P01 JB Combined drawings 22 09 09 Part1.pdf
PDF 7 MB Posted
- Solicitation number
- 36C25523R0026
About this file
This solicitation is for construction services required to replace obsolete air handling units (AHUs) that support Buildings 52 and 53 at the Jefferson Barracks Division of the St. Louis VA Medical Center in St. Louis, Missouri. The project involves replacing the existing AHUs, which date back 35 years and are beyond their useful life, with new units under Project Number 657-21-106JB. Construction services will include all architectural, electrical, structural, and hazardous material abatement work necessary to safely install the new AHUs and system components. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15 is the contracting agency.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25523R0026 0005.docx | DOCX document | |
| 36C25523R0026_1 Page 5 3 bid items.pdf | ||
| 36C25523R0026 0004.docx | DOCX document | |
| 36C25523R0026 0003.docx | DOCX document | |
| 657-21-106JB - RFI Prebid Jan-2023 Questions.docx | DOCX document | |
| 657-21-106JB Sign In Sheet.pdf | ||
| 36C25523R0026_1 Page 5.pdf | ||
| 36C25523R0026 0002.docx | DOCX document | |
| 36C25523R0026 0001.docx | DOCX document | |
| P01 JB Combined drawings 22 09 09 Part2.pdf | ||
| APPENDIX D - ACM LBP MOLD REPORTS PART 2.pdf | ||
| P01 APPENDIX B - 100 SPECIFICATIONS 22 09 30 Update.pdf | ||
| APPENDIX D - ACM LBP MOLD REPORTS PART 1.pdf | ||
| P01 JB Combined drawings 22 09 09b Part3.pdf | ||
| 36C25523R0026_1.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JE
FFER
SON D
RIV
E
SO
U
TH
G
ATE
E N
TR
AN
C E D
R
IV
E
IN
T
ER
ST
AT
E
IN
TE
R
STA
TE
TO INTERSTATE 255 →
N O
R T H
G A T E
E N
T R
A N C
E D
R
IV
E
KOCH ROAD
KOCH ROAD
MISSISSIPPI RIVER
I-2
LO
T
1i
0 GRID / COLUMN LINE DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
Ga5xFB1
WALL TYPE
WINDOW TYPE
ROOM NAME
ROOM NAME / NUMBER
REVISION TAG
PLAN NORTH
TRUE NORTH
NORTH
NORTH ARROW WITH TRUE
NORTH INDICATION
EGRESS ROUTE ID AND
SECTION LENGTH
ROOM
ROOM OCCUPANCY
150 SF
EGRESS : EGRESS ID
Egress Length
ROOM OCCUPANCY & AREA
ELEVATION NUMBER
SECTION
INTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
Name Elevation
FLOOR LEVEL &
NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
SHEET KEYNOTE
A101
SIM
EXTERIOR ELEVATION
A-101
PLATE NUMBER WHERE
SECTION/DETAIL IS DRAWN
DISCIPLINE:
G - GENERAL
A - ARCHITECTURE
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
SHEET TYPE
DESIGNATOR
VICINITY MAP
PROJECT TEAM
BUILDING SUMMARY
PROJECT INFORMATION
THE INTENT OF THIS PROJECT IS TO REPLACE OBSOLETE AIR HANDLERS THAT SUPPORT BUILDINGS 52 & 53. THIS INCLUDES ALL ARCHITECTURAL, ELECTRICAL, STRUCTURAL AND HAZARDOUS MATERIAL ABATEMENT NECESSARY TO SAFELY PROVIDE THE NEW EQUIPMENT AND SYSTEM COMPONENTS.
ANNOTATION DRAWING SYMBOLSGENERAL NOTES
PROJECT NAME: FCA REPLACE AIR HANDLING UNITS BUILDINGS 52 & 53
PROJECT NUMBER: 657-21-106JB
PROJECT LOCATION: JEFFERSON BARRACKS VA MEDICAL CENTER, 1 JEFFERSON BARRACKS DR., ST. LOUIS, MO 63125
PROJECT PURPOSE/USE: REPLACE OBSOLETE AHUS THAT SUPPORT BUILDINGS 52 & 53 PER FCA RECOMMENDATIONS
BUILDING 52 AREA:
BASEMENT (EXISTING) 34,923 GSF
LEVEL 01 (EXISTING) 34,963 GSF
LEVEL 02 (EXISTING) 30,936 GSF
BUILDING NUMBER
1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION.
THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE
SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW ALL DRAWINGS AND
PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING
PERFORMED BEFORE SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE A/E PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES,
DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED
FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE PROVIDED PRIOR TO
CONTINUING WITH WORK.
4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE A/E.
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL,
STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE
WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS
AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING
JURISDICTION. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED
WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF
PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF
OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL
TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND
EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO
EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL
CONDITION AT THE CONTRACTOR'S EXPENSE.
7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE
ON A DAILY BASIS.
8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE
ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS
PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH RESPECT TO DELIVERY DATE,
QUALITY, OR COST.
9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND
FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE A/E DOES NOT
ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S MEANS AND METHODS OR FOR
TEMPORARY STRUCTURES.
10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL
CONTRACTOR. THE CONTRACTOR SHALL EMPLOY ENGINEERING EXPERTISE AS NEEDED TO
ASSIST IN DEMOLITION.
11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL
CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE
AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING
CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA
REGULATIONS DURING CONSTRUCTION.
12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF
BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT,
AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS
FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO
PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD,
RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE
GENERAL CONTRACTOR'S EXPENSE.
13. FLAMMABLE AND COMBUSTIBLE MATERIALS IF USED DURING CONSTRUCTION, SHALL BE
HANDLED AND STORED IN ACCORDANCE WITH NFPA 30.
14. ANY DUCTWORK THAT PENETRATES A RATED ASSEMBLY SHALL BE PROTECTED WITH AN
APPROPRIATE DAMPER AND TIED TO THE FIRE ALARM.
15. ALL ENGINEERED SHOP DRAWINGS ARE TO BE REVIEWED BY THE ARCHITECT AND/OR
ENGINEER OF RECORD PRIOR TO BEING SUBMITTED TO THE BUILDING DEPT. FOR REVIEW.
16. THE GENERAL CONTRACTOR TO BE RESPONSIBLE FOR ABATEMENT OF ALL ASBESTOS
FOUND ON ASBESTOS REPORT PROVIDED BY SCI ENGINEERING.
17. THE GENERAL CONTRACTOR IS TO SUBMIT SUBSTITUTE MATERIAL, SPECIFICATIONS,
PROPOSED +/- COST, AND A SAMPLE FOR APPROVAL IN WRITING TO THE ARCHITECT PRIOR
TO COMMENCEMENT OF WORK.
A101
A101
SCOPE OF WORK SUMMARY:
SHEET NUMBER
WITHIN SERIES
INDEX OF DRAWINGS
BUILDING 53 AREA:
BASEMENT (EXISTING) 28,104 GSF
LEVEL 01 (EXISTING) 24,427 GSF
LEVEL 02 (EXISTING) 24,382 GSF
N O
R T
H
DRAWING INDEX
DEDUCT ALTERNATESNONE AT THIS TIME.
52-AE101
DEMOLITION NOTES
1. FOR DEMOLISHED ITEMS, WHAT IS TAKEN OUT MUST BE LISTED AND REPORTED ON
APPROPRIATE FORM (EE NUMBER ITEMS).
2. ALL EE NUMBERED EQUIPMENT REMOVED DURING SHALL BE DOCUMENTED ON THE BSE
TURN IN FORM AND TURNED IN TO THE COR.
3. ALL EQUIPMENT INSTALLED DURING THIS PROJECT SHALL BE DOCUMENTED ON THE BSE
FORM CHECK IN FORM AND TURNED IN TO THE COR. REFER TO SPECIFICATIONS FOR
FORMS.
OWNER:
Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth, KS 66048-5012
CONTRACTING OFFICER REPRESENTATIVES:
Jefferson Barracks VA Medical Center 1 Jefferson Barracks Drive St. Louis, MO 63125
Lydia Oswald lydia.oswald@va.gov
314.652.4100 x66719
ARCHITECT:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Michele M. Kiehl, AIA, LEED AP BD+C Michele.Kiehl@RomanykConsulting.com
855.424.3838 x313
913.908.3280 cell
MECHANICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
402.981.8882 cell
ELECTRICAL ENGINEER:
Romanyk Consulting Corp.
15 Sunnen Drive, Suite 104 Plano, Texas 75093
Yumei Wang P.E, RCDD, CTS, LEED AP Yumei.Wang@RomanykConsulting.com
855.424.3838 x311 402.321.3766
PROJECT MANAGER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Arlo Wieczorek, PE Arlo.Wieczorek@RomanykConsulting.com
855.424.3838 x324
402.981.8882 cell
Devin Gates devin.gates@va.gov
314.652.4100 x67669
BUILDING SCHEDULE
1 OUTPATIENT CLINICS - VSO
1G EMERGENCY GENERATOR FOR BUILDING 1
1CC CONNECTING CORRIDORS
2 HEALTHACRE ENVIRONMENT AND FACILITY PROGRAMS
3 DOMICILIARY
3T DOMICILIARY OFFICES
18 FISCAL HUMAN RESOURCES
23 PROSTHETICS
24 CANTEEN - LIBRARY - AUDITORIUM
25 NATIONAL CANTEEN SERVICE EXECUTIVE SUITE
25T NRM IMPACT
51 INPATIENT MENTAL HEALTH
51T NEURO PSYCHIATRIC
52 SPINAL CORD INJURY (SCI)
52G EMERGENCY GENERATOR FOR BUILDING 52
52SG TRANSFER SWITCH GEAR
53 COMMUNITY LONG-TERM CARE (CLC)
53G EMERGENCY GENERATOR FOR BUILDING 53
53T HOME BASE PRIMARY CARE
54 REHAB ILITATION
55 OUTPATIENT CLINICS
55G EMERGENCY GENERATOR FOR BUILDING 55
56 TENANTS (NCA,EES,OIT, OGC)
56G EMERGENCY GENERATOR FOR BUILDING 56
57 ENGINEERING LOGISTICS, LAUNDRY
58 MENTAL HEALTH CLINIC
59 FISCHER HOUSE
60 MAIN KITCHEN
60G EMERGENCY GENERATOR FOR BUILDING 60
60T FOOD - NUTRITION - DIETETICS
75 ENERGY PLANT
89 SECURITY STATION
93 HAZARDOUS WASTE STORAGE
101T CFM MAJOR PROJECTS
101T
53T
52G
52SG
60T
60G
51T
1CC
25T
3 3T 18
56G
BUILDINGS IN
PROJECT SCOPE
NOTE: SEE GC100 SERIES FOR SITE STAGING INFORMATION.
CONTRACTOR ENTRANCE
CONTRACTOR PARKING AND
STORAGE, GRAVEL LOT.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
NOT FOR
PERMITTING OR
CONSTRUCTION
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA ST. LOUIS HEALTH CARE SYSTEM
FULLY SPRINKLERED
52 & 53
JEFFERSON BARRACKS
Office of Construction and Facilities Management
B
IM
/V
IS
N
J e ff e rs o n B a rr a c k s R e p la c e
A H
U s B
V
/J e ff e rs o n
B a rr a c k s R e p la c e
A H
U s B
V
.r v t
/9
/2
:2
:4
P M
PROJECT INFORMATION AND SHEET INDEX
AUGUST 25, 2022
657-21-106JB
PROJECT NUMBER - 657-21-106JB
FCA REPLACE AIR HANDLING UNITS
BUILDINGS 52 & 53
BID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW DAW
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GI100
BID DOCUMENTS Part 1
SHEET # SHEET TITLE
52-AE100 BUILDING 52 - LEVEL 00 - RM.GN39- ARCHITECTURAL PLANS
52-AE101 BUILDING 52 - LEVEL 00 - RM. GS08A - ARCHITECTURAL PLANS
52-AE102 BUILDING 52 - LEVEL 02 - RM.2S14 - ARCHITECTURAL PLANS
53-AD101 BUILDING 53 - ROOF PLAN - NORTH WING - DEMOLITION PLAN
53-AD102 BUILDING 53 - ROOF PLAN - SOUTH WING - DEMOLITION PLAN
53-AE140 BUIDLING 53 - OVERALL ROOF PLAN
53-AE141 BUILDING 53 - ROOF PLAN - NORTH WING - ARCHITECTURAL
53-AE142 BUILDING 53 - ROOF PLAN - SOUTH WING - ARCHITECTURAL
53-AE530 BUILDING 53 - ROOF DETAILS
ASBESTOS ABATEMENT
52-HA100 BUILDING 52 - ENLARGED PLANS - ASBESTOS CONTAINING MATERIALS (ACM) TO BE ABATED
52-HA101 BUILDING 52 - ENLARGED PLANS SUSPECT MOLD GROWTH TO BE ABATED
52-HA102 BUILDING 52 - ENLARGED PLANS - SUSPECT MOLD GROWTH LOCATIONS
53-HA100 BUILDING 53 - OVERALL PLAN - SUSPECT MOLD GROWTH TO BE ABATED
FIRE PROTECTION
F-100 FIRE PROTECTION LEGEND, DETAILS, GENERAL NOTES AND ABBREVIATIONS
52-FD100 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION DEMOLITION
52-FD101 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION DEMOLITION
52-FS100 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION
52-FS101 BUILDING 52 ENLARGED PLANS - FIRE PROTECTION
MECHANICAL
M-100 MECHANICAL LEGEND AND GENERAL NOTES
M-101 MECHANICAL ABBREVIATIONS
52-MO100 BUILDING 52 - OVERALL PLAN - BASEMENT & LEVEL 01 - MECHANICAL
52-MO101 BUILDING 52 - OVERALL PLAN - LEVEL 02 & ROOF - MECHANICAL
52-MD100 BUILDING 52 - ENLARGED PLANS - HVAC DEMOLITION
52-MD101 BUILDING 52 - ENLARGED PLANS - HVAC DEMOLITION
52-MD200 BUILDING 52 - ENLARGED PLANS - PIPING DEMOLITION
52-MD201 BUILDING 52 - ENLARGED PLANS - PIPING DEMOLITION
52-MH100 BUILDING 52 - ENLARGED PLANS - HVAC
52-MH101 BUILDING 52 - ENLARGED PLANS - HVAC
52-MP100 BUILDING 52 - ENLARGED PLANS - PIPING
52-MP101 BUILDING 52 - ENLARGED PLANS - PIPING
53-MO100 BUILDING 53 - OVERALL PLAN - BASEMENT & LEVEL 01 - MECHANICAL
53-MO101 BUILDING 53 - OVERALL PLAN - LEVEL 02 & ROOF - MECHANICAL
53-MD100 BUILDING 53 - ENLARGED PLANS - HVAC DEMOLITION
53-MD101 BUILDING 53 - ENLARGED PLANS - HVAC DEMOLITION
53-MD200 BUILDING 53 - ENLARGED PLANS - PIPING DEMOLITION
53-MD201 BUILDING 53 - ENLARGED PLANS - PIPING DEMOLITION
53-MH100 BUILDING 53 - ENLARGED PLANS - HVAC
53-MH101 BUILDING 53 - ENLARGED PLANS - HVAC
53-MP100 BUILDING 53 - ENLARGED PLANS - PIPING
53-MP101 BUILDING 53 - ENLARGED PLANS - PIPING
M-300 MECHANICAL DETAILS
M-301 MECHANICAL DETAILS
M-400 MECHANICAL SCHEDULES
M-500 MECHANICAL EQUIPMENT CONTROLS DIAGRAM
M-501 MECHANICAL EQUIPMENT CONTROLS DIAGRAM
M-502 MECHANICAL EQUIPMENT CONTROLS DIAGRAM
M-600 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM
M-601 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM
M-602 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM
M-603 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM
M-604 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM
M-605 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM
M-606 MECHANICAL EQUIPMENT SCHEMATICS DIAGRAM
ELECTRICAL
E-100 ELECTRICAL LEGEND, GENERAL NOTES AND ABBREVIATIONS
ES100 ELECTRICAL SITE PLAN
52-ED100 BUILDING 52 - LEVEL 00 - ELECTRICAL DEMOLITION PLAN
52-ED101 BUILDING 52 - LEVEL 02 - ELECTRICAL DEMOLITION PLAN
52-EP100 BUILDING 52 - LEVEL 00 - ELECTRICAL PLAN
52-EP101 BUILDING 52 - LEVEL 01 - ELECTRICAL PLAN
52-EP102 BUILDING 52 - LEVEL 02 - ELECTRICAL PLAN
53-ED100 BUILDING 53 - ROOF NORTH & PENTHOUSE - ELECTRICAL DEMOLITION PLAN
53-ED101 BUILDING 53 - ROOF SOUTH - ELECTRICAL DEMOLITION PLAN
53-EP100 BUILDING 53 - LEVEL 02 - ELECTRICAL PLAN
53-EP101 BUILDING 53 - ROOF NORTH & PENTHOUSE - ELECTRICAL PLAN
53-EP102 BUILDING 53 - ROOF SOUTH - ELECTRICAL PLAN
E-400 ELECTRICAL SCHEDULES
SHEET # SHEET TITLE
GENERAL INFORMATION
GI100 PROJECT INFORMATION AND SHEET INDEX
GENERAL CONTRACT
GC100 PROJECT STAGING - OVERALL SITE PLAN
GC101 PROJECT STAGING - ENLARGED SITE PLAN
GC102 PROJECT STAGING - CRANE PLAN
GC103 PROJECT STAGING - ROOF TOP EQUIPMENT WEIGHTS
GC104 BUILDING 53 - TEMPORARY HVAC PHASING PLAN
GC105 BUILDING 53 - TEMPORARY HVAC PHASING PLAN
GC106 BUILDING 53 - TEMPORARY HVAC PHASING PLAN
GC107 BUILDING 53 - TEMPORARY HVAC PHASING PLAN
GC108 BUILDING 52 - TEMPORARY HVAC PHASING PLAN
GC109 BUILDING 52 - TEMPORARY HVAC PHASING PLAN
GC110 BUILDING 52 - TEMPORARY HVAC PHASING PLAN
GC111 BUILDING 52 - LEVEL 00 & 01 - INFECTION CONTROL/PHASING PLANS
GC112 BUILDING 52 - LEVEL 02 - INFECTION CONTROL/PHASING PLANS
GC113 BUILDING 53 - LEVEL 02 & ROOF LEVEL - INFECTION CONTROL/PHASING PLANS
GI202 BUILDING 52 - LEVEL 00 & 01 OVERALL - LIFE SAFETY PLAN
GI203 BUILDING 52 & 53 - LEVEL 02 OVERALL - LIFE SAFETY PLAN
ARCHITECTURAL
52 & 53-AC100 BUILDING 52 & 53 - LEVEL 00 & 02 - REFLECTED CEILING PLANS
Revisions: Date:
Revision 1 Date 1
P
BUILDING LEGEND
CONST
ZONE
CONST.
ZONE
CONST.
ZONE
CONST.
ZONE
CONST.
ZONE
CONST.
ZONE
CONSTRUCTION
ZONE
JE
FFERSO
N D
RIV
E
SO
U
TH
G
ATE E
N
TR
AN
C E D
R
IV
E
IN
TE
R S
TA
TE
IN
TE
R S
TA
TE
TO INTERSTATE 255 →
N O
R T H
G A T E E
N T R
A N
C E D
R
IV
E
KOCH ROAD
KOCH ROAD
I-2
LO
T
PHASING PLAN & GENERAL NOTESELECTRICAL PHASING NOTES
1 OUTPATIENT CLINICS - VSO
1G EMERGENCY GENERATOR FOR BUILDING 1
1CC CONNECTING CORRIDORS
2 HEALTHACRE ENVIRONMENT AND FACILITY PROGRAMS
3 DOMICILIARY
3T DOMICILIARY OFFICES
18 FISCAL HUMAN RESOURCES
23 PROSTHETICS
24 CANTEEN - LIBRARY - AUDITORIUM
25 NATIONAL CANTEEN SERVICE EXECUTIVE SUITE
25T NRM IMPACT
51 INPATIENT MENTAL HEALTH
51T NEURO PSYCHIATRIC
52 SPINAL CORD INJURY (SCI)
52G EMERGENCY GENERATOR FOR BUILDING 52
52SG TRANSFER SWITCH GEAR
53 COMMUNITY LONG-TERM CARE (CLC)
53G EMERGENCY GENERATOR FOR BUILDING 53
53T HOME BASE PRIMARY CARE
54 REHAB ILITATION
55 OUTPATIENT CLINICS
55G EMERGENCY GENERATOR FOR BUILDING 55
56 TENANTS (NCA,EES,OIT, OGC)
56G EMERGENCY GENERATOR FOR BUILDING 56
57 ENGINEERING LOGISTICS, LAUNDRY
58 MENTAL HEALTH CLINIC
59 FISCHER HOUSE
60 MAIN KITCHEN
60G EMERGENCY GENERATOR FOR BUILDING 60
60T FOOD - NUTRITION - DIETETICS
75 ENERGY PLANT
89 SECURITY STATION
93 HAZARDOUS WASTE STORAGE
101T CFM MAJOR PROJECTS
101T
53T
52G
52SG
60T
60G
51T
25T
3 3T 18
56G
1CC
1CC
1CC
PATIENT AND
EMPLOYEE ENTRANCE
GRAVEL PARKING LOT FOR
CONTRACTOR PARKING AND
STORAGE
GC101
CONTRACTOR
ENTRANCE
1. CONTRACTOR(S) SHALL COORDINATE WITH VA FOR ALL LOGISTICS.
2. WORK SHALL BE COMPLETED DURING NORMAL BUSINESS HOURS FROM 7:00 AM TO 5:00
PM, MONDAY THROUGH FRIDAY. ANY WORK THAT WILL BE REQUIRED AFTER HOURS
(SUCH AS DURING SHUTDOWNS), THE CONTRACTOR SHALL COORDINATE ALL AFTER
HOURS REQUIRED WORK WITH COR 14 DAYS IN ADVANCE.
3. THE SPECIFIED TEMPORARY AIR HANDLER IS A BASIS OF DESIGN FOR MINIMUM
PERFORMANCE REQUIREMENTS. PROVIDE AIR HANDLER CONTROLS SYSTEM. PROVIDE
TEMPORARY POWER GENERATOR AND FUEL TANK WITH CAPACITY TO PROVIDE MINIMUM
7 DAYS OF OPERATION. PROVIDE TEMPORARY POWER CONDUITS AND AIR DUCTS AS
NEEDED FOR CONNECTIONS. CONTRACTORS SHALL COORDINATE AVAILABILITY OF
TEMPORARY EQUIPMENT TO MEET OR EXCEED REQUIREMENTS. CONTRACT SHALL
INCLUDE SUFFICIENT FUEL SUPPLY THROUGH DURATION OF TEMPORARY AIR HANDLER
USE. FUEL TANK SHALL BE REFILLED FREQUENTLY ENOUGH TO AVOID SHUT DOWN.
FACILITY IS OPERATIONAL 24 HOURS A DAY, 7 DAYS A WEEK.
4. COMMISSION TEMPORARY AIR HANDLER AND POWER GENERATOR PRIOR TO ALLOWING
CONNECTION OF SERVICE TO BUILDING.
5. MODIFY SEQUENCE OF OPERATIONS AND CONTROL SET POINTS AS REQUIRED TO SUITE
EACH SPECIFIC AIR HANDLER SYSTEM.
6. DOWN TIME OF ANY AND ALL AIR HANDLERS FOR SERVICE CHANGE OVERS SHALL BE
LIMITED TO 4 HOURS MAXIMUM DUE TO PATIENT SAFETY.
7. DURATION FOR EACH AIR HANDLER REPLACEMENT SPECIFIC WORK SHALL BE LIMITED TO
2 WEEKS (14 DAYS) MAXIMUM. AIR HANDLER INSTALLATION SHALL BE FULLY COMPLETE,
FUNCTIONAL, AND COMMISSIONED WITHIN THIS TIME.
8. LIMIT ONE AIR HANDLER PICK AND REPLACEMENT PER CRANE DAY. IF MULTIPLE AIR
HANDLERS ARE TO BE DONE IN THE SAME PHASE (I.E. UNITS 1, 4, &5) THEN LIMIT CRANE
TIME TO ONE WEEK PER PHASE.
9. PERFORM TESTING OF AIR HANDLER'S EXISTING PERFORMANCE PARAMETERS PRIOR TO
DECOMMISSIONING AND DEMOLITION. PROVIDE REPORT TO ENGINEER.
10. CONTROLS CONTRACTOR SHALL RECORD AUTOMATION SYSTEM SEQUENCES AND
POINTS, PRIOR TO DECOMMISSIONING AND DEMOLITION, FOR REFERENCE USE FOR
PROGRAMMING NEW EQUIPMENT.
11. FACTOR SEASONAL LIMITATIONS INTO CONSTRUCTION SCHEDULE.
12. FACTOR MATERIAL AND EQUIPMENT PROCUREMENT LEAD TIMES IN CONSTRUCTION
SCHEDULE. AIR HANDLERS MAY HAVE LEAD TIMES UP TO 40 WEEKS FOR DELIVERY.
PROCESS EQUIPMENT SUBMITTALS AND PURCHASE ORDERS WITHIN 30 DAYS OF NOTICE
TO PROCEED.
13. MAXIMUM PERIOD OF CONSTRUCTION PERFORMANCE SHALL BE 14 MONTHS.
14. COMMISSIONING SHALL BE PROVIDED UNDER PRIME CONTRACTOR BY A THIRD PARTY
AGENT.
15. REFERENCE PHASE PLAN DETAILS FOR PHASING CONCEPTS. NOT ALL SPECIFIC DETAILS
ARE NOTED. CONCEPTS AND PHASES ARE SUBJECT TO CHANGE.
16. REFERENCE "PROJECT STAGING - CRANE PLAN" FOR INTENDED LOGISTICS AND
LIMITATIONS.
17. REMOVAL AND INSTALLATION OF EQUIPMENT SHALL BE TRACKED USING THE BSE CHECK
IN AND BSE TURN IN FORMS.
18. TEMPORARY DUCT TO BE SHEET METAL WITH EXTERIOR INSULATION, AND WEATHER
PROOF JACKETING, PER SPECIFICATIONS.
19. ENTIRE FLOOR CONTAINS IN-PATIENT CARE SPACES. CONTRACTOR TO COORDINATE
PHASING WITH THE VA.
20. CONSTRUCTION FOR BUILDING #52 WILL RUN CONCURRENT WITH THE CONSTRUCTION
OF BUILDING #53.
1. SEE GC100 SERIES FOR SITE STAGING INFORMATION AND PHASING NOTES.
2. ELECTRICAL WORK SHALL FOLLOW MECHANICAL GENERAL AND MECHANICAL
CONTRACTORS PLANS.
3. REMOVE POWER TO DEMOED MECHANICAL EQUIPMENT. COORDINATE WITH
MECHANICAL CONTRACTOR FOR SCHEDULE FOR MECHANICAL EQUIPMENT
DEMOLITION. RETAIN POWER ON WHILE MECHANICAL EQUIPMENT IS
SCHEDULED TO BE ON.
4. INSTALL NEW POWER AT NEW MECHANICAL EQUIPMENT LOCATIONS AND
CONNECT. COORDINATE WITH MECHANICAL FOR SCHEDULE OF NEW
EQUIPMENT INSTALLATION.
5. THE SPECIFIED TEMPORARY GENERATOR FOR TEMPORARY AHU IS A BASIS OF
DESIGN FOR MINIMUM PERFORMANCE REQUIREMENTS. PROVIDE TEMPORARY
POWER GENERATOR AND FUEL TANK PER MECHANICAL REQUIREMEMTS.
NORTH
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
FULLY SPRINKLERED
52 & 53
Office of Construction and
Facilities Management
B
IM
/V
IS
N
J e ff e rs o n B a rr a c k s R e p la c e
A H
U s B
V
/J e ff e rs o n
B a rr a c k s R e p la c e
A H
U s B
V
.r v t
/9
/2
:2
:4
P M
PROJECT STAGING - OVERALL SITE PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW DAW
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC100
1" = 100'-0"
SITE PLAN - PROJECT COVER SHEET
0' 50' 100' 200'
Graphic Scale : 1" = 100'-0"
DUMPSTER
CONSTRUCTION LAY DOWN AREA/
MATERIAL STORAGE
Revisions: Date:
KEYNOTES
53T
52G
52SG
GC102
2 3
2 3
R 50'7
R 50'7
R 50'
R
0'
NORTH
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
FULLY SPRINKLERED
52 & 53
Office of Construction and
Facilities Management
B
IM
/V
IS
N
J e ff e rs o n B a rr a c k s R e p la c e
A H
U s B
V
/J e ff e rs o n
B a rr a c k s R e p la c e
A H
U s B
V
.r v t
/9
/2
:2
:4
P M
PROJECT STAGING - ENLARGED SITE PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW DAW
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC101
1" = 30'-0"
SITE PLAN - PROJECT PHASING
NO. DESCRIPTION
1 TEMPORARY AIR HANDLER ON FLATBED TRAILER. SEE MECHAICAL PLANS FOR MORE
INFORMATION.
2 TEMPORARY GENERATOR FUEL TANK WITH SAFETY PERIMETER FENCING.
3 TEMPORARY POWER GENERATOR.
4 CONTRACTOR ENTRANCE FOR AIR HANDLERS THROUGH LOADING DOCK DOORS.
5 TEMPORARY CONSTRUCTION FENCING.
7 50 FT. RADIUS DISTANCE FROM SOURCES OF CONTAMINATION.
0' 15' 30' 60'
Graphic Scale : 1" = 30'-0"
GENERAL NOTESKEYNOTES
53-AH-5
53-AH-2
53-AH-4
53-AH-3 53-AH-1
53T
PROPOSED CRANE
POSTION 1
PROPOSED CRANE
POSTION 2
C R
A N
E
C R
A N
E
53-ERC-5
53-ERC-1
1. ALL CRANE WORK SHALL COMPLY WITH OCCUPATIONAL SAFETY AND HEALTH
ADMINISTRATION (OSHA) REGULATIONS (STANDARDS - 29 CFR) PART Part 1926 -
SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION, § CC - CRANES AND
DERRICKS IN CONSTRUCTION.
2. PRIOR TO OPERATING A CRANE, THE OPERATOR MUST BE LICENSED, QUALIFIED OR
CERTIFIED TO OPERATE THE CRANE. THUS, ALL THE PROVISIONS CONTAINED WITH
SUBPART CC ARE EFFECTIVE AND THERE IS NO “PHASE IN” DATE.
3. A DETAILED LIFT PLAN FOR ALL LIFTS SHALL BE SUBMITTED TO THE VA ENGINEER
AND/OR OTHER GOVERNMENT DESIGNATED AUTHORITY 21 DAYS PRIOR TO THE
SCHEDULED LIFT, COMPLETE WITH ROUTE FOR TRUCK CARRYING LOAD, CRANE
LOAD ANALYSIS, SITING OF CRANE AND PATH OF SWING AND ALL OTHER ELEMENTS
OF A CRITICAL LIFT PLAN WHERE THE LIFT MEETS THE DEFINITION OF A CRITICAL
LIFT. CRITICAL LIFTS REQUIRE A MORE COMPREHENSIVE LIFT PLAN TO MINIMIZE THE
POTENTIAL OF CRANE FAILURE AND/OR CATASTROPHIC LOSS. THE PLAN MUST BE
REVIEWED AND ACCEPTED BY THE GENERAL CONTRACTOR BEFORE BEING
SUBMITTED TO THE VA FOR REVIEW. THE LIFT WILL NOT BE ALLOWED TO PROCEED
WITHOUT PRIOR ACCEPTANCE OF THIS DOCUMENT.
4. CRANE OPERATORS SHALL NOT CARRY LOADS:
• OVER THE GENERAL PUBLIC OR VAMC PERSONNEL.
• OVER ANY OCCUPIED BUILDING UNLESS THE TOP TWO FLOORS ARE VACATED
OR OVERHEAD PROTECTION WITH A DESIGN LIVE LOAD OF 300 PSF IS PROVIDED.
• OVER SPECIFIED AREAS CALLED OUT ON THIS PLAN.
5. CONTRACTOR HAS THE CHOICE TO INSTALL AIR HANDLERS AS A SINGLE UNIT, OR TO
INSTALL AIR HANDLERS IN SECTIONS BY DISASSEMBLING THEM AT SHIPPING SPLITS
AND REASSEMBLING THEM ONTO THEIR RESPECTIVE ROOF CURB. CONTRACTOR TO
SELECT THE APPROPRIATE CRANE SIZE TO MINIMIZE SWING AREA INORDER TO
MINIMIZE RELOCATION OF PATIENTS AND MAXIMIZING SAFETY.
6. GENERAL CONTRACTOR SHALL ENSURE THAT ANY AND ALL DISTURBED AND/OR
DAMAGED WALKWAYS, RAILINGS, PARKING SURFACES, LANSCAPE, LAWN AREA,
SIGNAGE, WAY FINDINGS, LIGHTING, ETC. AS A RESULT OF THE CRANE LIFT
PREPERATIONS AND PROCEDURES IS REPAIRED TO PREVIOUS EXISTING
CONDITIONS AFTER ALL CRANE LIFTING IS COMPLETE.
7. REFER TO SHEET "GC103 - PROJECT STAGING - ROOF TOP EQUIPMENT WEIGHTS"
FOR ROOF TOP EQUIPMENT WEIGHT CALCULATION ESTIMATIONS.
8. CRANE LOCATIONS SHOWN ARE ONLY A SUGGESTION. ACTUAL CRANING POSITIONS
WILL NEED TO BE DETERMINED.
9. CRANE LIFTS SHALL BE COORDINATED WITH COR AND END USERS 21 DAYS PRIOR
TO THE LIFT.
NORTH
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
Office of Construction and Facilities Management
FULLY SPRINKLERED
52 & 53
B
IM
/V
IS
N
J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
V
/J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
M
E P
V
.r vt
/9
/2
:0
:2
P M
PROJECT STAGING - CRANE PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW DAW
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC102
1/16" = 1'-0"1
BUILDING 53 - CRANE PLAN
NO. DESCRIPTION
1 SHADED/HATCHED AREA IS OFF LIMITS FOR CRANE SWINGING MATERIALS AND
EQUIPMENT OVER.
2 BOOM CRANE EQUIPMENT.
3 GENERAL CRANE MIN. RADIUS (FOR REFERENCE ONLY).
4 GENERAL CRANE MAX. RADIUS (FOR REFERENCE ONLY).
GENERAL NOTES
[1,168 mm]
46 in
[1,981 mm]
78 in
[762 mm]
30 in
[1,930 mm]
76 in
[2,083 mm]
82 in
[457 mm]
18 in
[1,016 mm]
40 in
[914 mm]
36 in
[610 mm]
24 in
[559 mm]
22 in
[457 mm]
18 in
[914 mm]
36 in
[610 mm]
24 in
[1,067 mm]
42 in
[610 mm]
24 in
[406 mm]
16 in
P1
P2
P4
P3
1 2 3 4 5 6
[8,382 mm]
330 in
1. PENTAGRAM KEYNOTE SYMBOL INDICATES EQUIPMENT'S SECTION NUMBER.
2. REFER TO "BUILDING 53 ROOF TOP EQUIPMENT WEIGHTS" SCHEDULE FOR SECTION AND CORNER WEIGHTS.
3. SPECIFICATIONS ARE PROVIDED AS A MEANS OF CONVENIENCE FOR LOAD ESTIMATION CALCULATIONS. REFER TO ACTUAL
MANUFACTURER'S SPECIFICATIONS FOR ACCURATE LIFTING INFORMATION.
[2,134 mm]
84 in
[1,676 mm]
66 in
[1,524 mm]
60 in
[1,524 mm]
60 in
[1,676 mm]
66 in
[914 mm]
36 in
[610 mm]
24 in
[1,118 mm]
44 in
[559 mm]
22 in
[762 mm]
30 in
[914 mm]
36 in
P1
P2
P4
P3
1 2 3 4 5 6
[11,582 mm]
456 in
[610 mm]
24 in
[508 mm]
20 in
[1,016 mm]
40 in
[1,270 mm]
50 in
[610 mm]
24 in
[406 mm]
16 in
[2,286 mm]
90 in
[762 mm]
30 in
[2,286 mm]
90 in
[1,473 mm]
58 in
[1,524 mm]
60 in
[1,524 mm]
60 in
[1,727 mm]
68 in
[914 mm]
36 in
[610 mm]
24 in
[914 mm]
36 in
[559 mm]
22 in
[813 mm]
32 in
[914 mm]
36 in
P1
P2
P4
P3
1 2 3 4 5 6
[11,532 mm]
454 in
[660 mm]
26 in
[508 mm]
20 in
[1,118 mm]
44 in
[1,270 mm]
50 in
[610 mm]
24 in
[406 mm]
16 in
[2,286 mm]
90 in
[711 mm]
28 in
[3,150 mm]
124 in
P1
P2
P4
P3
1 2
[5,994 mm]
236 in
[2,845 mm]
112 in
[1,016 mm]
40 in
[914 mm]
36 in
[914 mm]
36 in
[508 mm]
20 in
[559 mm]
22 in
[914 mm]
36 in
[610 mm]
24 in
[559 mm]
22 in
[1,118 mm]
44 in
[2,134 mm]
84 in
[610 mm]
24 in
[914 mm]
36 in
[610 mm]
24 in
P1
P2
P4
P3
1 2 3 4 5
[8,280 mm]
326 in
[559 mm]
22 in
[559 mm]
22 in
[610 mm]
24 in
[1,930 mm]
76 in
[2,489 mm]
98 in
[1,016 mm]
40 in
[914 mm]
36 in
[1,067 mm]
42 in
[610 mm]
24 in
[406 mm]
16 in
[406 mm]
16 in
[1,981 mm]
78 in
P1
P2
P4
P3
1 2
[3,150 mm]
124 in
[1,168 mm]
46 in
[1,168 mm]
46 in
[813 mm]
32 in
[305 mm]
12 in
[864 mm]
34 in
[1,981 mm]
78 in
P1
P2
P4
P3
1 2
[3,150 mm]
124 in
[1,168 mm]
46 in
[1,168 mm]
46 in
[813 mm]
32 in
[305 mm]
12 in
[864 mm]
34 in
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
Office of Construction and Facilities Management
FULLY SPRINKLERED
52 & 53
B
IM
/V
IS
N
J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
V
/J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
M
E P
V
.r vt
/9
/2
:0
:3
P M
PROJECT STAGING - ROOF TOP EQUIPMENT
WEIGHTS
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW DAW
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC103
1. SPECIFICATIONS ARE PROVIDED AS A MEANS OF CONVENIENCE FOR LOAD
ESTIMATION CALCULATIONS. REFER TO ACTUAL MANUFACTURER'S
SPECIFICATIONS FOR ACCURATE LIFTING INFORMATION.
NOTES:
TOTAL: 112 2,367 644 466 540 717
2 44 701 216 204 135 146 NOTE 1.
-E
R C
-5 1 68 1,666 428 262 405 571 NOTE 1.
TOTAL: 124 3,688 924 719 920 1,125
2 46 1,126 315 302 248 261 NOTE 1.
-E
R C
-1 1 78 2,562 609 417 672 864 NOTE 1.
TOTAL: 326 6,047 1,901 1,282 1,123 1,743
5 98 1,451 464 396 262 330 NOTE 1.
4 76 1,808 549 241 355 663 NOTE 1.
3 24 362 93 93 88 88 NOTE 1.
2 84 1,791 651 408 244 488 NOTE 1.
-A
H -5
1 44 635 144 144 174 174 NOTE 1.
TOTAL: 236 3,728 1,171 760 693 1,104
2 112 2,018 672 370 337 639 NOTE 1.
-A
H -4
1 124 1,710 499 390 356 465 NOTE 1.
TOTAL: 454 12,245 3,358 2,919 2,707 3,146
7 28 542 137 137 134 134 NOTE 1.
6 90 2,299 654 654 495 495 NOTE 1.
5 68 2,742 774 465 597 906 NOTE 1.
4 60 2,156 776 646 302 432 NOTE 1.
3 60 986 270 270 223 223 NOTE 1.
2 58 1,411 305 305 344 344 NOTE 1.
-A
H -3
1 90 2,109 442 442 612 612 NOTE 1.
TOTAL: 456 12,321 3,399 2,910 2,721 3,211
7 30 554 140 140 137 137 NOTE 1.
6 90 2,267 646 646 487 487 NOTE 1.
5 66 2,933 806 495 660 971 NOTE 1.
4 60 2,214 820 642 287 466 NOTE 1.
3 60 986 270 270 223 223 NOTE 1.
2 66 1,438 313 313 367 367 NOTE 1.
-A
H -2
1 84 1,929 404 404 560 560 NOTE 1.
TOTAL: 330 9,012 2,660 2,243 1,846 2,263
6 18 417 106 106 103 103 NOTE 1.
5 82 1,948 518 596 456 378 NOTE 1.
4 76 2,308 648 370 506 784 NOTE 1.
3 30 548 146 146 128 128 NOTE 1.
2 78 2,870 1,019 802 416 633 NOTE 1.
-A
H -1
1 46 921 223 223 237 237 NOTE 1.
P1 P2 P3 P4
MARK SECTION
LENGTH
(in)
WEIGHT
(lb)
CORNER WEIGHT (lb) REMARKS
BUILDING 53 ROOF TOP EQUIPMENT WEIGHTS
1/2" = 1'-0"
RTU 53-AH-1 SPLIT SECTION DIMENSIONS
1/2" = 1'-0"2
RTU 53-AH-2 SPLIT SECTION DIMENSIONS
1/2" = 1'-0"3
RTU 53-AH-3 SPLIT SECTION DIMENSIONS
1/2" = 1'-0"
RTU 53-AH-4 SPLIT SECTION DIMENSIONS
1/2" = 1'-0"
RTU 53-AH-5 SPLIT SECTION DIMENSIONS
1/2" = 1'-0"6
RTU 53-ERC-1 SPLIT SECTION DIMENSIONS
1/2" = 1'-0"
RTU 53-ERC-5 SPLIT SECTION DIMENSIONS
SCOPE OF WORK
VTR
(EX)
RH
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
44"x28"
VTR
(EX)
RH
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
KEYNOTES
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
53-AH-5
53-TEMP-AHU
53-ERC-5
36"x36" SA
"x
6"
S A
"x
R A
"x
6"
S A
36"x36" RA
53-TEMP-AHU
53-AH-2
53-AH-5
53-ERC-5
36"x36" SA
"x
4"
S A
"x
R A
"x
6"
S A
NORTH
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
Office of Construction and Facilities Management
FULLY SPRINKLERED
52 & 53
B
IM
/V
IS
N
J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
V
/J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
M
E P
V
.r vt
/9
/2
:0
:3
P M
BUILDING 53 - TEMPORARY HVAC PHASING
PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW MS
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC104
1/16" = 1'-0"1
BUILDING 53 OVERALL PLAN - TEMPORARY AHU - PHASE 1
1/16" = 1'-0"2
BUILDING 53 OVERALL PLAN - TEMPORARY AHU - PHASE 2
NO. DESCRIPTION
1 TEMPORARY AHU LOCATED ON ELEVATED TRAILER SKID. TEMPORARY AHU TO
SERVE SYSTEM WHILE PERMANENT AHU IS INSTALLED. ONLY ONE AHU IS TO BE
INSTALLED AT A TIME. COMMISSION AIR HANDLER AND POWER GENERATOR PRIOR
TO ALLOWING CONNECTION OF SERVICE TO BUILDING.
2 TEMPORARY DUCT. ROUTING IS SCHEMATIC IN NATURE. CONTRACTOR TO
DETERMINE BEST ROUTING IN FIELD.
3 CONNECT TEMPORARY DUCT INTO EXISTING SYSTEM WHILE PERMANENT AHU IS
INSTALLED.
4 INSTALL TEMPORARY DUCT CONNECTION ELBOWS WITH PROPER TRANSITIONS.
REPLACE WITH PERMANENT FITTINGS ONCE AHU IS REPLACED AND FULLY
FUNCTIONAL.
5 INSTALL AIR HANDLER 53-AH-5. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE.
6 INSTALL PERMANENT UNIT 53-ERC-5 AND PLACE FAN INTO OPERATION WITHIN 4
HOURS FOR USE DURING COMPLETION OF INSTALLATION.
7 PROVIDE TEMPORARY ROOF INTAKE HOOD WITH 0.5" MESH BIRD SCREEN.
8 EXTEND SUPPLY AND RETURN DUCT TO SERVICE POINTS.
9 INSTALL AIR HANDLER 53-AH-2. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE.
(EX)
RH
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
"x
"R A
36"x12" 30"x15" 18"x24"
"x
"x
"R
A
"x
"S A
B E
L O
W
"x
"R A
"x
"S
A B
E L O
W
48"x28"
36"x12" RA DN 36"x12" SA DN
24"x12" SA DN 28"x12" RA DN
28"x15" RA DN
(TYP 3)
VTR
(EX)
RH
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
"x
"R A
36"x12" 30"x15" 18"x24"
54"x24"SA
"x
"x
"R
A
"x
"S A
B E
L O
W
KEYNOTES
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
36"x36" RA
53-TEMP-AHU
3 34 4
53-AH-3
34"x34" SA
36"x36" SA
"x
4"
S A
53-AH-3
53-TEMP-AHU
2 7
53-AH-4
9 10
"x
R A
36"x36" SA
"x
4"
S A
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
Office of Construction and Facilities Management
FULLY SPRINKLERED
52 & 53
B
IM
/V
IS
N
J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
V
/J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
M
E P
V
.r vt
/9
/2
:0
:3
P M
BUILDING 53 - TEMPORARY HVAC PHASING
PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW MS
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC105
1/16" = 1'-0"1
BUILDING 53 OVERALL PLAN - TEMPORARY AHU - PHASE 3
1/16" = 1'-0"2
BUILDING 53 OVERALL PLAN - TEMPORARY AHU - PHASE 4
NO. DESCRIPTION
1 TEMPORARY AHU LOCATED ON ELEVATED TRAILER SKID. TEMPORARY AHU TO
SERVE SYSTEM WHILE PERMANENT AHU IS INSTALLED. ONLY ONE AHU IS TO BE
INSTALLED AT A TIME. COMMISSION AIR HANDLER AND POWER GENERATOR PRIOR
TO ALLOWING CONNECTION OF SERVICE TO BUILDING.
2 TEMPORARY DUCT. ROUTING IS SCHEMATIC IN NATURE. CONTRACTOR TO
DETERMINE BEST ROUTING IN FIELD.
3 CONNECT TEMPORARY DUCT INTO EXISTING SYSTEM WHILE PERMANENT AHU IS
INSTALLED.
4 INSTALL TEMPORARY DUCT CONNECTION ELBOWS WITH PROPER TRANSITIONS.
REPLACE WITH PERMANENT FITTINGS ONCE AHU IS REPLACED AND FULLY
FUNCTIONAL.
5 INSTALL AIR HANDLER 53-AH-3. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE.
6 EXTEND SUPPLY AND RETURN DUCT TO SERVICE POINTS. ROUTE OVER
STRUCTURE TO ALLOW ACCESS CLEARANCE ON ROOF.
7 INSTALL AIR HANDLER 53-AH-4. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE. REMOVE TEMPORARY BLANK PANELS, REINSTALL
AND RESEAL EXTERIOR WALL PANEL.
8 FOR TEMPORARY AIR HANDLER TO SERVE BUILDING, REMOVE WALL PANEL ON AIR
HANDLER OF SUPPLY FAN SECTION. PLACE SHEETMETAL BLANK PANEL IN PLACE
OF WALL AND CONNECT TEMPORARY DUCT TO PANEL. INSTALL TEMPORARY
BLANK PANELS INSIDE AIR HANDLER SUPPLY FAN INLETS, TO DIRECT AIR FLOW TO
BUILDING.
9 PROVIDE TEMPORARY ROOF INTAKE HOOD WITH 0.5" MESH BIRD SCREEN.
10 DEMOLISH TEMPORARY RETURN DUCT BACK TO THIS POINT.
(EX)
RH
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
KEYNOTES
VTR
(EX)
RH
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
"x
"R A
36"x12" 30"x15" 18"x24"
54"x24"SA
"x
"x
"R
A
"x
"S A
B E
L O
W
"x
"R A
"x
"S
A B
E L O
W
48"x28"
36"x12" RA DN 36"x12" SA DN
24"x12" SA DN 28"x12" RA DN
28"x15" RA DN
(TYP 3)
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
34"x34" SA
53-TEMP-AHU
53-AH-1
53-ERC-1
36"x36" SA
"x
4"
S A
"x
R A
53-TEMP-AHU
53-AH-1
53-ERC-1
53-AH-4
53-AH-353-AH-2
53-AH-5
53-ERC-5
9 9 9
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
Office of Construction and Facilities Management
FULLY SPRINKLERED
52 & 53
B
IM
/V
IS
N
J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
V
/J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
M
E P
V
.r vt
/9
/2
:0
:3
P M
BUILDING 53 - TEMPORARY HVAC PHASING
PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW MS
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC106
1/16" = 1'-0"2
BUILDING 53 OVERALL PLAN - TEMPORARY AHU - PHASE 5
NO. DESCRIPTION
1 TEMPORARY AHU LOCATED ON ELEVATED TRAILER SKID. TEMPORARY AHU TO
SERVE SYSTEM WHILE PERMANENT AHU IS INSTALLED. ONLY ONE AHU IS TO BE
INSTALLED AT A TIME. COMMISSION AIR HANDLER AND POWER GENERATOR PRIOR
TO ALLOWING CONNECTION OF SERVICE TO BUILDING.
2 TEMPORARY DUCT. ROUTING IS SCHEMATIC IN NATURE. CONTRACTOR TO
DETERMINE BEST ROUTING IN FIELD.
3 CONNECT TEMPORARY DUCT INTO EXISTING SYSTEM WHILE PERMANENT AHU IS
INSTALLED.
4 INSTALL TEMPORARY DUCT CONNECTION ELBOWS WITH PROPER TRANSITIONS.
REPLACE WITH PERMANENT FITTINGS ONCE AHU IS REPLACED AND FULLY
FUNCTIONAL.
5 INSTALL AIR HANDLER 53-AH-1. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE.
6 INSTALL PERMANENT UNIT 53-ERC-1 AND PLACE FAN INTO OPERATION WITHIN 4
HOURS FOR USE DURING COMPLETION OF INSTALLATION.
7 TEMPORARY ROOF INTAKE HOOD WITH 0.5" MESH BIRD SCREEN.
8 DECOMMISSION TEMPORARY AIR HANDLER AND POWER GENERATOR.
REMOVE TEMPORARY DUCT, PIPE, CONDUITS, AND SUPPORTS.
REMOVE CONSTRUCTION DEBRIS.
9 COMPLETE FINAL COMMISSIONING AND BALANCING OF SYSTEMS TO MEET
ORIGINAL OPERATING CONDITIONS WITHIN BUILDING.
1/16" = 1'-0"1
BUILDING 53 OVERALL PLAN - TEMPORARY AHU - PHASE 6
(EX)
RH
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
VTR
(EX)
44"x28"
SCOPE OF WORK
KEYNOTES
GENERAL NOTES
34"x34" SA
53-TEMP-AHU
53-AH-1
53-ERC-1
53-AH-4
53-AH-5
53-ERC-5
34"x34" SA
"x
R A
36"x36" SA
"x
6"
S A
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
1. PHASE 1 ALTERNATE PLAN TO REPLACE 53-AH-1, 53-AH-4, AND AH-53-5 AT THE SAME
TIME.
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
Office of Construction and Facilities Management
FULLY SPRINKLERED
52 & 53
B
IM
/V
IS
N
J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
V
/J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
M
E P
V
.r vt
/9
/2
:0
:3
P M
BUILDING 53 - TEMPORARY HVAC PHASING
PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW MS
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC107
1/16" = 1'-0"
BUILDING 53 OVERALL PLAN - TEMPORARY AHU - PHASE 1 ALTERNATE
NO. DESCRIPTION
1 TEMPORARY AHU LOCATED ON ELEVATED TRAILER SKID. TEMPORARY AHU TO
SERVE SYSTEM WHILE PERMANENT AHU IS INSTALLED. COMMISSION AIR HANDLER
AND POWER GENERATOR PRIOR TO ALLOWING CONNECTION OF SERVICE TO
BUILDING.
2 TEMPORARY DUCT. ROUTING IS SCHEMATIC IN NATURE. CONTRACTOR TO
DETERMINE BEST ROUTING IN FIELD.
3 CONNECT TEMPORARY DUCT INTO EXISTING SYSTEM WHILE PERMANENT AHU IS
INSTALLED.
4 INSTALL TEMPORARY DUCT CONNECTION ELBOWS WITH PROPER TRANSITIONS.
REPLACE WITH PERMANENT FITTINGS ONCE AHU IS REPLACED AND FULLY
FUNCTIONAL.
5 INSTALL AIR HANDLER 53-AH-5. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE.
6 INSTALL PERMANENT UNIT 53-ERC-5 AND PLACE FAN INTO OPERATION WITHIN 4
HOURS FOR USE DURING COMPLETION OF INSTALLATION.
7 EXTEND SUPPLY DUCT TO SERVICE POINT. ROUTE OVER STRUCTURE TO ALLOW
ACCESS CLEARANCE ON ROOF.
8 INSTALL AIR HANDLER 53-AH-4. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE. REMOVE TEMPORARY BLANK PANELS, REINSTALL
AND RESEAL EXTERIOR WALL PANEL.
9 FOR TEMPORARY AIR HANDLER TO SERVE BUILDING, REMOVE WALL PANEL ON AIR
HANDLER OF SUPPLY FAN SECTION. PLACE SHEETMETAL BLANK PANEL IN PLACE
OF WALL AND CONNECT TEMPORARY DUCT TO PANEL. INSTALL TEMPORARY
BLANK PANELS INSIDE AIR HANDLER SUPPLY FAN INLETS, TO DIRECT AIR FLOW TO
BUILDING.
10 INSTALL AIR HANDLER 53-AH-1. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE.
11 INSTALL PERMANENT UNIT 53-ERC-1 AND PLACE FAN INTO OPERATION WITHIN 4
HOURS FOR USE DURING COMPLETION OF INSTALLATION.
12 TEMPORARY ROOF INTAKE HOOD WITH 0.5" MESH BIRD SCREEN.
M E C H . R M .
G N 3 9
P H Y S I C A L T H E R A P Y
G N 3 1 H A C
G S 6 0
H A C
G S 5 7
H A C
G S 5 8
H A C
G S 5 9
UT I L I T Y R M . ,
S O I L E D
G S 0 6 B
M E C H . R M .
G S 0 9
W O R K R M .
G S 1 4
T O I L E T , M A L E
G S 1 8 A
T O I L E T , F E M A L E
G S 1 8 B
M E C H . R M .
G S 2 0 A
E N G I N E E R I N G
G S 2 0 B
C O R R I D O R
H 0 0 4
T O I L E T
G S 2 2 F
O F F I C E
G S 2 2 A O F F I C E
G S 2 2 B
O F F I C E
G S 2 2 C
O F F I C E
G S 2 2 D
O F F I C E
G S 2 2 E O F F I C E
G S 2 2 E L E V A T O R
L O B B Y
G S 2 4
EL E V . N O . 3
E 2
T O I L E T
G N 2 7
C L O S E T
G N 2 7 A
H A C
G N 2 8
V E N D I N G R M .
G N 2 9
S T O R A G E
G N 3 0
O F F I C E
G N 3 2
W O R K R M .
G N 3 3
W O R K R M .
G N 3 4
T O I L E T
G N 3 5
S T O R A G E
G N 3 6 O F F I C E
G N 3 7 T O I L E T
G N 3 8
P . T . S T O R A G E
G N 4 3
W H E E L C H A I R S
G N 4 3 A
O F F I C E
G N 4 4
F O Y E R
G N 5 7
D R I V E R ' S T R A I N I N G
G N 4 8
M E C H . R M .
G N 5 0 L I N E N C H U T E
G N 5 2 S T O R A G E
G N 5 3
F . E . C L O S E T
G N 5 1
S T A I R 3
S 0 0 3
S T O R A G E
G N 5 4
F . E . C L O S E T
G N 5 5
P I P E C H A S E
Z 0 0 4
P I P E C H A S E
Z 0 0 5
P I P E C H A S E
Z 0 0 1
P I P E C H A S E
Z 0 0 2
P I P E C H A S E
Z 0 0 3
EL E V . N O . 1
E 1
S T A I R 2
S 0 0 2
O I & T
G S 0 1 A
W H E E L C H A I R
S T O R A G E
G S 0 1
H A C
G S 0 2
F . E . C L O S E T
G S 2 3
EL E V . N O . 2
E 3
C O R R I D O R
H 0 0 4 A
C O R R I D O R
H 0 0 2
C O R R I D O R
H 0 0 3 C O R R I D O R
H 0 0 5
C O R R I D O R
H 0 0 6
S H O P
G S 5 8 A
C H A S E
C H - S - 2
C H A S E
C H - N - 1
CHASE
CH-N-2
C H A S E
C H - S - 3
C H A S E
C H - N - 4 C H A S E
C H - N - 3
O F F I C E
G S 1 4 A
W O R K R M .
G S 1 4 B
C H A S E
C H - S - 5
C H A S E
C H - S - 4
C L O S E T
G N 3 6 A
PI T
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
"x
6"
S A
52-AH-1
36"x16" SA52-TEMP-AHU
GN39
MECH. RM.
GC108
NORTH
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
V
/J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
M
E P
V
.r vt
/9
/2
:0
:3
P M
BUILDING 52 - TEMPORARY HVAC PHASING
PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW RAW
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC108
1/2" = 1'-0"1
MECH RM. GN39 - TEMPORARY AHU - PHASE 1
NO. DESCRIPTION
1 TEMPORARY AHU LOCATED ON ELEVATED TRAILER SKID. TEMPORARY AHU TO
SERVE SYSTEM WHILE PERMANENT AHU IS INSTALLED. COMMISSION AIR HANDLER
AND POWER GENERATOR PRIOR TO ALLOWING CONNECTION OF SERVICE TO
BUILDING.
2 TEMPORARY DUCT ROUTED UP THROUGH WINDOW INTO MECHANICAL ROOM.
TEMPORARY DUCT SHALL BE INSULATED SHEETMETAL. FLEX DUCT IS NOT
PERMITTED.
3 ROUTING IS SCHEMATIC IN NATURE. CONTRACTOR TO DETERMINE BEST ROUTING
IN FIELD.
4 CONNECT TEMPORARY DUCT INTO EXISTING SYSTEM WHILE PERMANENT AHU IS
INSTALLED.
5 INSTALL AIR HANDLER 52-AH-1. CONNECT UNIT TO SUPPLY AIR MAIN AFTER UTILITY
CONNECTIONS ARE COMPLETE.
6 TEMPORARILY REMOVE WINDOW SASHES FOR ROUTING OF TEMPORARY DUCT.
7 ROUTE TEMPORARY DUCT ALONG FLOOR. INSTALL HANGING AHU ABOVE
TEMPORARY DUCT.
NTS
KEYPLAN - BLDG 52 - LEVEL 00
M E C H . R M .
G S 0 8 A
P H Y S I C A L T H E R A P Y
G N 3 1 H A C
G S 6 0
H A C
G S 5 7
H A C
G S 5 8
H A C
G S 5 9
UT I L I T Y R M . ,
S O I L E D
G S 0 6 B
M E C H . R M .
G S 0 9
W O R K R M .
G S 1 4
T O I L E T , M A L E
G S 1 8 A
T O I L E T , F E M A L E
G S 1 8 B
M E C H . R M .
G S 2 0 A
E N G I N E E R I N G
G S 2 0 B
C O R R I D O R
H 0 0 4
T O I L E T
G S 2 2 F
O F F I C E
G S 2 2 A O F F I C E
G S 2 2 B
O F F I C E
G S 2 2 C
O F F I C E
G S 2 2 D
O F F I C E
G S 2 2 E O F F I C E
G S 2 2 E L E V A T O R
L O B B Y
G S 2 4
EL E V . N O . 3
E 2
T O I L E T
G N 2 7
C L O S E T
G N 2 7 A
H A C
G N 2 8
V E N D I N G R M .
G N 2 9
S T O R A G E
G N 3 0
O F F I C E
G N 3 2
W O R K R M .
G N 3 3
W O R K R M .
G N 3 4
T O I L E T
G N 3 5
S T O R A G E
G N 3 6 O F F I C E
G N 3 7 T O I L E T
G N 3 8
P . T . S T O R A G E
G N 4 3
W H E E L C H A I R S
G N 4 3 A
O F F I C E
G N 4 4
F O Y E R
G N 5 7
D R I V E R ' S T R A I N I N G
G N 4 8
M E C H . R M .
G N 5 0 L I N E N C H U T E
G N 5 2 S T O R A G E
G N 5 3
F . E . C L O S E T
G N 5 1
S T A I R 3
S 0 0 3
S T O R A G E
G N 5 4
F . E . C L O S E T
G N 5 5
P I P E C H A S E
Z 0 0 4
P I P E C H A S E
Z 0 0 5
P I P E C H A S E
Z 0 0 1
P I P E C H A S E
Z 0 0 2
P I P E C H A S E
Z 0 0 3
EL E V . N O . 1
E 1
S T A I R 2
S 0 0 2
O I & T
G S 0 1 A
W H E E L C H A I R
S T O R A G E
G S 0 1
H A C
G S 0 2
F . E . C L O S E T
G S 2 3
EL E V . N O . 2
E 3
C O R R I D O R
H 0 0 4 A
C O R R I D O R
H 0 0 2
C O R R I D O R
H 0 0 3 C O R R I D O R
H 0 0 5
C O R R I D O R
H 0 0 6
S H O P
G S 5 8 A
C H A S E
C H - S - 2
C H A S E
C H - N - 1
CHASE
CH-N-2
C H A S E
C H - S - 3
C H A S E
C H - N - 4 C H A S E
C H - N - 3
O F F I C E
G S 1 4 A
W O R K R M .
G S 1 4 B
C H A S E
C H - S - 5
C H A S E
C H - S - 4
C L O S E T
G N 3 6 A
PI T
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
24"x12" RA
34"x6" SA
"x
2"
S A
52-AH-S2
52-TEMP-AHU
24"x12" SA
24"x12" RA
GC109
NORTH
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
U.S. Department of Veterans Affairs
Phase
STAMP
5 4 3 2 1
NOT FOR
PERMITTING OR
CONSTRUCTION
Office of Construction and Facilities Management
FULLY SPRINKLERED
B
IM
/V
IS
N
J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
V
/J e ff e rs o n B a rr a ck s R e p la ce
A H
U s
B
M
E P
V
.r vt
/9
/2
:0
:4
P M
BUILDING 52 - TEMPORARY HVAC PHASING
PLAN
AUGUST 25, 2022
657-21-106JBBID DOCUMENTS FCA REPLACE AIR HANDLING
UNITS BUILDINGS 52 & 53
AW RAW
JEFFERSON BARRACKS
#1 JEFFERSON BARRACKS DR., ST LOUIS, MO 63125
GC109
NO. DESCRIPTION
1 TEMPORARY AHU LOCATED ON ELEVATED TRAILER SKID. TEMPORARY AHU TO
SERVE SYSTEM WHILE PERMANENT AHU IS INSTALLED. COMMISSION AIR HANDLER
AND POWER GENERATOR PRIOR TO ALLOWING CONNECTION OF SERVICE TO
BUILDING.
2 TEMPORARY DUCT ROUTED UP THROUGH WINDOW INTO MECHANICAL ROOM.
TEMPORARY DUCT SHALL BE INSULATED SHEETMETAL. FLEX DUCT IS NOT
PERMITTED.
3 ROUTING IS SCHEMATIC IN NATURE. CONTRACTOR TO DETERMINE BEST ROUTING
IN FIELD.
4 CONNECT TEMPORARY DUCT INTO EXISTING SYSTEM WHILE PERMANENT AHU IS
INSTALLED.
5 INSTALL AIR HANDLER 52-AH-S2. CONNECT UNIT TO SUPPLY AIR MAIN AFTER
UTILITY CONNECTIONS ARE COMPLETE.
6 TEMPORARILY REMOVE WINDOW SASHES FOR ROUTING OF TEMPORARY DUCT.
7 ROUTE TEMPORARY DUCT ALONG CEILING. INSTALL FLOOR MOUNTED AHU BELOW
TEMPORARY DUCT.
8 INSTALL TEMPORARY DUCT CONNECTION ELBOWS WITH PROPER TRANSITIONS.
REPLACE WITH PERMANENT FITTINGS ONCE AHU IS REPLACED AND FULLY
FUNCTIONAL.
1/2" = 1'-0"1
MECH RM. GS08A - TEMPORARY AHU - PHASE 2
NTS
KEYPLAN - BLDG 52 - LEVEL 00
EXAM
2S12B
EXAM
2S12A
OFFICE
2S18
CHASE
CH-S-4
OFFICE
2S19A
EXAM
2S12B
EXAM
2S12A
OFFICE
2S18
CHASE
CH-S-4
OFFICE
2S19A
2 S 1 6
S T O R A G E
2 S 1 4
2 S 1 5 2 S 1 6
S T O R A G E
2 S 1 4
2 S 1 5
NO SCOPE OF WORK ASSOCIATED WITH THIS AREA
28"x20" SA
52-AH-4
52-TEMP-AHU
"x
0"
S A
28"x20" SA 28 "x
0"
S A
28"x20" SA
GC110
NORTH
' 6
G ra p h ic S c a le
/2
G ra p h ic S c a le
/3
G ra p h ic S c a le
/1
G ra p h ic S c a le
/8
G ra p h ic S c a le
/4
G ra p h ic S c a le
/8
G ra p h ic S c a le
/2
G ra p h ic S c a le
/4
G ra p h ic S c a le
Romanyk Consulting Focusing on what matters
VA FORM 08 - 6231
F
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
ARCHITECT/ENGINEER OF RECORDCONSULTANT
8910 7 6
Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
Project…