclosures

2017 PROJECTS\2017-0502 VISN 15 MATOC-Romanyk\T007-Jefferson Barracks VA-Bldgs. 52 and 53 AHU\!MOLD\Bldg. 52\FCA Replace AHUs Bldg 52 - Mold Report.doc

GEOTECHNICAL

ENVIRON…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .